Seals Patented Installation System Working Area Preparation ( Step by step )

11
Seals Patented Installation System Working Area Preparation ( Step by step )

description

Seal jig : seal jig is designed to work on all A4 seals You can ajust seals on left side… … or right side… if you turn the jig over…

Transcript of Seals Patented Installation System Working Area Preparation ( Step by step )

Page 1: Seals Patented Installation System Working Area Preparation ( Step by step )

Seals Patented Installation System

Working Area Preparation ( Step by step )

Page 2: Seals Patented Installation System Working Area Preparation ( Step by step )

You need the following :

* 1 seal jig

* 1 adapted installation tool

* 1 glue roller

Page 3: Seals Patented Installation System Working Area Preparation ( Step by step )

Seal jig :seal jig is designed to work on all A4 seals

You can ajust seals on left side…

… or right side…

if you turn the jig over…

Page 4: Seals Patented Installation System Working Area Preparation ( Step by step )

Adapted installation tool :2 tools exist,

one for HP 1010 / 1200 , one for AX / HP 1320

AX one is wider than HP 1200 one….

Page 5: Seals Patented Installation System Working Area Preparation ( Step by step )

Glue roller :

is really inexpensive,

use Pritt permanent glue

Page 6: Seals Patented Installation System Working Area Preparation ( Step by step )

First step :

Place seal jig in front of youPlace seals on the jig

Page 7: Seals Patented Installation System Working Area Preparation ( Step by step )

Second step :

Take glue roller and place glue on bottom both ends of the tool ( 2 cm ) plus 2-3 cm in the middle

pasting the tool

Tool has to be sticky enough to hold the seal,

But less sticky than seal’s adhesive,

otherwise, seal will not stick on hopper and will stay on the tool….

Page 8: Seals Patented Installation System Working Area Preparation ( Step by step )

Third step :

Place the insertion toll on the seal,

Using jig and handle as guides

Page 9: Seals Patented Installation System Working Area Preparation ( Step by step )

Then…..Act as shown on my video…

If you do not see the video, please look at www.proton.fr home page…..

Page 10: Seals Patented Installation System Working Area Preparation ( Step by step )

Always replace installation toll on next seal :

!! Important Tip !!

* In this case, one gluing operation can last a full work day* You are saving few more time on production operations* Tooling will last much longer without anymore maintenance

Page 11: Seals Patented Installation System Working Area Preparation ( Step by step )

Has been proud to show you it’s french patented sealing system…..