INTRODUCTION TO POST-TENSIONED CONCRETE

DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE

Page 2: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

NOTE: MOMENT DIAGRAM CONVENTION

• In PT design, it is preferable to draw moment diagrams to the tensile face of the concrete section. The tensile face indicates what portion of the beam requires reinforcing for strength.

• When moment is drawn on the tension side, the diagram matches the general drape of the tendons. The tendons change their vertical location in the beam to follow the tensile moment diagram. Strands are at the top of the beam over the support and near the bottom at mid span.

• For convenience, the following slides contain moment diagrams drawn on both the tensile and compressive face, denoted by (T) and (C), in the lower left hand corner. Please delete the slides to suit the presenter's convention.

Page 3: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

REVIEW: FUNDAMENTALS OF

PRESTRESSED CONCRETE

NEW: DIFFERENCES

BETWEEN PRE-TENSIONING AND POST-TENSIONING

Page 4: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

REVIEW OF REINFORCED CONCRETE

Critical Point for Cracking

Stages of BehaviorUncracked

σ

Cracked (~Elastic)

σ

Ultimate

σ

Page 5: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

REVIEW OF REINFORCED CONCRETE

Mcr

My

Mn

Mom

ent

Curvature

Large deflections due to cracking

Steel is not engaged until after cracking

Page 6: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

REVIEW OF REINFORCED CONCRETE

Reinforcement is PASSIVE

Steel crosses cracks, but does not prevent them

Page 7: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.
Page 8: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

QUESTION TO PONDERSuppose a R/C beam has too much cracking and too

much deflection. How might you propose to fix it? (i.e. not replace it)

Tension (bending) + Compression (“squeezing”) =

Net Zero Stress

“Sqeezed” Before Loading (Pre-compressed):

Pre-Compression (“prestressing”) + Tension (bending) =

Net Zero Stress

Page 9: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

HOW TO BUILD IT?

Prestressing: Concrete pre-compressed before loading in bending (flexural tension)

1. Pre-Tensioning: Steel tensioned before concrete is placed

2. Post-Tensioning: Steel tensioned after concrete is hardened

Prestressing is ACTIVE – can prevent cracks from forming

Page 10: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONING

1. Tension Strands

2. Cast Concrete – Bond strands to concrete

3. Cut Strands – Transfer force to concrete

Page 11: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

1. Cast Concrete with Duct

2. Feed Strands through Duct

3. Tension Strands

4. Grout Duct (or other corrosion protection)

Section

Page 12: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING• Post-tensioning can take on any profile

• Draped configurations are much more common than straight tendons• Why?

Page 13: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONING

Post-Tensioning

Force Transfer by Steel-Concrete bond

Force Transfer at end anchor

Strain Compatibility and Force Equilibrium:

Steel held at length longer than it “wants” to be: Tension

Concrete compressed shorter than it “wants” to be: Compression

Page 14: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

Pre-Tensioned elements are often precast in a factory and shipped to the site

Post-Tensioned elements can be cast and tensioned in the final location (cast-in-place). They can also be precast.

Page 15: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGINSTALL PRESTRESSING STRANDS

Page 16: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGTENSION STRANDS

Page 17: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGSTRANDS AFTER TENSIONING

Page 18: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGINSTALL MILD REINFORCEMENT

Page 19: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGINSTALL INSERTS AND ASSEMBLIES

Page 20: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGSET FORM SIDES

Page 21: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGPLACE CONCRETE

Page 22: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGCURE CONCRETE WITH ACCELERATED

METHODS

Page 23: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGREMOVE GIRDER FROM CASTING BED

Page 24: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGMOVE GIRDER TO STORAGE

Page 25: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGTRANSPORT TO JOBSITE

Page 26: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PRE-TENSIONINGGIRDERS IN FINISHED STRUCTURE

Page 27: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONINGDucts for Post-Tensioning

Page 28: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

Page 29: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

Page 30: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

Page 31: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

Page 32: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

Page 33: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

Page 34: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONINGStressing Strands:

Multiple Strands: Multistrand

Single Strand: Monostrand

Page 35: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

HOW ARE STRANDS ANCHORED?

Cast against concrete at end of beam

Page 36: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

HOW ARE STRANDS ANCHORED?

Concrete

Duct

Strand

Anchor cast in concrete

Page 37: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING:Bonded System(at high point)

Unbonded System

Grout

“PT Coating” (grease)

Page 38: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

GROUTING POST-TENSIONED SYSTEMS

Grout In

Vent

Vent

Page 39: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

POST-TENSIONING

Page 40: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

STRUCTURAL EFFECT OF PRESTRESSING

True for Pre- and Post-Tensioning

Pre-Stressing

+

Applied Load

=

T C T C

Total Stress

T C

Stress Limits

Page 41: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

STRUCTURAL EFFECT OF PRESTRESSING

True for Pre- and Post-Tensioning

Pre-Stressing

+

Applied Load

=

T C T C

Total Stress

T C

+

T C

Service

Transfer

Page 42: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

ECCENTRIC PRESTRESSING

Eccentricity in prestressing:- Desirable at midspan- Not productive, even detrimental, at end of span

Strategies for pre-tensioned systems:- Draped / harped profiles

Temporarily held in place before concrete is hardened

- DebondingNot all strands are active at end of span

Strategies for post-tensioned systems:- Install ducts in desired profile

Page 43: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

COMMON CONFIGURATIONSPre-tensioning:

Draped

Debonded

Post-tensioning:

Page 44: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

(T)

Page 45: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

(C)

Page 46: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 1

Good:• Efficient at midspan• Easy to construct

Bad:• Counter-productive over

support(T)

Page 47: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 1

Good:• Efficient at midspan• Easy to construct

Bad:• Counter-productive over

support(C)

Page 48: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 2

Good:• Efficient over support• Easy to construct

Bad:• Counter-productive at

midspan(T)

Page 49: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 2

Good:• Efficient over support• Easy to construct

Bad:• Counter-productive at

midspan(C)

Page 50: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 3

Good:• Efficient over support• Efficient at midspan

Bad:• Difficult to construct

(T)

Page 51: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 3

Good:• Efficient over support• Efficient at midspan

Bad:• Difficult to construct

(C)

Page 52: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 4

Requires post-tensioning; very difficult to achieve by pre-tensioning

No net eccentricity

No net eccentricity

(T)

Page 53: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

PROBLEM FOR THOUGHT…Where should the prestressing be placed?

Tension

Tension

Mom

ent

Dia

gram

Option 4

Requires post-tensioning; very difficult to achieve by pre-tensioning

No net eccentricity

No net eccentricity

(C)

Page 54: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE.

SUMMARY: PRESTRESSED

CONCRETE Efficient use of materials – concrete maintained in compression, crack control

Smaller deflections/thinner members Longer spans Corrosion resistance Less material; reduced environmental

impact