Week Date Schedule Notes 1 11/01/13 Production logo Treatment Locations Completed in time and was enjoyable. I had to readjust my production logo as it was tacky. 2 18/01/13 Location shots Script Storyboard/animatic 3 25/01/13 Costume design and props list Contracts for location Risk assessment 4 01/02/13 Contingency plan Casting list Crews roles 5 08/02/13 All scenes shot and labelled Problems/ issues/ successes 6 15/02/13 finishing the Production and sound design 7 22/02/13 Editing and organisation Rough cut 8 01/3/13 Re-shoots 9 08/3/13 Final cut Scheduling

Transcript of Schedule

Page 1: Schedule

Week Date Schedule Notes1 11/01/13 Production logo

TreatmentLocations

Completed in time and was enjoyable. I had to readjust my production logo as it was tacky.

2 18/01/13 Location shotsScriptStoryboard/animatic

3 25/01/13 Costume design and props listContracts for locationRisk assessment

4 01/02/13 Contingency planCasting listCrews roles

5 08/02/13 All scenes shot and labelledProblems/ issues/ successes

6 15/02/13 finishing the Production and sound design

7 22/02/13 Editing and organisationRough cut

8 01/3/13 Re-shoots

9 08/3/13 Final cut

Scheduling