Science Centre Station Open House - June 2017

36
CROSSTOWN LRT Science Centre June 15, 2017

Transcript of Science Centre Station Open House - June 2017

Page 1: Science Centre Station Open House - June 2017

CROSSTOWN LRTScience Centre June 15, 2017

Page 2: Science Centre Station Open House - June 2017

2

WHO IS METROLINX?

Page 3: Science Centre Station Open House - June 2017

3

Page 4: Science Centre Station Open House - June 2017
Page 5: Science Centre Station Open House - June 2017
Page 6: Science Centre Station Open House - June 2017
Page 7: Science Centre Station Open House - June 2017

7

Construction of the Eglinton Crosstown LRT Line

Background

• In September 2008, Metrolinx launched a regional transportation plan – a 25-year, $50 billion plan -- to coordinate and integrate transportation and transit in the Greater Toronto Area

• In 2010, City of Toronto approved the project to build the Eglinton Crosstown from Weston Road in the west to Kennedy Station in the east.

• Following a competitive process, Crosslinx Transit Solutions (CTS) was awarded a contract in July 2015 to design, build, finance, and maintain the Eglinton Crosstown Light Rail Transit (LRT).

Page 8: Science Centre Station Open House - June 2017

8

Project Players and Roles

Page 9: Science Centre Station Open House - June 2017

9

What Are We Building – a New Modern LRT

• 15 underground stations and 10 surface stops – 9 km below ground and 10 km above ground

• A maintenance and storage facility

• A 19-kilometre route separated from regular traffic

• Transit communications system

• Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station

Page 10: Science Centre Station Open House - June 2017

10

Safety First – Our #1 Priority

We train and direct staff to:

• Always have a site specific safety plan and site specific emergency plan.

• Ensure pre-work hazard assessments are complete and understood.

• Ensure job hazards analyses are complete and understood.

• Do everything possible to protect themselves, co-workers, and members of the public.

• Stop work if the safety of themselves, co-workers and members of the public cannot be assured.

• Identify and report unsafe behaviour and coach each other to make improvements.

• Be prepared and equipped to work safely.

Page 11: Science Centre Station Open House - June 2017

11

Crosstown Design Approach

Street Level – Contextual and Inviting

An International Signature for Toronto

Entrance – Bright & Secure

Concourse – Simple & Pristine Concourse – Transparent & Open Platform – Spacious & Animated

Page 12: Science Centre Station Open House - June 2017

12

Accessibility

Station and Stops are designed to be universally accessible, including satisfaction of the AODA, applicable City of Toronto Guidelines, the OBC, and CSA Standards.

Some of those features include:

• Barrier‐free paths from the entrance level to the station platform level

• Tactile warning strips and tactile walking surface indicators

• Signage systems with tactile indicators

• Passenger Assistance Intercoms (PAI)

• Low floor Light Rail Vehicles (LRV) with designated wheelchair locations

• Nominal gaps from platform edges to LRV entries

• Automated visual and audible stop announcements

• On-street and off-street paratransit passenger pick-ups and drop-offs

Page 13: Science Centre Station Open House - June 2017

13

Environment & SustainabilityDuring Construction

• Programs to minimize impact on wildlife, their habitats, watercourses and trees

• Reduce impact on our community neighbours through the management of dust,

noise and vibration

• Sustainable construction practices, including active management of construction

and demolition generated wastes, targeting 75% waste diversion from landfills;

and off-site beneficial reuse of excess soil.

Project Design Sustainability

• Project wide application of Toronto Green Standard

• LEED Certification at EMSF

• Bike parking for short- and long-term users

• Dedicated pedestrian routes

• High Solar Reflectance Index paving

• Green roofs

• Water use conservation/efficiency

• Fritted glazing (minimize bird collisions)

• Shielded exterior lighting (prevent off-site light trespass)

• Sheltered waiting areas

• Energy efficiency – LED lighting, heat recovery systems

• Landscaping – use of native, drought-tolerant plants and large trees

Page 14: Science Centre Station Open House - June 2017

14

How We’re Building the Crosstown: Construction Overview

Page 15: Science Centre Station Open House - June 2017

15

Mined StationsCut-and-Cover Stations

• An area the size of the station’s footprint is cut, a shallow area excavated, and steel piles, braces, and tie-backs are installed. Decking is then placed over the excavation to allow traffic to resume overhead.

• At Science Centre Station decking will only be placed over the intersection.

• Mining occurs from inside of the excavated entrances after the shoring is complete. Each underground area to be mined is divided into segments, and mined in sequence.

How We’re Building: Two Methods

Page 16: Science Centre Station Open House - June 2017

16

How we’re building the Crosstown:

Construction Overview

Distinct phases of construction:

• Preliminary works

• Utility relocations

• Handover of tunnel sections

• Support of excavation (shoring)

• Excavation & mining works

• Structural and architectural works

• Track work and systems installation

• Traction power system

• Signalling system

• Testing and commissioning

• Restoration works

Page 17: Science Centre Station Open House - June 2017

17

The Crosstown: 2016 in Review

17

• Tunnels complete

• Construction activities at all 15 underground stations

• Utility relocations & support in place, underway or complete

• Shoring work underway or nearing completion at several stations

• All design through 60% completion

• Transit system definition for underground segments 60% complete

• Full Building Permit application packages being finalized for submission Q1-Q3

Page 18: Science Centre Station Open House - June 2017

18

The Crosstown: 2017 Construction Milestones

• Year of the Dig – 1 million tons to be excavated in 2017

• Start excavating main station boxes

• Shoring & utility relocations at interchange stations – Cedarvale, Eglinton, Kennedy

• Track work – pour concrete base and first track installation

• Maintenance & Storage Facility buildings enclosed

• New Photography Bridge construction

• Mount Dennis foundation complete; Kodak Building moved back

• Mount Dennis Pedestrian/LRT Tunnel Connection

18

Page 19: Science Centre Station Open House - June 2017

19

How we’re building Science Centre Station

Cut and Cover Methodology at Science Centre Station

Page 20: Science Centre Station Open House - June 2017

20

Science Centre Aerial View (90%)

Main Entrance

Bus Terminal and Secondary Entrance

Page 21: Science Centre Station Open House - June 2017

21

Science Centre Main Entrance Plaza (90%)

Page 22: Science Centre Station Open House - June 2017

22

Science Centre Main Entrance Dusk (90%)

Page 23: Science Centre Station Open House - June 2017

23

Science Centre West Portal (60%)

Located west of the Don Mills Road and Eglinton Avenue East intersection

Page 24: Science Centre Station Open House - June 2017

24

Science Centre East Portal (60%)

Located east of the Don Mills Road & Eglinton Avenue East intersection

Page 25: Science Centre Station Open House - June 2017

25

Science Centre Bus Terminal (60%)

Page 26: Science Centre Station Open House - June 2017

26

Science Centre Bus Terminal (60%)

Page 27: Science Centre Station Open House - June 2017

27

Science Centre Station Update

• Preparatory works are underway or complete

• Utility Relocation work continues

• Piling, the first step for Support of Excavation (Shoring), almost complete for Bus Terminal, Secondary Entrance, Station Box and Portals. Main Entrance works scheduled to get underway as early as summer 2017.

• Existing traffic set up installed in early May and expected to be in place for approximately three months. Traffic set up supports piling, utility works and road widening.

• Next stage of work will include:

– piling at the Main Entrance located at the southwest corner of Eglinton Ave. East and Don Mills Road, and

– excavation in the centre of Eglinton Avenue to begin underground works: shoring, portals, station box, and track work.

Page 28: Science Centre Station Open House - June 2017

28

Current Traffic Staging at Don Mills & Eglinton

Began early May. Scheduled to be in place for approximately 3 months.

Page 29: Science Centre Station Open House - June 2017

29

Science Centre Station: What to Expect in 2017

Year Quarter Construction Activity / ClosureApprox.

Duration

2017

Q1

(Jan-March)

• Install SOE piles for pedestrian tunnel and West portal

• Complete Phase I road widening

6 months

Complete

Q2

(April-June)

• Begin excavation for pedestrian tunnel

• Install SOE piles for Main entrance

• Relocate E-W Storm Sewer and Water Mains

2 months

1 month

9 months

Q3

(July-Sept)

• Install SOE piles for Station box

• Relocate N-S Sanitary Sewer

• Excavation for Main Entrance and West Portal

• Place concrete for pedestrian tunnel

11 months

13 months

3 months

3 months

Q4

(Oct-Dec)

• Excavation for Bus Terminal and East Portal

• Place concrete for Main Entrance

6 months

5 months

Page 30: Science Centre Station Open House - June 2017

30

Community Benefits

The Community Benefits Program aims to ensure people from historically disadvantaged communities and equity-seeking groups are positively impacted by the Eglinton Crosstown LRT Project.

Program will be divided into streams:

1. Employment, Training and Workforce Development

2. Social Enterprise and Social Procurement

3. Investment (Community Improvements)

Page 31: Science Centre Station Open House - June 2017

31

Community Benefits: Employment

CTS is an equal opportunity and inclusive employer and we are building relationships with local workforce agencies who work with individuals facing barriers to employment.

We also organize job fairs, offer resume review tips and provide pre-orientation details to help improve job matches and support applications to CTS.

To date we have:

• Hired 74 people who work in professional, non-union roles

• Hired 17 apprentices from historically disadvantaged communities

• Held an employment information session at Golden Mile Employment and Social Services (TESS) Centre and met with over 200 interested job seekers in May 2016.

Page 32: Science Centre Station Open House - June 2017

32

Community Benefits: Business Spend

CTS procurement policy includes a commitment to maximizing procurement and supplier opportunities for social enterprises and local businesses.

Social enterprise spend– Public Art Installation with the PATCH Project (Steps Initiative)– Printing with Eva’s Phoenix Print Shop– Total to date: $34,016.93

Local business spend– Venue space with the Ontario Science Centre (at Don Mills)

and Aga Khan Museum (at Wynford)– Fleet maintenance with Donway Ford (at Bermondsey)– Total to date: $2,085,980.97

Page 33: Science Centre Station Open House - June 2017

33

Community Benefits: Investment

CTS Builds Communities is a program where CTS demonstrates care and stewardship for the neighbourhoods that span Eglinton Avenue

• In partnership with the YWCA Toronto (near Kennedy Station) CTS organized a 3-part Women in Construction series to empower and provide mentorship to more than 20 Eglinton-area girls in March 2017.

• In support of New Circles Community Services (near future O’Connor stop) CTS staff sponsored 7 families through the Holiday Giving Program in December 2016.

• CTS construction and engineering staff mentored students from Marc Garneau C.I. (near future Science Centre station) at a Habitat for Humanity GTA Build in November 2016.

• CTS Staff sorted food donations at Dorset Park Food Bank (near Kennedy Station) after Thanksgiving in October 2016.

Page 34: Science Centre Station Open House - June 2017

34

Business Support

Marketing and Advertising Support in 2017:

• Host focus groups with businesses to determine marketing/advertising priorities

• Implement Marketing and Advertising campaign to support businesses across Eglinton

• Rollout social media, digital, print and traditional forms of marketing and advertising

Ongoing On-the-Ground Business Liaison:

• Open for Business signage for impacted businesses

• Parking support strategy to identify local Green P lots along the corridor

• Monthly Marketing meetings with the seven local BIAs

• Business Marketing workshops

• Collaboration with Digital Main Street to provide online and digital support to businesses

• Monthly canvassing to obtain regular feedback

Page 35: Science Centre Station Open House - June 2017

35

Stay up to date

Page 36: Science Centre Station Open House - June 2017

36

416-782-8118 or 416-482-741124 hours/7days a week

www.thecrosstown.ca

[email protected]

facebook.com/thecrosstown

twitter.com/crosstownTO

instagram.com/eglinton_crosstown

Crosstown West Office1848 Eglinton Ave W (at Dufferin)Crosstown East Office660 Eglinton Ave E (at Bayview)

Stay in Touch