Seahorse Relocation Plan HMAS PLATYPUS, NEUTRAL BAY AUGUST 2010

Transcript of Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan...

Page 1: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse Relocation Plan HMAS PLATYPUS, NEUTRAL BAY

AUGUST 2010

Page 2: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010 i

 

 

Page 3: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010 ii

Table of Contents 

1  BACKGROUND INFORMATION ............................................................................. 1 

1.1  PROPOSAL IDENTIFICATION ................................................................................................................ 1 

1.2  WHITES SEAHORSE ECOLOGY .............................................................................................................. 1 

1.3  SEAHORSE RELOCATION ...................................................................................................................... 1 

1.4  PURPOSE OF THE PLAN ....................................................................................................................... 2 

2  METHODOLOGY ................................................................................................... 3 

2.1  SITES .................................................................................................................................................... 3 2.1.1  Construction site .......................................................................................................................................... 3 2.1.2  Receiver site ................................................................................................................................................. 3 

2.2  RELOCATION METHODS ...................................................................................................................... 3 

2.3  TIMING ................................................................................................................................................ 4 

2.4  MANAGEMENT MEASURES ................................................................................................................. 4 

2.5  EQUIPMENT ......................................................................................................................................... 4 

2.6  PERSONNEL ......................................................................................................................................... 4 

2.7  ADDITIONAL REQUIREMENTS ............................................................................................................. 4 2.7.1  OH&S ............................................................................................................................................................ 4 2.7.2  Permits ......................................................................................................................................................... 5 

3  REFERENCES ......................................................................................................... 6 

4  APPENDICES ......................................................................................................... 7 

APPENDIX A SITES ........................................................................................................... 8 

APPENDIX B DR RAPHAEL MORGAN CV ......................................................................... 10  

 

Page 4: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

1

1 BACKGROUND INFORMATION 

1.1 PROPOSAL IDENTIFICATION 

Sydney Harbour  Federation  Trust  (SHFT)  (Commonwealth  Agency)  is  proposing  to  remediate  the HMAS Platypus site (Commonwealth land) in Neutral Bay to develop it as a public urban park.  The proposed works would include repairs to the seawall and the 250 metre long wharf (Refer to Appendix A for site location).   

Seawall repairs would include re‐pointing of existing gaps using grout.  The wharf repairs would include the removal of the timber fender piles, cleaning and repair of all concrete piles and patch repair works of the concrete slab. 

An aquatic flora and fauna assessment (nghenvironmental 2010) prepared for the proposed works has revealed that impacts to the marine environment are unlikely to be significant and that a referral is not required.  Furthermore, management measures have been proposed to minimise potential impacts to marine biodiversity.  These include the relocation of a small population of White’s seahorse (protected under the Environment Protection and Biodiversity Conservation Act and under the NSW Fisheries Management Act) prior to start of construction activities to an appropriate receiving site within Neutral Bay. 

1.2 WHITES SEAHORSE ECOLOGY 

White's Seahorse is endemic to Australia. It occurs in depths down to about 25 m in temperate marine waters along the south‐eastern and south‐western coasts of Australia. It is common in Sydney Harbour. The species occurs in a variety of habitats. It can be found in shallow protected waters in seagrass, algae beds and under wharves. It is commonly seen holding onto the mesh of swimming enclosures. In White's Seahorse, the male fertilises the eggs and cares for them for about three weeks (depending upon several factors including temperature). During this time, he aerates the pouch and nourishes the eggs through a capillary network in the pouch with his own 'placental fluids'. At the end of the 'pregnancy', the male gives birth to 100‐250 fully formed young seahorses of about 1 cm in length which are able to care for themselves. The male then 'becomes pregnant' again almost straight away. White's Seahorse is monogamous (females and males form permanent pairs) with recent studies showing that these pairs are sometimes maintained over more than one reproductive season. They breed from October to April (Australian Museum 2010). 

1.3 SEAHORSE RELOCATION 

Cleaning of subtidal artificial structures (eg. wharf piles, shark nets) for maintenance purposes has been shown to have an impact on seahorse populations with decreased numbers recorded following cleaning.  It has been shown that it can sometimes take up to 15 months for a seahorse population to re‐establish itself at a site following cleaning.  A number of management measures have been successfully employed to minimise impacts to seahorse populations during such procedures.  These include: 

• Relocation of seahorses to appropriate adjacent habitats  

• Limiting cleaning operations and retaining some habitat on artificial surfaces (Harasti 2009). 

Page 5: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

2

1.4 PURPOSE OF THE PLAN 

The aims of this plan are to: 

• Identify a  receiver site 

• Describe the methodology to be used during the relocation of seahorses 

• Identify personnel that will be undertaking the relocation 

• Identify any additional requirements including permit requirements 

Page 6: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

3

2 METHODOLOGY 

2.1 SITES 

2.1.1 Construction site 

The seahorse population that would be relocated is located below the HMAS Platypus wharf.  Three individuals were recorded amongst the sponges and other biota attached to the wharf piles on May 2010.  Due to their inconspicuous nature, further specimens could be found during more extensive searches. The wharf is located on the western side of Neutral Bay, North Sydney (refer to Appendix A for location). 

GPS Coordinates: Latitude (33 o 50’35”); Longitude (151o 13’3”) 

2.1.2 Receiver site 

Three potential receiver sites located on the eastern side of the bay were identified within Neutral Bay including: 

• Australian Customs Marine Centre Wharf 

• Private jetty 

• Neutral Bay Ferry jetty 

Of the three sites, the Neutral Bay Ferry jetty was assessed during a site survey as offering similar habitat to that located at the construction site and therefore is the most appropriate receiver site for seahorses. The site included large piles covered with biota including various sponges and macroalgae, a subtidal rocky reef with macroalgae cover closer to the shore, additional habitats in vicinity allowing dispersal and sufficient depths to minimise impacts from boats/adverse sea conidtions. 

2.2 RELOCATION METHODS 

• Large buckets filled with water from Neutral Bay and with a seaweed frond would be prepared in readiness for seahorses.   

• Two divers would dive below the HMAS Platypus wharf and search the sponges and other attached biota of each wharf pile for seahorses.  The full length of the piles would be searched. 

• Seahorses located would be captured by hand and placed in a catch bag. 

• At the end of each dive captured seahorses would be placed in the buckets.  It is anticipated that three dives would be required to complete the searches.  

• The third diver, who would stay on shore, monitor the captured seahorses for signs of stress and replace the water as required. 

• At completion of the dives, captured seahorses would be transported by either car or boat to the selected receiver site. 

• Seahorses would be placed in catch bags and divers would release seahorses in appropriate habitat (eg. sponges, seaweed). 

Page 7: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

4

2.3 TIMING 

The installation of the silt curtain required for the proposed construction works on the HMAS Platypus wharf would be undertaken some time between the end of August 2010 and September 2010.  Relocation of the seahorses would be undertaken immediately before or after the installation of the silt curtain.  The silt curtain would act as a barrier for any seahorses trying to move within the construction footprint.   

The Whites seahorse’s reproduction period is between October and April.  Relocation of the seahorses during August and/or September would minimise potential impacts to their reproduction cycle.  All seahorses would be relocated at the same receiver site to minimise impacts to these monogamous species. 

2.4 MANAGEMENT MEASURES 

• Relocation of the seahorses would be undertaken immediately before or after the installation of a silt  curtain around  the  construction  site.   This would prevent any  seahorses  located outside  the construction site from moving to the wharf during construction activities. 

• Seahorses would be relocated prior to the start of the reproductive period for the species.   • Relocation would be undertaken during  the winter  season where  seahorse numbers  are not  as 

high as in summer. • All seahorses found would be relocated to the same site (White's seahorse is monogamous and has 

been shown to maintain reproductive pairs over more than one reproductive season). • All relocation would be to the Neutral Bay Ferry jetty.  This site has been selected as it provides the 

most similar habitat to that at the construction site. 

• Relocation  would  be  undertaken  by  suitably  qualified  marine  biologists  with  experience  in underwater surveys and animal handling. 

2.5 EQUIPMENT 

• SCUBA diving equipment 

• Catch bags (ie. bags made of fine and non abrasive mesh) 

• Large buckets to carry seahorses from construction site to receiver site 

2.6 PERSONNEL 

The relocation of the seahorses would be undertaken by certified scientific divers with a marine ecology background and extensive experience in subtidal habitat surveys and animal handling. 

Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses with two experienced scientific divers.  Raphael’s CV is provided in Appendix B. 

2.7 ADDITIONAL REQUIREMENTS 

2.7.1 OH&S 

All field work would be undertaken under an appropriate Safe Work Method Statement and by appropriately qualified personnel.  Sydney Ferries and the Harbour Master would be contacted prior to relocation. 

Page 8: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

5

2.7.2 Permits 

Under Part 13, Division 4, of the EPBC Act Environmental Protection of Biodiversity and Conservation Act (EPBC Act) a permit is required to do any of the following in a Commonwealth area: 

• take an action that results in the death or injury of a member of a listed marine species (other than a cetacean or a member of a listed marine species that is also a listed threatened species or listed migratory species); or 

• take, trade, keep or move a member of a listed marine species (other than a cetacean or a member of a listed marine species that is also a listed threatened species or listed migratory species). 

Under Clause 37 of the NSW Fisheries Management Act (FM Act), a permit is required to take and possess fish or marine vegetation of any kind.   

Relocation would be undertaken in compliance with a permit under the EPBC Act and NSW FM Act. 

Page 9: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

6

3 REFERENCES 

Australian Museum (2010). http://australianmuseum.net.au/Whites‐Seahorse‐Hippocampus‐whitei‐Bleeker‐1855. Accessed July 2010. 

Harasti, D., Glasby, T.M. and Martin‐Smith, K.M (2009). Striking a balance between retaining populations of protected seahorses and maintenance of swimming nets. Final report to Sydney Aquarium Conservation fund. 

Page 10: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

7

4 APPENDICES 

   

Page 11: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

8

Appendix A  SITES 

   

Page 12: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1. Location of construction site (highlighted in yellow) and receiver site (red star – Neutral Bay ferry jetty) within Neutral Bay. 

   

50 metres

Page 13: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Seahorse relocation plan

August 2010

10

Appendix B  DR RAPHAEL MORGAN CV 

 

Page 14: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

 

 

 

 

Raphael  has  Australian  and  international  experience  in  aquatic  ecology.  He  has  completed  a  master’s  thesis  in  sea  urchin aquaculture and a PhD  in Marine Ecology at  the Universite Libre de Bruxelles,  in Belgium. Additional components of his  research included teaching and review of scientific papers before their publication in international journals. In Australia, Raphael has worked as a Research Assistant with the Marine Ecology Group at Macquarie University and the Marine Biology Laboratory at the University of  Sydney.  As  a  Project  Officer  at  nghenvironmental,  Raphael  has  been  involved  in  a  number  of major  environmental  impact assessment projects and has knowledge of NSW and Australian Legislative requirements as they relate to EIAs.  Some of the clients he  has  worked  with  include  Local  councils,  the  Roads  and  Traffic  Authority,  the  Transport  Infrastructure  and  Development Corporation,  Rail  Corporation  NSW,  Department  of  Agriculture,  NSW  Fisheries  and  Forestry,  Silcar  communications,  Canberra Investment Corporation, Sydney Ferries Corporation, Baulderstone, SKM, Bilfinger Berger.  

TERTIARY EDUCATION 

 

PhD in Science (2004)

Free University of Brussels, Belgium 

Marine Biology 

 

Master in Science (2001) 

Free University of Brussels, Belgium 

Marine Biology 

 

Bachelor of Science (Honours) (1998) 

Free University of Brussels, Belgium 

Marine Biology 

 PROFESSIONAL EXPERIENCE 

October 2006 ‐ present   Project Officer, nghenvironmental 

• Manage  and  carry  out  a  range  of  environmental  projects  including  EIAs,  EMPs, biodiversity assessments (terrestrial and aquatic) and constraints studies. Preparation of  reports  include  Review  of  Environmental  Factors,  Environmental  Assessment reports (Part 3A Major Projects), Biodiversity Assessment, Environmental Constraints Analysis,  National  Pollutant  Inventory  reporting, Waste  Reduction  and  Purchasing Policy  reporting,  Consistency  reports  and  assessments  for  Major  Projects, Environmental  Management  Plans,  Data  Compilation  Studies  for  Estuary Management Plans. 

• Carry out terrestrial and aquatic biodiversity surveys. Aquatic surveys and monitoring include  the  use  of  SCUBA  and/or  Research  Vessels  applying  methods  such  as transects, quadrats and underwater photography and through the use of specialised 

Raphael Morgan PhD (Marine Biology), certified scientific diver 

Page 15: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

equipment  (e.g.  trawls,  Reinecks,  Van  Veen  grabs, Niskin  bottles).    Assessment  of freshwater  creek/wetland  conditions  including  through  the  use  of macroinvertebrates.   

• Manage staff and sub‐consultants  

• Prepare proposals and budget estimates 

October 2005 – August 2006  Research Assistant, Marine Ecology Group, Macquarie University. 

• Prepare experimental designs 

• Statistical analysis of data  

• Prepare progress reports 

• Histology 

• Aquaculture 

February 2005 – October 2005 

Research Assistant, Marine Biology Laboratory, Sydney University.  

• Train staff and students in various laboratory techniques (larval culture, histology) 

• Review of scientific papers before submission 

• Histology 

October 1998 – October 2004  PhD candidate, Free University of Brussels, Belgium

• PhD  research  involved  the  study  of  the  larval  development,  juvenile  biology  and population dynamics of a gregarious brittle star, Ophiothrix fragilis, in the North Sea‐English  Channel  region  in  order  to  understand  the  biological  and  environmental processes involved in the maintenance of marine benthic invertebrate populations 

• Involvement in a research project funded by the Belgian Ministry of Economic Affairs which  aimed  at  understanding  the  impact  of  the  extraction  of  sand  and  gravel  in Belgian  territorial waters on  the biological,  chemical and physical properties of  the pelagic  and  benthic  zones  of  the  region.  My  involvement  included  planning  and research  as well  as  logistic  support  during  15 missions  aboard  the  research  vessel Belgica.  

• Involvement  in  a  research  project,  funded  by  the  Federal  Office  for  Scientific, Technical and Cultural Affair, to assess the  impact and biomonitor the heavy metals and  polychlorinated  biphenyls  associated  to  sediments  in  the  North  Sea macrobenthos. 

• Prepare  and  supervise  a  Bachelor  of  Science Honours  project which  obtained  first prize for best research project 

TRAINING AND MEMBERSHIPS 

 

SOPA Wetland Workshop – Climate Change and Wetland Adaptations 

EIANZ Full Member 

Marine Pests Workshop 

Wetland  Care  Australia Workshop  – Wetland  Assessment  Techniques  applicable  to freshwater and estuarine wetlands 

SOPA Wetlands Workshop – Climate Change, Sea Level Rise and Wetland Adaptations 

Page 16: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Wetlands.edu Workshop – Wetlands ecology fundamentals needed for site management 

Birding Essentials Workshop 

Research and Restricted Scientific diver 

Rail Safety Induction training 

OHS General Induction for Construction Work in NSW (Green card) 

One month European (ERASMUS) training course at the marine biological station of Roscoff  (France): Biodiversity in a megatidal sea – marine zoology and ecology 

One week training course in Treignes (Belgium): Terrestrial ecology and ethology 

One week training course at the marine biological station of Wimereux (France): Marine zoology and ecology 

One week training course in Treignes (Belgium): Continental zoology and ecology 

 PUBLICATIONS Scientific  Morgan  R.,  Hermans,  J.  and  Gosselin  P.  (2006).  Substrate  selection  under  different 

hydrodynamic conditions  in the brittle‐star Ophiothrix fragilis (Echinodermata) : a preliminary study. Ready for submission 

Morgan  R.  and  Jangoux,  M.  (2006).  Population  dynamics,  structure,  and  growth  of  the gregarious brittle‐star Ophiothrix fragilis (Echinodermata) in the Eastern Scheldt (Netherlands): A case of density‐dependent regulation? Accepted Marine Ecology Progress Series. 

Morgan R., Prince M. and Warnau M.  (2005). The axial complex of  the ophiuroid Ophiothrix fragilis (Echinodermata). Zoomorphology In Press. 

Morgan  R.  and  Jangoux  M.  (2005).  Larval  morphometrics  and  influence  of  adults  on settlement  in the gregarious ophiuroid Ophiothrix fragilis (Echinodermata). Biological Bulletin 208: 92‐99. 

Morgan  R.  (2004).  ‘Reproduction,  larval  development,  juvenile  biology  and  population dynamics  of  the  gregarious  ophiuroid  Ophiothrix  fragilis  (Abildgaard,  1789)  in  the  English Channel‐North Sea region’. PhD thesis. 

Morgan  R.  and  Jangoux M.  (2004).  Assessment  of  arm  regeneration  and  its  effect  on  the reproductive  cycle  of  the  gregarious  brittle‐star  Ophiothrix  fragilis  (Echinodermata)  in  the Oosterschelde (Netherlands). Cahiers de Biologie Marine 45(3): 277‐280. 

Morgan  R.  and  Jangoux M  (2004).  Juvenile‐Adult  relationship  in  the  gregarious  brittle‐star Ophiothrix  fragilis  (Echinodermata):  A morphological  and  behavioral  study. Marine  Biology 245(2), pp. 265‐276. 

Morgan  R.  and  Jangoux  M  (2002).  Reproductive  cycle  and  spawning  induction  in  the gregarious brittle star Ophiothrix fragilis (Echinodermata)  in the Oosterschelde (Netherlands). Invertebrate reproduction and development 42(2‐3), pp. 145‐155. 

Morgan R. (2001). Comparative study of the recruitment modalities in two brittle‐stars of the North Sea‐English Channel region. Master’s thesis. 

Vaitilingon D., Morgan R., Grosjean Ph., Gosselin P. and Jangoux M. (2000) Effect of delayed metamorphosis  and  food  rations  on  the  perimetamorphic  events  in  the  echinoid Paracentrotus lividus (Lamarck 1816) (Echinodermata). Journal of Experimental Marine Biology and Ecology 262 (2001) 41‐60 

Page 17: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Morgan R.  (1998).  Effect  of  the  larval  trophic  environment  on  the  postlarval  period  of  the edible sea urchin Paracentrotus lividus (Echinodermata). Honours thesis. 

Environmental ‐ Aquatic  URS 

Proposed powerplant at  SEFE  chip mill  site,  Eden, Part 3A project  (2009). Marine Biodiversity Assessment  

Baulderstone Hornibrook 

Seagrass Specialist for the expansion of Sydney Ports, Port Botany (2008‐2011) 

RTA 

Alfords  Point  Bridge  Duplication:  Temporary  rock  jetty  and  works  area  (2007). Addendum Review of Environmental Factors. 

Underwater  bridge  inspections  on  30  bridges  in  the  RTA  southern  region  (2007). Desktop Aquatic Ecological Assessment. 

Proposed  rehabilitation  of  the  Sackville  Ferry  Southern  Approach  Ramp  (2008). Review of Environmental Factors. 

Proposed  duplication  of  Camden  Valley  Way  (2009).  Biodiversity  Impact Assessment. 

Proposed drainage works as part of the Great Western Highway duplication, Lawson (2009).  Addendum Review of Environmental Factors 

Spit Bridge Drive  system Upgrade  (2010). Aquatic Biodiversity  Impact Assessment and Review of Environmental Factors. 

Wisemans  Ferry  ramp upgrade, Wisemans  Ferry  (2010). Review of  Environmental Factors. 

Silcar communications 

Proposed  Telstra  submarine  communication  cable,  Port  Stephens  (2007).  Aquatic Ecological Assessment. 

Parsons Brinkerhoff 

Southern  Sydney  Freight  line,  ARTC  (2007).  Aquatic  environmental management sub‐plan. 

Baulkham Hills Shire Council 

Proposed  Fish  Friendly  Passage  at  Cattai  Creek, Baulkham Hills  (2007). Review of Environmental Factors, DPI permit application, Environmental Management Plan. 

Waterway Rehabilitation at Harry Carr Reserve, Baulkham Hills Shire Council. Review of Environmental Factors. 

Ryde City Council 

Proposed  stormwater  harvesting  and  reuse  (2008).  Review  of  Environmental Factors. 

Sydney Ferries Corporation 

Proposed upgrade of the Balmain Shipyards (2008). Aquatic Constraints Study 

Bilfinger Berger 

Page 18: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Fish Monitoring Program for the Albury Bypass Maintenance Project (2008‐2012).

SKM 

Proposed  creek  crossing  at  quarry  site  as  part  of  Hume  Highway  bypass  (2008). Environmental assessment. 

Canberra Investment Corporation 

Proposed Tathra River Estate Development, Tathra, Part 3A Project (2008). Aquatic Biodiversity Constraints Study. 

Bega Valley Shire Council 

Data Compilation Study for the Pambula Lake Estuary Management Plan(2008) 

Rehabilitation  of  two  jetties  and  boat  ramp  in  Merimbula.  Aquatic  Biodiversity Assessment and Review of Environmental Factors (2009) 

Shell 

Clyde Refinery Wetlands Baseline Assessment and Management Plan (2008). 

Commonwealth Department of Agriculture, Fisheries and Forestry 

Panel  of  experts  member  for  the  national  system  for  the  prevention  and management  of marine  pest  incursions.  In  association with  Elgin  Pty  Ltd.  (2007‐2009) 

Pittwater Council 

Proposed unleashed dog swimming area at Station Beach, Palm Beach.  Biodiversity Assessment and REF (2008) 

NSW Maritime 

Proposed redevelopment of Wentworth Point, Sydney, Part 3A Project (2009).  Flora and Fauna Assessment. 

Sydney Harbour Federation Trust 

Rehabilitation  of  the HMAS  Platypus  site  , Neutral  Bay  (2010). Aquatic  Flora  and Fauna Assessment. 

KBR on behalf of Sydney Water 

Sewer Pipe repair works, Oatlands (2009). Aquatic Biodiversity Assessment. 

 

Environmental ‐ Terrestrial 

 

RTA 

Proposed  intersection upgrades Princes Highway, Broughton Village (2006). Review of Environmental Factors.  

SCA Bulk Water Road upgrades at the Blue Mountains Catchment (2007). Review of Environmental Factors.  

Proposed  duplication  of  MR217  from  Fennell  Bay  to  Booragul,  Lake  Macquarie (2007). Preliminary Biodiversity Investigation. 

Proposed  bus  priority  treatment  Windsor  Road,  Sydney  (2007).  Review  of Environmental Factors. 

Proposed  bus  priority  treatment  Anzac  Parade,  Sydney  (2007).  Review  of 

Page 19: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Environmental Factors.

Proposed  bus  priority  treatment  Warringah  Road,  Sydney  (2007).  Review  of Environmental Factors. 

Proposed  bus  priority  treatment  Talavera  Road,  Sydney  (2007).  Review  of Environmental Factors. 

Proposed bus priority treatment File notes (13 treatments) (2007‐2008) 

Proposed  pedestrian  bridge  over  Silverwater  Road,  Ermington  (2007).  Review  of Environmental Factors and Project Environmental Management Plan. 

Proposed  pedestrian  bridge  over  Anzac  Parade  at Moore  Park  (2007).  Review  of Environmental Factors. 

Alfords Point Bridge Duplication: Bridge pier 1 foundation works (2007). Addendum Review of Environmental Factors. 

Alfords Point Bridge Duplication: compound, stockpile and access track (2008). Addendum Review of Environmental Factors. 

Proposed  blast  cleaning  and  repainting  of  the  Darling  Harbour  bridges,  Sydney (2007‐2009). Review of Environmental Factors. 

Proposed  safety  screens  at  signal  post  locations,  Sydney  (2007).  Review  of Environmental Factors. 

Proposed Statue of New Zealand Soldier at Anzac Bridge, Sydney (2007). File Note. 

Proposed upgrade of the Great Western Highway, Bullubura (2007‐2008). Review of Environmental Factors, Fauna and Flora Assessment. 

Proposed  Bus  Priority  Treatment  General  Holmes  Drive  (2007).  Review  of Environmental Factors, Fauna and Flora Assessment. 

Proposed  rehabilitation  of  Endeavour  Bridge,  Kyeemagh  (2007).  Review  of Environmental Factors. 

Proposed  rehabilitation  of  Tarban  Creek  Bridge  (2008).  Review  of  Environmental Factors. 

Slope stabilisation treatments, Old Pacific Highway (2008). Review of Environmental Factors.  

Proposed duplication of  the Great Western Highway, Bullaburra East  (2007‐2008) Review of Environmental Factors. 

Proposed  realignment  of  the  Flinders  Road  intersection,  South  Nowra  (2009). Constraints analysis. 

Proposed  realignment  of  the  Princes Highway/  intersection,  South Nowra  (2009). Biodiversity Constraints Analysis. 

Proposed Bus Priority Treatment along Victoria Road (2009). Minor Works Review of Environmental Factors. 

Proposed  Canal  Road  Tidal  Flow  Replacement  System,  St  Peters  (2009).  Minor Works Review of Environmental Factors. 

Bus  priority  treatments  in  the  Sydney  CBD  (2010).  Minor  Works  Review  of Environmental Factors. 

Proposed  Bus  priority  treatment  at  Darcy  Road,  Wentworthville  (2010).  Minor 

Page 20: Seahorse relocation planenvironment.gov.au/system/files/pages/6e422e64-b48... · Dr Raphael Morgan would be responsible for supervising and undertaking the relocation of the seahorses

Works Review of Environmental Factors.

Proposed Bus priority treatment at President Avenue, Kogarah (2010). Minor Works Review of Environmental Factors. 

Proposed Bus priority  treatment at Victoria Road, Ermington  (2010). Minor Works Review of Environmental Factors. 

RailCorp 

RailCorp Waste Reduction and Purchasing Policy Report 2005‐2007. 

RailCorp National Pollutant Inventory Report 2006‐2007. 

TIDC 

Beecroft Substation Mural (2007). Consistency Report and Assessment. 

RailCorp electrical distribution and communications maintenance depot and access road, Chatswood (2007). Review of Environmental Factors and Consistency Report 

Transfield 

F3 Stockpile, Old Pacific Highway, Cowan (2006). Management Plan.