4'-0''
4'-0''12'-0''12'-0''4'-0''
4'-0'' 62'-4" (Span 3)78'-0" (Span 2)62'-4" (Span 1)
61'-
6''
1'-
5''
1'-
5"
Lanes
24'-0''
Shld.
4'-0''
Shld.
4'-0''
Shldr
''2
16'-
7
Shldr
''2
16'-
7
1'-
5''
1'-
5''
2'-
11"
210'-8" Bk. to Bk. Abutments
typ.
10'-0''
typ.
±8'-0"
1"
Open Jt.
61°08'00"
"2
172'-
1
NB Lanes
36'-
0''
Shld.
16'
Stage 1 Const.
43'-
0''
Stage III Const.
''2
151'-
4Stage II Const.
39'-
3''
25'-0''
SB Lanes
36'-
0''
to 11'-
9"
E.
Abut.
15'-
11 1/2"
W.
Abut.
Shld.
Varie
s
8501 W. Higgins Road; Suite 280
Chicago, Illinois 60631; (773) 399-0112
MO
DE
L:
Defa
ult
X:\
OH\2
019\2
0193008-0
3\D
esig
n\D
esig
n Files\6
2H
03\C
AD
_Sheets\T
SL\0
30-0
99-0
028-D
62
H03-T
SL-0
01.d
gn
Specifications, Customary U.S. Units, 9th Edition
2020 AASHTO LRFD Bridge Design
fy = 50,000 psi (M270 Grade 50)
fy = 60,000 psi (Reinforcement)
f'c = 4,000 psi (Superstructure)
f'c = 3,500 psi (Substructure)
D1
DS
New Construction:
LOADING HL-93
DESIGN SPECIFICATIONS
DESIGN STRESSES
SEISMIC DATA
NOTES:
New Construction:
FIELD UNITS (New Construction)
E
Tw
p.
37
NN 11 12
14 13
LOCATION SKETCH
Range 10E Of The 3 P.M.
I-55
Joliet
Road
I-55
PLAN
EF E
N
ELEVATION
SCOPE OF WORK HIGHWAY CLASSIFICATION
Elev. 750.39
Sta. 299+84.29
Bk. W. Abut.
El. 750.43
Sta. 299+88.29
¡ Brg. W. Abut.
Increase
Stations
Increase
Stations
El. 750.56
Sta. 300+21.44
¡ Pier 1
El. 750.96
Sta. 300+50.61
¡ Pier 1
El. 751.64
Sta. 301+28.61
¡ Pier 2
El. 750.01
Sta. 299+59.11
¡ Brg. W. Abut.
Elev. 749.98
Sta. 299+55.11
Bk. W. Abut.
El. 752.18
Sta. 301+90.95
¡ Brg. E. Abut.
Sta. 14+33.85 (Joliet Rd.)
Sta. 300+49.14 (F.A.I. I-55)
Sta. 14+17.20 (Joliet Rd.)
Sta. 300+63.71 (SB PGL)
Sta. 14+50.49 (Joliet Rd.)
Sta. 300+34.56 (NB PGL)
Slab (Typ.)
Approach
30' Bridge
Sta. 299+58.92
Light Pole
Sta. 301+90.01
Light Pole
GENERAL PLAN
to out bridge width varies from 119'-2 7/8" to 123-6 18". Traffic shall be maintained utilizing stage construction.
The structure is skewed 61*08' left advanced. The overall length measures 210'-8" back to back of abutment with an out
on concrete piles. the Piers are multi-column piers rectangular concrete pier substructure units on spread footings.
structure is comprised of a three span, non-composite, continuous 36" steel wide flange beams on stub abutments founded
US66A (North Ramp), Section 29R1-HB, at Station 684+80.6. Structure was widened in 1976 and 1987. The existing
Existing Structures: Structure Number 099-0028 was originally constructed in 1955 as IN 187(5), FA Rt.34 (US 66) over
No Salvage
£ Joliet Rd.
NB I-55 P.G.
SB I-55 P.G.
P.G.
Joliet Rd. P.G.
Type 6B Std. 631033 (typ.)
Traffic Barrier Terminal
1.5%1.5%
F.A.I. RTE. 55 (I-55)
F.A.U. RTE 378 (JOLIET RD)
SB-01
SB-03SB-04
SB-02
Elev. ± 725.1
Elev. ± 743.4Elev. ± 741.5*
*
*At rt. L's to Skew
vertical clearance
Point of minimum
Elev. 752.21
Sta. 301+94.95
Bk. E. Abut.
Elev. 751.82
Sta. 301+65.77
Bk. E. Abut.
El. 751.79
Sta. 301+61.77
¡ Brg. E. Abut.
El. 751.24
Sta. 300+99.44
¡ Pier 2
Line, typ.
Existing Ground
STRUCTURE NO. SN 099-0028
STATION 300+49.14
WILL COUNTY
F.A.I. RTE. 55 - SEC. (29-R1HP)99R-4
I-55 OVER JOLIET ROAD
GENERAL PLAN & ELEVATION
Two-Way Traffic
Posted Speed: 55 m.p.h.
Design Speed: 60 m.p.h.
DHV: 23,401 (2032)
ADTT:14,816 (2019); 37,440 (2032)
ADT:92,600 (2019); 234,005 (2032)
Functional Class: Interstate
One-Way Traffic
Posted Speed: 45 m.p.h.
Design Speed: 50 m.p.h.
DHV: 1,811 (2032)
ADTT:6,195 (2019); 3,802 (2032)
ADT:29,500 (2019); 18,104 (2032)
Functional Class: Arterial
Ramp £
Entrance
¡ F.A.I. 552'-
11"
Vert. Clearance
Minimum 14'-9"
Footing
Spread
All Structural steel shall be hot dipped galvanized.
elevations after grinding.
The profile grade shows the final
bridge deck and the bridge approach slabs.
Up to Ɓ inch may be ground off the
Soil Site Class = C
Design Spectral Acceleration at 0.2 sec. (S ) = 0.122 g
Design Spectral Acceleration at 1.0 sec. (S ) = 0.065 g
Seismic Performance Zone (SPZ) = 1
¡ F.A.I. 55
Measured along
**
*
**
**
4.00 %
to be reinstalled on new foundation, typ.
Remove existing Light Pole and Luminaire
Entrance Ramp
Only.
at West Abut.
Retention System
Temporary Soil
Piling, typ.
Temporary Sheet
Piling, typ.
Temporary Sheet
Type 6B Std. 631033
Traffic Barrier Terminal
Type 6B Std. 631033
Traffic Barrier Terminal
Structure
Proposed
1:2 (V:H) 1:2 (V:H
)
**
Elev. ± 724.9
FIELD UNITS (Existing Construction)
fy = 60,000 psi (Reinforcement)
f'c = 4,000 psi (Substructure)
typ.
Structure
Limits of Existing
Elev. 753.835
Bench Mark: BM #3. " " Cut on top at the west end of the northern parapet wall of bridge of I-55 over Joliet Rd.
See Roadway Plans for Traffic Control
Shell Piles typ.
Piles and New Metal
Existing Concrete
(Composite full length)
W36
Only.
at West Abut.
Retention System
Temporary Soil
Allow for 25#/sf future wearing surface.
Sewer
Storm
Existing
SB-05
SB-06
SB-07
SB-08
Replace bridge deck expansion joints.8.
Remove and replace existing approach slabs.7.
Replace existing bearings with elastomeric.6.
repairs and fill piers windows at existing piers.
Construct bearing pedestals, complete substructure5.
Widen existing piers & abutments on NB & SB sides.4.
Joliet Road.
Remove and Replace underpass lighting over existing 3.
accommodate the new bridge width.
Remove and replace existing bridge superstructure to 2.
Widen embankment cone at abutments on NB & SB sides.1.
Sides, typ.
spacing, Both
DS-11 Scupper
Utility Box
" E.
Abut.
21
14'-
10
10'-
8"
W.
Abut.
Lane
Varie
s
115+00
15+
00
300+00
PI Sta 111
+19.5
2
PI Sta 115
+38.2
2
1 3
SECTION COUNTY
ILLINOIS FED. AID PROJECT
55 3 1
TOTAL
SHEETS
SHEET
NO.RTE.
(29-R1HB)99R-4
CONTRACT NO. 62H03DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.I.
WILL
SHEET OF SHEETS
-
-
-
-
-
-
-
-
HA
KW
OM
HA
CHECKED
DRAWN
CHECKED
SN 099-0028
8:49:57 PM12/16/2020
FIL
E N
AM
E:
1'-0'' 1'-0''
''211'-10
9''
Joint
1" Open
1'-6''
1'-0" 1'-0"
''211'-4 ''2
11'-4
1'-0"1'-5 1/8" to 5'-5 3/8"
''211'-10
3'-0''''434'-9''4
34'-9
2 Spa. at 4-0" = 8'-0" at ¡ Brg. W. Abut.
3'-0'' 7 Spaces at 6'-9" = 47'-3''
1'-0''
1'-0'' ''211'-10
9''
Joint
1" Open
1'-0"1'-0"
''211'-4 ''2
11'-4
1'-0"
1'-9''''2
13'-10
2'-6''
''211'-10
''214'-8
''211'-10
1'-6'' 1'-0''Stage II Widening
" to 1'-11"216'-1
5 Spaces at 6'-9" = 33'-9'' 3'-0''''434'-9''4
34'-9
Stage II Removal
" to 37'-4"2133'-1
7 Spaces at 6'-9" = 47'-3''Spaces at 6'-9" = 27'-0''3'-0''
1'-0"1'-0''''2
11'-10
''214'-8
2'-6''
1'-0''''2
1111'-0''
61'-6''
"211'-10
1'-9''1'-6''
3'-0'' 7 Spaces at 6'-9" = 47'-3'' 3'-0''''434'-9''4
34'-910 Spaces at 6'-9" = 67'-6''
Deck"
41
8
61'-6''''2172'-1
typ.
3'-
8"
3'-0'' 10 Spaces at 6'-9" = 67'-6'' 7 Spaces at 6'-9" = 47'-3''
6'-7''
Stage I Removal
37'-11''
''2172'-1
Stage III Construction
18'-6''
Stage III Construction
''2132'-10
7 Spaces at 6'-9" = 47'-3''''214'-4
''211'-7 ''2
11'-7
''211'-7''2
11'-7
''851'-7 ''8
31'-7
''415
''211'-7''2
11'-7
Varies
VariesVaries
3'-0''''434'-9''4
34'-9
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0"
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0''
Lane
11'-0"
Lane
11'-0''
Lane
12'-0''
Lane
12'-0''
Lane
12'-0''
Varies from 10'-8"
''211'-5''2
11'-5
Shoulder
16'-0"
Lane
12'-0''
Lane
12'-0''
Lane
12'-0''
Shoulder
"216'-7
Shoulder
''216'-7
"21Varies from 15'-11
Stage I Const.
43'-0''
Stage II Const.
39'-3''
Parapet
1'-7''
Parapet
1'-5''
Parapet
1'-5''
Parapet
1'-5''
Parapet
1'-5''
Parapet
1'-5''
Parapet
1'-5''
Parapet
1'-5''
54'-11''
61'-6''
64'-3" ¡ Brg. W. Abut. to 68'-5 1/2" ¡ Brg. E. Abut.
Stage III Removal
''2131'-1
Stage III Removal
17'-0''
8501 W. Higgins Road; Suite 280
Chicago, Illinois 60631; (773) 399-0112
MO
DE
L:
Defa
ult
X:\
OH\2
019\2
0193008-0
3\D
esig
n\D
esig
n Files\6
2H
03\C
AD
_Sheets\T
SL\0
30-0
99-0
028-D
62
H03-T
SL-0
02.d
gn
CROSS SECTION
***
**
*
STRUCTURE NO. SN 099-0028
STATION 300+49.14
WILL COUNTY
F.A.I. RTE. 55 - SEC. (29-R1HP)99R-4
I-55 OVER JOLIET ROAD
CROSS SECTION
After Grinding.
approach slabs.
ground off the bridge deck and bridge
Prior to grinding. Up to 1/4" may be
Stage Construction Line, typ.
¡ Exist. & Prop. F.A.I. RTE. 55
Typ.
DS-11,
Type
Scupper
Drainage
212019181716151
765432 1098 1211 1413
STAGE I REMOVAL & CONSTRUCTION" at ¡ Brg. E. Abut.2
1" = 12'-2412 Spa. at 6'-1
(typ.)
Girder
Existing
21201918171615654321
STAGE II REMOVAL & CONSTRUCTION
1413121110987
21201918171615654321
STAGE III REMOVAL & CONSTRUCTION
*
**
"/ft.41"/ft.16
3"/ft.16
3
Typ.
DS-11,
Type
Scupper
Drainage
Crown*** NB PGL SB PGL***
"/ft.41
"/ft.41"/ft.4
1"/ft.41
conduits to be removed and replaced, typ.
Exist. Under Lighting fixtures and
LaneShoulder
**
"/ft.163
"/ft.163
"/ft.163
"/ft.41
and size to be determined
Fiber optic cable, number
Crown
to 11'-9"
FINAL CROSS-SECTION
212019181716151413121110987654321
Widening
Stage I
"21to 14'-10
(NORTHBOUND)(SOUTHBOUND)
(SOUTHBOUND) (NORTHBOUND)
(NORTHBOUND)(SOUTHBOUND)
(NORTHBOUND)(SOUTHBOUND)
(Comp. Full Length), typ.
Prop. W 36 Girder
2" � Conduit
(LOOKING EAST)
(LOOKING EAST)
(LOOKING EAST)
(LOOKING EAST)
*
1" Open
Joint
1" Open
Joint2" � Conduit
¡ Exist. & Prop. F.A.I. RTE. 55
¡ Exist. & Prop. F.A.I. RTE. 55
¡ Exist. & Prop. F.A.I. RTE. 55
2 3
SECTION COUNTY
ILLINOIS FED. AID PROJECT
55 3 2
TOTAL
SHEETS
SHEET
NO.RTE.
(29-R1HB)99R-4
CONTRACT NO. 62H03DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.I.
WILL
SHEET OF SHEETS
-
-
-
-
-
-
-
-
HA
KW
OM
HA
CHECKED
DRAWN
CHECKED
SN 099-0028
8:50:00 PM12/16/2020
FIL
E N
AM
E:
6"
1'-0"
6"
1'-2" 1'-6"1'-8"
4'-4"
1'-0"
''811'-11
''811'-11
Min.
3'-
6"
Min.
1'-
0"
at rt. L's
10'-0"
at rt. L's
± 8'-0"
8501 W. Higgins Road; Suite 280
Chicago, Illinois 60631; (773) 399-0112
MO
DE
L:
Defa
ult
X:\
OH\2
019\2
0193008-0
3\D
esig
n\D
esig
n Files\6
2H
03\C
AD
_Sheets\T
SL\0
30-0
99-0
028-D
62
H03-T
SL-0
03.d
gn
1
1
Strip Seal Exp. Jt.
Approach Slab
Construction Joint
¡ Brg.
CROSS SECTIONS & DETAILS
+0.87% +0.86%
undisturbed embankment
Poured against2'-
0"
A
A
4"
6"
full length
2" PJF6"
2'-
0"
Edge of deck
SECTION A-A
6"
6"
4"
Slopewall 4"
6"
1:2 (V:H)
5'-0"
2'-0"
1'-
0"
pipe underdrain
4" Ø Perforated
1'-
0"
Drainage Aggregate
French Drains
Geotechnical Fabric for
4"
Wall Drain
Geocomposite
Bridge Omission Bridge Approach Slab
(Looking West)
PIER SKETCH
Ele
v.
748.7
6
Sta.
298
+15.6
1
Ele
v.
749.9
0
Sta.
299
+27.2
4
Ele
v.
753.5
8
Sta.
303
+53.5
8
1
1
Strip Seal Exp. Jt.
Approach Slab
Construction Joint
¡ Brg.
2'-0"
1'-
0"
pipe underdrain
4" Ø Perforated
1'-
0"
Drainage Aggregate
French Drains
Geotechnical Fabric for
4"
Wall Drain
Geocomposite
Bridge Omission Bridge Approach Slab
Note:Hatched area indicates Concrete Removal.
SUPPORTED STUB ABUTMENT
SECTION THRU EXISTING PILE
SUPPORTED STUB ABUTMENT
SECTION THRU PROPOSED PILE
Piles
Exis. Conc.
CONCRETE SLOPEWALL
SECTION THRU PROPOSED
¡ Pier
design
As req'd. by
full length
2" PJF
¡ I-55
¡ I-55
Match Line
Match Line
(Horiz. Dimensions @ Rt. 's )
(Horiz. Dimensions @ Rt. 's )
STRUCTURE NO. SN 099-0028
STATION 300+49.14
WILL COUNTY
F.A.I. RTE. 55 - SEC. (29-R1HP)99R-4
I-55 OVER JOLIET ROAD
GENERAL DETAILS
Ele
v.
752.3
2
Sta.
302
+22.6
7
Ele
v.
733.9
8
Sta.
12
+06.2
8
Ele
v.
731.8
6
Sta.
16
+06.3
6
Ele
v.
732.7
4
Sta.
13
+00.0
0
Ele
v.
731.4
7
Sta.
14
+00.0
0
Ele
v.
730.9
9
Sta.
15
+00.0
0
Bk. of Abut.
Bk. of Abut.
EXISTING PROFILE GRADE JOLIET RD.
of Abut.
Front Face
Bearings
New Elastomeric
Bearings
New Elastomeric
final design.
determined during
Dimensions to be
Bearings, typ.
to accommodate new
Concrete Pedestals
be determined during final design.
new Bearings, typ. Dimensions to
Concrete Pedestals to accommodate
be determined during final design.
new Bearings, typ. Dimensions to
Concrete Pedestals to accommodate
Elev. ± 724.9 (Pier 2)
Elev. ± 725.1 (Pier 1)
Elev. ± 731.0 (Pier 2)
Elev. ± 731.6 (Pier 1)
Granular Backfill for Structures
Granular Backfill for Structures
PROFILE GRADE F.A.I. I-55 SB
EXISTING AND PROPOSED
PROFILE GRADE F.A.I. I-55 NB
EXISTING AND PROPOSED
design
As req'd. by
Metal Shell Piles
Typ. fill of pier windows under pier cap
(Comp. full length)
W36
(Comp. full length)
W36
2"
3 3
SECTION COUNTY
ILLINOIS FED. AID PROJECT
55 3 3
TOTAL
SHEETS
SHEET
NO.RTE.
(29-R1HB)99R-4
CONTRACT NO. 62H03DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.I.
WILL
SHEET OF SHEETS
-
-
-
-
-
-
-
-
HA
KW
OM
HA
CHECKED
DRAWN
CHECKED
SN 099-0028
8:50:01 PM12/16/2020
FIL
E N
AM
E: