i I.
$.
c
I NTE R PRETATI ON S
NO. 12 - SECTION Il-A
Replies to Technical Inquiries July 1, 1982, through December 31, 1982
and Revisions Issued July 1, 1982, through April 1, 1983
FOREWORD
This publication includes all of the written replies issued between the indicated dates by the ASME Staff on behalf of the ASME Boiler and Pressure Vessel Committee to inquiries concerning interpretations of the Boiler and Pressure Vessel Code.These interpretations are not a part of the Addenda or the Code.
These replies are taken verbatim from the original letters, except for a few typographical and editorial corrections made for the purpose of improved clarity. In some instances, a review of the interpretation revealed a need for corrections of a technical nature. In these cases, a revised reply, bearing the original Interpretation Number with the suffix R, is presented. Following these revised replies, new interpretations, and revisions to them issued during the same 6-month period, are assigned Interpretation Numbers in chronological order. Interpretations applying to more than one Code Seaion appear with the replies pertaining to each affected Section.
ASME procedures provide for reconsideration of these interpretations when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the Statement of Policy in the Code documents, ASME does not “approve,“ “certify,” “rate,” or ”endorse” any item, construction, proprietary device, or activity.
These replies apply to the latest Edition and Addenda at the time of the inquiry or the Edition and Addenda stated in the reply. Subsequent revisions to the rules may have superseded the reply.
For detailed instructions on “Preparation of Technical Inquiries to the Boiler and Pressure Vessel Committee,” refer to Appendix 1.
1
Copyright ASME International Provided by IHS under license with ASME Licensee=Larsen and toubro/5954522010
Not for Resale, 07/18/2010 03:59:37 MDTNo reproduction or networking permitted without license from IHS
--`,`,`,,```,```,,,,``,,,`,,```,-`-`,,`,,`,`,,`---
~~ ~~ ~
D 9009275 0033483 2 5 1
SECTION II - PART A
Subiect
4
interpretation F ik CJO.
........................................................................... llA-83-03 Bco2451 SA-182, Paragraph 9.4
SA-479, Table 1, Type 316 Hardness Requirement ........................................... llA-83-01 K 8 2 - 3 7 9 SA-540.. .......................................................................................... ll A-83-02 BC82-625
i- 3
I- .*.+
Copyright ASME International Provided by IHS under license with ASME Licensee=Larsen and toubro/5954522010
Not for Resale, 07/18/2010 03:59:37 MDTNo reproduction or networking permitted without license from IHS
--`,`,`,,```,```,,,,``,,,`,,```,-`-`,,`,,`,`,,`---
o
Section Il-A - Interpretations No. 12 NA-8301, llA-83-02
Interpretation: UA-83-01
Subject: Section il-Part A, SA-479, Table 1, Type 316 Hardness Requirement
Date Issued: August 23, 1982
File: BC82-379
Question: It appears that the hardness requirement for Type 31 6 strain-hardened material in Table 1 of Spec. SA-479 is in error. is the requirement proper and intended and, if not, may it be ignored?
Reply: The ASTM subcommittee which has jurisdiction over the ASTM specification has determined that the hardness requirement for Type 31 6 strain-hardened material in Table 1 of the specification is an error and was not intended. Action has been taken to delete the hardness specification from the ASTM specification. Hardness requirements for strain-hardened material are being developed in ASTM.
Section li is also of the opinion that the requirement is an error since the minimum tensile and hardness requirements are in conflict. Action is being taken to delete the hardness requirement from SA-479. Section li is of the opinion that this hardness requirement should not apply.
Interpretation: HA-83-02
Subject: Section Il-Part A, SA-540
Date issued: September 21, 1982
File: BC82-625
Question (1): May the tempering operation for SA-540 material supplied in quenched and tempered condition be performed in more than one cycle in order to obtain the required mechanical properties?
Reply (1): Yes. It is permissible to perform the tempering operation in more than one cycle.
Question (2): in the case performing tempering as per Question (11, would each cycle be considered a new heat treatment, therefore allowing only one quenching and three tempering cycles to be permitted?
Reply (2): No, Paragraph 14.1 limits heat treatment to three complete quenching and tempering cycles, regardless of the number of tempering steps applied in each cycle.
5
Copyright ASME International Provided by IHS under license with ASME Licensee=Larsen and toubro/5954522010
Not for Resale, 07/18/2010 03:59:37 MDTNo reproduction or networking permitted without license from IHS
--`,`,`,,```,```,,,,``,,,`,,```,-`-`,,`,,`,`,,`---
~
9009275 0033485 024
1983 ASME BOILER AND PRESSURE VESSEL CODE SI EDITION
AV A I ì A0 L E OCTOBER 1,1983
Prices include 3-year update service through June 30,1986
SI Edition of all Sections - with the exception of Il-A, Il-B, and
I I € and both Code Cases Books
Bk. No. SI0230 and SI0330 include al l 19 S I books plus the 5 non-SI books
* * * * * *
Loose-Leaf Edition Only
Addenda and Supplements issued in loose-leaf, replacement-page format
* * * * * *
Interpretations issued to individual Sec- tions and included with Addenda service trJ those Sections - Interpretations to Section III, Divisions
1 and 2, issued with Addenda service to Subsection NCA
* * * * * *
New Binder
Cloth over heavy board Reinforced hinges
5-prong mechanism 2% inch capacity
Section List ASM E
Price Members Book Number
1 PowerBoilers . . . . . . . . . . . . . . . . . . . . . . . $ 100.00
II Material Specifications Part A - Ferrous Materials. . . . . . . . . . . . . . Part B - Nonferrous Materials. . . . . . . . . . . . Part C - Welding Rods, Electrodes and Filler
Metals . . . . . . . . . . . . . . . . . . . . . . . III Nuclear Power Plant Components
Subsection NCA - General Requirements for Division 1 and Division 2 . . . . . . . . . .
Subsection NB -Class 1 Components . . . . . . . Subsection NC -Class 2 Components . . . . . . . Subsection ND - Class 3 Components . . . . . . . Subsection NE -Class MCComponents. . . . . . Subsection NF -Component Supports . . . . . . Subsection NG -Core Support Structures . . . . Appendices . .....................
III Division 1:
I I I Division 2: Code for Concrete Reactor Vessels and
Containments . . . . . . . . . . . . . . . . . . . IV Heating Boilers . . . . . . . . . . . . . . . . . . . . . . V Nondestructive Examination . . . . . . . . . . . . . . VI Recommended Rules for Care and Operation of
Heating Boilers . . . . . . . . . . . . . . . . . . . . VI1 Recommended Rules for Care of Power Boilers. . . . VIII Pressure Vessels
Division 1 . . . . . . . . . . . . . . . . . . . . . . . Division 2 - Alternative Rules . . . . . . . . . . .
I X
X
X I
Welding and Brazing Qualifications. . . . . . . . . . . Fiberglass-Reinforced Plastic Pressure Vessels. . . . . Rules for Inservice Inspection of Nuclear Power Plant
Components. . . . . . . . . . . . . . . . . . . . . .
Boilers and Pressure Vessels . . . . . . . . . . . . . Nuclear Components . . . . . . . . . . . . . . . . .
Special Offer for All of Above. . . . . . . . . . . . . . . . . Special Offer for All of Above Plus 24 Binders . . . . . . .
0 Code Cases Books
200.00 175.00
90.00
100.00
120.00 120.00 120.00 120.00 80.00 80.00
160.00
150.00
100.00
100.00
50.00
70.00
200.00 200.00
100.00
80.00
175.00
125.00 175.00
2690.00 3 O O O. O O
$ 80.00
160.00 140.00
72.00
80.00
96.00 96.00 96.00 96.00 64.00 64.00
128.00
120.00
80.00
80.00
40.00
56.00
160.00 160.00
80.00
64.00
140.00
100.00 140.00
21 52.00 2400.00
s10010
YOOOZA YOOO2B
Y0002C
SIO03R
SI0036 s1003c S1003D S1003E S1003F S1003G S1003A
SI0032
SI0040
s10050
SI0060
510070
SI0081 SI0082
s10090
s10100
5101 10
YO0120 Y0012N
SI0230 SI0330
12.00 YS1140 Binder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.00
OF INTEREST TO ALL CODE USERS
Companies Holding Nuclear Certificates of Authorization
Companies Holding Boiler and Pressure Vessel Certificates OF Authorization
for Ur of Code Symbol Stamps
Issued six times a year o Issued April, August, and December.
0 Lists holders of N-type Certificates of Authorization, 0 Lists holders of the various Boiler and Pressure Vessel Code Certificates of Authorization and Symbol Stamps.
o Provides company name, certificate number, and expira-
Quality System Certificates (Material), Interim Letters, and Owner Certificates.
0 Provides company name, location, Certificate number, tion date. and expiration date and scope.
One Year Subscription (Six Issues) Book Number E00061 $65 (list) $52 (ASME members)
One Year Subscription (Thne Issues) Book Number E00052
$75 (list) $60 (ASME members)
7
... J
Copyright ASME International Provided by IHS under license with ASME Licensee=Larsen and toubro/5954522010
Not for Resale, 07/18/2010 03:59:37 MDTNo reproduction or networking permitted without license from IHS
--`,`,`,,```,```,,,,``,,,`,,```,-`-`,,`,,`,`,,`---