Seattle Department of Transportation ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM SDOT Pilot Permit Program Requirements Final – July 18, 2017 Updated – December 19, 2018

Transcript of Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take...

Page 1: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

Seattle Department of Transportation

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAMSDOT Pilot Permit Program Requirements

Final – July 18, 2017Updated – December 19, 2018

Page 2: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive
Page 3: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

CONTENTS

1. Purpose, Authority, and References ....................................................................4

2. Definitions ............................................................................................................6

3. Infrastructure Siting .............................................................................................8

4. Charging and Parking Management ..................................................................10

5. Permitting ...........................................................................................................11

Attachment 1. Potential Electric Vehicle Charging Station Locations in the Public Right-of-Way

Attachment 2. Insurance Requirements for Privately-Owned Electric Vehicle Charging Infrastructure Providers

Attachment 3. Applicant Process

Attachment 4. Request for Installation (RFIn) Form

Page 4: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

4 | SEATTLE DEPARTMENT OF TRANSPORTATION

1. PURPOSE, AUTHORITY, AND REFERENCES

Pursuant to Seattle Municipal Code (SMC) Titles 3, 11, and 15, the Seattle Department of Transportation (“SDOT”) Director (“Director”) establishes the following pilot permitting requirements for installing and operating electric vehicle (“EV”) supply equipment (“EVSE” or “EV charging infrastructure”) in the public right-of-way.

1.1 BackgroundTransportation pollution is over two thirds of Seattle’s carbon footprint. Thanks to carbon-neutral electricity from Seattle City Light, each gallon of oil which is replaced with electricity is a 100% reduction in carbon pollution.

In early 2016, Mayor Murray announced Drive Clean Seattle, a major new transportation initiative to tackle climate change at the local level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive plan to electrify transportation at scale and set us on a path to transition away from oil.

In the Fall of 2016, the Mayor and the City Council confirmed their commitment to transportation electrification by passing the Drive Clean Seattle Resolution, calling for significant reductions in oil use in the city. Among other target objectives, the City set a goal that 30% of light duty vehicles registered in Seattle should be electric by 2030. To accommodate the growth in EVs, the City is:

• Making significant investment in public EV charging infrastructure; and

• Developing policies to accommodate charging infrastructure for people of all walks of life, living in a diversity of housing types, charging their vehicles at home or in the public right-of-way, and using a shared or owned vehicle.

To accomplish this, SDOT will allow public and private EV charging infrastructure providers to install publicly-available EV charging infrastructure during a pilot phase in 2017 and 2018. The Electric Vehicle Charging in the Public Right-of-Way Public Space Management Renewable Permit Pilot (“EVCROW Permit Pilot” or “Permit Pilot”) phase will start on July 13, 2017 and end on or before December 31, 2019. Any company or public agency interested in installing EVSE in Seattle during this pilot phase will need to submit the appropriate permitting applications to SDOT demonstrating that they meet the base requirements for siting, construction, and installation. SDOT will review applications and issue the construction and Permit Pilot permits if all the requirements are met.

During the pilot phase, SDOT will assess the permitting process, installation challenges, and EV charging behavior in advance of developing a permanent Street Use permitting program.

Page 5: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 5

1.2 PurposeThe following describes the requirements and underlying set of principles and requirements that applicants shall meet when applying to install EVSE in the public right-of-way. The EVCROW Permit Pilot will establish guidelines for EV charging on non-residential streets within Urban Centers and Urban Villages and commercial streets outside of Urban Centers and Urban Villages. This Permit Pilot is the first step in a multi-step process to develop right-of-way charging policies city-wide. Seattle curb space policies prioritize allowing EV spaces for short-term and shared-use as opposed to long-term vehicle storage on right-of-way in commercial and mixed-use areas. SDOT will evaluate the pilot permit program and update permit program requirements, as necessary.

1.3 Administration, Interpretation, and EnforcementSDOT’s Street Use Division (“Street Use”) and Transit and Mobility Division (“Transit and Mobility”) administer, interpret, and enforce the EVCROW Permit Pilot under the authority of the SDOT Director. The SDOT Director may revoke one or more EVSE permitted for installation in the public right of way with 30 days’ notice. The SDOT Director may also require individual permitted EVSE to be temporarily or permanently decommissioned as a result of a construction project or an emergency shutoff.

1.4 Permits for EVSE Installation in the Public Right-of-WaySDOT permits shall be obtained before any installation or use of EVSE in the public right-of-way. Applicants will be assigned a EVCROW application coordinator and application checklist to aid progress through permitting. To install EVSE in the public right-of-way, the applicant shall obtain a Public Space Management Renewable permit for the long-term use of the right-of-way and a construction permit for the installation of the infrastructure from SDOT’s Street Use Division. A complete set of application materials is required and the permit application materials shall be approved before any permit is issued and work can begin. Contact Street Use for the specific requirements based on type and extent of work. An electrical permit from the Seattle Department of Construction and Inspections is required to establish an electrical connection to each new EV charging station unit. The applicant must also complete a service connection application with Seattle City Light, as well as a meter hooding permit from Seattle Department of Transportation (if infrastructure will be installed in a paid parking area).

1.5 EquityIn partnership with the Seattle Office of Sustainability and Environment, SDOT will evaluate the racial equity benefits to and burdens on communities of color, immigrants, refugees, people with low incomes and limited-English proficiency individuals due to charging stations permitted through this Permit Pilot. This evaluation will allow for the City of Seattle to more fully understand how the availability of publicly-accessible EV charging affects the City’s environmental justice, racial equity, and equitable development goals and to develop policy and programmatic actions to advance these goals.

Page 6: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

6 | SEATTLE DEPARTMENT OF TRANSPORTATION

2. DEFINITIONS

“DC fast charging station” means a device used to recharge an Electric Vehicle that meets the definition of “DC Level 1”, “DC Level 2”, or “DC Level 3” as defined in Standard J1772 of SAE International or an equivalent power output level and which is listed under the applicable UL Standards and requirements or the equivalent listing by a nationally-recognized testing laboratory.

“Electric vehicle (EV)” means any vehicle that operates, either partially or exclusively, on electrical energy from an off-board source that is stored on-board for motive purpose.

“Electric vehicle supply equipment (EVSE)” means a unit of fueling infrastructure that supplies electric energy for the recharging of electric vehicles, such as plug-in electric vehicles, including electric cars, neighborhood electric vehicles, and plug-in hybrids. EVSE is also referred to as EV charging station unit and EV charging infrastructure.

“Festival street” means a public place or portion of a public place that has been designated by the Director of Transportation for recurring temporary closure to vehicular traffic use for the purpose of pedestrian-oriented special activities, as established by the Director of Transportation.

“Furniture zone” means an area between the roadway curb face and the front edge of the walkway.

“Application programming interface (API)” means a set of commands, functions, protocols, and objects that programmers can use to create software or interact with an external system.“Bike lane or bicycle lane” means to designate an exclusive space for bicyclists with pavement markings and signage. The bicycle lane is located adjacent to motor vehicle travel lanes.

“Business and transit (BAT) lane” means to designate lanes that help move bus riders and others more efficiently and improve access to businesses and residences along the route by reserving outside curb lanes for right-turning vehicles and buses.

“Car share” means a system in which a fleet of cars (or other vehicles) is made available for use by members of the car share group in a wide variety of ways. Car sharing provides an alternative to car ownership where: (a) persons or entities that become members are permitted to use vehicles from a fleet on an hourly basis; (b) vehicles are available to members in parking spaces at dispersed locations or facilities; and (c) no separate written agreement is required each time a member reserves and uses a vehicle.

“Charging event” means the length of time in which an EV is plugged into the EV supply equipment and in the process of charging.

Page 7: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 7

“Historic District” means any district designated or created by City ordinance as a Landmark District. Seattle has established eight historic districts: Ballard Avenue, Columbia City, Fort Lawton, Harvard-Belmont, International District, Pike Place Market, Pioneer Square, and Sand Point. A citizens’ board or the Landmarks Preservation Board reviews development activity in these districts to maintain the historical integrity of structures and public spaces.

“Level 2 AC charging station” means a device used to recharge an Electric Vehicle that meets the definition of “AC Level 2” as defined in Standard J1772 of SAE International or an equivalent power output level and which is listed under the applicable UL Standards and requirements or the equivalent listing by a nationally-recognized testing laboratory.

“Parking stay” means the length of time a vehicle is parked in a parking space along the curb.

“Park drive or boulevard” means a public place under the jurisdiction of the Department of Parks and Recreation described in Title 15 Appendix I of the Seattle Municipal Code or shown in the map in Title 15 Appendix II of the Seattle Municipal Code or a park, administered by the Superintendent.

“Protected bike lanes” means lanes designated as an exclusive space for bicyclists with pavement markings and signage, and include physical separation from adjacent motor vehicle traffic. Protected bicycle lanes may be one- or two-way, and may be at street level, raised to the sidewalk, or an intermediate level.

“Public right-of-way” means the strip of land platted, dedicated, condemned, established by prescription, or otherwise legally established for the use of pedestrians, vehicles, or utilities.

“Publicly- and privately-owned electric vehicle charging infrastructure providers” means any entity, either public or private that owns the EV supply equipment that is being requested for installation in the public right-of-way.

“Shared fleet vehicles” means any permitted or licensed transportation network company, car share, taxi, or for-hire service vehicle that is continuously shared among different individual users for personal use over discrete time intervals.

“Transit-only lane” means a lane reserved at peak travel times or longer for the exclusive use of authorized public transit vehicles.

“Unimproved public streets or right-of-way” means street right-of-way that has not been improved for pedestrian or vehicular travel. “Urban Center” means relatively small areas designated in Seattle’s Comprehensive Plan that are expected to accommodate the highest densities of development for housing and employment.

“Urban Village” means areas designated in Seattle’s Comprehensive Plan for future growth. These are generally areas that include long-standing neighborhood business districts with zoning that can accommodate further development. The three types of urban villages in Seattle are urban centers, hub urban villages, and residential urban villages.

Page 8: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

8 | SEATTLE DEPARTMENT OF TRANSPORTATION

3. INFRASTRUCTURE SITING

• On public alleys; or• On any unimproved public streets (e.g.,

unpaved, gravel streets).

3.1.3 EVSE along bike lanes or protected bike lanes: EV charging infrastructure in the public right-of-way may be located along current bike lanes (unless that bike lane is planned to be upgraded to a protected bike lane) or protected bike lanes, as designated in the 2012 update of the Bicycle Master Plan.

3.1.4 Locations to avoid: EV charging infrastructure providers should avoid siting EVSE at locations that may interfere with bus layover, may interfere with bus layover or festival streets. Applicants should consider “around the corner” solutions in major thoroughfares to reduce potential traffic conflicts.

3.2 Siting allowancesSDOT seeks to minimize permanent installations in the public right-of-way and as much as possible, minimize the EVSE footprint and avoid removing vegetation.

3.2.1 Furniture zone: EV charging infrastructure in the public right-of-way may be constructed in the furniture zone of the sidewalk with permission and approved permits by the relevant City departments.

3.2.2 Buffer zone of protected bike lane: EV charging infrastructure in the public right-of-way may be constructed in the protected bike lane buffer zone upon review by the Transportation Operation Division and approval by the Director. This is to ensure EVSE charging cables will not interfere with safe operation of the adjacent bike lane.

3.1 Location allowancesThe following siting criteria govern where EV charging infrastructure may be located in the public right-of-way, subject to final approval and permitting for specific locations (per the Attachment 1).

3.1.1 Urban Centers and Urban Villages: EV charging infrastructure in the public right-of-way may be located in designated Urban Centers and Urban Villages, except:

• On residential local access streets, adjacent to parcels zoned as single-family;

• Along current or planned transit priority streets where EV charging infrastructure may obstruct an existing or future transit-only lane or business and transit (BAT) lane, as designated in the 2016 update of the Transit Master Plan;

• On peak-period restricted parking block faces;

• On public alleys; or• On any unimproved public streets, for

example unpaved, gravel streets.

3.1.2 Commercial zoning frontage outside of Urban Centers and Urban Villages: EV charging infrastructure in the public right-of-way may be located along commercial zoning frontage outside of Urban Centers and Urban Villages (including NC1, NC2, NC3, C1, and C2), except:

• Along current or planned transit priority streets where EV charging infrastructure may obstruct an existing or future transit-only lane or business and transit (BAT) lane, as designated in the 2016 update of the Transit Master Plan;

• On peak-period restricted parking block faces;

Page 9: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 9

3.2.3 Street tree protection: EV charging infrastructure in the public right-of-way shall be constructed within a protected distance from street trees. Coordination with the City Arborist shall be required during Transit and Mobility Division review when EV charging infrastructure is proposed to be located within 10 feet of a tree.

3.2.4 Lighting: EV charging infrastructure in the public right-of-way should be constructed on block faces with street lighting. The Transit and Mobility Division will provide guidance during site review.

3.2.5 Americans with Disabilities Act (ADA) compliance: SDOT intends to guide infrastructure providers to site, design, and construct EV charging infrastructure in the public right-of-way so that people with mobility impairments can safely and comfortably navigate the sidewalk, consistent with the United States Access Board’s Proposed Guidelines for Pedestrian Facilities in the Public Right-of-Way.

Below are minimum accessibility requirements for the EVCROW pilot that will be enforced for all EV charging infrastructure and the parking spaces it services. SDOT retains the right to modify and add accessibility requirements for each site due to unique site factors including presence/absence of sidewalk, space availability, and traffic considerations.

GROUND SPACE REQUIREMENTS• Clear ground space for access to operable

controls• 30"*48”clear ground space provided

adjacent to operable controls and equipment

• 36" clear width accessible route to operable controls

*Curb space is not counted toward these measurements

PEDESTRIAN CLEAR ZONEA minimum pedestrian clear zone for pedestrian mobility must be maintained within all sidewalks.

The minimum width dimension for the pedestrian clear zone is 6-feet in most of the city and 8-feet downtown. Additionally, structures, including EV charging infrastructure, must be setback a minimum of 1-foot from the edge of the pedestrian clear zone.

REACH RANGE REQUIREMENTS• Operable controls located at 48" max height• No reaching obstructions greater than 10"

for any operable controls

ADDTL REQUIREMENTS• Minimum 8' wide parking lane on an

arterial street with a bus lane or bike lane• Location of stations in a generally flat area

3.3 Project coordinationWe encourage applicants to review the list of upcoming projects in the City’s freight, transit, bicycle, and pedestrian master plans and our Capital Projects Dashboard, available on the Seattle Department of Transportation website. Applicants will coordinate with SDOT’s Street Use Division Project Construction Coordination Office to convey conflicts with pavement moratoria (see www.seattle.gov/transportation/stuse_rowopen.htm), SDOT’s Maintenance Operations Division to determine future paving project conflicts, and Seattle Department of Construction and Inspections to mitigate conflicts with permitted construction projects (see www.seattleinprogress.com/). Applicants shall also work with Seattle City Light to assess preliminary utility locations to avoid conflicts that might increase project complexity.

3.4 MeteringEV charging infrastructure, including all auxiliary loads, shall be metered in accordance with the requirements outlined in the Seattle City Light’s Requirements for Electrical Service Connection. The Applicant shall work with Seattle City Light to identify the appropriate metering approach to satisfy electric service connection requirements, while minimizing metering’s physical footprint on the public right of way.

Page 10: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

10 | SEATTLE DEPARTMENT OF TRANSPORTATION

4. CHARGING AND PARKING MANAGEMENT

while charging only” stall, while adhering to the posted time regulation. The Seattle Police Department will chalk vehicle tires to enforce this regulation. In addition, a company may employ a model to charge if the car stays beyond charge completion on a public street.

4.2.4 Coverage in paid parking areas: EV charging infrastructure located in the public right-of-way shall not exceed a maximum percentage of total paid parking spaces dedicated to 60-minute EV charging spaces in each paid parking area as determined by the Director.

4.2.5 Transactions: EV charging infrastructure located in the public right-of-way shall integrate paid parking area transactions and EV fueling transactions into one transaction for the user. There shall not be two separate transactions imposed on the customer (the charging charge and parking fee). Publicly- and privately-owned EV charging station owners shall pay for lost meter revenue at the end of each month based on the duration (i.e., time while plugged in, but not charging before and after the charging event plus the charging event time), time-of-day, and location of each charging event. All data related to the charging event shall be provided to the SDOT Transit and Mobility Division as described in Section 4.4 below.

4.3 Non-electric vehicle use

Non-electric vehicles are prohibited from parking in a space with an EV charging station that is marked as “electric vehicle parking while charging only” with penalties for violating this regulation consistent with SMC 11.72.125.

4.1 Charging requirements for EV charging infrastructure providers

4.1.1 Availability: EV charging infrastructure located in the public right-of-way shall be publicly available unless specific to annually-designated on-street car share spaces.

4.1.2 EVSE types: EV charging infrastructure located in the public right-of-way is required to be at least AC Level 2 charging stations or DC fast charging stations to encourage quick charging and parking turnover.

4.2 Parking requirements for electric vehicles

4.2.1 Maximum parking stays per EVSE type: EV charging infrastructure located in the public right-of-way shall only be permitted at 60-minute parking stalls for DC fast charging stations (Levels 1, 2, or 3), 2-hour parking stalls for AC Level 2 charging stations, or 4-hour parking stalls for AC Level 2 charging stations and will be available to be used by the public and shared fleet vehicles.

4.2.2 Parking stay changes: SDOT may make changes to parking stays (the length of time a vehicle can park in a stall) in locations requested to permit an EV charging space.

4.2.3 Parking while charging: EVs are prohibited from parking in a space with an EV charging station that is marked as “electric vehicle parking while charging only” if the EV is not in the process of charging. SDOT defines the “process of charging” as a being plugged into an EVSE charger in the dedicated “electric vehicle parking

Page 11: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 11

5. PERMITTING

5.1 Permit requirements

The following permit requirements are established for prospective EVSE applicants:

5.1.1 Permit types: Privately- and publicly-owned EV charging infrastructure shall be required to obtain permits from SDOT Street Use Division that is subject to all relevant siting standards and shall be reviewed by SDOT’s Transit and Mobility, Transportation Operations, Street Use and Project Development Divisions for the long-term use of the right-of-way. Required permits shall include:

• A Public Space Management Renewable permit for the long-term use of the right-of-way (annual renewal with Street Use inspection);

• A Street Use utility permit for installing the infrastructure;

• An electrical permit from the Seattle Department of Construction and Inspections to establish an electrical connection to each new EV charging station unit;

• Seattle City Light service connection application;

• Approval from the Historic Landmark District review board, as applicable;

• Written authorization from telecommunications utilities to permit connections to fiber or other telecommunications infrastructure, as applicable; and

• Parking permit from Seattle Department of Transportation.

5.1.2 Permits per EVSE: All required permits shall be obtained for each piece of EVSE.

5.1.3 City of Seattle staff review: Before applying for Street Use permits from SDOT’s Street Use Division, appropriate staff from SDOT’s Transit and Mobility, Transportation Operations, and Project Development Divisions will assess and conceptually approve the optimal EVSE location. Seattle City Light is offered the right of first refusal for all privately-owned EV charging infrastructure locations. Siting review will include considerations for proposed locations in Historic Districts.

5.1.4 Public Space Management Renewable permit submittal: The Street Use Division’s Public Space Management Renewable permit process requires submitting an application, site plan, insurance, and bond (can be submitted prior to issuance). More details on the public space renewable permit process are located at: www.seattle.gov/transportation/publicspacemanagement.htm

5.1.5 Construction permit submittal: The Street Use Division’s utility permit process requires submitting an application, site plan, and traffic control plan (if applicable). More details on the utility permit process are located here: www.seattle.gov/transportation/stuse_utilpermits.htm

Page 12: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

12 | SEATTLE DEPARTMENT OF TRANSPORTATION

5.1.6 Public notice: Installation of each new EV charging station unit shall require a public notice and 14-day public comment period as a condition of application prior to permit approval. After a new EV charging station permit application and concept design is submitted, SDOT shall issue a public notice of the application and begin the comment period. Notices shall be posted on-site in the immediate vicinity of the proposed EV charging station location and listed on SDOT’s website. Comments may be submitted to SDOT in writing or by email. In addition, prior to Street Use application submittal, the Applicant must conduct reasonable outreach to properties on the same block, across the street, and to additional properties if SDOT informs that applicant that they could reasonably be affected by the proposed installation. Written notice delivered in mail, on door knobs via door hangers, or in person is presumed sufficient unless the applicant is otherwise informed by SDOT. The applicant shall present a summary of the outreach conducted during the initial site review process, including methods as well as names, addresses, and feedback from affected stakeholders.

5.1.7 Block reservations: EVSE applicants shall submit a Request for Installation (RFIn) email to the Transit and Mobility Division (T&M) at [email protected] indicating the block face they seek permission to install EVSE. The RFIn email timestamp will serve as the “first come, first served” reservation to install EVSE upon successful completion and approval of all appropriate permits and processes. No more than one piece of EVSE shall be reserved per block unless approved by the Director. Block reservations will expire for any application that is inactive for over one month.

5.2 Insurance, bond, and payment security standards

5.2.1 General liability insurance and minimum limits: Each privately-owned EV charging infrastructure provider will have commercial general liability insurance on form CG 00 01 or equivalent with minimum limits of $2,000,000 per occurrence and $4,000,000 aggregate and name the City of Seattle as an additional insured. The insurance policy shall cover each piece of EVSE in the public right-of-way under the jurisdiction of the City of Seattle, and each EVSE user during the period of charging. An insurance policy is not required for each piece of EVSE. Additional terms and conditions apply per Attachment 2.

5.2.2 Deductibles and self-insured retentions: Related to deductibles and self-insured retentions, any self-insurance retention or deductible in excess of $25,000 that is not “fronted” by an insurer and for which claims the permittee is directly responsible for defending and indemnifying shall be disclosed on the certificate of liability insurance. The permittee agrees to defend and indemnify the City under its self-insured or deductible layer and upon City’s request advise the full delivery address of the individual or department to whom a tender of a claim should be directed.

5.2.3 Bond: Before Street Use may grant a Public Space Management Renewable permit, privately-owned EV charging infrastructure providers shall provide a $30,000 performance bond for each piece of infrastructure per SMC 15.04.040.

5.2.4 Payment security standards: Any company interested in launching in Seattle must show a current Attestation of Compliance (AOC) for the payment gateway provider. Additionally, the credit card gateway utilized must maintain appropriate Payment Card Industry Data Security Standards (PCI DSS) certification as a Level 1 Service Provider. The gateway provider shall comply with Visa Cardholder Information Security Program (CISP) and Mastercard Data Protection (SDP) programs.

Page 13: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 13

5.3 Construction and maintenance

5.3.1 Construction costs (private provider): Privately-owned EV charging infrastructure providers are responsible for all construction costs associated with infrastructure installation and removal, including striping, signs, labor from City crews, and any necessary public infrastructure restoration costs. In any case where SDOT revokes the Public Space Management Renewable permit, the EV charging permit holder is expected to restore the right-of-way at their expense per SMC 15.04.070.

5.3.2 Construction costs (public provider): All construction costs associated with publicly-owned EV charging infrastructure installation and removal—including striping, signs, labor from City crews, and any necessary public infrastructure restoration costs—shall be covered by the City of Seattle department or external third-party public agency that owns the charging equipment.

5.3.3 Maintenance and repair: Privately and publicly-owned EV charging infrastructure providers shall be responsive to maintain and repair their infrastructure, both at the network level or with individual EVSE, in the following timeframes:

• The EV charging infrastructure provider should respond to any system-wide outages or network issues within one hour.

• The EV charging infrastructure providers should respond to any need to repair a malfunctioning unit within one business day.

• Reported (graffiti should be abated within six business days, per the Graffiti Nuisance Ordinance 118082).

All infrastructure shall have a label on the unit that identifies the contact information for repair and maintenance requests. Requests may be given by phone or email.

5.4 Data sharing and devices

5.4.1 Required data sharing: Privately-owned EV charging infrastructure providers are required to report the following “charging event” data for each EV charging station unit on a monthly basis, or upon request:

• EV charging station unit type (DC fast charge or Level 2 charging stations);

• Company name of EV charging station provider;

• EV charging station unit location (cross streets);

• EV charging station unit location (latitude);• EV charging station unit location

(longitude);• Charging event start date (in YYYY-MM-DD

format); • Charging event end date (in YYYY-MM-DD

format); • Charging event start time in minute and

seconds format (MM:SS);• Charging event end time in minute and

seconds format (MM:SS);• Time while plugged in, but not charging;• Total charging event cost to consumer;• Total parking charge to consumer;• Zip code of the customer (if available); and• Whether the vehicle is a car share vehicle

(as feasible).

5.4.2 Application programming interface: Privately-owned EV charging infrastructure providers or station owners are required to provide their application programming interface (API) to the City of Seattle and any other applicable web or app platform of the City of Seattle’s choosing. The API shall indicate in real-time the EVSE location, number of stalls, and whether the EVSE is in use or not in use.

Page 14: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

14 | SEATTLE DEPARTMENT OF TRANSPORTATION

5.4.3 Internet of Things (IoT) devices and sensors: EV charging infrastructure providers or station owners may integrate IoT devices or other sensor infrastructure within EVSE upon privacy review and written approval by the Seattle Information Technology Department (Seattle IT). If the EV charging infrastructure provider or station owner seeks to add additional IoT devices or sensors beyond those included in the initial EVSE installation, they must complete a privacy review and obtain written approval by Seattle IT prior to installation of the additional devices or sensors. IoT devices or other sensor infrastructure shall not include any audio or video data collection components and shall not collect personally identifiable information. EV charging infrastructure providers or station owners that have been approved to install IoT devices or other sensor infrastructure as part of their EVSE shall notify the public what data is being collected using a visible sticker on the EVSE. SDOT and Seattle IT reserve the right to access and audit all data collected, but will not sell any data.

5.4.4 Wireless (Wi-Fi) connectivity services: EV charging infrastructure providers or station owners with the intent to provide Wi-Fi connectivity to the public may integrate Wi-Fi devices within EVSE upon privacy review and written approval by Seattle IT. As part of the privacy review, Seattle IT seeks to minimize the collection of personally identifiable information. EV charging infrastructure providers or station owners that have been approved to provide Wi-Fi connectivity as part of their EVSE installation shall notify the public what data is being collected using a visible sticker on the EVSE.

5.5 FeesThe following permit fees are required to be paid by the EVSE applicant. All fees are subject to change.

• Street Use Public Space Management Renewable permit fee: $146

• Street Use Simple Utility permit fee: $305• Street Use hourly permit review and

inspection fee (for both the Street Use Simple Utility and Public Space Management Renewable permits): $209

• SDCI electrical permit: Varies. See page 37 of the following document: www.seattle.gov/dpd/cs/groups/pan/@pan/documents/web_informational/p2374952.pdf

• Parking space reservation with a meter or pay station during construction: The cost for reserving paid spaces (meter or pay station) is a one-time $18.50 installation/removal fee per space, plus $15 per space per day for “No Parking 7 a.m. to 6 p.m. (Mon - Sat),” or $18 per space per day for “No Parking - Tow Away Zone.”

Page 15: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 15

ATTACHMENTS

Page 16: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

16 | SEATTLE DEPARTMENT OF TRANSPORTATION

14TH

AV

E

32N

DAV

EN

W

MA

RIN

EVIEW

DR

SW

40TH

AVE

NE

48TH

AV

E SW

LAKEW

ASHINGTON

BLVDS

NE 55TH ST

N 125TH ST

17TH

AV

E S

NE 70TH ST

3RD

AV

E N

W

14TH

AV

E N

W

34TH

AV

E31

ST

AVE

S

19TH

AV

E E

NE 75TH ST

NE 110TH ST

28TH

AV

E W

LAK E

SID

EAV

ES

14T H

A VE

S

30TH

AV

E N

E

20TH

AV

E N

E

DAY

TON

AV

E N 1S

T AV

E N

E

MA

GN

OLIA

BLVD

W

BEAC

ON

WR

AVE S

HARBOR

AVESW

RENTONAVE

S

24TH

AV

E N

W

34TH

AV

E W

FAU

NTL

ERO

YW

AYSW

NE 95TH ST

3RD

AVE

W

DEXTER

AVE

N

E PIKE ST

E MADIS

ON ST

15TH

AV

E E

N 45TH ST

BEACHDR

SW

CA

L IF O

RN

IAAV

ES

W

1 5T H

AVE

S

PHIN

NE

Y AV

E N

E YESLER WAY

NW 85TH ST

8TH

AVE

NW

NW 80TH ST

35T

HAV

EN

E

10TH

AV

E E

S ORCAS ST

SAND

POIN

TW

AYN

E

N 40TH ST

NE 65TH ST

1ST AVE 3RD AVE

15TH

AV

E N

E

SW ADMIRAL WAY

SW BARTON ST

N 80TH ST

BEAC

ON

AVE S

5TH

AV

E N

E

12TH

AV

E

51S

T AV

E S

SEW

AR

D PAR

K AVE

S

16TH

AV

E SW

ALKI A

VE SW

ML

KIN

GJ R

WAY

S

6TH

AV

E S

SEAV

I EW

AVE

NW

WESTLAKE

A VEN

SW ROXBURY ST

DENNY WAY

LAKE

CITY

WAY

NE

EAS

TM

AR

GIN

ALW

AYS

M L KIN

G JR

ER W

AY S

WEST SEATTLE BR WB

RO

OS

EVE

LT W

AY N

E

GR

EEN

WO

OD

AV

E N

15TH

AV

E W

DE

LRID

GE

WAY

SW

N 34TH ST

23R

D A

VE S

23R

D A

VE

WE

ST

MAR

GIN

ALW

AYSW

SWIFTAVE

S

NE 45TH ST

M L KIN

G JR

WR

WAY S

NE 50TH ST

NE 125TH ST

24T H

AVE

EMADISON ST

2ND AVE

4TH

AV

E S

N 130TH ST

PINE ST

PIKE ST

AUR

OR

A AV

E N

NE 145TH ST

S JACKSON ST

N 85TH ST

25TH

AV

E N

E

HOLMAN RD NW

EAST

LAK E

AVE

E

WEST SEATTLE BR EB

12TH

AV

E N

E

ELLIOTT AVEW

35TH

AVE

SW

15TH

AVE

NW

1ST

AVE

S

RAI

NIE

R A

VE SSR

509 NB

AIRPORT WAY S

SR

509S

B

ALAS

K AN

WY

VINB

0 0.75 1.5 2.25 3Miles

Potential EV Charging Station LocationsAlong Arterial Street

Along Transit Street*Urban Center

Urban Village

*Only if electric vehicle charging infrastructure does not obstruct an existing or future transit only lane or business and transit (BAT) lane, as designated in the 2016 update to the Transit Master Plan

N

EW

S

DISCLAIMER: This map is subject to change and any proposed electric vehicle charging infrastructure in the public right-of-way is subject to SDOT approval. Streets indicated are subject to review and may not be accurate

Attachment 1: Potential Electric Vehicle Charging Station Locations in the Public Right-of-Way

Page 17: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 17

Attachment 2: Insurance Requirements for Privately-Owned Electric Vehicle Charging Infrastructure Providers

Each privately-owned electric vehicle charging infrastructure provider (Provider) shall maintain continuously throughout the entire term of the permit, at no expense to the City, the following insurance coverage and limits of liability:

A. STANDARD INSURANCE COVERAGES AND LIMITS OF LIABILITY REQUIRED:

1. Commercial General Liability (CGL) written on an occurrence form at least as broad as ISO CG 00 01, with Minimum Limits of Liability:

$1,000,000 per Occurrence$2,000,000 General Aggregate$2,000,000 Products/Completed Operations Aggregate$1,000,000 Personal/Advertising Injury Liability

Coverage shall include: Premises and Operations; Personal Injury and Advertising Liability; Independent Contractors; Severability of Interest Clause; General Aggregate Limits of Insurance shall apply separately; “Claims Made” and “Modified Occurrence” policy forms are not acceptable.

2. Umbrella or Excess Liability “follow form” insurance over primary CGL insurance limits, if necessary, to provide total minimum limits of liability of $2,000,000 per occurrence, $4,000,000 aggregate. These required total minimum limits of liability may be satisfied with primary limits or any combination of primary and umbrella/excess limits.

3. Automobile Liability insurance for owned, non-owned, leased or hired vehicles, as applicable, written on a form CA 00 01 or equivalent WITH MINIMUM LIMITS OF LIABILITY OF $1,000,000 CSL.

C. CITY AS ADDITIONAL INSURED; PRODUCTS-COMPLETED OPERATIONS: Provider shall include “the City of Seattle” as an additional insured to all of the insurance coverage listed above on a CG 2012, CG 20 26 or equivalent; which must also be as primary and non-contributory with any insurance or self-insurance coverage or limits of liability maintained by the City, and in the form of a duly issued additional insured endorsement and attached to the policy or by the appropriate blanket additional insured policy wording, and in any other manner further required by Contractor’s insurance coverage to provide the City of Seattle additional insured coverage as set forth herein.

D. NO LIMITATION OF LIABILITY: Insurance coverage and limits of liability as specified herein are minimum coverage and limit of liability requirements only. Nothing in the City of Seattle’s requirements for minimum insurance coverage shall be interpreted to limit or release liability of the Provider or any of the Provider’s insurers. The City shall be an additional insured as required in paragraph C. regarding the total limits of liability maintained, whether such limits are primary, excess, contingent or otherwise.

Page 18: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

18 | SEATTLE DEPARTMENT OF TRANSPORTATION

E. REQUIRED SEPARATION OF INSURED PROVISION; CROSS-LIABILITY EXCLUSION AND OTHER ENDORSEMENTS PROHIBITED: Provider’s insurance policy shall include a “separation of insureds” or “severability” clause that applies coverage separately to each insured and additional insured, except with respect to the limits of the insurer’s liability. Provider’s insurance policy shall not contain any provision, exclusion or endorsement that limits, bars, or effectively precludes the City of Seattle from coverage or asserting a claim under the Provider’s insurance policy on the basis that the coverage or claim is brought by an insured or additional insured against an insured or additional insured under the policy. Provider’s failure to comply with any of the requisite insurance provisions shall be a material breach of, and grounds for, the immediate termination of the Contract with the City of Seattle; or if applicable, and at the discretion of the City of Seattle, shall serve as grounds for the City to procure or renew insurance coverage with any related costs of premiums to be repaid by Provider or reduced and/or offset against the Contract.

F. NOTICE OF CANCELLATION: The above checked insurance coverages shall not be canceled by Provider or Insurer without at least 30 days written notice to the City, except 10 days’ notice for non-payment of premium.

G. INSURER’S A.M. BEST’S RATING: Each insurance policy shall be issued by an insurer rated A-: VII or higher in the A.M. Best’s Key Rating Guide, unless a surplus lines placement by a licensed Washington State surplus lines broker, or as may otherwise be approved by the City.

H. EVIDENCE OF INSURANCE: Provider must provide the following as evidence of insurance:

a) A certificate of liability insurance evidencing coverages, limits of liability and other terms and conditions as specified herein. In the “Certificate Holder” field of the certificate of insurance, write “City of Seattle.”;

b) An attached City of Seattle designated additional insured endorsement or blanket additional insured wording to the required insurance policies.

At any time upon the City’s request, Provider shall also cause to be timely furnished a copy ofdeclarations pages and schedules of forms and endorsements. In the event that the City tendersa claim or lawsuit for defense and indemnity invoking additional insured status, and the insurereither denies the tender or issues a reservation of rights letter, Provider shall also cause acomplete and certified copy of the requested policy to be timely furnished to the City of Seattle.

Send certificate and additional insured endorsement to Evan Corey at [email protected].

Page 19: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 19

ELEC

TRIC

VEH

ICLE

CH

ARGI

NG

IN T

HE

PUBL

IC

RIGH

T OF

WAY

(EVC

ROW

) PIL

OT P

ERM

IT P

ROGR

AMUp

date

d M

arch

21,

201

8

Appl

ican

t Pro

cess

and

City

of S

eattl

e Ro

les

Step

Deta

ilSt

ep 1

: Sub

mit

Elec

tric

Veh

icle

Cha

rgin

g in

the

Publ

ic R

ight

of W

ay (E

VCRO

W) R

eque

st fo

r Ins

talla

tion

(RFI

n)1.

1Ap

plic

ant s

ends

a R

eque

st fo

r Ins

talla

tion

(RFI

n) to

the

Tran

sit a

nd M

obili

ty D

ivis

ion

(T&

M) a

t new

mob

ility

@se

attle

.gov

indi

catin

g at

whi

ch b

lock

face

s th

ey s

eek

perm

issi

on

to in

stal

l ele

ctric

vehi

cle

supp

ly e

quip

men

t (EV

SE).

The

RFIn

sho

uld

incl

ude

the

follo

win

g in

form

atio

n:•

Lega

l Com

pany

Nam

e•

Appl

icat

ion

date

• Ci

ty o

f Sea

ttle

Busi

ness

Lic

ense

Num

ber

• Ge

nera

l loc

atio

n an

d bl

ock

face

of t

he p

ropo

sed

EVSE

(e.g

., St

reet

X b

etw

een

Stre

et Y

and

Str

eet Z

; Nor

th b

lock

face

)•

Num

ber o

f des

ired

park

ing

spac

es E

VSE/

char

gers

pro

pose

d fo

r the

site

• EV

SE lo

catio

n co

ntex

t, in

clud

ing

side

wal

k co

nditi

on, t

ree

loca

tions

, pla

ntin

g st

rip a

vaila

bilit

y, ad

jace

nt la

nd u

ses

and

busi

ness

es (i

nclu

ding

nam

es a

nd a

ddre

sses

) on

the

prop

osed

blo

ck fa

ce•

Prop

osed

wra

ps a

nd m

essa

ges

on E

VSE

acce

ss a

nd p

aym

ent s

cree

ns•

Prop

osed

Inte

rnet

of T

hing

s (Io

T) d

evic

es o

r sen

sors

to b

e in

clud

ed in

the

EVSE

as

wel

l as

all p

ropo

sed

data

to b

e co

llect

ed

• Pr

elim

inar

y Te

chni

cal P

lan:

- Con

cept

ual d

iagr

ams

of th

e in

fras

truc

ture

› EVS

E an

d ut

ility

met

er lo

catio

n &

dim

ensi

ons

› Wid

th o

f sid

ewal

k an

d ac

cess

isle

› E

lect

rical

con

duit

leng

th a

nd p

ropo

sed

path

› Pro

pose

d up

grad

es to

ele

ctric

al in

fras

truc

ture

, if n

eces

sary

› Loc

atio

n an

d di

men

sion

s of

exi

stin

g ve

rtic

al s

truc

ture

s in

pro

xim

ity to

site

- Pow

er o

utpu

t spe

cs a

nd d

imen

sion

s of

EVS

E •

Proo

f of P

CI c

ompl

ianc

e.

1.2

The

City

will

sen

d an

em

ail r

ecei

pt o

f the

EVC

ROW

RFI

n to

the

appl

ican

t. Th

is e

mai

l will

ass

ign

the

appl

icat

ion

an R

FIn

ID #

and

an

EVCR

OW a

pplic

atio

n co

ordi

nato

r who

w

ill tr

ack

prog

ress

thro

ugh

the

perm

ittin

g pr

oces

s. T

he a

pplic

ant i

s re

spon

sibl

e fo

r rou

ting

appl

icat

ion

prog

ress

to th

e EV

CROW

app

licat

ion

coor

dina

tor.

Step

2: C

ity o

f Sea

ttle

Staf

f Rev

iew

2.1

The

follo

win

g ta

sks

are

com

plet

ed c

oncu

rren

tly:

• SD

OT’s

T&

M P

arki

ng a

nd N

ew M

obili

ty T

eam

s re

view

site

con

ditio

ns, c

urb

regu

latio

n, p

arki

ng u

tiliz

atio

n, m

odal

pla

n co

nflic

ts, a

nd p

rovi

de in

itial

siti

ng g

uida

nce

to th

e ap

plic

ant.

This

als

o in

clud

es a

revi

ew o

f pro

pose

d si

tes

for p

roje

ct c

onfli

cts

and

cont

inui

ty w

ithin

the

publ

ic ri

ght-

of-w

ay.

• SD

OT’s

Tra

nspo

rtat

ion

Oper

atio

ns D

ivis

ion

(TOD

) rev

iew

s pr

opos

ed s

ites

for p

oten

tial o

pera

tiona

l iss

ues.

• SD

OT’s

Mai

nten

ance

Ope

ratio

ns D

ivis

ion

(MOD

) rev

iew

s pr

opos

ed s

ites

for c

onfli

cts

with

futu

re p

avin

g pr

ojec

ts.

• Se

attle

City

Lig

ht (S

CL) r

evie

ws

loca

tion

and

exer

cise

s rig

ht o

f firs

t ref

usal

for E

V ch

argi

ng s

tatio

n si

ting.

• Se

attle

IT re

view

s PC

I com

plia

nce,

IoT

devi

ces/

sens

ors,

Wi-F

i ser

vice

s, a

nd d

ata

colle

ctio

n be

ing

prop

osed

, inc

ludi

ng a

priv

acy

revi

ew (u

pon

whi

ch S

eattl

e IT

info

rms

the

appl

ican

t whe

ther

any

pro

pose

d Io

T de

vice

s, s

enso

rs, a

nd W

i-Fi s

ervi

ces

are

appr

oved

).

2.2

SCL

and

SDOT

coo

rdin

ate

on m

eter

ing

solu

tions

ava

ilabl

e at

the

prop

osed

site

.

2.3

Pre

limin

ary

revi

ew o

f Pre

limin

ary

Tech

nica

l Pla

n su

bmitt

ed in

Ste

p 1.

1.

Atta

chm

ent 3

: App

lican

t Pro

cess

Page 20: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

20 | SEATTLE DEPARTMENT OF TRANSPORTATION

Step

Deta

il2.

4Up

on c

ompl

etio

n of

Ste

ps 2

B.2

and

2B.3

, the

app

lican

t mus

t con

duct

reas

onab

le o

utre

ach

(mai

l, do

or h

ange

r, or

in-p

erso

n ou

trea

ch) t

o pr

oper

ties

on th

e sa

me

bloc

k an

d ac

ross

the

stre

et fr

om th

e pr

opos

ed lo

catio

n. D

irect

out

reac

h m

ust b

e ve

rified

.

2.5

The

EVCR

OW a

pplic

atio

n co

ordi

nato

r sen

ds th

e ap

plic

ant a

Let

ter o

f Fea

sibi

lity

dete

rmin

atio

n de

taili

ng n

ext s

teps

in to

pro

ceed

to p

erm

ittin

g.

Step

3A:

App

ly fo

r Str

eet U

se P

erm

its fr

om S

DOT’

s St

reet

Use

Div

isio

n3A

.1Ap

plic

ant s

ubm

its fo

r a R

ight

of W

ay M

anag

emen

t Min

or U

tility

Per

mit1 a

nd P

ublic

Spa

ce M

anag

emen

t Ren

ewab

le P

erm

it pe

r site

to S

DOT

Stre

et U

se D

ivis

ion

at

SDOT

UtilP

erm

its@

seat

tle.g

ov o

r at t

he S

tree

t Use

per

mit

coun

ter l

ocat

ed o

n Fl

oor 2

3 of

the

Seat

tle M

unic

ipal

Tow

er. A

pplic

atio

n m

ater

ials

for b

oth

appl

icat

ions

are

su

bmitt

ed s

imul

tane

ousl

y. Th

e ap

plic

atio

n re

quire

men

ts in

clud

e:•

Min

or U

tility

App

licat

ions

foun

d at

the

follo

win

g lin

k: w

ww.

seat

tle.g

ov/ t

rans

port

atio

n/do

cs/s

tuse

/Util

ityAp

plic

atio

nFor

mFI

LL.p

df•

Publ

ic S

pace

Man

agem

ent P

rogr

am P

ublic

Spa

ce R

enew

able

App

licat

ion

foun

d at

the

follo

win

g lin

k: w

ww.

seat

tle.g

ov/D

ocum

ents

/Dep

artm

ents

/SDO

T/Se

rvic

es/

Perm

its/A

nnua

lsAp

plic

atio

nFor

mFI

LL.p

df•

Site

pla

n sh

owin

g re

quire

d Ri

ght-

of-W

ay (R

OW) u

se fo

r ins

talla

tion

per C

lient

Ass

ista

nt M

emo

(CAM

) 211

6 an

d si

te p

lan

tem

plat

es fo

und

at th

e fo

llow

ing

links

:- C

AM 2

116:

ww

w.se

attle

.gov

/tran

spor

tatio

n/ca

ms/

CAM

2116

.pdf

- Site

pla

n te

mpl

ates

: ww

w.se

attle

.gov

/tran

spor

tatio

n/st

use_

form

s.ht

m•

Traf

fic c

ontr

ol p

lan

if w

ork

is o

n an

art

eria

l or w

ithin

a H

ub o

r in

the

Hig

h Im

pact

Are

a pe

r CAM

211

1 fo

und

at th

e fo

llow

ing

link:

w

ww.

seat

tle.g

ov/ t

rans

port

atio

n/ca

ms/

CAM

2111

.pdf

• Te

chni

cal s

ite p

lan

with

met

er lo

catio

n an

d al

l ass

ocia

ted

infr

astr

uctu

re, R

OW im

prov

emen

ts a

nd R

OW b

ound

arie

s•

Elev

atio

n dr

awin

g of

all

prop

osed

infr

astr

uctu

re•

Insu

ranc

e do

cum

enta

tion

per C

AM 2

102

at th

e fo

llow

ing

link:

w

ww.

seat

tle.g

ov/D

ocum

ents

/Dep

artm

ents

/SDO

T/CA

Ms/

cam

2102

.pdf

• Le

tter o

f Aut

horiz

atio

n if

appl

ican

t is

othe

r tha

n th

e in

fras

truc

ture

ow

ner

• SC

L se

rvic

e co

nnec

tion

appr

oval

per

ste

p 2A

.1•

His

toric

or L

andm

ark

Dist

rict a

ppro

val i

f req

uire

d•

Lette

r of f

easi

bilit

y de

term

inat

ion

from

the

EVCR

OW a

pplic

atio

n co

ordi

nato

r to

valid

ate

com

plet

ion

of S

tep

2B.5

.

3A.2

Perm

it Se

rvic

es U

tility

Rev

iew

er ro

utes

the

appl

icat

ion

info

rmat

ion

to a

ll re

quire

d se

cond

ary

revi

ewer

s in

clud

ing

Proj

ect C

onst

ruct

ion

& C

oord

inat

ion

Offic

e (P

CCO)

, Pub

lic

Spac

e M

anag

emen

t (PS

M),

and

Tran

spor

tatio

n Op

erat

ions

(site

pla

n m

ust a

dher

e to

the

Righ

t of W

ay Im

prov

emen

ts M

anua

l, Di

rect

or’s

Rul

e 01

-201

7, a

nd D

irect

or’s

Rul

e 10

-201

5).

3A.3

PSM

will

revi

ew th

e M

inor

Util

ity a

nd P

ublic

Spa

ce M

anag

emen

t Ren

ewab

le P

erm

it Ap

plic

atio

ns a

s a

seco

ndar

y re

view

er fo

llow

ing

the

Divi

sion

’s s

tand

ard

revi

ew p

roce

ss.

PSM

revi

ews

appl

icat

ion

info

rmat

ion

(site

pla

n m

ust a

dher

e to

the

Righ

t of W

ay Im

prov

emen

ts M

anua

l, an

d Di

rect

or’s

Rul

e 01

-201

7, a

nd D

irect

or’s

Rul

e 10

-201

5).

3A.4

EVCR

OW a

pplic

atio

n co

ordi

nato

r fac

ilita

tes

the

revi

ew p

roce

ss.

3A.5

Perm

it Se

rvic

es U

tility

Rev

iew

er ro

utes

the

appl

icat

ion

info

rmat

ion

to a

ll re

quire

d se

cond

ary

revi

ewer

s in

clud

ing

Proj

ect C

onst

ruct

ion

& C

oord

inat

ion

Offic

e (P

CCO)

, Pub

lic

Spac

e M

anag

emen

t (PS

M),

and

Tran

spor

tatio

n Op

erat

ions

(site

pla

n m

ust a

dher

e to

the

Righ

t of W

ay Im

prov

emen

ts M

anua

l, Di

rect

or’s

Rul

e 01

-201

7, a

nd D

irect

or’s

Rul

e 10

-201

5).

1 The

Min

or U

tility

app

licat

ion

requ

irem

ent i

s ba

sed

on th

e im

pact

of w

ork

not t

rigge

ring

a Ut

ility

Maj

or P

erm

it (U

MP)

. Ple

ase

revi

ew C

AM 2

600

prio

r to

appl

icat

ion

to e

nsur

e an

UM

P w

ill n

ot b

e tr

igge

red.

CAM

260

0 ca

n be

foun

d at

the

follo

win

g lin

k: w

ww.

seat

tle.g

ov/tr

ansp

orta

tion/

cam

s/CA

M26

00.p

df.

Page 21: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 21

Step

Deta

ilSt

ep 3

B: C

ompl

ete

Requ

irem

ents

for E

lect

rica

l Ser

vice

3B.1

Appl

ican

t sub

mits

Sea

ttle

City

Lig

ht (S

CL) E

lect

rical

Ser

vice

App

licat

ion

onlin

e at

: ww

w.se

attle

.gov

/ligh

t/ele

ctric

serv

ice/

appl

icat

ion.

asp.

3B.2

SCL

wor

ks w

ith a

pplic

ant t

o id

entif

y th

e ap

prop

riate

met

erin

g ap

proa

ch b

ased

on

infr

astr

uctu

re d

imen

sion

s, p

oten

tial c

abin

et lo

catio

ns, e

xist

ing

pow

er d

eliv

ery

infr

astr

uctu

re, a

nd o

ther

fact

ors.

3B.3

Appl

ican

t rec

eive

s Se

rvic

e Re

quire

men

ts L

ette

r fro

m S

eattl

e Ci

ty L

ight

.

3B.4

To c

onne

ct e

lect

rical

ser

vice

the

cond

ition

s in

the

Serv

ice

Requ

irem

ents

Let

ter m

ust b

e m

et A

ND

the

appl

ican

t mus

t obt

ain

a Se

attle

Dep

artm

ent o

f Con

stru

ctio

n an

d In

spec

tion

(SDC

I) el

ectr

ical

per

mit

over

the

coun

ter a

t the

Sea

ttle

Mun

icip

al T

ower

. Inc

lude

the

SDOT

Min

or U

tility

per

mit

num

ber o

n th

e SD

CI e

lect

rical

per

mit

appl

icat

ion

form

s.

3B.5

Appl

ican

t not

ifies

the

EVCR

OW a

pplic

atio

n co

ordi

nato

r onc

e th

e SD

CI p

erm

it ha

s be

en is

sued

and

Ser

vice

Req

uire

men

ts L

ette

r con

ditio

ns h

ave

been

met

.

Step

4: R

ecei

ve F

inal

App

rova

ls fr

om S

DOT

4.1

Fina

l pro

duct

che

ck b

y EV

CROW

app

licat

ion

coor

dina

tor.

4.2

Deci

sion

doc

umen

tatio

n ob

tain

ed fr

om th

e SD

OT D

irect

or.

4.3

Emai

l wor

k or

der p

roce

ss fo

r sig

n an

d pa

vem

ent m

arki

ngs

to S

DOT’

s N

ew M

obili

ty te

am a

t new

mob

ility

@se

attle

.gov

.

Step

6: C

ompl

ete

all S

tree

t Use

and

SDC

I Con

ditio

ns6.

1Co

nditi

ons

can

incl

ude,

but

are

not

lim

ited

to th

e fo

llow

ing:

• Se

nd o

ut n

otifi

catio

n of

the

proj

ect t

o th

e re

quire

d ra

dius

and

dur

atio

n in

adv

ance

of b

egin

ning

con

stru

ctio

n•

Obta

in a

par

king

per

mit

from

SDO

T’s

Tran

spor

tatio

n Op

erat

ions

Div

isio

n on

line

or a

t the

per

mit

coun

ter l

ocat

ed o

n flo

or 3

7 of

the

Seat

tle M

unic

ipal

Tow

er. C

heck

the

web

site

for h

ours

of o

pera

tion.

• Co

ordi

nate

with

Kin

g Co

unty

Met

ro if

a tr

ansi

t fac

ility

is b

eing

impa

cted

• N

otify

Str

eet U

se J

ob S

tart

at S

DOTJ

obSt

art@

seat

tle.g

ov o

r 206

-684

-527

0 at

leas

t 2 b

usin

ess

days

prio

r to

begi

nnin

g w

ork.

6.2

Begi

n co

nstr

uctio

n.

Page 22: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

22 | SEATTLE DEPARTMENT OF TRANSPORTATION

Applicant Submits RFin

Refer to Applicant Process for further detail.

*Over-the-counter SDCI permit required to make electrical connection.

Permit Issued

EVCROW APPLICATION PERMITTING PROCESS

1 2

3A 3B

4 5

City of Seattle Staff Review

Applicant Submits Service Connection Application

SDOT Street Use Division 14 day public comment

Seattle City Light*

Applicant must complete all Street Use and SDCI conditions

Letter of Feasibility

Service Requirements Letter

Applicant Applies for SDOT Street Use Permit

SDOT Sends Applicant Final Approval

Begin Construction

[email protected]

Receipt of Application

Page 23: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM | 23

EVCR

OW A

pplic

atio

n Pe

rmitt

ing

Proc

ess

Tim

elin

e

Thes

e ar

e es

timat

ed ti

mes

and

ass

ume

the

appl

ican

t sub

mits

all

mat

eria

ls a

nd is

read

ily a

vaila

ble

to a

nsw

er q

uest

ions

/mak

e ch

ange

s to

the

appl

icat

ion

as n

eede

d.

MON

TH 1

MON

TH 2

MON

TH 3

MON

TH 4

MON

TH 5

Step

1

Step

2

Step

3A

Step

3B

Step

4

Step

5

48 h

ours

2 w

eeks

1 w

eek

Cons

truc

tion

4-6

wee

ks

8-12

wee

ks

Page 24: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

24 | SEATTLE DEPARTMENT OF TRANSPORTATION

Attachment 4: Request for Installation (RFIn) Form

SDOT ELECTRIC VEHICLE CHARGING IN THE PUBLIC RIGHT-OF-WAY (EVCROW) PROGRAM

Pilot Permit Program Request of Installation (RFIn)

Application Date

Legal Company Name

Primary Contact Name/Email/Phone #

City of Seattle Business License Number

General location and block face of the proposed EVSE (e.g., Street X between Street Y and Street Z; north blockface)

Number of desired parking spaces and EVSE/chargers

EVSE location context, including sidewalk condition, tree locations, planting strip availability, adjacent land uses and businesses (including names and addresses) on the proposed block face

Proposed wraps and messages on EVSE access and payment screens

Proposed Internet of Things (IoT) devices or sensors to be included in the EVSE as well as all proposed data to be collected

Please attach the following to the RFIn:• Preliminary Technical Plan

- Conceptual diagrams of the infrastructure> EVSE and utility meter location & dimensions> Width of sidewalk and access isle > Electrical conduit length and proposed path> Proposed upgrades to electrical infrastructure, if necessary

- Power output specs and dimensions of EVSE • Proof of PCI compliance

Page 25: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive
Page 26: Seattle Department of Transportation ELECTRIC VEHICLE … · 2019. 1. 4. · level and take meaningful action to reduce greenhouse gas emissions. Drive Clean Seattle is a comprehensive

26 | SEATTLE DEPARTMENT OF TRANSPORTATION

The Seattle Department of Transportation700 5th Avenue, Suite 3800PO Box 34996Seattle, WA 98124-4996(206) 684-ROAD (7623)www.seattle.gov/transportation

7.2017Updated – December 19, 2018