Second Announcement - IERE...resources. This section will explore about the role of distributed...

30
Second Announcement 2019 IERE-PLN Bali Workshop “Smarter and Cleaner Electricity for Better Life” Pura Ulun Danu Bratan, Bali, Indonesia March 11 – 14, 2019 Bali, Indonesia Organized by IERE and PLN

Transcript of Second Announcement - IERE...resources. This section will explore about the role of distributed...

Page 1: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

Second Announcement

2019 IERE-PLN Bali Workshop

“Smarter and Cleaner Electricity for Better Life”

Pura Ulun Danu Bratan, Bali, Indonesia

March 11 – 14, 2019 Bali, Indonesia

Organized by IERE and PLN

Page 2: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

1

Smarter and Cleaner Electricity for Better Life About the theme The economy is largely built on a reliable supply of cheap electricity. Therefore electricity production is still mostly based on fossil fuels. A challenge is to keep the supply system stable and affordable with the rapid expansion of intermittent renewable energy sources. The power lines, transformers, and control stations that make up our current energy grid are old, increasingly unreliable, and not adequate to handle a significant increase in renewable energy. In addition the utilization electricity for non-power sector such as transportation is still growing significantly. To move toward a cleaner energy economy, improvements of electrical grid is needed, as well as construct the smart system which can solve the issues arising from the intermittency of renewable electricity sources. Smart appliances respond intelligently to a signal from the grid operator. Variable pricing of electricity might also help, and for this smart meters with a momentary tariff indicator are needed. Modern contingency reserves have to consist of smaller agile power plants that are well distributed across the area to be served. Decentralized generation is beneficial in this respect, since it reduces the dependence on a few distant generators and long power lines. Despite its smart and clean value to society, electricity has to be affordable. Indeed the use of electrical energy should be directly linked with economic value. To make the integration successful and to ensure prosperity in the future, new technical solutions and business conditions are needed. Who should attend? The workshop is intended for experts actively involved in the selected themes, from IERE members and non-members, as well as all those interested in the evolution of the electrical power industry and the technology development and business development opportunities associated to this evolution. IERE will invite prominent speakers for keynote speeches.

Page 3: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

2

Outline Schedule: Monday – March 11, 2019 Welcome Reception

Tuesday – March 12, 2019 2019 IERE-PLN Bali Workshop (Day 1)

Official Dinner

Wednesday – March 13, 2019 2019 IERE-PLN Bali Workshop (Day 2)

Social Event (Optional)

Thursday – March 14, 2019 Technical Visit (Optional)

General Theme: Smarter and Cleaner Electricity for Better Life Session 1: Advanced Metering Infrastructure (AMI) Utilities today are seeking ways to enhance energy efficiency, reduce costs and improve customer service. One strategy is to deploy an advanced metering infrastructure (AMI). However, installation and execution are still challenging. Implementing AMI is a complex undertaking involving multiple technologies. This session will discuss about all content of AMI and its implementation strategy. Potential topics include:

1. Smart meter 2. Communication protocol and technology 3. Meter data management system 4. Security issues and challenge 5. AMI implementation strategy etc.

Session 2: Renewable Energy Grid Integration To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy (RE) targets for their electricity supply. Because RE especially solar and wind tend to be more variable and uncertain than conventional sources, various technical and economic issues occur in the integration of these resources into a grid. Technical problems arise in the areas of power quality, voltage stability, harmonics, reliability, protection, and control. The session will investigate the possible solutions for those issues and other related challenges. Potential topics include:

1. System flexibility 2. Storage system and technology 3. Stochastic modelling 4. Demand side management 5. Hybrid system etc.

Page 4: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

3

Session 3: Distributed Power Generation Environmentally friendly renewable energy technologies such as photo-voltaic and clean, efficient, fossil-fuels technologies such as micro-turbines and fuel cells are among new generating systems driving the demand for distributed generation of electricity. The smallness of these new distributed generations along with the low voltages at the interface creates a new class of problems which requires innovative approaches to managing and operating the distributed resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics include:

1. Solar photovoltaic panels (solar farm, PV rooftop) 2. Small wind turbines 3. Micro gas fired (turbines/engines) 4. Fuel cells using by natural gas or biomass 5. Reciprocating combustion engines etc.

Session 4: Electric Vehicle (EV) Infrastructure The development of electric vehicle has been over a hundred years but failure to gain the public acceptance in various stages due to various reasons. Therefore, widespread electric vehicle adoption requires a supportive ecosystem of stakeholders including utilities, government, vehicle OEMs, charging providers, interest group and drivers. With the correct policy and government help and advancement of electric vehicle technology, the prospect of Electric Vehicle will be bright and the focus point of future development. The session will elaborate those issues and the following potential topics:

1. Standard and type of charger 2. EV business model 3. E-mobility concept and model 4. EV infrastructure development strategy etc.

Session 5: Advanced Thermal Power Generation Although the renewable energy has emerging globally yet the energy supply in the world is still mostly produced by thermal power generation. To move toward a cleaner energy economy, improvements of emission reduction technology are needed, as well as construct the smart system overcoming the intermittency of renewable electricity penetration. Additionally to achieve higher efficiency and reliability, modernization of thermal power plants has been conducted through utilization of advance management and digital technology. Potential topics include:

1. Thermal power plant flexibility 2. Status of emission reduction technology (eg. Carbon capture storage, Clean

coal technology etc.) 3. Asset management on power generation 4. Artificial intelligence and Data analytics of thermal power plants. 5. Other green thermal power plants recent issues (eg. Geothermal, Bio mass to

energy etc.)

Page 5: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

4

Poster Session The Poster will be presented in the Pre-Function room next to the Grand Ball room.

Poster Session is intended to lead more detailed discussions in front of the poster in the conference (Coffee break, Lunch time etc.).

Exhibition

The exhibition will be held next to the Grand Ballroom.

Page 6: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

5

Program : Session structure, speakers and timetable are subject to change.

Welcome Reception

Monday, March 11, 2019 Ayodya Resort Bali, Beach Garden

17:30 – Registration

18:00 – 20:00 Welcome Reception

2019 IERE-PLN Bali Workshop

- Workshop Day 1 -

Tuesday, March 12, 2019 Ayodya Resort Bali , Level 1, Grand Ballroom

08:00– 08:40 Registration

Opening Ceremony

08:40 – 09:00 Welcome at Bali’s traditional dance

Opening Session

09:00 – 09:10 O-1 Opening Address Gregory Tosen (IERE Chair)

09:10 – 09:20 O-2 Welcome Address Mrs. Syofvi Roekman

(Director of Planning PLN, PT PLN (Persero), Indonesia)

Keynote Addresses 09:20 – 09:50 K-1 ‘Global Trend and Korean Prospect of Smart Grid’ Dr. Sung Hwan Bae (Chief Researcher, KEPCO Research Institute, Korea) 09:50 – 10:20 K-2 ‘Ocean Energy; status, prospect and development for future energy’ Prof. Mukhtasor (Coordinator of Post Graduate Program in Marine Resources

Management, Sepuluh Nooember Institute of Technology, Indonesia) 10:20 – 10:30 Coffee Break

Page 7: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

6

Session 1 : Advanced Metering Infrastructure (AMI)

Chair person: TBD

10:30 – 10:55 S1-1 ‘Method and Strategy for AMI Development Based on AMR System Infrastructure to Support Electricity System Digitalization’ Mr. Ignatius Rendroyoko

(General Manager, PT. PLN (Persero) Region of East Nusa Tenggara, Indonesia)

10:55 – 11:20 S1-2 ‘Highly Reliable Automatic Metering Infrastructure with Narrow

Band Power Line Communication’ Mr. Shinnosuke Nakano

(Engineer, Power Systems R&D Center, Sumitomo Electric Industries Ltd., Japan)

11:20 – 11:45 S1-3 ‘Linky, Enedis' AMI program: a powerful tool for energy transition

and network management’ Mr. Christophe Boisseau

(R&D Coordinator,Technical Division, Enedis, France) 11:45 – 12:10 S1-4 ‘Research on Low Voltage Power Line Broadband Communication in

the AMI system’ Mr. Hailong Zhang

(Engineer, Metering Department, CEPRI, China)

12:10 – 13:10 Lunch break, Poster Session & Exhibition

Session 2 : Renewable Energy Grid Integration

Chair person: Dr. Taku Noda (Power Quality Group, Energy Innovation Center, CRIEPI, Japan)

13:10 – 13:35 S2-1 ‘Development of a power system analysis tools (CPAT) to support

stable operation of large scale electric power system: Standard and reliable tool in Japan’ Dr. Masaki Nagata (Deputy Director, System Engineering Research Laboratory, CRIEPI, Japan)

Page 8: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

7

13:35 – 14:00 S2-2 ‘The Development and Application of DC Technologies in Renewable Energy Integration’ Dr. Hongzhi Liu

(Engineer, Renewable Energy Research Center, CEPRI, China) 14:00 – 14:25 S2-3 ‘Demonstration of Peer to Peer (P2P) Transaction of Surplus Energy

Using BLOCKCHAIN Technology’ Fumiaki Ishida (General Manager, R&D Centre, The Kansai Electric Power Co. Inc.,

Japan)

14:25 – 14:50 S2-4 ‘Battery Energy Storage System for Grid peak shaving ‘ Wilhelm van Butselaar

(Wärtsilä, the Netherlands) 14:50 – 15:00 Coffee Break

Session 2 : Renewable Energy Grid Integration (continued)

Chair person: Dr. Masaki Nagata (Deputy Director, System Engineering Research Laboratory, CRIEPI, Japan)

15:00 – 15:25 S2-5 ‘Pumped Storage Hydro Plant: Battery of the Grid’ Mohamad Hakim Bin Zainuddin

(Manager, Single Buyer Department, Tenaga Nasional Berhad, Malaysia)

15:25 – 15:50 S2-6 ‘An Introduction to the Simulation Program XTAP for the Analysis

of Electromagnetic Transients in Power Systems’ Dr. Taku Noda

(Power Quality Group, Energy Innovation Center, CRIEPI, Japan) 15:50 – 16:15 S2-7 ‘Management of REN on the Distribution Grid’

Mr. Ross Smith (Smart Grid Opportunity Leader EAJ., Schneider Electric, UK) 16:15 – 16:40 S2-8 ‘Trends in hydrogen storage technology in Europe and Japan to

achieve a low carbon society’ Dr. Joji Kawano

(Senior Research Associate, Research Department, JEPIC, Japan)

16:40 – 17:30 Coffee break, Poster Session & Exhibition

Page 9: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

8

< Poster Session > P-1 Methods for The Integration of Variabel Renewable Energy into Unit

Commitment Scheme in Microgrid System Mr. Ignatius Rendroyoko

(General Manager, PT. PLN (Persero) Region of East Nusa Tenggara, Indonesia)

P-2 Cost Effective Maintenance to Increase Performance and Reliability

in Wayang Windu Geothermal Power Station Amri Zein

(Coordinator Power Plant, Operation, Star Energy Geothermal (Wayang Windu) Ltd., Indonesia)

P-3 Wayang Windu Unit 2 CDM Program Hariyanto

(Production Superintendent, Operation, Star Energy Geothermal (Wayang Windu) Ltd., Indonesia)

P-4 Beyond Compliance : IP Local Community Empowerment to Utilize

Municipal Solid Waste (MSW) Enrichment as Alternative Clean Fuel for Power Generation Sugeng Triyono

(Engineering Departement, PT Indonesia Power, Indonesia)

P-5 Demand Side Management (DSM) for PV Rooftop Customer in PLN UID Banten Ika Khoirun Nisa

(Assistant Analyst, Planning Departement, PT PLN (Persero) Distribution Unit of Banten, Indonesia)

P-6 ‘Risk Based methods for 10 MW of PV Project development planning’

Sinung Dwi Anggraeni (Risk Management Staff, Risk Management Division, PT Indonesia

Power, Indonesia) P-7 Universal Device for Live Maintenance - U_DEVICE

Lilik Dian Rofik (PT PLN (Persero) Distribution Unit of East Java, Indonesia)

P-8 Steam-Water Warning System (SWS)

Iqbal Felani (PT PLN (Persero) Research Institute, Indonesia)

Page 10: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

9

P-9 Distribution Management System 20 kV based on SMART DAS I Nyoman Aryawan

(PT PLN (Persero) Distribution Unit of Bali, Indonesia)

P-10 PUSAKO (PUPUK ABU SILIKA KOTA SAWAHLUNTO)

Ari Rudianto (PT PLN (Persero) Power Generation Unit of South Sumatera, Indonesia)

P-11 AVATOR (Automatic Vibration Monitor Calibrator) Special Tool

Portable Alfian Budiarmoko

(PT Pembangkitan Jawa-Bali, Indonesia)

P-12 Fleksible Rotary Sleeve (FLAS)

Angga Putra Kriswardana (PT PLN (Persero) Distribution Unit of East Java, Indonesia)

P-13 “EMO” Expert System for Efficiency Diagnostic in Power Plant

using Fuzzy Logic Totok Gunawan

(PT Indonesia Power, Indonesia)

P-14 GLIFTER (Gsw LIFTER)

Haddy Suwarna (PT PLN (Persero) Power Generation and Transmission Unit of

Kalimantan, Indonesia)

P-15 Expert System for Problems Handling in Water Vapor Chemical

Cycles in Steam Power Plant Harry Indrawan

(Manager of Research and Technology Assessment of Energy and Power Generation System, PT PLN (Persero) Research Institute, Indonesia)

Session 3 : Distributed Power Generation

Chair person: Dr. Hongzhi Liu (Engineer, Renewable Energy Research Center, CEPRI, China)

17:30 – 17:55 S3-1 ‘Blockchain: Inflated hype or value-adding technology for the energy sector?’ Dr. Felix Cebulla

(Senior Expert, Corporate Technology, innogy SE, Germany)

Page 11: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

10

17:55 – 18:20 S3-2 ‘Key Technologies and Control Strategy for Distributed Photovoltaic

Micro-Grid’ Mr. Tong Wang

(NARI Research Institute, Nanjing NARI Group Co. Ltd., China) 18:20 – 18:45 S3-3 ‘Effects of regenerator structure on performance of free piston stirling

engine (FPSE)’ Dr. Wonshik Park

(Principal Researcher, R&D Strategy and Policy Office, KEPCO Research Institute, Korea)

18:45 – 19:10 S3-4 ‘How Gas-To-Liquids (Gtl) Based Technology Can Help To Enhance

The Reliability Of Transformer’ Mr. Volker Null

(Product Application Specialist, Shell, Germany) 19:30 – 22:30 Dinner [Ayodya Resort Bali, Balinese Theater, Level 1]

Page 12: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

11

2019 IERE-PLN Bali Workshop - Workshop Day 2 -

Wednesday, March 13, 2019

Ayodya Resort Bali , Level 1, Grand Ballroom

Session 4 : Electric Vehicle (EV) Infrastructure

Chair person: Dr. Seong-Woo Yim (Senior researcher, New Energy business Laboratory, KEPCO Research Institute, Korea)

08:30 – 08:55 S4-1 ‘A Green Cloud Enabled EV Charging EcoSystem’ Ir. Nirinder Singh Johl

(Managing Director, TNBX Sdn Bhd, Retail Division, Tenaga Nasional Berhad, Malaysia)

08:55 – 09:20 S4-2 ‘Development of 6.6kW class wireless power transfer EV charging

system and field tests for KEPCO application’ Dr. Seong-Woo Yim

(Senior researcher, New Energy business Laboratory, KEPCO Research Institute, Korea)

09:20 – 09:45 S4-3 ‘Research on Key Technologies of Multi-domain Sharing Modes of

Electric Vehicles ‘ Ms. Linru Jiang

(Research Associate, Department of Power Consumption & Energy Efficiency, CEPRI, China)

09:45 – 10:10 S4-4 ‘EV Technology: Global Developments and Infrastructure

Considerations’ Mr. Kumai Rashid

(ABB, Singapore)

10:10 – 10:35 S4-5 ‘Electric Vehicle Charging with Dynamic Energy Management’

Francko Nasarino (Final Distribution Product Application Specialist, Schneider Electric,

Indonesia) 10:35 – 10:45 Coffee Break

Page 13: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

12

Session 5 : Advanced Thermal Power Generation

Chair person: Mr.U. Anang Ischak (Ops Eng Team Manager, Facilities Engineering, Star Energy Geothermal Darajat II, Limited, Indonesia)

10:45 – 11:10 S5-1 ‘Development of biowaste treatment technology for conversion of

EFB to high quality biofuel’ Dr. Bum-Shin Kim

(Principal Researcher, KEPCO Research Institute, KEPCO, Korea) 11:10 – 11:35 S5-2 ‘Efficiency Improvement by Implementing Energy and Operation

Management System (NEMESYS)‘ Mr. Andi Taufik Saputra

(Efficiency Senior Supervisor, Engineering, PT Indonesia Power, Indonesia)

11:35 – 12:00 S5-3 ‘Condition Monitoring and Diagnosis of Power Plants using

EnergyWin™’ Mr. Eiichi Koda (Deputy Associate vice president, Energy Platform Creation Sector,

Energy Engineering Research Laboratory, CRIEPI, Japan) 12:00 – 12:25 S5-4 ‘Utilization of Biofuel in Kumai Diesel Power Plant, Central

Kalimantan, Indonesia: Power Plant Performance and Operating and Maintenance Costs’

Mutiara Sofia Siregar (Engineer, Operation Division of Kalimantan Region, PT PLN

(Persero) Head Office, Indonesia)

12:25 – 13:25 Lunch break, Poster Session & Exhibition

Session 5 : Advanced Thermal Power Generation (continued)

Chair person: Mr. Andi Taufik Saputra (Efficiency Senior Supervisor, Engineering, PT Indonesia Power, Indonesia)

13:25 – 13:50 S5-5 ‘Implementation of Plant Performance & Reliability Monitoring (P2RM) to Darajat and Salak Geothermal Power Plant’ Mr. U. Anang Ischak

(Ops Eng Team Manager, Facilities Engineering, Star Energy Geothermal Darajat II, Limited, Indonesia)

Page 14: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

13

13:50 – 14:15 S5-6 ‘Electromagnetic Risk Management in Digital Power System’

Prof. Dr. Ing. Eko Supriyanto (Senior Consultant to PETRONAS and Head of Electromagnetic

Compatibility Laboratory, Universiti Teknologi Malaysia, Malaysia)

14:15 – 14:25 Coffee Break

14:25 – 14:50 S5-7 ‘Tackling Varnish Formation in Turbomachinery Which Lead to

Maximize Turbine and Compressor Availability’ Bambang Wahyudi (Country Technical Manager, Shell, Indonesia)

14:50 – 15:15 S5-8 ‘Steam Turbine Lifetime Assessment’ Ilham Kurniawan (Ops Eng Team Leader, Facility Engineering, Star Energy

Geothermal Salak, Ltd., Indonesia) 15:15 – 15:40 S5-9 ‘Modeling, Design, and Simulation Thermal Solar Power Plant by

using Parabolic trough Collector to Generate 100kW steam located in Nusa Tenggara’ Hendra Yudisaputro

(Junior Efficiency Specialist, Engineering, PT Indonesia Power, Indonesia)

Closing Remarks

15:40 – 15:45 TBD (from PT PLN (Persero) , Indonesia) 15:45 – 15:50 Dr. Takao Watanabe (Secretary General, IERE Central Office)

Social Event (optional) The Kecak Fire Dance at Pura Uluwatu Temple and Seaside Dinner

16:15 Meeting point Ayodya Resort Bali Bus transfer, 1 hour 17:15 Sightseeing Pura Uluwatu Temple 18:00 – 19:00 Kecak Fire Dance Performance at Pura Uluwatu Temple Bus transfer, 40 minutes 20:00 – 21:00 Seaside Dinner at Jimbaran Beach Return, bus transfer, 25 minutes 21:25 Arrival Ayodya Resort Bali

• Time schedule may be changed. • Please register and finish payment by February 11 with Workshop registration

Page 15: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

14

THE DRAMATIC KECAK DANCE: EPISODE TAKEN FROM THE RAMAYANA EPIC POEM Kecak Dance is one of Balinese artistic masterpieces in the form of a dance and musical drama. Held in the open air at sunset , usually above a cliff facing the sea, the drama depends entirely on the natural light of day. Starting at dusk, the story continues into the dark, when only light comes only from flickering bamboo torches. What makes this dance particularly unique is that the drama uses no artificial backdrop, involving no musical instrument. The focus is entirely on the concentric circles of about 50-60 men, bare-chested, wearing only distinct Balinese sarongs sitting cross-legged around a set of torches in the center. Instead of the traditional “gamelan” orchestra which usually accompanies other Balinese traditional performances, the Kecak is simply accompanied by the chanting of the chorus of men representing an army of monkeys continuously intoning “Cak! Cak! Cak!” or “Keh-Chak" in polyrhythmic sounds during almost the entire performance. This amazing human voiced orchestra is led by a soloist, who is in charge of indicating the high and low notes, and also acts as narrator. The effect, after a while, is to provide a wall of dramatic sound against which the action of the play is enacted. The performance relates the shorter version of the epic Ramayana Saga with dancers playing as Rama, Shinta (Sita), Lakshmana, Rahwana (Ravana), Hanoman (Hanuman), Sugriwa (Sugriva), and other characters. Kecak Dance is said to originate from a Balinese ancient ritual called Sanghyang, aimed as a form of exorcism or to repel evil spirits in which dancers fall into a trance. Kecak Dance is regularly performed in many places all over Bali Island. However, the best place to watch this spectacular show is at the Pura Uluwatu, where the dance is performed daily with as background the dramatic sunset. (indonesia.travel)

Page 16: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

15

Technical Tour (Optional) - Workshop Day 3 -

Thursday, March 14, 2019

Visiting Pesanggaran Engine Gas Power Plant and lunch (For participants who have booked the optional Technical Tour)

09:15 Meeting point Ayodya Resort Bali Bus transfer, 25 minutes 09:40 Pesanggaran Engine Gas Power Plant, PT Indonesia Power Duration: about 2 hours 11:50 Bus transfer, 40 minutes 12:30 Lunch 13:30 Sightseeing the Garuda Wisnu Kencana Cultural Park

Return, bus transfer, 40 minutes 15:20 Arrival at Ayodya Resort Bali

• Time schedule may be changed. • The maximum number of participants is up to 70. • Please register and finish payment by February 11 with Workshop registration • Admission will be allotted in order of application. Pesanggaran Engine Gas Power Plant – Pesanggaran, Bali The Pesanggaran Bali 200 MW power plant is the largest engine-based power plant in Indonesia. Operated by PT. Indonesia Power, a subsidiary of the state utility PT Perusahaan Listrik Negara (PLN) (Persero), this multi-fuel power plant is answering challenging condition by its unique operational and fuel flexibility. With a fast start and stop ability to reach full loading in under 10 min and seamless control over load fluctuations, this plant provides a greater consistency in the supply of electricity to the Java-Bali grid. Pesanggaran Bali is powered by 12 Wärtsilä 50DF engines that can run on either regasified liquefied natural gas (LNG), light fuel oil (LFO), or heavy fuel oil (HFO). When the gas supply is uncertain, or prices are volatile, it is possible to switch from gas to liquid fuel, and vice versa, even during operation whilst also maintaining a high output. Announced as the winner of the best dual-fuel power plant of 2016 by Asian Power Awards, the Pesanggaran Bali was chosen for its large nominal output and ability to perform efficiently while operating on natural gas or HFO. (Pesanggaran Bali-Wartsila Reference Sheet)

Technical data of the Pesanggaran Engine Gas Power Plant Type Multi-fuel Power Plant Operating mode Flexible baseload Genset Wartsila 18V50DF Number of unit(s) 12 units Installed Power (Total) 200.16 MW Operated Power 182.40 MW Fuel Gas/MFO/HSD Operated since 2015

Page 17: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

16

Page 18: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

17

Call for Papers (closed) <<Abstract Submission: No later than December 7, 2018>> You are kindly invited to submit abstracts for the Oral Session or Poster Session for the 2019 Bali Workshop by e-mail by December 7, 2018 to: register (at) iere.jp [Please substitute “ (at) ” with “@”] IERE Central Office 2-11-1 Iwado Kita, Komae-shi, Tokyo 201-8511, Japan Phone: +81-3-5438-1717 Fax: +81-3-3488-5100 As for the format of the abstract, please refer to “Events” page on IERE website. https://www.iere.jp/events/workshop/2019-bali/forspeakers.html - Abstract is uploaded to IERE’s website and opened to the public after the workshop. - The medium of communication is English.

<< Presentation files Submission: No later than February 28, 2019 >> You are kindly requested to submit presentation files (Powerpoint) of the Oral Session and Poster Session for the 2019 IERE - PLN Bali Workshop by email by February 28, 2019. - Presentation file will be uploaded to IERE website and opened to all participants before the Workshop. - The medium of communication is English.

Page 19: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

18

Exhibition The conference will be accompanied by an exhibition, which gives exhibitors the opportunity to present their companies and/or products. Exhibitors are required to register, pay the participation fee, and contact IERE Central Office.

Registration (a) On-line Registration URL: https://www.iere.jp/cgi-bin/event_form/19WS/event_form_entry.cgi or (b) Please submit a registration form (Format 1) to IERE Central Office by e-mail.

Deadline: February 11, 2019

Registration Fee Please make payment of following fee No later than February 11, 2019 by credit card payment or bank transfer. The Registration fee will cover attendance at both workshop days (include lunches & refreshments at coffee breaks), welcome reception on March 11, official dinner on March 12 and conference package:

IERE members: US$ 350.- Non-members: US$ 525.- Academic participants: US$ 260.-

Recommended options Social Event (optional): US$ 60.-

The Kecak Fire Dance at Pura Uluwatu Temple and Seaside Dinner on March 13 Technical Visit(optional): US$ 45.-

Visiting Pesanggaran Engine Gas Power Plant (tentative) on March 14 *The maximum number of participants is up to 70. ** This offer is on a first-come-first-served basis.

Page 20: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

19

Payment On-line Credit Card Payment and Bank Transfer are available. Deadline: February 11, 2019 (a) On-line Credit Card Payment

If you prefer using your credit card for the payment of registration fee, please contact to this URL: https://www.iere.jp/Payment/paypal_19WS.html

(b) Bank Transfer * Name of the Bank: MUFG Bank, Ltd. Name of the Branch: Seijo branch Name of the account: IERE Account Number: 0068198 Bank address: 15-1 Seijo 6-chome, Setagaya-ku, Tokyo, 157-0066 JAPAN SWIFT code: B O T K J P J T

* Remittance charge, Lifting charge, Correspondent charge and other charges should be paid by participants.

Visa For participants from some countries needing a Visa to enter Indonesia, please consult with travel agent in your country for the details. If you need an Invitation Letter*, please refer to ‘Invitation Letter for Visa’ on Page 26. * PT. PLN may be able to issue an invitation letter for participants who need to apply for Visa.

It may take a few weeks to complete the procedures in PT. PLN, so please submit the form as soon as possible.

Disclaimer: PT. PLN reserves the right to fulfill or decline, at PT. PLN’s discretion, requests for

letters of invitation for visa application support purpose. [Visa information] Considering a participation on a Workshop/Conference can be decided as business purpose, visitors from NON-ASEAN countries are recommended to obtain VOA (Visa On Arrival) at the arrival airport. The outline of VOA is as follows.

- This VOA can be obtained by visitor from 68 countries - Expiration date of the applicant’s passport must be at least 6 months at the date of entry. - At least one blank visa page - Round-trip airplane ticket - Visa on Arrival fee ( USD 35: Cash in US dollars only )

For more information: http://www.imigrasi.go.id/index.php/en/public-services/visit-visa

Page 21: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

20

Conference Venue & Accommodations Conference Venue Ayodya Resort Bali, Bali Location: Jalan Pantai Mengiat, P.O.Box 46 Nusa Dua 80363, Bali, Indonesia, Website: http://www.ayodyaresortbali.com/

Page 22: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

21

Map URL: https://goo.gl/maps/TgY6kwdCjsw Accommodations Ayodya Resort Bali, Bali Location: Jalan Pantai Mengiat, P.O.Box 46 Nusa Dua 80363, Bali, Indonesia, Website: http://www.ayodyaresortbali.com/ Ayodya Resort Bali gives special rates for conference participants as indicated below. Website: https://bit.ly/2y8HihG *The reservation of accommodation is based on availability. ** Please be sure to read cancellation policy on the website before application.

Page 23: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

22

Submission Items & Deadlines For Participants [including speakers and exhibitors]

Items Format

No. Deadline To:

Registration Form 1 February 11, 2019 register(at)iere.jp [Please substitute (at) with @]

VISA Form (If necessary) 5 February 11, 2019

(It takes a few weeks to issue)

Ditto

Registration Fee - February 11, 2019 Please refer to Page 18

Social Event Fee [optional] - February 11, 2019 Ditto

Technical Visits Fee [optional] - February 11, 2019 Ditto

The formats (No.1 and 5) can be downloaded from URL: https://www.iere.jp/events/workshop/2019-bali/register.html

For Speakers

Items Format

No. Deadline To:

Abstract 2 December 7, 2018

register(at)iere.jp [Please substitute (at) with @.]

Speaker's Information 3 February 11, 2019

Copyright Permission 4 February 11, 2019

Presentation Slides (PowerPoint file) - February 28, 2019

The formats (No.2 to 4) can be downloaded from URL: https://www.iere.jp/events/workshop/2019-bali/forspeakers.html

Speakers are kindly requested to submit their Speaker’s Information and Copyright Permission February 11, 2019 and their Presentation Slides (PowerPoint file) by February 28, 2019.

Page 24: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

23

Information on Presentation:

Oral Session:

Speakers may only use PowerPoint files for their presentations. Speakers at all sessions are required to arrive at the session at least 15 minutes in advance of the first paper and be seated at the front of the room. Speakers are expected to get in contact with the Session Chair and confirm the PowerPoint files before the session begins. The session room will be equipped with a laptop computer loaded with Microsoft software and an LCD projector. Each presentation is strictly limited to 25 minutes max., which includes approximately 5 minutes for Q&A. Abstract and presentation file will be uploaded IERE website and opened to all participants before the Workshop and to the participants of the Workshop and IERE members after the Workshop.

Poster Session:

Presenters are requested to print their posters in A0 (approx. 119 cm x 84 cm / 47” x 33”) Format and bring with them. PowerPoint files of their posters are requested to submit by February 28 for uploading IERE website prior to the conference. - One poster A0 in portrait orientation or two pages A1 in landscape orientation - The Posters in A0 size will be displayed on the site at the Pre-Function room next to the

Grand Ball room. - Presenters are kindly requested to stay around their posters at coffee break period. Main

discussion period is afternoon coffee break on March 12. Language

Working language is English.

Page 25: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

24

REGISTRATION FORM 2019 IERE-PLN Bali Workshop March 11 – 14, 2019, Bali, Indonesia

Please type at appropriate boxes, then send this form February 11, 2019 via email to: IERE Central Office: register(at)iere.jp [Please substitute (at) with @] / Fax: +81-3-3488-5100

1. Name Prof. Dr. Mr. Ms. Other, Please specify:

First Name

Family Name

2. Position, Department

3.Company/Organization

4. Address Zip Code Country/Region

5. Contact Information E-mail

Phone Number

Fax Number

6. I will contribute to a presentation

Yes Title: No

7. Registration Fee

[March 11-14]

[Participants including speakers and exhibitors should pay registration fees.]

USD 350 : IERE Member USD 525 : Non-IERE Member USD 260 : Academia Note: When participation is canceled irrespective of the reason after February 11, 2019,

Registration Fee might be charged or not be reimbursed.

8. Welcome Reception attendance

[March 11]

not Mandatory

[For reservations, please let us know your attendance.] Yes (Included in Registration Fee)

Number of Accompanying Person if you have: person(s) (free)

No

9. Official Dinner attendance

[March 12]

not Mandatory

[For reservations, please let us know your attendance.] Yes (Included in Registration Fee)

Number of Accompanying Person if you have: person(s) (add USD 60 per person)

No

10. Social Event (Optional) [March 13]

The Kecak Fire Dance and Seaside Dinner

Yes (USD 60) Number of Accompanying Person if you have: person(s) (add USD 60 per person)

No

Format 1

Page 26: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

25

11. Technical Visit (Optional)

[March 14]

Visiting Pesanggaran Engine Gas Power Plant

Yes (USD 45) Number of Accompanying Person if you have: person(s) (add USD45 per person)

No * The maximum number of participants is up to 70.

** Admission will be allotted in order of application.

12. Payment Amount Total: USD

13. Payment Method [ to be completed

by February 11 ]

Credit Card: https://www.iere.jp/Payment/paypal_19WS.html Bank Transfer (available only for IERE members)

* IERE Central Office will send you the invoice.

14. Invitation Letter for VISA

PT. PLN may be able to issue an invitation letter for participants who need to apply for Visa. Disclaimer: PT. PLN reserves the right to fulfill or decline, at PT. PLN’s discretion, requests for letters of invitation for visa application support purposes. I need an invitation letter for Visa application.

*Please submit the `Format 5' of the 1st Announcement to IERE Central Office by e-mail by Feb. 11, 2019.

No

15. Information from IERE

Do you agree with receiving e-mail notice on future activities/IERE E-mail Magazine from IERE Central Office? Yes No

16. Personal Data I agree to disclose my personal data for the Participants list of this Workshop.

Central Office may enclose ‘Participants list’ in the conference bag to facilitate communication among participants. The list will contain 1. Name 2. Position, Department 3. Company/ Organization etc. 4. E-mail address 5. Country/Region of this format. If you DON’T want to open these information, please type ‘✓’ at appropriate boxes shown below.

2. Position, Department 4. e-mail address

Page 27: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

26

Invitation Letter for VISA

If participants need an invitation letter, please type and fill out the form and send to: IERE Central Office at

Email: register(at)iere.jp [Please substitute (at) with @].

I need an invitation letter for Visa application.

* PT. PLN (Persero) may be able to issue an invitation letter for participants who need to apply for Visa. It may take a few weeks to complete the procedures in PT. PLN (Persero), so please submit the form as soon as possible.

Disclaimer: PT. PLN (Persero) reserves the right to fulfill or decline, at PT. PLN (Persero)’s discretion, requests for letters of invitation for visa application support purposes.

Name on passport First Name:

Middle Name:

Family Name:

Gender □ Male □ Female

Nationality

Date of birth

Passport No.

Occupation Company/ Organization etc.

Expected date of entry

Duration of stay

Expected date of departure

Colloquium Participation

March 11, 2019 Welcome Reception

March 12, 2019 IERE-PLN Bali Workshop (Day 1)

March 13, 2019 IERE-PLN Bali Workshop (Day 2)

March 13, 2019 Social Event

March 14, 2019 Technical Visit

Format 5

Page 28: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

27

IERE Members List (as of January 18, 2019) Australia CS Energy Ltd. CSIRO Canada Powertech Labs Inc. China CEPRI GPG NARI France Enedis ENGIE Germany EnBW innogy SE RWE TI Hong Kong SAR CLPRI Indonesia PLN Iran NRI Japan Chubu EPCO Chugoku EPCO CRIEPI FEPC Fuji Electric Co., Ltd. Hitachi Hokkaido EPCO Hokuriku EPCO IHI J-POWER JAPC Kansai EPCO Kyushu EPCO MHPS Mitsubishi Electric NGK Sumitomo Electric Shikoku EPCO Tohoku EPCO TEPCO TOSHIBA Korea KEPCO KEPCO E&C KERI KOEN KOSPO Malaysia TNB Mexico INEEL Prolec GE Philippines APC MERALCO Singapore SPPG South Africa Eskom PIESA Spain NATURGY REE Taiwan TPC Thailand EGAT EURC* U.S.A. EPRI SwRI *: Academia

Page 29: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

28

About PT. PLN (Persero) PLN is the only state-owned enterprise in the power sector and ensures that everyone throughout Indonesia has access to electricity. Initially established by President Soekarno on October 27, 1945, PLN has since made rapid progress and in 2015 was recognized as one of the 500 biggest companies in the world (rank 480, Fortune 500). As a holding company, PLN has attained AAA rating from PT Pemeringkat Efek Indonesia and BBB-, BB, and Baa3 - from Fitch Ratings, Standard & Poor's, and Moody's - in 2015. PLN business has grown to other business sectors through subsidiaries, associate entities, joint ventures, and special purpose vehicle. Within headquarters in Jakarta, Indonesia PLN’s core business remains in electricity supply, especially in power generation, transmission, and distribution. Nowadays PLN owns and operates 39.562 MW power generation, 48.901 kms transmission lines, 1.028.679 distribution lines, 113.791 MVA substation. Its customer is already exceeding 68 million with more than 25 million using pre-paid meter technology.

About IERE IERE is an organization for exchanging electricity and energy related cutting-edge technologies and R&D information among its members from the electricity & energy supply industry, equipment provider businesses, academic research, government, etc. This unique platform is of great help for executives, senior managers, engineers, and researchers who are responsible for R&D and solutions. It is a worldwide, non-profit organization, established as “International Electric Research Exchange” in 1968.

Page 30: Second Announcement - IERE...resources. This section will explore about the role of distributed power generation for electrifying community and all related issues. Potential topics

29

IERE Central Office 2-11-1 Iwado Kita, Komae-shi

Tokyo 201-8511 JAPAN

Phone: +81-3-5438-1717 Fax: +81-3-3488-5100

https://www.iere.jp 1st issue: January 11, 2019 2nd issue: January 16, 2019 3rd issue: January 31, 2049