S c r o b y S a n d s O f f s h o r eW i n d F a r m - Rope Access Offshore Maintenance
www.abfad.co.uk
![Page 2: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/2.jpg)
Scroby Sands Wind Farm is an offshore wind farmlocated 2.5km off the coast of Great Yarmouth on
the Scroby Sands sandbank in the North Sea.
The wind farm itself is owned and operated by E.ONand consists of 30 wind turbine generators each
rated at 2MW, along with a metrological mastwhich lies to the North of the wind farm.
www.abfad.co.uk
![Page 3: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/3.jpg)
Abfad Limitedhave provided rope access
services to the wind farm onseveral big projects.
www.abfad.co.uk
![Page 4: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/4.jpg)
Monopile refurbishment of thefirst commercial wind farm in
the UKINDUSTRIAL ROPE ACCESS SPECIALISTS
www.abfad.co.uk
ABFAD LIMITED
![Page 5: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/5.jpg)
EXISTING CONDITION OF
MONOPILE STEEL BEFORE
PROJECT COMMENCED,
SEVERE CORROSION TO
STRUCTURAL BEAMS AND
MAIN BODY.www.abfad.co.uk
![Page 6: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/6.jpg)
Having extensive experience indealing with corrosion and specialistcoatings, Abfad Ltd were brought into refurbish the monopilessteelwork from grating elevation tosea level, using ropeaccess techniques and Abfad's unique Magnet System.
Once on the monopile structure theextent of the corrosion could beclearly seen. Blasting to SA2.5standard was carried out to removeall sections of corrosion and theexisting coating was profiled andfeathered back and the newprotective coating applied by airlessspray unit.
www.abfad.co.uk
![Page 7: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/7.jpg)
Abfad's patented permanent Magnet Systemhas proven invaluable in areas that can onlybe accessed by rope but need a reliablemethod of moving the rope technician closerto the working surface and anchoring themsecurely to enable them to carry out therequired work.
Use of this Magnet System provides the userwith a productivity advantage, increasing thespeed of work, such as blasting, spraying,mechanical surface preparation, welding,drilling, NDT inspections etc. by securing therope technician to the working substrate andenabling a greater precision of work.
ABFAD'S MAGNET SYSTEM
www.abfad.co.uk
![Page 8: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/8.jpg)
The work by Abfad was a completesuccess with all corrosion removed andthe new coating applied, ensuring themonopile was left with optimumprotection against the elements.
The work itself was carried out in two phases to enablecomplete refurbishment of the monopile.
Phase 1 consisted of structural steelwork below thewalkway gratings being refurbished.
Phase 2 was to refurbish all steelwork below the colalrsection to sea elevation.
Walkway gratings and davit arms were removed in stagesto enable each phase to be succesfully completed beforemoving onto the next.
www.abfad.co.uk
![Page 9: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/9.jpg)
INDUSTRIAL ROPE ACCESS SPECIALISTS
www.abfad.co.uk
ABFAD LIMITED
Major Restoration to ScrobySands Offshore Met Mast
![Page 10: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/10.jpg)
Scroby SandsWind FarmDue to corrosion andmechanical damage to accessladders, a tender was awardedto Abfad Ltd by E.ON Climateand Renewables UK Ltd.
www.abfad.co.uk
![Page 11: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/11.jpg)
S c r o b y S a n d s M e t M a s t
F a b r i c a t e n e w l a d d e r s e c t i o n sa n d e i g h t c l a m p s , r e m o v ee x i s t i n g d a m a g e d l a d d e r s e c t i o n sa n d c l a m p s , b l a s t c l e a n t h es t r u c t u r e t o S A 2 . 5 s t a n d a r d a n da p p l y a p r o t e c t i v e c o a t i n g , i n s t a l ln e w c l a m p s a n d t i g h t e n u s i n gH y d r a t i g h t h y d r a u l i c e q u i p m e n t ,t h e n i n s t a l l n e w a c c e s s l a d d e r st o t h e s t r u c t u r e .
T h e P r o j e c tD e t a i l s .
www.abfad.co.uk
![Page 12: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/12.jpg)
B l a s t i n gC o r r o s i o n t o
M a s t S t e m a n dU n d e r s i d e o f
w a l k w a y u s i n gA b f a d M a g n e t
S y s t e m
www.abfad.co.uk
![Page 13: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/13.jpg)
PROTECTIVE COATING
Once all blasting wascompleted, the met mastwas spray coated with aprotective coating in orderto protect it from furthercorrosion.
![Page 14: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/14.jpg)
Once new ladder and clamp sections werefabricated and coated ready forinstallation, they were installed usingpowered (battery) winches to swiftly lift theclamps and ladder sections in to place andhold them steady while they were installedby Abfad personnel using rope accesstechniques. This was to ensure the supportvessel deck was not damaged during thelifting process and sea swells.
www.abfad.co.uk
![Page 15: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/15.jpg)
HYDRATIGHT HYDRAULIC TIGHTENING
Newly fabricated clamp sections wereinstalled by Abfad personnel using ropeaccess techniques.Trained Abfad technicians thentightened the clamps using Hydratighthydraulic equipment.
www.abfad.co.uk
![Page 16: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/16.jpg)
Project Completion
To complete the project finalinspection and commissioningchecks were performed usingrope access methods.
www.abfad.co.uk
![Page 17: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/17.jpg)
www.abfad.co.uk
![Page 18: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/18.jpg)
NDTNDT inspections on the Met Mast were carriedout on another visit at a later date, this includedtightening of all bolts on the structure.
www.abfad.co.uk
![Page 19: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/19.jpg)
INDUSTRIAL ROPE ACCESS SPECIALISTS
www.abfad.co.uk
ABFAD LIMITED
Offshore Met Mast Removalat Scroby Sands
![Page 20: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/20.jpg)
SCROBY SANDS OFFSHORE
WIND FARM
REMOVAL OF
LATT ICE TOWER
SECT ION OF MET
MAST
www.abfad.co.uk
![Page 21: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/21.jpg)
MET MAST LATTICE TOWERREMOVAL
In 2015 E.ON wanted the latticetower structure of the Met Mastremoved.
Having over 20 years experience ofonshore and offshore rope accessAbfad were the ideal candidates toundertake such a task.
www.abfad.co.uk
![Page 22: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/22.jpg)
Removal UsingRope Access
The lattice tower isconstructed in twodistinct sections, withthe upper part makingup about 40% of thetower and consisting ofboth flanged and boltedvertical sections withwelded diagonaltubular bars.
www.abfad.co.uk
![Page 23: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/23.jpg)
The lower section of thelattice tower is made upof both vertical anddiagonal struts whichare fully bolted.
www.abfad.co.uk
![Page 24: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/24.jpg)
REDUNDANT ANEMOMETRYDEVICES WERE ALSO PRESENTAT THE TOP OF THE MAST,THESE WERE ALREADYDISCONNECTED FROM ANYSOURCE OF POWER
![Page 25: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/25.jpg)
T h e l a t t i c e t o w e r n e e d e d t ob e r e m o v e d i n m a n a g e a b l es e c t i o n s , a l o n g w i t h a n yi n s t r u m e n t a t i o n . A b f a d u s e dr o p e a c c e s s t e c h n i q u e s t or i g u p a p u l l e y s y s t e mw h i c h w o u l d s a f e l y a n ds e c u r e l y l o w e r t h e c u t s t e e ls e c t i o n s o n t o t h e w a l k w a ya n d t h e n o n t o a s e r v i c ev e s s e l f o r d i s p o s a l .
www.abfad.co.uk
![Page 26: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/26.jpg)
PROJECTCOMPLETEAll sections of the Met Mast Latticetower were cut and removed byAbfad's trained rope accesstechnicians, lowered using a ropeaccess pulley system and taken awayand disposed of by E.ON.
The job was a complete success andaccomplished well within schedule. www.abfad.co.uk
![Page 27: Scroby Sands Offshore Wind Farm - Rope Access Maintenance](https://reader033.fdocuments.in/reader033/viewer/2022061610/587424311a28ab72188b48f3/html5/thumbnails/27.jpg)
Abfad Limited have been established since 1996and provide IRATA approved rope access
services, both onshore and offshore.