Scaffold Inspection Register
Transcript of Scaffold Inspection Register
Scaffold Inspection Register
Name of person inspecting:
Date/time: 01.02.18 @ 14.20 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 02.01.18 @ 13.10 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 02.11.2017 @ 15.15 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 04.01.18 @ 14.32 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 04.05.2017 @ 10.45 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 04.08.2017 @ 13.00 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 06.04.2017 @ 10.30 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 07.09.2017 @ 13.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 08.06.2017 @ 11.20 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 12.10.2017 @ 14.25 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 15.05.2017 @ 11.45 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 17.08.2017 @ 13.15 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 19.10.2017 @ 15.40 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 20.04.2017 @ 14.40 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 20.07.2017 @ 13.00pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 21.12.2017 @ 14.45 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 23.03.2017 @ 12.25 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 24.08.2017 @ 13.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 25.04.2017 @ 11.00 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 27.07.2017 @ 12.20 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 28.09.2017 @ 14.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 29.06.2017 @ 13.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 31.08.2017 @ 13.15 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 05.01.2017 @ 10.30 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 02.02.2017 @ 11.15 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 09.02.2017 @ 09.40 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 12.01.2017 @ 13.00 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
Scaffold Inspection Register
Name of person inspecting:
Date/time: 26.01.2017 @ 11.25 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y