SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at...

4
SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at volume may not meet Performance Measures criteria Do not reuse Test Bed ESIIDs for sandbox testing Retail Operations resources available by approval and schedule (MarkeTrak, toubleshooting) Assumptions:

Transcript of SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at...

Page 1: SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at volume may not meet Performance Measures criteria Do.

SCR786 - Alt

• Remove SIM dates from CERT• Enhance CERT hardware and/or software• Processing times at volume may not meet

Performance Measures criteria• Do not reuse Test Bed ESIIDs for sandbox testing• Retail Operations resources available by approval

and schedule (MarkeTrak, toubleshooting)

Assumptions:

Page 2: SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at volume may not meet Performance Measures criteria Do.

• Prod-like aggregation for .edi (1 file of 3,000 transactions not 3,000 files of 1 transaction)

• Mimic functionality pushed to future release• Processing capacity approximately 1-3 market

participants daily production values• Remove current blackout structure*

SCR786 - Alt

Assumptions (cont):

Page 3: SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at volume may not meet Performance Measures criteria Do.

1) Sandbox Availabilitya) Mon - Fri outside scheduled (major) releasesb) Mon - Fri outside scheduled (major) releases and

outside approved Flight/ad hoc timelines

2) SLA - Uptimea) 95%b) 90%c) 85 %

SCR786 - Alt

Requests for Input:

Page 4: SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at volume may not meet Performance Measures criteria Do.

3) Additional Maintenance Outagesa) 3 business days monthly per standard communicated schedule outside approved Flight/ad hoc timelinesb) 3 floating business days per month with at least 7 days notice from ERCOT outside approved Flight/ad hoc timelines

SCR786 - Alt

Requests for Input: