SDO/HMI Preliminary Design Review

9
Introduction and agenda Page 1 MI Preliminary Design Review – Nov. 18 &19, 2003 SDO/HMI Preliminary Design Review Solar Dynamics Observatory Helioseismic and Magnetic Imager Preliminary Design Review anford University and Lockheed Martin Solar and Astrophysics Laborat 18-19 November 2003

description

SDO/HMI Preliminary Design Review. Solar Dynamics Observatory Helioseismic and Magnetic Imager Preliminary Design Review Stanford University and Lockheed Martin Solar and Astrophysics Laboratory 18-19 November 2003. HMI00384. HMI PDR Logistics and Agenda Review. Larry Springer - PowerPoint PPT Presentation

Transcript of SDO/HMI Preliminary Design Review

Page 1: SDO/HMI Preliminary Design Review

Introduction and agenda Page 1HMI Preliminary Design Review – Nov. 18 &19, 2003

SDO/HMI Preliminary Design Review

Solar Dynamics Observatory

Helioseismic and Magnetic Imager

Preliminary Design Review

Stanford University and Lockheed Martin Solar and Astrophysics Laboratory18-19 November 2003

Page 2: SDO/HMI Preliminary Design Review

Introduction and agenda Page 2HMI Preliminary Design Review – Nov. 18 &19, 2003

HMI PDR Logistics and Agenda Review

Larry Springer

HMI Program Manager

[email protected]

650-354-5793

HMI00384

Page 3: SDO/HMI Preliminary Design Review

Introduction and agenda Page 3HMI Preliminary Design Review – Nov. 18 &19, 2003

Agenda Day 1

Time Topic Presenter Duration

8:30 Coffee & Continental Breakfast 30 min9:00 Welcome & Logistics & Agenda Review Larry Springer 10 min9:10 Introduction Tom Cygnarowicz 5 min9:15 Investigation Overview Philip Scherrer 20 min9:35 Requirements Rock Bush 10 min9:45 Instrument Overview Larry Springer 20 min

10:05 Instrument Performance Requirements Jesper Schou 20 min10:25 S/C Accommodation & Resources Brock Carpenter 20 min10:45 Optics Alan Title 30 min11:15 Filter Systems 60 min

Front Window, Blocking Filter and Lyot Richard Shine

Michelson Inteferometers Rock Bush

12:15 Lunch1:15 Mechanical (OP structure, telescope, FPA) Barbara Fischer 70 min2:25 Thermal Design 40 min

Overall and Front Window Rose Navarro

Precision Oven Carl Yanari

3:05 Mechanisms David Akin 70 min4:15 Wrap-up and plan for tomorrow

Page 4: SDO/HMI Preliminary Design Review

Introduction and agenda Page 4HMI Preliminary Design Review – Nov. 18 &19, 2003

Agenda Day 2

9:00 CCD Camera Systems Overview Jake Wolfson 10 min CCD Sensors Gein Tsang 30 min CEB (Camera Electronics Box) Nick Waltham 40 min

10:20 Electronics Russ Lindgren 75 min11:35 Image Stabilization System Chris Edwards 30 min12:05 Lunch

1:05 Flight Software Jerry Drake 40 min1:45 Integration & Test (w/GSE/Verification) Michael Levay 45 min2:30 Calibration Jesper Schou 15 min2:45 Mission Assurance Ed McFeaters 60 min

Quality Assurance and InspectionSoftware Quality AssuranceMaterials and ProcessesSafetyEEE Parts

3:25 Reliability Dale Wolfe 10 min3:35 Contamination Control Syndie Meyer 10 min3:45 Ground System Jim Aloise 20 min4:05 Mission Operations Rock Bush 10 min4:15 Review Team Caucus 15 min4:30 Debrief and Wrap-up 10 min

Page 5: SDO/HMI Preliminary Design Review

Introduction and agenda Page 5HMI Preliminary Design Review – Nov. 18 &19, 2003

Acronym List (1/4)

ABPL As-Built Parts List

ABML As-Built Materials List ANSI American National Standards Institute

ASIC Application Specific Integrated Circuits

ASQ American Society for Quality

ASTM American Society for Testing and Materials

BB Ball Bearing BGA Ball Grid Array BOL Beginning of Life CA Corrective Action

CAGE Commercial and Government Entity Code

CCB Configuration Control Board

CCP Contamination Control Plan

CDR Critical Design Review

CIL Critical Items List

CM Configuration Management CPT Comprehensive Performance Test

CVCM Collectable Volatile Condensable Materials

DoD Department of Defense

DPA Destructive Physical Analysis

EDU Engineering Development Unit

EEE Electrical, Electronic, and Electromechanical

ELV Expendable Launch Vehicle

EMC Electromagnetic Compatibility

EMI Electromagnetic Interference

ESD Electrostatic Discharge

Page 6: SDO/HMI Preliminary Design Review

Introduction and agenda Page 6HMI Preliminary Design Review – Nov. 18 &19, 2003

Acronym List (2/4)

FMEA Failure Modes and Effects Analysis

FOR Flight Operations Review

FRB Failure Review Board

FTA Fault Tree Analysis

FRR Flight Readiness Review

GEVS General Environmental Verification Specification

GEVS-SE General Environmental Verification Specification for STS & ELV Payloads, Subsystems, and Components

GFE Government Furnished Equipment

GIDEP Government Industry Data Exchange Program

GSE Ground Support Equipment

GSFC Goddard Space Flight Center

I&T Integration and Test

ISO International Standards Organization

IV&V Independent Verification and Validation

LRR Launch Readiness Review

LWS Living With a Star

MA Mission Assurance MAR Mission Assurance Requirements

MCP Multi-Chip Module

MOR Mission Operations Review

MPCB Materials & Processes Control Board

MRB Material Review Board

MRR Mission Readiness Review

MUA Materials Usage Agreement

Page 7: SDO/HMI Preliminary Design Review

Introduction and agenda Page 7HMI Preliminary Design Review – Nov. 18 &19, 2003

Acronym List (3/4)

NAS NASA Assurance Standard

NASA National Aeronautics and Space Administration

NHB NASA Handbook

OSSMA Office of Systems Safety and Mission Assurance

PA Product Assurance or Performance Assurance

PAIP Performance Assurance Implementation Plan

PAPL Project Approved Parts List

PCB Parts Control Board

PDR Preliminary Design Review

PER Pre-Environmental Review

PIL Parts Identification List

PIND Particle Impact Noise Detection

PM Program Manger

PPL Preferred Parts List

PRA Probabilistic Risk Assessment

PSR Pre-Shipment Review

PWB Printed Wiring Board

QCM Quartz Crystal Microbalance

QE Quality Engineer or Quality Engineering QMS Quality Management System

Page 8: SDO/HMI Preliminary Design Review

Introduction and agenda Page 8HMI Preliminary Design Review – Nov. 18 &19, 2003

Acronym List (4/4)

SAM Systems Assurance Manager SCC Stress Corrosion Cracking

SCM Software Configuration Management

SOW Statement of Work

SQE Software Quality Engineer

SQMS Software Quality Management System

SMA Safety and Mission Assurance

SRO Systems Review Office

SRR Software Requirements Review

SSP System Safety Plan

TML Total Mass Loss

TRR Test Readiness Review

V&V Verification and Validation

Page 9: SDO/HMI Preliminary Design Review

Introduction and agenda Page 9HMI Preliminary Design Review – Nov. 18 &19, 2003

ITAR Considerations

• The HMI PDR Package has been reviewed with the LMATC Export Control Director to determine that it is not an ITAR controlled document.

• It is the opinion of the LMATC Export Control Director that ITAR and the provisos of the HMI TAA prevent us from exporting information about other programs that are regulated by ITAR

• Therefore the names and acronyms from previous programs covered by ITAR have been replaced by generic references (ie. Program A)

• THE Review Panel will be provided with a cross reference.

• Programs like MDI and TRACE which were developed prior to ITAR are not restricted.

• Because the audience of this review includes non US persons, who are members of the HMI team, it may be necessary to defer the answers to detailed technical questions that would include information considered technical data or defense service by ITAR.