SctRodDaq CGL. The ASICs are called “ABCD”s Where the tests come in.

18
SctRodDaq CGL
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    1

Transcript of SctRodDaq CGL. The ASICs are called “ABCD”s Where the tests come in.

SctRodDaq

CGL

The ASICs are called “ABCD”s

Where the tests come in

A “ROD” (Read Out D*****)

A Rod Crate:

SctRodDaq – The software “Glue”

How user gets a calib histo

The Analysis Rollercoaster

Not like this:

The Analysis Rollercoaster

The configuration service

SctGUISctGUI

ConfigurationService

SctApiCrateServer

Database

ROD crate

SctGUI

What we might want

SctGUISctGUI

ConfigurationService

SctApiCrateServer

Database

ROD crate

SctGUI

What I thought we had

SctGUISctGUI

ConfigurationService

SctApiCrateServer

Database

ROD crate

SctGUI

What we actually have …

IS Server

CalibrationController

Pat Ward

?

End of Run

Start of R

un

BOC

Reg

ConfigDB

SCT DAQ

RUN start RUN End

Conditions DB

Link MaskingCalib Data

Configuration Database

ConfigDB

SCT DAQRUN start RUN End

Conditions DB

Link MaskingCalib Data

Configuration Database: Current Situation

XMLConfig

New XMLConfig