SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND ... · 31/07/2018 VC148...

4
31/07/2018 VC148 SCHEDULE TO CLAUSE 53.01 PUBLIC OPEN SPACE CONTRIBUTION AND SUBDIVISION 1.0 25/07/2019 C224case Subdivision and public open space contribution Amount of contribution for public open space Type or Location of Subdivision All land shown on Plans 1.1 and 1.2 forming part of this schedule 10% CR1: 8% CR2: 7.5% CR3: 7% CR4: 5% CR5: 11% CR6: 3.08% CR7: 3.75% CR8: 5.9% CR9: 7.52% (Land north of Ballarto Road) CR10: 1.61% (Land south of Ballarto Road) 3.54% CR11: 1.5% CR12: 4.04% CR13: As to the composition of the contribution, it must be made in the manner set out and explained in the Cranbourne North Stage 2 Precinct Structure Plan, June 2011. 4.21% CR14: As to the composition of the contribution, it must be made in the manner set out and explained in the Botanic Ridge Precinct Structure Plan, December 2012. 1.85% Employment CR15 4.25% Residential As to the composition of the contribution, it must be made in the manner set out and explained in the Thompsons Road Precinct Structure Plan, October 2015. 3.99% CR16 Page 1 of 4 CASEY PLANNING SCHEME

Transcript of SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND ... · 31/07/2018 VC148...

Page 1: SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND ... · 31/07/2018 VC148 SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND SUBDIVISION 1.0 25/07/2019 C224case Subdivisionandpublicopenspacecontribution

31/07/2018VC148

SCHEDULE TO CLAUSE 53.01 PUBLIC OPEN SPACE CONTRIBUTION ANDSUBDIVISION

1.025/07/2019C224case

Subdivision and public open space contribution

Amount of contribution for public open spaceType or Location of Subdivision

All land shown on Plans 1.1 and 1.2 forming part ofthis schedule

10%CR1:

8%CR2:

7.5%CR3:

7%CR4:

5%CR5:

11%CR6:

3.08%CR7:

3.75%CR8:

5.9%CR9:

7.52%(Land north of BallartoRoad)

CR10:

1.61%(Land south of BallartoRoad)

3.54%CR11:

1.5%CR12:

4.04%CR13:

As to the composition of the contribution, it must bemade in the manner set out and explained in theCranbourne North Stage 2 Precinct Structure Plan,June 2011.

4.21%CR14:

As to the composition of the contribution, it must bemade in the manner set out and explained in theBotanic Ridge Precinct Structure Plan, December2012.

1.85% EmploymentCR15

4.25% Residential

As to the composition of the contribution, it must bemade in the manner set out and explained in theThompsons Road Precinct Structure Plan, October2015.

3.99%CR16

Page 1 of 4

CASEY PLANNING SCHEME

Page 2: SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND ... · 31/07/2018 VC148 SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND SUBDIVISION 1.0 25/07/2019 C224case Subdivisionandpublicopenspacecontribution

Amount of contribution for public open spaceType or Location of Subdivision

As to the composition of the contribution, it must bemade in the manner set out and explained in theClyde Creek Precinct Structure Plan, October 2015.

4.01%CR17

As to the composition of the contribution, it must bemade in the manner set out and explained in theCasey Fields South Residential Precinct StructurePlan, October 2015.

20%CR18

As to the composition of the contribution, it must bemade in the manner set out and explained in theFormer Amstel Golf Course Development Plan.

5.32%CR19

As to the composition of the contribution, it must bemade in the manner set out and explained in theBrompton Lodge Precinct Structure Plan, August2016.

6.51%CR20

As to the composition of the contribution, it must bemade in the manner set out and explained in theCasey Central Town Centre Precinct Structure Plan,May 2016.

Not specifiedThese amounts do not apply to:

the subdivision of land to create lots for existingdwellings, for which the amount is:

Not specifiedthe subdivision of any land not in a residentialzone, Urban Growth Zone or Precinct StructurePlan area for which the amount is:

– This exemption does not apply to land inCranbourne North Service Business Precinct(CR12).

– This exemption does not apply to landidentified for residential purposes or locatedin Precinct 5, in the Fountain Gate-NarreWarren CBD under Schedule 2 to the ActivityCentre Zone.

Page 2 of 4

CASEY PLANNING SCHEME

Page 3: SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND ... · 31/07/2018 VC148 SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND SUBDIVISION 1.0 25/07/2019 C224case Subdivisionandpublicopenspacecontribution

Plan 1.1 to Clause 53.01

Page 3 of 4

CASEY PLANNING SCHEME

Page 4: SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND ... · 31/07/2018 VC148 SCHEDULETOCLAUSE53.01PUBLICOPENSPACECONTRIBUTIONAND SUBDIVISION 1.0 25/07/2019 C224case Subdivisionandpublicopenspacecontribution

Plan 1.2 to Clause 53.01

Page 4 of 4

CASEY PLANNING SCHEME