    2/16

    Stupid Set-ups

    The plank issupported by an

    extension ladder,a closed stepladder and astraight ladder.

    The guardrails are

    not acceptable. There is no

    stability

  • 8/6/2019 SCAFF-1

    3/16

    1926.450 Scope, Application

    Covers all scaffolds used in

    workplaces.

    Does not apply to crane or derricksuspended personnel platforms,

    which are covered by 1926.550(g).

    Aerial lifts are covered 1926.453.

  • 8/6/2019 SCAFF-1

    4/16

    Scaffold Requirements

    Be on a firm foundation with base

    plates

    Be plumb, square and adequatelybraced

    Have a fully planked work deck

    Have guardrails over 10 feet Be tied in over 4 Vert./1 Horiz. high

    Have an adequate means of access

  • 8/6/2019 SCAFF-1

    5/16

    Scaffold Capacity

    Must be able support its own weight

    and 4 times the maximum intended

    load.

    Scaffolds must be designed by a

    qualified person.

    They must and built and loadedwithin design.

  • 8/6/2019 SCAFF-1

    6/16

    Competent Persons

    All scaffolds must

    be erected, moved,dismantled or

    altered only under

    the supervision of

    a competent

    person

  • 8/6/2019 SCAFF-1

    7/16

    Scaffold Foundations

    Scaffolds must

    have base plates,

    even when setting

    on a concrete

    floor.

    Also, the lack of abase plate could

    damage the

    scaffold leg.

  • 8/6/2019 SCAFF-1

    8/16

    Scaffold Foundations

    Scaffold legs must

    be set on base

    plates and adequatemudsills.

    There is no base

    plate and the scrap

    plywood is notadequate.

    The scaffold frame

    could penetrate the

    plywood.

  • 8/6/2019 SCAFF-1

    9/16

    Never on Masonry!

    Scaffolds should

    never be set on

    bricks, masonry

    blocks, etc.

    These are not

    structural elements

    and could crush

    under the scaffold

    load.

  • 8/6/2019 SCAFF-1

    10/16

    Good Foundations

    Masons Adjustable

    Hydro-mobile

    Frames

  • 8/6/2019 SCAFF-1

    11/16

    Plumb & Level The Scaffold

    It all starts in the

    first bay.

    If it is set plumb and

    square, the rest willfollow.

  • 8/6/2019 SCAFF-1

    12/16

    Guardrails are required at 10 feet.

    Fall protection can be used in lieu of

    guardrails on some scaffolds.

    Top rails must be 38 to 45 high

    You must have a mid rail.

    Use of cross bracing is allowed in lieu of

    top rail or mid rails in some cases but not

    both.

    Guardrails1926.451 (g)

  • 8/6/2019 SCAFF-1

    13/16

    Use of Braces forGuardrails

    Brace can be used as a Top Rail.

    Platform

    38 - 48"Install Mid Rail

    < 48"

  • 8/6/2019 SCAFF-1

    14/16

    Mobile

    Scaffolds

    Diagonal

    Brace

    Full Guardrails

    All Frame

    Bracing

    Fully Planked

    Deck

    ProperAccess

    Stack Pins

    Locked

    Level

    Surface

    Total Height Less than 4 times Base

  • 8/6/2019 SCAFF-1

    15/16

    Training Requirements

    1926.454

    Workers must be trained in Nature of electrical, fall, and falling object

    hazards Correct procedures for protection of above Proper use of the scaffold Load capacities of scaffolds Requirements of OSHAs Subpart L

    Retraining as necessary to restoreproficiency

  • 8/6/2019 SCAFF-1

    16/16

    Pump Jack

    Scaffolds

    Must have an 18

    platform.

    Must have guardrails

    or other fall

    protection