Schedule€-€A€€ EMD : Tender Date : 19.12.2019 Rs.4,12,000/- … · 2019-12-13 · 2.50 Kgs...
Transcript of Schedule€-€A€€ EMD : Tender Date : 19.12.2019 Rs.4,12,000/- … · 2019-12-13 · 2.50 Kgs...
Clearing the Light jungle and De-Silting the Earthen Drain at SIPCOT Industrial Complex,
Pudukottai.
GST 12% on Sub Total
Strengthening and improvement of balance existing roads including new formation of service
road with construction of box culvert and providing earthern drain at SIC, Nilakottai.
GST 12% on Sub Total
Special repairs to roads, fencing for Bus terminal area and renovation of A.O.Block at SIPCOT
Industrial Complex, Manamadurai
GST 12% on Sub Total
IV
V
GST 12% on Sub Total
Section Amount (Rs.)Description of work
Clearing the light jungle and De-Silting the RCC drain at SIPCOT Industrial Park, Pillaipakkam
GST 12% on Sub Total
Clearing of Scrub jungles in Roads and Common Purpose area at SIPCOT Industrial Complex,
Phase-I - Hosur.
GST 12% on Sub Total
De-Silting of Storm Water Drain in Phase - II and Expansion - I & II at SIPCOT Industrial
Complex, Hosur.
GST 12% on Sub Total
III
I
II
VIIRepair works to kerb wall in all roads at DTA in SIPCOT Industrial Growth Centre, Perundurai.
VI
Schedule - "A"
NAME OF THE WORK: Improvement of roads and other works in SIPCOT Industrial Complex/ Growth Centre/ Parks at
Pillaipakkam, Hosur, Bargur, Cheyyar, Pudukottai, Nilakottai, Manamadurai, Perundurai and Oragadam.
EMD :
Rs.4,12,000/-
Tender Date : 19.12.2019
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
GRAND TOTAL
VIII
Clearing the jungles along the roads on both sides, centre median and OSR area including
desilting of storm water drain, Spcial repairs of road work RNS parks & SEZ road and uplifting
works on all roads at SIPCOT Industrial Growth Centre, Oragadam.
GST 12% on Sub Total
IXDe-Silting of Storm Water Drain in Phase - I at SIPCOT Industrial Complex, Hosur.
GST 12% on Sub Total
XV Painting for Existing Compound Wall around A.O.Block at SIPCOT Industrial Complex, Cheyyar.
(Rupees__________________________________________________________________________________only)
GST 12% on Sub Total
XClearing of Scrub jungles in Roads and Common Purpose area at SIPCOT Industrial Complex,
Phase - II and Expansion - I & II - Hosur.
GST 12% on Sub Total
XI Clearing the Light jungles in DTA area at SIPCOT Industrial Complex, Bargur.
GST 12% on Sub Total
XIVJungle Clearance for OSR area at SIPCOT Industrial Complex, Cheyyar.
GST 12% on Sub Total
XII
Kerb Wall Painting, Line Marking and Providing Road Stud at SIPCOT Industrial Complex,
Cheyyar.
GST 12% on Sub Total
XIIIJungle Clearance and De-Silting the drains at SIPCOT Industrial Complex, Cheyyar.
GST 12% on Sub Total
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 213000.00
Sqm
(Two Lakhs
Thirteen
Thousand
square
metres only)
1 Sqm
(One
square
metre)
2 3900.00
Cum
(Three
Thousand
Nine
Hundred
cubic metres
only)
1 Cum
(One cubic
metre)
Section I - 2 items (Two items only) Sub Total
Clearing light jungles including the jungles with uprooting of
all vegetations and destroy by summary and cleaning away
from the site with all other incidental charges etc., complete
as per standard specification and as directed by SIPCOT
Officers.
Earth work excavation in all soils except hard rock requiring
blasting and conveying the excavated earth with a lead of 1
Km including initial lead of 10m and intial lift of 2 Km on
desilting of side drain both sides etc., Complete as per
standard specification and as directed by SIPCOT Officers.
Description of Work
I.Clearing the light jungle and De-Silting the RCC drain at SIPCOT Industrial Park, Pillaipakkam.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 73250.00
Sqm
(Seventy
Three
Thousand
Two Hundred
and Fifty
square
metres only)
1 Sqm
(One
square
metre)
Section II - 1 item (One item only) Sub Total
Description of Work
II. Clearing of Scrub jungles in Roads and Common Purpose area at SIPCOT Industrial Complex, Phase-I - Hosur.
Clearing of Scrub Jungles and clearing away from the site and
well burntout the same with all other incidental charges etc
complete as per standard specification and directed by SIPCOT
Officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 2100.00
Cum
(Two
Thousand
One Hundred
cubic metre
only)
1 Cum
(One cubic
metre)
Section III - 1 item (One item only) Sub Total
III. De-Silting of Storm Water Drain in Phase - II and Expansion - I & II at SIPCOT Industrial Complex, Hosur.
Description of Work
Earth work excavation and depositing on bank with a lead of 3
km including initial lead of 10m and lift of 2m in hard stiff clay
black cotton hard red earth, shales, murram, ordinary gravel,
stone earth and earth mixed with small size boulders for
foundation except hard rock requiring blasting etc., complete
with standard specification and as directed by SIPCOT
Officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 53100.00
Sqm
(Fifty Three
Thousand
One Hundred
square
metres only)
1 Sqm
(One
square
metre)
2 24000.00
Sqm
(Twenty Four
Thousand
square
metres only)
1 Sqm
(One
square
metre)
3 3100.00
Cum
(Three
Thousand
and One
Hundred
cubic metres
only)
1 Cum
(One cubic
metre)
Section IV - 3 items (Three items only) Sub Total
IV. Clearing the Light jungle and De-Silting the Earthen Drain at SIPCOT Industrial Complex, Pudukottai.
Description of Work
Clearing the Light jungle (Julifora and others) in OSR area,
road side and other in the Complex area and taking in to out
side at site and destory/ burnout the same with all other
incidental charges etc., complete as per standard specification
and as directed by SIPCOT officers.
Removing the weeds in road berm sides in the Complex area
and taking in to out side at site by vechile and destory it etc.,
complete and as directed by SIPCOT officers.
Earth work excavation in all classes of soils such as sand silt,
other loose soil, wet sand or silt not under water, light black
cotton soil, Hard Stiff Clay, Stiff black cotton, hard earth,
shales, murram, gravel, stoney earth and earth mixed with
small size boulders including excavated earth except hard rock
requiring blasting as per SS 20B with intial lead of 10m and lift
of 2m and conveying the earth and deposting on the places
shown by the SIPCOT Officer including cost of labour, tools
and plants, all other incidental charges etc., complete and as
directed by SIPCOT officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
1 8280.00
Sqm (Eight
thousand
and two
hundred and
eighty
square
metres only)
Clearing the light jungle with uprooting as per standard
specification and dispose them by burning and clearing the
site as per the direction of SIPCOT officials.
1 Sqm
(one
square
metre)
2 11000.00
Sqm (Elevan
thousand
square
metres only)
Picking the old surface of the low lying damaged road portion
to fill with GSB for raising the portion.
1 Sqm
(one
square
metre)
3 5200.00
Cum (Five
thousand
two hundred
Cubic metres
only)
Providing & laying Granular sub base (GSB) layer not
exceeding 100mm compacted thickness on the pr3pa43e sub
grade with approved minimum CBR value 30 grading
conforming to table 400-/1400-2 of MORT&H including
screening, spreading in uniform layer with grader, watering
and premising at optimum moisture content,compacting with
vibratory rollers of 80 to 100 KN static weight to not less than
98 % of the maximum laboratory dry density as per IS : 2720
Part8) and fine dressing to required grade and gorss slope as
shown on the drawing or as directed by the Engineer,
inlcuding obtaining and transporting all materials from
approved quarry site to work site with all lifts and leads by
mechanical transprot, head
1 Sqm
(one
square
metre)
V.Strengthening and improvement of balance existing roads including new formation of service road with construction of box
culvert and providing earthern drain at SIC, Nilakottai.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
4 4300.00
Cum (Four
thousand
and three
hundred
cubic metres
only)
Providing & laying Wet mix macadam Base course of
250mm compacted thickness in two layers or else as specified
on the prepared sub base with graded stone aggregateds and
granular materials of quality size and grading placed in layers
as specified, inlcuding mixing in base mix plant, spreading in
uniform layer with motor grader and compaction wih vibrating
rollers of 80 to 100 KN static weight and fine dressing to
required grade and corss slope as shown in drawing as per
techincal speficiation clause 406 of MORT & H. and as directed
by SIPCOT officials.
1 Cum
(one cubic
metre)
5 18600.00
Sqm
(Eighteen
thousand
and six
hundred
Square
metres only)
Providing & laying prime coat over WMM surface using 7 Kgs
of Bitumen emulsion for 10 Sq.m area including cost and
conveyance of Bitumen binder inlcuding labour charges for
preparing the surface and applying the required quantity as
tack coat by bitumen sprayer etc. complete per clause 502 of
MORT & H and as directed by SIPCOT Officials.
1 Sqm
(one
square
metre)
6 18600.00
Sqm
(Eighteen
thousand
and six
hundred
square
metres only)
Providing & laying Tack coat over treated WMM surface using
2.50 Kgs of Bitumen emulsion for 10 Sq.m srea including cost
and conveyance of Bitumen binder inlcuding labour charges
for preparing the surface and applying the required quanity as
tack coat by Bitumen sprayer etc complete as per clause 503
of MORT & H speficiations and as directed by SIPCOT officials.
1 Sqm
(one
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
7 950.00 Cum
(Nine
hundred and
fifty Cubic
metres only)
Providing & laying 50/60/75mm compacted thickness dense
bituminuous macadam using 0.35 cum of 26.5 - 13.2 mm
graded IRC size metal 0.21 cum of 13.2 - 2.36mm IRC graded
metal and 0.14 cubic metre of 2.36mm and below IRC size
HBG metal with 0.01 cum of quarry dust and 49.50 Kg of
bitumen 60/70 for premixing for 10Sq.meter inlcuding cost
and conveyance of all materials to CMP site inlcuding cost and
conveyance of bitumen and cement to CMP site heating the
bitumen and aggregate to required temperature and mixing
1 Cum
(one cubic
metre)
8 18600.00
Sqm
(Eighteen
thousand
and six
hundred
square
metres only)
Providing & laying tack coat over Bituminous surface using
2.00 kg bitumen to cut back for 10 Sq.m area including cost
and conveyanc of bitumen binder including labour charges for
preparing the surface and applying the required quantity as
tack coat by bitumen sprayer etc. complete as per clause 503
of MORT & H specification.
1 Sqm
(one
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
9 580.00 Cum
(Five
hundred and
eighty cubic
metres only)
Providing and laying 30 mm/40mm compacted thickness
bituminous concrete using 0.13 cum of 19.0 - 9.5 mm graded
IRC size HBG metal 0.17 cum of 9.5-2.36mm IRC graded
metal and 0.26 Cum. of 2.36 mm and below size graded metal
with 50.30 of bitumen grade VG 30/VG40 confirming to IS 73
for pre mixing for 10 Sq. meter and using materials as per
table 500 - 17 and staifying the physical requirement for
material for course aggregates for BC as per table 500 - 16 of
MORTH REV-V including cost and conveyance of all materials
to CMP site, heating the bitumen andaggregates to required
temperature and mixing them in required temperature in
central hot mix plant 20-30 tonnes capacity, conveyin the mix
by tipper trucks to paver site spreading the mix in required
temperature for uniform thickness of 40mm with mechanical
paver to the specified grades and cross sections and
consolidation 80 - 100 kn vibratory / Pneumatic road roller tot
eh requeired density etc., including labour charges for loading
the bitumen in bitumen tank and metal to feeder unit, labour
for attending to paver site etc., including hire, fuel charges for
20 - 30 tonnes capacity CMP unit bitumen boiler, tipper trucks,
paver finaisher / 9m paver finisher / vibratory / Pneumatice
road roller and all other tools and plants required, including
fuel and other incidental charges.
1 Cum
(one cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
10 150.00 Rm
(One
hundred and
fifty running
metres only)
Supplying, Laying and fixing of 300 mm dia RCC NP2 class
pipe with collars for cable duct arrangements including labour
charges for hoisting and placing the pipes and collars in
position etc., complete and as directed by SIPCOT Officials.
1 Rm
(One
running
metre)
11 800.00 Sqm
(Eight
hundred
square
metres only)
Providing and laying centre line / edgeline marking with
white hot applied thermoplastic compound 150 mm wide of
high quality 2.5 mm thick inlcuding reflectrising glass beads @
250gms per area, thickness of 2.5mm is exclusive of surface
applied glass beads as per IRC : 35 inlcuding cost and
coveyance of all materials to the work site inlcuding labour
charges for machinery and all other incidental charges et.
complete as per MORT & H specification and as directed by
SIPCOT Officerss. The finished surface to be level, uniformly
and free from streaks and holes.
1 Sqm
(one
square
metre)
12 970.00 Nos
(Nine
hundred and
seventy
Numbers
only)
Providing and fixing of road stud 100 X 100mm dia cast in
Aluminium resistent to corrosive effect of salt and frift, fitted
with lens reflections instaled in concrete asphalitic surface by
drilling hole 30mm upto a depth of 60mm and bodded in
suitable bituminous grout or epoxy mortar etc complete. (as
per BS : 873 (Part 4) 1973).
1 No
(Each)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
13 18.00 Nos
(Eighteen
Numbers
only)
Providing & fixing of following siiizes of Retro Reflectorised
contionary mandatory and informatory signs with
definition board made out of High intensity prismatic Grade
sheeting conforming to IRC 67 - 2010 and ASTM D 4956 - 09,
Type IV specification and fixed over 1.5 mm thick Aluminium
sheet fixed on back supporting frame of 25 mm x 25 mm x 3
mm mild steel angle and supported on a mild steel angle iron
post 75 mm x 75 mm x 6 mm firmly fixed to teh ground by
means of properly designed foundation with M 15 grade
cement including 7 years warrenty for the Retro reflctive
sheeting as per clause 6.9 of IRC 67 : 2010 specification and
as per MORTH specification No.801, including cost of
foundation and all labour charges etc., complete and as
directeed by SIPCOT Officers.
60cm equilateral traiangle (with definition board)
1 No
(Each)
14 2800.00
Cum (Two
thousand
and eight
hundred
Cubic metres
only)
Gravel Filling including cost and conveyance of the same to
work site with an average lead of 1 Km inlcuding stacking the
same to departmental gauge for premeasurement including all
labour charges for laying, spreading etc, complete and as
directed by the SIPCOT Officials.
1 Cum
(One cubic
metre)
15 230.00 Sqm
(Two
hundred and
thirty square
metres only)
Culvert white washing two coats with best quality shll lime,
including all necessary materials etc., complete and as
directed by SIPCOT Officials.
1 Sqm
(One
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
16 60.00 Cum
(Sixty cubic
metres only)
Earth work excavation in all classes of soils such as hard tiff
clay, stiff block cotton, hard red earth, shales, murram etc.
except hard rock requiring blastering as per SS 20B and
depositing on bank with all leads and lifts inlcuding cost of all
materials, labour, equipments and all other incidental charges
for foundation as per standard specification and as directed by
SIPCOT Officials.
1 Cum
(One cubic
metre)
17 5.00 Cum
(Five cubic
metres only)
Supplying and filling of stone dust to a thickness of 300mm
including cost and conveyance of stone dust at work site
inlcuding labour charges for spreading etc complete for
bottom of Culvert as per standard specification and as directed
by SIPCOT Officials.
1 Cum
(One cubic
metre)
18 5.00 Cum
(Five cubic
metres only)
Plain cement concrete 1:4:8 using 40mm ISS Size HBG metal
including cost and conveyance of all materials towork site
including cost and conveyance of cement labour charges for
form work and centering, labour charges maching for mixing
of concrete, transporting, laying, vibrating, compacting and
curing with all leads for soft potable water, hire and fuel
charges for all tools and plants including all other incidental
charges such as bailing out water, forming protective bunds,
cofferdams and shoring strutting etc. complete for footings of
body wall and substructure as per standard specification and
as directed by SIPCOT Officials.
1 Cum
(One cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
19 Providing formwork for centering for sides and soffits for
reinfoced cement concrete slab (or ) plain surfaces including
strutting upto 3.00m height using MS sheets of Size 90 X 60
cm and BG 10F guage stiffened with welded MS angles of Size
25 X 25 X 3 mm laid over silver oak ( country wood) joints of
size 10 X 6.50 cm space at about 90 cm C/c of 10 cm to 13
cm dia ( space 75 cm c/c) as per standard spefication and as
directed by SIPCOT Officials.
a 73.00 Sqm
(Seventy
three square
metres only)
Vertical Surface 1 Sqm
(One
square
metre)
b 17.00 Sqm
(Seventy
Square
metres only)
Plain Surface 1 Sqm
(One
square
metre)
20 26.00 Cum
(Twenty six
cubic metres
only)
Providing Reinforced cement concrete 1:11/2:3 using 20mm
HBG ISS stone jelly including cost and cenveyance of all
required materials at site and all labour charges for mixing
concrete, laying, curing, vibrating charges, hire charges for all
tools and plants and all other incidental charges etc., complete
as per standard specification and as directed by the SIPCOT
Officials.
1 Cum
(One cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
21 39.00 Qtl
(Thirty nine
quintal only)
Supplying fabrication & of HCRM (High Corrsive resistant
metal ) grills including cost of Steel.
1 Qtl (One
quintal
only)
22 10.00 Sqm
(Ten square
metres only)
White washing two coats with best quality shell lime, including
all necessary materials etc., complete as per standard
specification and as directed by SIPCOT Officials.
1 Sqm
(One
square
metre)
23 9100.00
Cum (Nine
thousand
and one
hundred
Cubic metres
only)
Earth work excavation in all classes of soils such as hard stiff
clay, stiff block cotton, hard red earth, shales, murram etc.
except hard rock requiring blastering as per SS 20B and
depositing on bank with all leads and lifts inlcuding cost of all
materials, labour, equipments and all other incidental charges
for foundation as per standard specification and as directed by
SIPCOT Officials.
1 Cum
(One cubic
metre)
SubToatalSection V - 23 items (Twenty three items only)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
1 3030.00
Sqm (Three
thousand
and thirty
square
metres only)
Clearing the light jungle with uprooting as per standard
specification and dispose them by burning and clearing the
site as per the direction of SIPCOT officials.
1 Sqm
(One
square
metre)
2 220.00 Sqm
(Two
hundred and
twenty
square
metres only)
Clearing the Scrub jungle with uprooting as per standard
specification and dispose them by burning and clearing the
site as per the direction of SIPCOT officials.
1 Sqm
(One
square
metre)
3 700.00 Sqm
(Seven
hundred
square
metres only)
Kerb Wall Painting two coats with best quality Paint, including
all necessary materials etc., complete as per standard
specification and as directed by SIPCOT Officials.
1 Sqm
(One
square
metre)
4 7.00 Cum
(Seven cubic
metres only)
Brick Work C.M 1:5 using second class ground moulded
chamber burnt bricks of size9''x4 3/2''x3/4'' including curing
etc.,complete as per standard specification and as directed by
SIPCOT Officials.
1 Cum
(one cubic
metre)
VI.Special repairs to roads, fencing for Bus terminal area and renovation of A.O.Block at SIPCOT Industrial Complex,
Manamadurai
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
5 190.00 Sqm
(One
hundred and
ninety
square
metres only)
Plastering C.M 1:3 10mm thick using cement mortar
including curing etc.,complete as per standard specification
and as directed by SIPCOT Officials
1 Sqm
(One
square
metre)
6 200.00 Sqm
(Two
hundred
square
metres only)
Culvert White washing two coats with best quality shell lime,
including all necessary materials etc., complete as per
standard specification and as directed by SIPCOT Officials.
1 Sqm
(One
square
metre)
7 6000.00
Cum (Six
thousand
cubic metres
only)
Earth work excavation in all classes of soils such as hard tiff
clay, stiff block cotton, hard red earth, shales, murram etc.
except hard rock requiring blastering as per SS 20B and
depositing on bank with all leads and lifts inlcuding cost of all
materials, labour, equipments and all other incidental charges
for foundation as per standard specification and as directed by
SIPCOT Officials.
1 Cum
(one cubic
metre)
8 40.00 Nos
(Fourty
Numbers
only)
Supply and erection of Precast RCC post of Dimension 0.1 x
0.1 x 2 m for Barbed wire fencing along the perimeter of the
plot proposed for parking including steel fabrication
1 No
(Each)
9 5.00 Cum
(Five cubic
metres only)
Earth work excavation and depositing on bank with initial lead
and lift in Hard stiff clay, stiff black cotton soil etc., complete
as per SS 20 B specifications.
1 Cum
(one cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
10 115.00 Rm
(One
hundred and
fifteen
running
metres only)
Supplying and Fixing of GI Barbed wire Fencing of GI wire 10
Gauge and 2 Ply four pronged tied Horizontally and Vertically
Strut at an interval of 0.30m to a height of 1.70m including
tying etc., complete and as directed by SIPCOT officers.
1 Rm
(One
running
metre)
11 4.00 Sqm
(Four square
metres only)
Centring all round for gate pillars (Box type) 1 Sqm
(One
square
metre)
12 1.00 Cum
(One cubic
metres only)
Providing vibratory reinforced cement Concrete mix 1 : 2 : 4
using 20 mm HBG ISS stone jelly and using concrete mixer
machin including cost and conveyance of all required materials
at site excluding cost of centering, shuttering and strutting
and MS / RTS reinforcement grill in position but including all
labour charges for mixing concrete, laying, curing, vibrating
charges, hire charges for all tools and plants and all other
incidental charges pipe etc., complete as per standard
specification and as directed by the SIPCOT Officers
1 Cum
(one cubic
metre)
13 1.50 Qtl
(One point
ffifty quintal
only)
Supplying, Fabricating and placing in position M.S / T.R.S.
grills including cost of steel and binding wire and labour for
cutting, bending, tying, placing in position etc. completee
complying with standard specification and as directed by
SIPCOT Officers.
1 Qtl (One
quintal
only)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
14 448.00 kg
(Four
hundred and
fourty eight
kilograms
only)
Supply and fixing of MS Grill two leafed entrance gate of width
3.5 m each and height 1.6 m
1 Kg (One
kilogram)
15 9.00 Cum
(Nine cubic
metres only)
Flooring Concrete CC 1:5:10 using HBG Jelly including
laying to the required thickness finishing nearly forming
covers., complete complying with standard specification and
as directed by "SIPCOT" officers.
1 Cum
(One cubic
metre)
16 30.00 Sqm
(Thirty
square
metres only)
Dismatling of weathering course with Prestressed tiles 1 Sqm
(One
square
metre)
17 3.00 Cum
(Three cubic
metres only)
Weathering Course with Concrete using best quality
broken brick jelly of 20mm uniform guage in pure freshly
burnt slaked like (stone like) (no sand to be used) the
popotion of brick jelly to like being 32:12:5., complete
complying with standard specification and as directed by
"SIPCOT" officers.
1 Cum
(One cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
18 30.00 Sqm
(Thirty
square
metres only)
Finishing the top roof with one course of best approved
quality machine pressed squre tiles size 230mmx230mm thick
of approved quality CM 1:3, 12mm thick mixed with WPC at
2% by weuight of cement used and pointing the joints nearly
to full depth of tiles with the same cement mortar mixed with
water proofing compound and Red oxide including curing etc.,
complete complying with standard specification and as
directed by "SIPCOT" officers.
1 Sqm
(One
square
metre)
19 6.00 Cum
(Six cubic
metres only)
Dismantling Concrete damaged RCC concrete of sunshade
facia complete complying with standard specification and as
directed by "SIPCOT" officers.
1 Cum
(One cubic
metre)
20 6.00 Cum
(Six cubic
metres only)
Providing RCC 1:1 1/2 : 3 concrete for sunshade facia
Sunshade Facia using machine crushed hard broken granite
stone jelly 20mm gauge for all RCC items of works excluding
centering shuttering and cost os Ms/RTS reinforcement grills
placed in including machune mixing of concrete laying
vibrating etc., complete complying with standard specification
and as directed by "SIPCOT" officers.
1 Cum
(One cubic
metre)
21 150.00 Sqm
(One
hundred and
fifty square
metres only)
Special Plastering and finishing all surface with cement
Mortar 1:3 10mm thick in all floors including hacking the
surfaces and providing necessary beadings,noisings, curing
etc., complete complying with standard specification and as
directed by "SIPCOT" officers.
1 Sqm
(One
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
22 960.00 Sqm
(Nine
hundred and
sixty square
metres only)
Painting Two Coats with approved best quality cement paint
over cement plastered wall surface, ceiling and other new
surface (total three coats - one priming coat with cement
paint including cleaning and preparing the surface complete
the rate include cost of all materials, brushed scaffolding
charges all labour charges etc.complying with standard
specification and as directed by "SIPCOT" officers.
1 Sqm
(One
square
metre)
23 310.00 Sqm
(Three
hundred and
ten square
metres only)
Supplying and painting one coat of redymix paint over old iron
works of approved quality and including labours etc., as
directed by SIPCOT officials
1 Sqm
(One
square
metre)
24 70.00 Sqm
(Seventy
square
metres only)
Providing formwork for centering for sides and soffits for
reinfoced cement concrete slab (or ) plain surfaces including
strutting upto 3.00m height using MS sheets of Size 90 X 60
cm and BG 10F guage stiffened with welded MS angles of Size
25 X 25 X 3 mm laid over silver oak ( country wood) joints of
size 10 X 6.50 cm space at about 90 cm C/c of 10 cm to 13
cm dia ( space 75 cm c/c) as per standard spefication and as
directed by SIPCOT Officials.
1 Sqm
(One
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
25 1140.00
Sqm (One
thousand
and one
hundred and
fourty
square
metres only)
White washing two coats with best quality shell lime,
including all necessary materials etc., complete as per
standard specification and as directed by SIPCOT Officials.
(allround )
1 Sqm
(One
square
metre)
26 75.00 Sqm
(Seventy five
square
meter only)
Polishing with one coat of approved quality sheenlac polish for
the old wood work., complete as per standard specification
and as directed by SIPCOT Officials. (allround )
1 Sqm
(One
square
metre)
SubToatalSection VI - 26 items (Twenty six items only)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
1 900.00 Rm
(Nine
hundred
running
metres only)
Manufacturing and fixing cement concrete Precast Block of
size 450 mm x 200 mm x 500 mm as directed by SIPCOT
Officers.
1 Rm
(One
running
metre)
2 7380.00
Sqm (Seven
thousand
and three
hundred and
eighty
square
metres only)
Plastering the damaged kerb wall with cement mortor 1:3
12mm thick as directed by the SIPCOT Officers etc.,
1 Sqm
(one
square
metre)
3 2630.00
Sqm (Two
thousand
and six
hundred and
thirty square
metres only)
Painting two coats of black and white bands alternatively each
coat separately using black and white enamel paints of
approved quality including cost and conveyance of paint,
painting articles and utensils, labour charges etc., complete
complying with standard specification and as directed by
SIPCOT Officers.
1 Sqm
(one
square
metre)
SubToatal
VII.Repair works to kerb wall in all roads at DTA in SIPCOT Industrial Growth Centre, Perundurai.
Section VII - 3 items (Three items only)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
1 5100.00
Sqm (Five
thousand
and one
hundred
square
metres only)
Clearing Scrub jungle and cleaning away from the site as
shown by the SIPCOT Officers and well burnt out the same
with all other incldental charges etc., complete as per
standard specification and as directed by SIPCOT officers.
1 Sqm
(One
square
metre)
2 80500.00
Sqm (Eighty
thousand
and five
hundred
square
metres only)
Clearing light jungle and cleaning away from the site as
shown by the SIPCOT Officers and well burnt out the same
with all other incldental charges etc., complete as per
standard specification and as directed by SIPCOT officers.
1 Sqm
(One
square
metre)
3 377000.00
Sqm (Three
lakhs and
seventy
seven
thousand
square
metres only)
Clearing Heavy jungle and cleaning away from the site as
shown by the SIPCOT Officers and well burnt out the same
with all other incldental charges etc., complete as per
standard specification and as directed by SIPCOT officers.
1 Sqm
(One
square
metre)
VIII.Clearing the jungles along the roads on both sides, centre median and OSR area including desilting of storm water drain,
Spcial repairs of road work RNS parks & SEZ road and uplifting works on all roads at SIPCOT Industrial Growth Centre,
Oragadam.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
4 14000.00
Cum
(Fourteen
thousand
Cubic metres
only)
Desilting of RCC/PCC/R.R Storm water drain under water
including removal of jungle and silt from the drain and
disposed the silt to the low lying area as directed by SIPCOT
Officers.
1 Cum
(one cubic
metre)
5 6000.00
Sqm (Six
thousand
square
metres only)
Picking the existing BT surface 1 Sqm
(One
square
metre)
6 1500.00
Cum (One
thousand
and five
hundred
Cubic metre
only)
Providing and laying, spreading and compacting graded stone
aggreates to Wet Mix Macadam Base Course of 250mm
compacted thickness specification in two layers of 125mm
thick each or else as specified on the prepared sub base by
providing approved Coarse graded material conforming to
Table 400 - 13 and satisfying the physical requirement for
material for WMM as per Table 400 - 12 of MORTH Rev.-5,
including pre-mixing the materials with water at OMC in
mechanical mix plant carriage of mixed matrerial by tipper to
site laying in uniform layers with favours in subbase/ base
course on well prepared surface and compacting with
vibratory roller to achieve the desired density including cost of
material, labour charges, rental for machinery, fuel and all
other incidental charges etc., complete as per clause 406 of
MORTH Rev.-5 and as directed by SIPCOT Officers.
1 Cum
(one cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
7 18200.00
Sqm
(Eighteen
thousand
and two
hundred
square
metres only)
Providing and laying Prime coat over wet mix macadam
surface using 7.00 Kg bitumen emulson for 10 sqm area
including cost and conveyance of bitumen binder including
labour charges for preparing the surface and applying the
required quantity as tack coat by bitumen sprayer
etc.complete as per clause 502 of MORT & H specifications.
1 Sqm
(One
square
metre)
8 18200.00
Sqm
(Eighteen
thousand
and two
hundred
square
metres only)
Providing and laying Tack coat over treated wet mix macadam
surface using 2.50 Kg bitumen emulson to cut back for 10
sqm area including cost and conveyance of bitumen binder
including labour charges for preparing the surface and
applying the required quantity as prime coat by bitumen
sprayer etc.complete as per clause 503 of MORT & H
specifications.
1 Sqm
(One
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
9 910.00 Cum
(Nine
hundred and
ten cubic
metres only)
Providing and laying 50 mm compacted thickness dense
bituminous macadam using 0.35 cum of 26.50 -13.20 mm IRC
size graded metal 0.21 cum of 13.20 - 2.36mm IRC graded
metal and 0.14 cum of 2.36mm and below IRC size HBG metal
with 49.00 kg of VG30/VG40 bitumen for premixing for 10
Sq.meter includin cost and conveyance of all materials to CMP
site including cost and conveyance of bitumen and other
materilas to CMP site heating the bitumen and aggregates to
required temperature and mixing them in required
temperature in central hoti mix plant 20-30 tonnes capacity,
conveying the mix by tipper trucks to paver site, spreading
the mix in required temperature for uniform thickness of
50mm with mechanical paver to the specified grades and
cross sections and compaction by vibratory Pneumatic Roller
to the required density etc., including labour charges for
loading the bitumen in bitumen tank and metal to feeder unit,
labour for attending to paver site etc., including hire,fuel
charges for 20-30 tonnes capacity CMP unit bitumen boiler,
tipper trucks, paver finisher/9 m paver finisher,
vibratary/Pneumatic Roller, and al other tools & plants
required including fuel and all other incidental charges etc.,
complete asper specification using CMP as per clause 505
MORTH REV. V Specification and as per direction of SIPCOT
Officers.
1 Cum
(one cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
10 18200.00
Sqm
(Eighteen
thousand
and two
hundred
square
metres only)
Providing and laying Tack coat over Bituminous surface using
2.00 Kg bitumen emulson to cut back for 10 sqm area
including cost and conveyance of bitumen binder including
labour charges for preparing the surface and applying the
required quantity as tack coat by bitumen sprayer
etc.complete as per clause 503 of MORT & H specifications.
1 Sqm
(One
square
metre)
11 728.00 Cum
(Seven
hundred and
twenty eight
cubic metres
only)
Providing and laying 40mm compacted thickness bituminous
concrete using 0.40 cum of 19.0 - 9.5 mm graded IRC size
HBG metal 0.22 cum of 9.5-2.36mm IRC graded metal and
0.28 Cum. of 2.36 mm and below size graded metal with
43.28 of bitumen grade VG 30 confirming to IS 73 for pre
mixing for 10 Sq. meter and using materials as per table 500 -
17 and satisfying the physical requirement for material for
course aggregates for BC as per table 500 - 16 of MORTH REV-
V including cost and conveyance of all materials to CMP site ,
heating the bitumen andaggregates to required temperature
and mixing them in required temperature in central hot mix
plant 20-30 tonnes capacity, conveyin the mix by tipper trucks
to paver site spreading the mix
1 Cum
(one cubic
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
in required temperature for uniform thickness of 40mm with
mechanical paver to the specified grades and cross sections
and consolidation 80-100 kn vibratory/Pneumatic road roller
to the required density etc., including labour charges for
loading the bitumen in bitumen tank and metal to feeder unit,
labour for attending to paver site etc., including hire, fuel
charges for 20-30 tonnes capacity CMP unit bitumen boiler,
tipper trucks, paver finaisher/9 m paver finisher
/Vibratory/Pneumatice road roller , and all other tools and
plants requried, including fuel and all other incidental charges
etc., complete as per specification using CMPP as per clause
507 OF MORTH REV. specification and as directed by SIPCOT
Officers.
12 37000.00
Cum (Thirty
seven
thousand
cubic metres
only)
Filling the hard shoulder portion with good qaulity earth with a
conveyance of 5 km belt around SIPCOT area in layers of not
more than 15cm thick well watering, ramming and
consolidation etc. complete complying with standard
specifications and as directed by "SIPCOT" officers.
1 Cum
(One cubic
metre)
13 4500.00
Sqm (Four
thousand
and five
hundred
square
metres only)
Providing and laying of hot applied thermo plastic compound
2.5 mm thick including refletorising glass beads @ 250 gms
per Sq.m. area, thickness of 2.50 mm is exclusive of surface
applied glass beads as per IRC : 35. The finished surface to be
level, uniform and free from streaks and holes etc., complete
as per MORTH Specification No. 803 and as directed by
SIPCOT officers
1 Sqm
(One
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
14 16750.00
Sqm
(Sixteen
thousand
and seven
hundred and
fifty square
metres only)
Providing and fixing reflective Road studs of category 'B'
Raised pavement markers made out of poly carbonate / ABS
moulded body and reflective panels (bi-convex reflectors) with
micro prismatic lens capable of providing total internal
reflection of the light entering the lens face with retro-
reflectance and chromaticity values conforming to ASTM
D4280. The reflective raised pavement markers shall also
confirm to the MORTH circular No.RW / NH.
33023/10/97.DO.III dt. 11.06.97 and the length, height and
width of the body shall not be less than 100 mm, 15 mm and
90 mm and base of marker shall be flat within 1.3 mm. The
marker shall supplort a load of 13635 kg tested in accordance
with ASTM D4280. Lenses shall be moulded of Polycarbonate
or methyl methecrylate conforming to ASTM D788. The area
of each retro - reflectory surface shall not be less than 13.0
sq.cm. The slope or retro - reflectory surface shall be 35 + 5
degree to base. Each reflector shall have a CIL not less than
values specified in table 2 of said MORT &H circular and two
cylindrical Polymer Shanks of not less than 20 mm diameter
and not less than 30 mm length shall be provided for better
anchorage.
1 Sqm
(One
square
metre)
15 1750.00
Sqm (One
thousand
and seven
hundred and
fifty square
metres only)
Plastering with cement mortar 1:5, 20mm thick in external
walls and concrete including cost and conveyance of all
materials to site of work, mixing, curing etc complete as per
standard specification and as directed by SIPCOT Officers
1 Sqm
(One
square
metre)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
16 4600.00
Sqm (Four
thousand
and six
hundred
square
metres only)
Painting two coats of black and white bands alternatively each
coat seperately using black and white enamal paints of
approved quality including cost and conveyance of paint,
painting articles and utencils, labour charges etc. complete
complying with standard specification and as directed by
SIPCOT officers.
1 Sqm
(One
square
metre)
17 400.00 Sqm
(Four
Hundred
square
metres only)
White washing 2 coats using slaked shell lime including
cleaning and preparing the surface by thoroughly scrapping
the old surface wherever necessary the rate shall include cost
of all materials, brush, all labour charges etc., Complete
complying with standard specifications and as directed by
SIPCOT Officials.
1 Sqm
(One
square
metre)
Section VIII - 17 items (Seventy items only)
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 2850.00
Cum
(Two
Thousand
Eight
Hundred and
Fifty cubic
metres only)
1 Cum
(One cubic
metre)
Section IX - 1 item (One item only) Sub Total
Description of Work
Earth work excavation and depositing on bank with a lead of 3
km including initial lead of 10m and lift of 2m in hard stiff clay
black cotton hard red earth, shales, murram, ordinary gravel,
stone earth and earth mixed with small size boulders for
foundation except hard rock requiring blasting etc., complete
with standard specification and as directed by SIPCOT
Officers.
IX. De-Silting of Storm Water Drain in Phase - I at SIPCOT Industrial Complex, Hosur.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 73550.00
Sqm
(Seventy
Three
Thousand
Five Hundred
and Fifty
square
metres only)
1 Sqm
(One
square
metre)
Section X - 1 item (One item only) Sub Total
X. Clearing of Scrub jungles in Roads and Common Purpose area at SIPCOT Industrial Complex, Phase - II and Expansion - I &
II - Hosur.
Description of Work
Clearing of Scrub Jungles and cleaning away from the site and
well burnt at the same use all other incidental charges etc.,
complete as per standard specification and as directed by
SIPCOT Officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 80000 Sqm
(Eighty
Thousand
square
meter only)
1 Sqm
(One
square
metre)
2 8000 Cum
(Eight
thousand
cubic metres
only)
Conveyance charges for 3km 1 Cum
(One cubic
metre)
Section XI - 2 items (Two item only) Sub Total
XI. Clearing the Light jungles in DTA area at SIPCOT Industrial Complex, Bargur.
Description of Work
Clearing of Scrub Jungles and cleaning away from the site and
well burnt at the same use all other incidental charges etc.,
complete as per standard specification and as directed by
SIPCOT Officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 820.00 Sqm
(Eight
Hundred and
Twenty
square
meter only)
1 Sqm
(One
square
metre)
2 400.00 Sqm
(Four
Hundred
square
meter only)
1 Sqm
(One
square
metre)
Painting two coats of black and white bands alternatively each
coat separately using black and white enamel paints of
approved quality including cost and conveyance of paint,
painting articles and utencils, labour charges etc., complete
complying with standard specification and as directed by
SIPCOT Officers.
Providing and laying Centreline/Edgeline marking with white
hot applied thermoplastic compound 150mm wide of high
quality 2.5mm thick including reflectorising glass beads @250
gms per sqm area, thickness of 2.5mm is exclusive of surface
applied glass beads as per IRC:35. The finished surface to be
level, uniform and free from streaks and holes etc., including
cost and conveyance of all materials to the work site including
labour charges for machinery and all other incidental charges
etc.complete as per MORTH specification and as directed by
SIPCOT officers.
XII. Kerb Wall Painting, Line Marking and Providing Road Stud at SIPCOT Industrial Complex, Cheyyar.
Description of Work
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
3 670.00 Nos
(Six Hundred
and Seventy
numbers
only)
1No
(Each)
Section XII - 3 items (One items only) Sub Total
Providing and fixing reflective Road studs of category 'B'
Raised pavement markers made out of poly carbonate / ABS
moulded body and reflective panels (bi-convex reflectors) with
micro prismatic lens capable of providing total internal
reflection of the light entering the lens face with retro-
reflectance and chromaticity values conforming to ASTM
D4280. The reflective raised pavement markers shall also
confirm to the MORTH circular No.RW / NH.
33023/10/97.DO.III dt. 11.06.97 and the length, height and
width of the body shall not be less than 100 mm, 15 mm and
90 mm and base of marker shall be flat within 1.3 mm. The
marker shall supplort a load of 13635 kg tested in accordance
with ASTM D4280. Lenses shall be moulded of Polycarbonate
or methyl methecrylate conforming to ASTM D788. The area
of each retro - reflectory surface shall not be less than 13.0
sq.cm. The slope or retro - reflectory surface shall be 35 + 5
degree to base. Each reflector shall have a CIL not less than
values specified in table 2 of said MORT &H circular and two
cylindrical Polymer Shanks of not less than 20 mm diameter
and not less than 30 mm length shall be provided for better
anchorage etc., Complete complying with standard
specification and as directed by the SIPCOT Officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 8300.00
Sqm
(Eight
Thousand
and Three
Hundred
square
meter only)
1 Sqm
(One
square
metre)
2 860.00 Cum
(Eight
Hundred and
Sixty cubic
metre only)
1 Cum
(One cubic
metre)
Section XIII - 2 items (Two items only) Sub Total
XIII. Jungle Clearance and De-Silting the drains at SIPCOT Industrial Complex, Cheyyar.
Description of Work
Clearing light jungles after setting out the alignment including
grubbing the root, bush, wastage logs and other debris, etc.,
complete as directed by SIPCOT Officers.
Earth work excavation for in all classes of soils such as sand
silt other loose soil, wet sand or silt not under water, light
back cotton soil including excavated earth except hard rock
requiring blasting as per SS 20B with intial lead of 10m and lift
of 2m and conveying the earth to a lead of 2Km and deposting
on the places shown by the Project Officer including cost of
labour, tools and plants and including all other incidental
charges etc., complete and as directed by SIPCOT officers for
clearing earth deposited in drains.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 210000.00
Sqm
(Two Lakhs
Ten
Thousand
square
metres only)
1 Sqm
(One
square
metre)
Section XIV - 1 item (One item only) Sub Total
XIV. Jungle Clearance for OSR area at SIPCOT Industrial Complex, Cheyyar.
Description of Work
Clearing light jungles after setting out the alignment including
grubbing the root, bush, wastage logs and other debris, etc.,
complete as directed by SIPCOT Officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE
Sl.
No.
Quantity TNBP
No.
Rate Both in figures
and in words (Rs.)
Unit Amount
(In Rupees)
1 1370.00
Sqm
(One
Thousand
and three
hundred and
seventy
square
metres only)
1 Sqm
(One
square
metre)
2 10.00 Sqm
(Ten square
metres only)
1 Sqm
(One
square
metre)
Section XV - 2 items (Two items only) Sub Total
XV. Painting for Existing Compound Wall around A.O.Block at SIPCOT Industrial Complex, Cheyyar.
Description of Work
Painting two coats with approved cement paint over one coat
of priming coat over including cement plastered exposed
surface cleaning, preparing the surface and curing etc.,
complete and as directed by SIPCOT officers.
Painting with synthetic enamel paint two coat over old iron
work including cost of all material and labour charges etc.,
complete and as directed by SIPCOT officers.
CONTRACTOR
No.of Corrections:.........
No. of Overwritings:.........
SE