TATA BLUESCOPE STEEL LIMITED (TBSL) JAMSHEDPUR SPECIFICATION NO. 25331-00-08-ELA-001 FOR SUPPLY, ERECTION, TESTING & COMMISSIONING OF SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM FOR WATER & UTILTIES SERVICES NOVEMBER 2009 M. N. DASTUR & COMPANY (P) LTD Consulting Engineers P-17, Mission Row Extension Kolkata 700013

Transcript of SCADA spec 25331-00-08-ELA-0001

Page 1: SCADA spec  25331-00-08-ELA-0001

TATA BLUESCOPE STEEL LIMITED (TBSL) JAMSHEDPUR

SPECIFICATION NO. 25331-00-08-ELA-001

FOR

SUPPLY, ERECTION, TESTING & COMMISSIONING

OF

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM

FOR

WATER & UTILTIES SERVICES

NOVEMBER 2009

M. N. DASTUR & COMPANY (P) LTD Consulting Engineers

P-17, Mission Row Extension Kolkata 700013

Page 2: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

TABLE OF CONTENTS

PAGES 1. SPECIFICATION OF SUPPLY, ERECTION, TESTING & 31

COMMISSIONING OF SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM FOR WATER AND UTILITIES SERVICES

ANNEXES

ANNEX - 1 SPECIFICATION FOR UNINERRUPTED

POWER SUPPLY (UPS) EQUIPMENT ANNEX - 2 SYSTEM ACCEPTANCE

ANNEX - 3 DRAWINGS AND DOCUMENTS ANNEX - 4 PREFERRED MAKE LIST

APPENDICES APPENDIX - 1 TENTATIVE LIST OF PARAMETERS FOR UTILITY SYSTEMS APPENDIX - 2 TENTTIVE LIST OF PARAMETERS FOR WATER SYSTEMS

TENDER DRAWINGS

25331-00-08-ELA-0001 .. TYPICAL CONFIGURATION DIAGRAM OF SCADA SYSTEM

25331-00-08-ELA-0002 .. INTERPLANT CABLE ROUTING LAYOUT

Page 3: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

1 of 31

SPECIFICATION

FOR

SUPPLY, ERECTION, TESTING & COMMISSIONING OF SCADA SYSTEM

FOR UTILITY, WATER AND POWER SYSTEMS

FOR

COATED STEEL COMPLEX

OF

TATA BLUESCOPE STEEL LIMITED (TBSL)

SECTION-I - GENERAL 1.0 INTRODUCTION 1.1 Tata Bluescope Steel Limited (TBSL), a joint venture company between Tata Steel Limited, India and BlueScope Steel Limited, Australia proposes to set up a major state-of-the-art metallic coating and painting facility in Bara Ash pond Area in the city of Jamshedpur (West Singhbhum district) in the state of Jharkhand, India. The proposed coated steel complex will be situated adjacent to Tata Steel’s existing steelworks. The proposed facility shall have an annual metallic coating capacity of 250,000 tons and paint line capacity of 150,000 tons followed by a coil slitting-cum-recoiling line and a coil packaging line. 1.2 TBSL desires to set-up a Supervisory Control and Data Acquisition (SCADA) system for collection, processing, on-line visualization and storage of parameters related to utilities, water and power systems covering the plant units coming in the coated steel complex. 1.3 This technical specification covers the design, engineering, manufacture, supply, installation, integration, testing at supplier’s works as well as at sites, tuning and commissioning of hardware and software for the SCADA system to be installed for utility and water services including successful demonstration of the various functions and other aspects, as specified elsewhere in this technical specification. 1.4 This specification forms a part of the tender document and should be read in conjunction with Invitation To Tender and General Conditions of Contract and list of preferred makes.

Page 4: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

2 of 31

1.5 The Tenderer shall study all sections of the specification and visit the site to ascertain for himself the existing installations, the route of cables to be laid, ground contours, roads, railway tracks, pipe towers/trestles, nullahs, buildings, hutments, structures, overhead lines/towers/gantries, fencing/boundary walls, etc. for arriving at the requisite length and route of fibre optic cables and other cables. 1.6 The Tenderer shall satisfy himself about the suitability and workability of the equipment, accessories and the system proposed and shall take full responsibility in offering equipment and accessories with guaranteed performance and smooth reliable operation of the individual item, interfacing with other systems and the integrated operation of the total system as a whole. 2.0 The following processing lines are to be setup by different

suppliers in the coated steel complex: - Metal Coating Line (MCL) - Coil Paint Line (CPL) - Slitting-Cum-Recoiling Line (SRL) - Packaging Line (PL) 3.0 The tentative material flow in the coated steel complex is

indicated in the Material flow diagram (Fig-1)

Page 5: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

3 of 31

MATERIAL FLOW DIAGRAM

FIGURE -1

CPL 150,000 t/yr

YMS

SRL

150,000 t/yr 15 avg wt.

30,000 t/yr 15 avg wt.

120,000 t/yr 15 avg wt.

PACK LINE

MES

MCL 250,000t/yr

105,000 t/yr

Bore Vert Yard

145,000 t/yr

Direct Pack 100,000 t/yr 15 avg wt.

Bore Horiz Yard

Page 6: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

4 of 31

SECTION–II - TECHNICAL 1.0 GENERAL 1.1 This technical specification covers the design, engineering, manufacture, supply, installation, integration, testing, tuning and commissioning of hardware and software for the SCADA system to be installed for utility, water and electric power services for Coated Steel Project of Tata Bluescope Ltd. 1.2 The Tenderer shall take full responsibility for guaranteed operation and performance of the equipment and system being supplied and to be in full conformity to all technical requirements as laid down in this specification. 1.3 All items covered under this specification shall be complete in all respects and any item or accessory not covered in this specification, but essential for proper design and operation of the system shall be included by the Tenderer in the offer within the price quoted, indicating the purpose of such inclusions. 2.0 DESIGN BASIS 2.1 A new Supervisory Control and Data Acquisition (SCADA) system is proposed to be set-up for collection, processing, visualization and storage of on-line data/information related to utility, water and power systems in a real time environment covering the new plant units coming in TBSL complex. The system will be located in the MCL Exit ECR building. 2.2 The proposed system shall work in conjunction with the various control and monitoring systems of each packaged units, which shall be provided by ‘others’ for operational controls and management of the respective processes, mostly functioning independent of each other. The typical system configuration is schematically represented in drawing no 25331-00-08-ELA-0001. 2.3 The proposed system shall be designed for collection of relevant information and data related to water, utility and power systems over front end devices and transmit the same to the SCADA system for computer based processing, visualization, storage and retrieval in real-time environment. 2.4 The signals generated at various points of different plant units will be collected at the RTU (Remote Terminal Unit)

Page 7: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

5 of 31

which will act as front-end device to be integrated with the SCADA system. The tentative number of RTUs to be considered will be about six (6) as follows. One (1) RTU is proposed to be installed in CPL area, one(1) in MCL area, one(1) in N2 generation plant area, one(1) in utility ECR building, one(1) in propane storage area and one(1) in boiler area. The RTU at boiler area will have approximately two (2) nos Remote I/Os to cater signals from Incinerator and DM plant & WWTP area. The RTU at utility ECR building will have approximately one (1) no Remote I/O to be located at compressor station area. The RTU at N2 plant area will have approximately one(1) no Remote I/Os to cater signals from H2 generation plant area. However, the exact number of RTUs and Remote I/Os will be proposed by the bidder depending on the technical parameters of the proposed system and the plant requirement. Location of MCL Exit ECR and various plant units are indicated in drawing no 25331-00-08-ELA-0002. The tentative location of RTUs and RIOs are indicated in Table -1.

Table-1: Tentative locations of RTUs & RIOs

2.5 The signals which are already measured by the plant package supplier in their respective PLCs will be made available to SCADA RTUs through 4-20 ma signals regenerated by plant package suppliers PLCs. Also interface hardware and software as required for receiving necessary signals from package supplier’s PLCs will be provided at SCADA RTUs. The interface details will be finalized during engineering. Coordination with package supplier for smooth implementation of the SCADA system will be included in the scope of work of the Tenderer. For the signals which are not available through package supplier PLCs, new instruments dedicated for SCADA system are to be included in Tenderer’s scope. Supply of analog outputs at SCADA RTUs for regeneration of signals if required is also included in the Tenderer’s scope.

RTU Tentative location of RTU Remote I/O Tentative location of

Remote I/O

RTU 1 N2 Generation Plant Area RIO 1 of RTU 1 H2 Generation Plant Area

RTU 2 MCL Area ------ ------

RTU 3 Utility ECR Building RIO 1 of RTU 3 Compressor Station Area

RTU 4 CPL Area ------ ------ RIO 1 of RTU 5 Incinerator Area

RTU 5 Boiler Area RIO 2 of RTU 5 DM Plant &

WWTP Area

RTU 6 Propane Storage Area ------ ------

Page 8: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

6 of 31

2.6 Power consumption at CCL, MCL, SRL, PL and Utility ECR will be monitored in SCADA system. Also input to the LBSS will be monitored in SCADA system. All power consumption related parameters like MW, MVA, MVAR, MWH, MVARH will be made available by LBSS supplier at their Substation Automation System. SCADA system will collect all relevant data from LBSS through OPC connectivity over Ethernet network. The necessary hardware and software required for the connectivity as well as cabling from LBSS to SCADA system is included in the scope of the Tenderer. 2.7 Tentative list of utility and water parameters to be measured are indicated in Appendix-1 and Appendix-2 respectively. 2.8 The connections between the RTUs and SCADA system shall be through fibre optic based Ethernet LAN. The fibre optic based Local Area Network (LAN) shall have the following minimum characteristics:

- Gigabit Ethernet backbone network - Tiered architecture - Scalability and upgradability - State-of-the-art network management - L3 routing support

2.9 SCADA system shall have interface with the Manufacturing Execution System (MES) through DB link over Fiber optic based 1 GBPS Ethernet LAN. Supply of hardware and software as required at the SCADA system as well as supply and laying of Fiber optic cables for connectivity of the SCADA system with MES will be included in Tender’s scope. 2.10 The proposed system will be flexible with provision for expansion and reconfiguration in respect of both hardware and software as may be necessary to take care of any addition / deletion of number and type of signals as well as connectivity to the SCADA system. 2.11 The SCADA system will be designed to perform the following minimum tasks/functions, which need to be developed/customized to suit the specific requirements of the Purchaser.

- Mimic and data display of utility, water and power system networks

- Alarms/Event management including message display and

acknowledgement - Real-time and historical data trending.

Page 9: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

7 of 31

- Generation of Reports at preset times, on demand and on event occurrence.

- Storage of historical data on HDD/backup media 2.12 The successful Tenderer shall submit a detailed functional requirement specification along with the system requirements for approval of the purchaser, based on which the application software shall be developed. 2.13 Instrumentation 2.13.1 All process related data required for design of the instrumentation system are given in the list of parameters to be measured for various utility/water services in Appendix-1 & Appendix-2. 2.13.2 For flow measurement of compressible fluid (N2, H2, LPG, Propane, Compressed air, Instrument Air etc), suitable correction for pressure and temperature variations shall be done in the SCADA system. 2.13.3 All analog input signals in the SCADA system shall have provision of retransmission for further use by the purchaser which shall be effected either by using signal distributor multiplier or by providing analog output signal for the corresponding input signal as suitable. Wherever such retransmission output is required, the same shall be brought and terminated at a common junction box from where further cabling will be done by others. 2.13.4 For interconnection of individual field instruments with the RTU/Remote I/O units of the SCADA system, screened, twisted pair cable (2 pair) shall be used. Whenever possible, the closely located field transmitter shall be grouped together and connected to the system through intermediate junction boxes using screened twisted pair cables. 2.13.5 All the field mounted transmitters shall be provided with transmitter housing for protection against sun/rain/dust etc. 2.13.6 12 mm OD SS 304 impulse pipes shall generally be used

along with SS compression fittings.

Page 10: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

8 of 31

3.0 SYSTEM FEATURES The SCADA system shall have the following minimum features: Open system architecture with relational database

management system. Feature for checking the healthiness of the system and

communication links. Sufficient capacity in terms of memory and I/O to

perform the required functions including spare for future upgradation.

User-friendliness using ‘Windows’ based applications. Keeping of statistics of errors encountered in

communication. Prioritisation of tasks like alarm processing etc. Database for storing and retrieval of various parameters,

historical data etc. Historical data archiving on hard disk as well as on

removable media for at least one year. Multiple levels of security for users with predefined

access rights and password protected access. Alarm generation with time-stamping. Trending of real-time and historical data in different user

configurable formats. Flexible reporting system providing pre-formatted

standard reports for common requirements as well as generation of free format reports configurable by the user, available on demand, event/application initiation or at preset time intervals.

Information display in various formats including bar

graph, chart etc.

Time synchronisation amongst various sub systems of the SCADA system

Page 11: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

9 of 31

4.0 SCOPE The scope of supply and services to be provided by the successful Tenderer shall include but not be limited to the following: 4.1 Design, engineering, manufacture, inspection, testing at manufacturer's works, supply, installation, cable route survey, laying of cables, integration, testing at site, erection, commissioning, tuning and demonstration of the complete system. 4.2 Software engineering for development of the application software for the complete development cycle covering preparation of functional requirement specification, global & detail design document, coding, testing as well as fine tuning including supply of documented source code for the complete application software. 4.3 Supply and installation of hot redundant SCADA application cum database servers as specified in item No. 5.1 in the SCADA control room along with necessary software. 4.4 Supply and installation of required nos of RTUs (Remote Terminal Unit) for the SCADA system (tentative six(6) nos) as specified in item No. 5.9 which will be finalised depending on the technical parameters of the proposed system and the plant requirement. The RTUs will be connected to nearest network switch of SCADA network through fibre optic cable. RTUs will have the required number of Remote I/Os to be supplied by the Tenderer. Supply of necessary Fiber optic cables and cable laying for connecting RTUs, Remote I/Os is under the scope of the Tenderer. 4.5 For each RTU location, separate UPS along with SMF batteries with backup of minimum 1 hour to be supplied by the Tenderer. Power distribution boards as required will also be supplied by the Tenderer. Remote I/O units shall be powered with 230 VAC, 50Hz general purpose power supply to be arranged by TBSL. If any equipment is designed for voltage different from that specified above the Tenderer shall include necessary transformers, conversion and stabilizing equipments etc in the offer as required. 4.6 Supply and installation of minimum four (4) Nos. operator stations in the control room with necessary software and 20” TFT colour monitor as specified in item No. 5.2 4.7 Supply and installation of two (2) Nos. Engineering stations in the control room with 20” TFT colour monitor as specified in item 5.4 with RTU (PLC) configuration Software and HMI Development Software.

Page 12: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

10 of 31

4.8 Supply and installation of one (1) No. Laptop PC as specified in item 5.4 with RTU (PLC) configuration software. 4.9 Supply and installation of required networking equipment including network switches and network management software as specified in item 5.7 and 6.1.2. The supply and laying of necessary cables and cable accessories for connecting switches and nodes with the fiber optic based network will be under the scope of Tenderer. 4.10 The Network switches at each location will be supplied from UPS (Uninterrupted Power Supply) of required capacity with sealed maintenance-free battery for one (1) hour back-up. 4.11 Supply and installation of one (1) No. networked colour Laser printer and one (1) No. Dot-matrix printer in SCADA control room. 4.12 The SCADA system with its terminals in the SCADA control room shall be supplied from a parallel redundant Uninterrupted Power Supply (UPS) system with sealed maintenance-free battery for back-up of one (1) hour as specified in Annex-1. 4.13 The cable route survey, cable engineering, supply and laying of all types of cables including fibre optic cables, UTP cables, power, control and screened cables as required. 4.14 The required numbers of Light guide Interconnection Unit (LIU) as required for termination of fiber optic cables in the network. 4.15 Trays, racks, conduits, supports, junction boxes, cable tags and associated fittings as may be required. 4.16 Separate earthing including earth pit and required cables and accessories for the SCADA system. Earthing system shall be properly designed to provide safety as well as signal noise grounding. The earth loop impedance shall be as recommended by the computer manufacturer and shall preferably be not more than 0.3 ohms. 4.17 Instrumentation 4.17.1 Design, engineering, supply, installation, testing and commissioning of all necessary instrumentation system for the proposed SCADA system for Tata Blue Scope. 4.17.2 Supply of all necessary field instruments like flow meter (either orifice/DP transmitters or Magnetic flow meter), Pressure transmitters, temperature elements with temperature transmitters and other special type of instruments like Analyzers etc. as

Page 13: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

11 of 31

required complete with companion flanges, matching flanges, carrier rings (wherever required) nuts, bolts, gaskets etc. Pressure transmitters shall be supplied with 2 valve SS manifolds and DP transmitters shall be supplied with 3 valve SS manifolds with necessary mounting brackets etc. Necessary thermowells of SS material from drilled bar stock shall be supplied with temperature elements like RTD or Thermocouples. 4.17.3 Supply of signal distributers/multipliers for multiplication of signals, transmitters / converters for magnetic flow meters along with transmitter housing and other mounting accessories as required. 4.17.4 Supply of all necessary installation hardware like impulse pipes, fitting and piping accessories as required for hook-up with the process for proper functioning of the instruments / transmitters. 4.17.5 Supply of all necessary cables like power, control, screened as well as other special cables as required. 4.17.6 Supply and installation of all cabling installation accessories like junction boxes, pull boxes, cable trays, tray supports, conduit, lugs, terminal etc. 4.17.7 Various tapping points on piping shall be provided by the piping contractors. However sockets, nipples, first isolation valves for pressure transmitters and sockets / boss / flanges for mounting of temperature elements shall be supplied by the successful Tenderer. 4.17.8 Installation & testing of all necessary instruments, panels, cubicles etc., cable laying, termination and successful commissioning of the entire instrumentation system. 4.17.9 In the areas where the instruments are supplied by the respective package suppliers, the SCADA supplier will provide the signal splitters as required. Supply and laying of cables from signal splitters to SCADA RTUs are also included in the scope of SCADA supplier. 4.18 Co-ordination with concerned agencies for integration of SCADA system with other systems and equipment, as required. 4.19 Supply of spares and consumables as required for commissioning of the system, upto issue of PAC. 4.20 All computer equipment furniture such as operator console, desks, printer tables, equipment cabinet/rack etc as well as storage cabinet and operators chair as required.

Page 14: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

12 of 31

4.21 Supply of necessary software as specified in Software item No. 6.0. 4.22 Connectivity with MES over Ethernet network as described

in Design Basis, item No. 2.8. 4.23 Inspection and Testing at manufacturer’s works and at site as per test specification to be furnished by the successful tender for approval of the EMPLOYER/ENGINEER. The successful Tenderer shall provide required personnel, equipment and all test programs and documentation for the purpose of testing. The details of testing is described in item No. 7.0. 4.24 Warranty maintenance for both hardware and software including supply free software updates during warranty period. 4.25 Conducting system acceptance tests as indicated in item No. 7.8 4.26 Supply of all drawings/documents as described in item No.9.0. 4.27 Training of TBSL’s personnel as described in item No. 8.0.

Page 15: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

13 of 31

5.0 Equipment specification The following equipment as indicated below shall be included in the scope of supply of the tenderer. 5.1 Rack Optimised Hot Redundant SCADA Application cum Database servers: Two (2) nos rack mounted servers (hot redundant) with the following specification:

1. Processors 2 Nos Quad core Intel Xeon processor X5470 (3.33 GHz, 1333MHz FSB) with minimum 8 MB Level 2 cache and higest available clock speed. The server shall be expandable to support upto 4 processors

2. RAM 8GB expandable to minimum 64 GB

3. Hot swappable HDD drive

2 X 300 GB SAS hot plug drives with RAID1 controller.

4. Optical Drives DVD RW 5. Power Supply Redundant hot-plug power supply 6 Fan Redundant fan 7. Colour Monitor Min. 20” Flat TFT monitor, 8. Network

interface Two(2) Nos. 10/100/1000 base T

9. Key Board & Mouse

Standard

10. Ports Four (4) USB, one(1) serial 11. I/O expansion

interfaces Min 4 PCIx / PCIe should be offered

12 Magnetic backup device

Rack mounted chassis type LTO 4 tape drive, minimum 200/400GB capacity

13. Operating System

Windows 2008 Server or latest version with latest service pack

14. Management tools

Comprehensive system management tools including Configuration Management, Event Scheduling, Alert Management, RAID management, Remote Management (Dedicated firmware based remote management for the server should be offered), diagnostic software for processors, disk, memory, power supplies, fans

Page 16: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

14 of 31

failure etc. 15. Others The servers should be rack

optimised (2U height). Supply of the suitable rack is included in the scope of supply of the tenderer.

16 Common Disk storage for the servers

Rack mounted type Chassis, 5 nos 146 GB SAS HDD with RAID 5 configuration, redundant power supply and redundant fan. The disk scalability should be Min 8 nos.

5.2 Operator Station Minimum Four (4) no. operator stations in with following minimum specification:

1. Processor 1 No. Intel Core 2 Duo or higher grade processor, latest available clock speed

2. Mother Board Intel E6600 or higher 3. Main Memory 1 GB (or more) 4. HDD 160 GB SATA HDD (or more) 5. Optical Drives DVD RW 6. Colour Monitor Min. 20” Flat TFT monitor, 1280

X 1024 Resolution supportive or higher, viewing angle 170degree or higher

7. Network Adapter

One(1) No. 10/100/1000 base T

8. Key Board & Mouse

Standard

9. Display Card/ Sound Card

Built in Video Graphics display and sound card

10. Operating System

Windows XP professional or latest Windows version with latest service pack

11. Ports Minimum Four (4) USB, One (1) serial port

5.3 Engineering Station Minimum two (2) No. Engineering station in with following minimum specification:

1. Processor 1 No. Intel Core 2 Duo or higher grade processor, latest available clock speed

Page 17: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

15 of 31

2. Mother Board Intel E6600 or higher 3. Main Memory 1 GB (or more) 4. HDD 160 GB SATA HDD (or more) 5. Optical Drives DVD RW 6. Colour Monitor 20” Flat TFT monitor, 1280 X

1024 Resolution supportive or higher, viewing angle 170degree or higher

7. Network Adapter

One (1)No. 10/100/1000 base T

8. Key Board & Mouse

Standard

9. Display Card / Sound Card

Built in Video Graphics display and sound card

10. Operating System

Windows XP professional or latest Windows version with latest service pack

11. Ports Minimum Four (4) USB, One (1) serial

5.4 Laptop PC Minimum three (3) No. Laptops with following minimum specification:

1. Processor Intel Core 2 Duo Processor with latest available clock speed

2. Motherboard Mobile Intel Chipset 3. Main Memory 1 GB 4. HDD 160 GB SATA HDD 5. Optical Drives DVD RW 6. Display 15” SXGA TFT monitor or higher 7. Network

Adapter On board 10/100/1000 base T Gigabit Ethernet card, Modem, WiFi

8. Key Board & Mouse

Keypad and integrated Touch Pad/Pointing device. Additional 1 (one) No external USB mouse

9. Display Card/ Sound Card

Built in Video Graphics display and sound card

10. Wireless 802.11a/b/g wireless 11. Operating

System Windows XP professional or latest Windows version with latest service pack

12. Ports Minimum 3 USB, 1 RJ-45 (NIC), 1 RJ-11 (Modem), 1 No serial

13. Batteries & Power Adaptor

Lithium-Ion Re-chargeable battery pack with estimated 3 to

Page 18: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

16 of 31

5 hours battery life or higher 5.5 Printer Printers with the following minimum configuration:

1. One(1) No. colour Laser jet printer

- 22 PPM Colour or higher - 600 X 600 dpi or higher - 160 MB memory or higher - A3 size paper - Ethernet Interface - minimum two paper trays

2. One (1) Dot– Matrix printer

- 136 column type - 400 cps speed or higher - Test and graphics character set - Heavy duty type

5.6 Standard racks: As per requirement for the above mentioned servers and other equipment, suitable sized rack with minimum 30% additional spare capacity should be provided. The rack should be from the same OEM as that of the servers & storage with cable guides and other complete accessories. For management, 1U rack mountable 17.0” LCD monitor with rack mounting kits, touch-pad, keyboard and KVM having necessary H/W, cables and software shall be provided.

Page 19: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

17 of 31

5.7 Network Equipment

I. Central switch: Central switch with the following minimum feature and configurations: - Fully SNMP managed Layer 3 switch - 10/100/1000 Ethernet FO/UTP interface - Support for link aggregation, automatic fail- over protection, priority queuing, RSTP - Redundant Power Supply - Termination of Fiber links into switch directly without using Media converter - Minimum 30% spare ports of each type after commissioning of the system

II. Distribution/Edge Switch Required No. of Distribution/Edge switches with the following minimum feature and configurations: - Manageable type with Layer 2 functionality - 10/100/1000 Ethernet FO/UTP interface - Support for link aggregation, automatic fail- over protection, priority queuing, RSTP - Termination of Fiber links into switch directly without using Media converter - Minimum 20% spare ports after commissioning of the system

5.8 Fibre-optic networking cables

- Single mode and/or mutlimode types depending on plant requirement.

- Single mode: 8.3/125-micron core/cladding, enhanced graded index glass fibre.

Page 20: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

18 of 31

- Multimode: 62.5/125-micron core/cladding, enhanced graded index glass fibre.

- Outside cable shall be armoured, gel filled with UV protection and suitable for direct buried application

- Minimum Two (2) cores as spares after installation of the system

5.9 Remote Terminal Unit (RTU)/Programmable Logic Controller (PLC) Minimum six(6) Nos. RTUs (PLCs) with the following

minimum features: - I/O handling capacity shall be atleast 50% more than the

required I/Os - IEEE 802.3 compliant Ethernet communication ports with

minimum 100 Mbps speed, maintenance port, port for GPS clock.

- IEC 61131-3 compliant system logic software - Minimum RAM capacity shall be 1 MB - RTU (PLC) configuration from remote engineering station

shall be possible - Compliance with IEEE and IEC standards. - Suitable for carrying out functions like signal acquisition,

processing, self diagnostic checks, logical & mathematical functions, floating point calculation and communication with SCADA system

- Battery back-up for the programmed memory

- Redundant power supply

- Memory utilization shall not exceed 50 % of its full rated capacity

- Minimum 30% spare I/O of each type after

commissioning of the system - RTU (PLC) shall have space and mounting arrangement

for installation of additional 15% I/O in future - LED status indication on I/O cards

- Isolation of I/O cards from the field signals by opto-coupling

Page 21: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

19 of 31

- Facility for time stamping with accuracy less than 50 msec.

- Self diagnostic feature for detecting hardware and

software fault upto card level - Support of Industry standard protocols like DNP 3.0,

Modbus TCP/IP, Modbus RTU, Profibus - The RTUs (PLCs) shall be supplied with floor mounted

cabinet. 6.0 Software 6.1 The software to be supplied shall be comprehensive and suitable for supporting all functions as per this specification. Software licenses as far as possible shall be supplied on group basis rather than individual basis. All operating system, antivirus and other standard software shall be provided in CDs with licenses. Only preloaded version not be acceptable. The software shall include but not be limited to the following: 6.1.1 Basic software - Windows 2003 Server or latest version with latest service

pack and required no of cal licenses for servers - Windows XP professional or latest Windows version with

latest service pack for operator stations, engineering stations and laptop PC.

- Utilities like mimic developer, text and graphic editor,

communication manager, sorting and merging facility for data, file manager, debugging aids, diagnostic programs etc.

6.1.2 Standard software - Visualisation software with features for generation,

editing, storage and display of visual information with powerful set of graphic primitives

- Relational Data Base Management System (RDBMS),

preferably Oracle (latest version), with forms and report generation tools having support for OLEDB/ODBC, facility for online backup/restore, self tuning memory management, distributed query and transaction etc. In

Page 22: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

20 of 31

case, the Tenderer offers RDBMS other than Oracle, suitable connectivity have to be provided by the Tenderer

- Communication software for communication with other

application systems, as required - Office application package, Antivirus software etc - Network management software - Compilers, as required for the project 6.1.3 Besides the above basic and standard software, any other software packages as may be necessary are also to be supplied from third party sources with prior approval of the Purchaser. 6.1.4 Application Software: The application software with minimum 10000 tags shall be provided to perform the various functions as detailed in this specification and shall have the following minimum considerations: - The application software shall be developed using

suitable programming language to fullfill the functional requirements of the system. Software development tools as will be used during software development shall be supplied to the user

OR standard off-the – self SCADA package will be suitably

customized to meet functional requirements as specified. - Programs should be written with sufficient comments

inside for ease of understanding. - Programs should be structured in modules with each

module having unique entry and exit points for ease of modifications and/or addition/deletion of functions.

- Uniqueness of data/field names, sub-routine names and

labels throughout the system. 7.0 Inspection and Testing 7.1 Inspection and Testing at Manufacturer’s Premises 7.2 All supply items under the scope of the specification shall be inspected by the Purchaser as per inspection procedure to be finalized between the Purchaser and the Tenderer. 7.3 The Tenderer shall submit the proposed Inspection Procedure of all electrical, instrumentation and automation items in

Page 23: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

21 of 31

duly filled-in format under the scope of supply to the purchaser for finalization. 7.4 Factory Acceptance Test (FAT) shall be conducted on the complete integrated system at manufacturer’s premises as per test specification to be furnished by the successful Tenderer for approval of Purchaser. 7.5 Testing at site 7.6 Provisional and final acceptance (Site Acceptance Test) shall be conducted at site after commissioning of the system. These acceptance tests shall be carried out to ensure correct integrated function of the system as a whole after a specified period of operation, to be mutually decided with Purchaser. 7.7 The Tenderer shall rectify any hardware and/or software malfunctions, which might occur during the period between commissioning and final acceptance, and shall demonstrate performance to the satisfaction of the Purchaser. 7.8 For the purpose of testing, the Contractor shall furnish a test specification document in accordance with the manufacturers recommended tests and latest trends & practices, for approval of the Purchaser. In the test document Tenderer shall describe tests for all features and functionalities of the SCADA system including the various system parameters as indicated in System Acceptance Test, Annex -2 . The test shall be completely defined and the exact testing methods, duration as well as the acceptance criteria shall be clearly indicated. 7.9 For the purpose of testing, the Tenderer shall provide the required personnel, equipment, special instruments and all test programs and documentation as required. 8.0 Training 8.1 The Tenderer shall include in his offer the training of

Purchaser’s personnel. 8.2 The Tenderer shall indicate in his offer the number & category of personnel proposed to be trained indicating the training needs in specific areas of hardware and software, the duration, the location as well as the methods of imparting such training. 9.0 Drawings and documentation

Successful Tenderer shall supply drawings and documents as listed in Annex-3 .

Page 24: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

22 of 31

10.0 Reference list 10.1 A reference list of similar jobs executed by the bidder indicating the system details, time of execution and completion time shall be furnished by the bidder. 11.0 Information to be furnished 11.1 The tenderer shall furnish in his offer the information called for in different parts/sections of the tender documents without which the offer is liable to be rejected. The information to be furnished shall include but not be limited to the following : - General description of the equipment and software offered specifying the important features and system operation along with technical brochures. - Following conceptual drawings/documents : i) System configuration ii) Heat and Power load data iii) Time schedule for the complete system implementation 12.0 Validity of offer 12.1 The offer made by the Tenderer against this specification shall remain valid for a minimum period of six (6) months from the date of submission of the offer. 13.0 Price 13.1 The tenderer shall submit the price for supply and services covered in the prescribed formats as per price schedule enclosed with the specification. 14.0 Completion period 14.1 The complete SCADA system is required to be commissioned for integrated operation with the control systems of various package units within twelve (12) months from the date of order. The tenderer shall quote the best delivery period and the offer shall be accompanied by a time schedule showing various activities like submission of engineering drawings/ documents, software development / customisation, installation, testing, tuning etc.

Page 25: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

23 of 31

15.0 Exclusion 15.1 The following works are excluded from the scope of work of the tenderer : - Civil foundation and engineering work for the building/control room housing the SCADA system - Provision of space for housing and installation of RTU, UPS and other hardware equipment/devices required for the SCADA system - Room lighting for the control room.

Page 26: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

24 of 31

ANNEX - 1

TECHNICAL SPECIFICATION FOR UNINERRUPTED POWER SUPPLY (UPS) EQUIPMENT

I. UPS FOR SCADA CONTROL ROOM 1.0 Parallel redundant (current sharing mode) on line industrial

type UPS with Bypass transformer & Servo Controlled Voltage Stabilizer (SCVS) of required capacity shall be provided. The UPS shall have self diagnostic features and shall be suitable for the following:

1.1 Two different sources of input supply: one (1) for each UPS and

one (1) for SCVS of 415 V, 3 phases, 4 wires, 50 Hz. 1.2 +10%, -15% input voltage tolerance and +1%, -1% output

voltage tolerance. 1.3 +6%, -6% input frequency tolerance and +0.1%, -0.1% output

frequency tolerance. 1.4 Continuous duty with status display. 1.5 Overloading capacity 125% of rated load for 10 minutes and

150% of rated load for 1 minute. 1.6 Static by pass switch and manual changeover arrangement. 1.7 One (1) hour battery backup at full load with lead acid sealed

maintenance free battery with necessary battery racks. 1.8 Enclosure degree of protection of IP41. 1.9 Noise level: <65 dB at 1 meter distance. 1.10 UPS distribution board (ACDB) of 240V AC, 16A. 1.11 Steady state output voltage (nominal/variation): 230 VAC ±1%.

Steady state output frequency (nominal/variation): 50 Hz ±0.1%. Output voltage adjustment range @ rated load: ±5%.

1.12 Cable entry: from bottom. 1.13 Painting: Shade 631. 1.14 Feature for connectivity with Computer / SCADA system for UPS

status display. 1.15 Internal fans for cooling

Page 27: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

25 of 31

ANNEX - 2 SYSTEM ACCEPTANCE

1.0 The contractor shall arrange to conduct a System Acceptance Test. 2.0 The criteria for acceptance of the SCADA system shall

include the successful demonstration of all the functions and features of the proposed system. 2.1 The following system parameters are to be successfully demonstrated for system acceptance:

1. Availability of automation system : >99.9% 2. Network bandwidth utilization

(Average) (To be measured over continuous period of 8 hrs)

: <20%

3. Spare I/O capacity of each type : >20% (after commissioning) 4. Spare capacity of network switch

ports of each type : >20% (after commissioning)

5. UPS spare capacity : >20% (after commissioning) 6. UPS battery back-up time : 60 minutes

2.2 Availability of the SCADA system (i) For the test purpose of assessing system availability the

SCADA system will be operated continuously for a period of seven (7) days. (ii) Availability calculation

The above mentioned system availability will be calculated as follows:

System Availability = Total Test time - Total down time x 100% Total Test time

Page 28: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

26 of 31

The total down time shall be calculated using the following co-efficient for each device. Device Co-efficient 1. Server hardware : 100% (For redundant

servers if both the primary and secondary servers are down)

2. HMI / Engg. Station hardware

/printer : 15%

3. Networking equipment : 50% 4. Application software failure : 100%

Total down time calculation Total down time = Σ ( ti * ei) Where ti : Down time of individual device ei : Coefficient

Page 29: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

27 of 31

ANNEX – 3

DRAWINGS AND DOCUMENTS The drawings and documents to be furnished by successful tenderer during engineering shall be as per the table given below:

Sl. No. Document Name Type of

Document 1 Project Organization

I 2 Project / Implementation Schedule I

3 Drawings/Documents Issue Schedule A

4 Monthly Progress Report I

5 FAT Procedure A

6 SAT Procedure A

7 Inspection QAP I

8 FRS document A

9 System Configuration Diagram A

10 Bill of Material A

11 I/O assignment I

12 Cabinet Internal Layout Diagram I

13 Internal Wiring Diagram. I

14 Power Supply Distribution I

15 Cable schedule and JB schedule I

16 Cable Interconnection Diagram

I

17 Cable Route Diagram

I

18 Data sheets for computer hardware and networking equipments

A

19 Data sheet for Fiber optic cable

A

20 Data sheet for UPS and UPS battery

A

Page 30: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

28 of 31

21 Datasheet for Network Management Software

A

22 Transmitter Data sheets along with manufacturer catalog. A

23 RTD Data Sheet & Thermowell Assembly drawings A

24 Thermocouple Data Sheet & Thermowell Assembly drawings A

25 Orifice plate data sheets, sizing calculations, & assembly drawings. A

26 Venturi data sheets, sizing calculations and assembly drawings A

27 Magnetic Flow meter data sheets along with manufacturer catalog A

28 Instruments Installation Diagram I

29 Outline Dimensional Drawing for RTU/PLC A

30 Equipment Specifications for RTU/PLC/remote I/O (Upto card level).

A

31 PLC ladder program.

I I - Information Category ; A - Approval Category.

Page 31: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

29 of 31

ANNEX-4

PREFERRED MAKE LIST Field Instruments & PLC

S.No.

Items

Type

Vendors

1.

Pressure & DP (Flow & Level) Transmitters

Electronic & Smart type

EMERSON YOKOGAWA INDIA HONEYWELL ABB

2. Thermocouple Assemblies

PYROELECTRIC GIC IND. INST. EMERSON

3. MI Thermocouples & RTD

PYROELECTRIC GIC IND. INST. EMERSON

4. Temperature Transmitters

EMERSON YOKOGAWA INDIA HONEYWELL ABB

5.

Mini PLC

SIEMENS ABB ROCKWELL AUTOMATION GE FANUC

Flow Meter :

S.No.

Items

Type

Vendors

1.

Magnetic Flow Meters

YOKOGAWA INDIA ABB EMERSON E & H

Page 32: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

30 of 31

Flow Elements : S.No.

Items

Type

Vendors

1.

Orifice plates, Nozzles & Venturi

ENGG. SPECIALTIES MECH. ENGINEERS EMERSON

Analysers :

S.No.

Items

Type

Vendors

1.

Gas Analysers

ABB ANALYTICAL SHAW (MOISTURE) INVENSYS - FOXBORO SIEMENS (ADAGE AUTOMATION) (HUMIDITY) EMERSON YOKOGAWA INDIA

2.

CV Analysers

UNION REINEKE

SCADA System : S.No.

Items

Type

Vendors

1.

SCADA System

SCADA system software

ABB/ALSTOM/HAIL/GE FANUC/SIEMENS/RAIL/GE ENERGY/ YOKOGAWA INDIA / CITECT

Computer and Peripherals : S.No.

Items

Type

Vendors

1.

UPS

EMERSON/ HI-REL

2.

Computer

Server/PC

HP/ IBM / DELL

3.

Computer Peripherals

Printers, Scanners and

HP /EPSON/CANON

Page 33: SCADA spec  25331-00-08-ELA-0001

25331-00-08-ELA-001

31 of 31

Plotters

4. Network Components

Switches, HUB, Routers

CISCO/3-COM/NORTEL

UTP, Fibre Optic

RPG/ AT&T/ MOLEX/ LUCENT

5.

Cables

Instrumentation and control

DELTON/ CORDS INDIA / SPECIAL CABLES/ ELKAY TELELINKS /UNIVERSAL CABLE

Page 34: SCADA spec  25331-00-08-ELA-0001

Measurement Connectivity TentativeSl. No. Service Viscosity Sp.Gr. Type of MOC Pressure Purity

Dew Point Temp. parameters of signals to Location of

( Poise ) service DN O/D Thk. Flow element Max. Avg. range(ADP), Deg C with Tag No. RTU / RIO RTU / RIO

( mm ) ( mm ) ( mm ) & type Nm3 / hr Nm3 / hr

1 Nitrogen (generation) 0.00016 0.966 Gas 100 115 4.5

As selected by N2 plant supplier 2000 350 4 - 5

N2: 99.99%, O2 < 10ppm (-) 60 45 0 C

F, T, P, Purity,Dew point

N2 plantSupplier - atB/L of N2 plantonly.

RTU 1N2

Generation Plant Area

( From N2 generation plant)

MCL (con.) 150 166.5 4.8

SS-316 Orifice CS-Flange with DP Transmitter 1950 250 4 - 5 45 0 C F, P SCADA

RTU 2 MCL Area

2 Air Compressor Plant`

Plant Air (generation) 0.00017 1.000 Air 150 166.5 4.8

As selected by CA plant supplier 6200 1500 6.5 - 7.5 - (-) 20 45 0 C F, P, T

Air Comp. plantSupplier - atB/L of AirComp. plantonly.

RIO 1 of RTU 3

CompressorStation Area

From Compressor House

MCL (con.) 250 273.1 5.56

SS-316 Orifice CS-Flange with DP Transmitter 1700 700 5.5 - 7.5 45 0 C F, P

SCADA Measurements

at three (3) points

RTU 2 MCL Area

CPL (con.) 200 219.1 4.78

SS-316 Orifice CS-Flange with DP Transmitter 1500 496 5.5 - 7.5 45 0 C F, P SCADA

RTU 4 CPL Area

SRL & PL (con.) 250 273.1 5.56

SS-316 Orifice CS-Flange with DP Transmitter 900 840 5.5 - 7.5 45 0 C F, P SCADA

RTU 4 CPL Area

Incinerator (con.) 50 60.8 3.6

SS-316 Orifice CS-Flange with DP Transmitter 300 270 5.5 - 7.5 45 0 C F, P SCADA

RIO 1 of RTU 5

Incinerator Area

DM plant (con.) 25 34.2 3.2

SS-316 Orifice CS-Flange with DP Transmitter 90 70 5.5 - 7.5 45 0 C F, P SCADA

RIO 2 of RTU 5

DM Plant & WWTP Area

Boiler (con.) 25 34.2 3.2

SS-316 Orifice CS-Flange with DP Transmitter 100 90 5.5 - 7.5 45 0 C F, P SCADA

RTU 5 Boiler Area

Dry Air 0.00017 1.000 Air 65 76.6 3.6

As selected by CA plant supplier 200 80 6.5 - 7.5 - (-) 40 45 0 C F, P, T

Air Comp. plantSupplier - atB/L of AirComp. plantonly.

RIO 1 of RTU 3

CompressorStation Area

From Compressor House

MCL (con.) 65 76.6 3.6

SS-316 Orifice CS-Flange with DP Transmitter 170 124 5.5 - 7.5 45 0 C F, P SCADA

RTU 2 MCL Area

Process Data

Flow

Pipe Details

APPENDIX-1

LIST OF PARAMETERS FOR UTILITY SYSTEMS TO BE MEASURED FROM VARIOUS PLANT UNITS

Remarks / Scope

Page 35: SCADA spec  25331-00-08-ELA-0001

Measurement Connectivity TentativeSl. No. Service Viscosity Sp.Gr. Type of MOC Pressure Purity

Dew Point Temp. parameters of signals to Location of

( Poise ) service DN O/D Thk. Flow element Max. Avg. range(ADP), Deg C with Tag No. RTU / RIO RTU / RIO

( mm ) ( mm ) ( mm ) & type Nm3 / hr Nm3 / hr

Process Data

Flow

Pipe Details

Remarks / Scope

CPL (con.) 65 76.6 3.6

SS-316 Orifice CS-Flange with DP Transmitter

120 40 5.5 - 7.5 45 0 C F, P

SCADA Measurements

at two (2) points

RTU 4 CPL Area

3 Propane 0.00014 Ref. hand Gas 100 114.3 6.02

As selected by propane supplier 1600 1250 1.5 kscg - - 45 0 C F, P,T

F,P - Propanesupplier T - SCADASupplier

RTU 6Propane

Storage Area

(From Propane Storage Area) book

MCL (con.) 0.00014 -do- Gas 200 219.1 8.18

SS-316 Orifice CS-Flange with DP Transmitter 600 575 1.5 kscg 45 0 C F, P SCADA

RTU 2 MCL Area

CPL (con.) 0.00014 -do- Gas 150 168.3 7.11

SS-316 Orifice CS-Flange with DP Transmitter 630 598 1.5 kscg 45 0 C F, P Blue Star Ltd.

RTU 4 CPL Area

Incinerator (con.) 0.00014 -do- Gas 50 60.3 3.91 91 91 1.5 kscg 45 0 C F, P Inc. supplier

RIO 1 of RTU 5

Incinerator Area

Boiler (con.) 0.00014 -do- Gas 80 88.9 5.49 280 280 1.5 kscg 45 0 C F, P

F - Boiler supplier P - SCADA

RTU 5 Boiler Area

4 H2 (generation)

0.0000865 (1.013 bar and 15 °C )

0.0696 (1.013 bar and 21 °C

) Gas 25 33.4 3.4As selected by

H2 supplier 36 35 3 kscg

99.995%, O2<10pp

m (-) 60 45 0 CF, T, P, Purity,Dew point

To be provided by H2 plant

supplier

RIO 1 of RTU 1

H2 Generation Plant Area

(From H2 plant to MCL)

MCL (con.) -do- -do- -do- 25 33.4 3.4

SS-316 Orifice CS-Flange with DP Transmitter 30 30 45 0 C F, P SCADA

RTU 2 MCL Area

5 Steam ( LPST ) 0.00015233 Ref. std.

table Steam 150 168.3 7.11As selectedby Boiler supplier 10 TPH 7 TPH

7~10.5 kscg

186 +/- 5 0

C F, P,T

F,T - by Boiler plant supplier ;

P - SCADA

RTU 5 Boiler Area

( From Boiler plant to MCL)

Note:

1. For orifice plate, line size up to DN 300, carrier ring will be used. SS nipples and SS isolation valves shall be used.

2. F - Flow element with Transmitter, P – Pressure transmitter, T – Temperature element with Transmitter.

3. The parameter details are tentative and will be finalized during engineering.

4. Refer to drawing no. 25331-00-08-ELA-0001 for RTU location.

Dry saturated

Page 36: SCADA spec  25331-00-08-ELA-0001

Measurement DN O/D Thk. parameters

( mm ) ( mm ) ( mm ) Max. Min. Avg. (Main header)

1. Drinking water GI 50 60.8 4.5 NA NA NA F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Magnetic RTU3 Utility ECR

2. Make-up water MS 200 219.1 7 NA NA NA F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Magnetic RTU3 Utility ECR

3. Drinking water (Outlet from overhead

tank)

GI 100 115 5.4 20 10 15 F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Magnetic RTU3 Utility ECR

4. Make-up water (Outlet from overhead

tank)

MS 150 166.5 4.8 120 50 100 F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Magnetic RTU3 Utility ECR

5. Make-up water (CT-1) MS 80 89.5 4 60 0 20 F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Orifice RTU3 Utility ECR

6. Make-up water (CT-2) MS 65 76.6 3.6 40 0 5 F Under SCADA scope SCADA PLC Magnetic RTU4 CPL Area

7. Make-up water (DM Plant) MS 65 76.6 3.6 40 0 20 F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Orifice RTU2 MCL Area

8. MW water- service drop for entry

section (G01 - MCL)

MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU2 MCL Area

9. MW water- service drop for cleaner

section (G03 - MCL)

MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU2 MCL Area

10. MW water- Skin pass area (G15 - MCL) MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU2 MCL Area

11. MW water- service drop for chemical

circulation system (G17 - MCL)

MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU2 MCL Area

12. MW water- Zinc pot area (G13 - MCL) MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU2 MCL Area

13. MW water- Exit area (G21 - MCL) MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU2 MCL Area

14. MW water- service drop for entry

section & cleaning section (C26 - CPL)

MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU4 CPL Area

15. MW water- service drop for chemical

section & exit section (C24 - CPL)

MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU4 CPL Area

16. MW water- service drop for water

quench area (C20 - CPL)

MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU4 CPL Area

17. MW water- service drop for painting

section (C15 - CPL)

MS 25 34.2 3.2 5 0 2 F Under SCADA scope SCADA PLC Magnetic RTU4 CPL Area

18. DM water (MCL) MSRL 80 89.4 5 100 0 10 F Provided by BSL, Signal regeneration at buyer's PLC

UECR (Buyer's PLC) Orifice RTU4 CPL Area

19. DM water (CCL) MSRL 80 89.4 5 100 0 10 F Provided by BSL, Signal regeneration at buyer's PLC

UECR (Buyer's PLC) Orifice RTU4 CPL Area

20. DM water (CCL) at C27 MSRL 80 89.4 5 100 0 10 F Under SCADA scope SCADA PLC Magnetic RTU4 CPL Area

Pipe Details Process DataFlow

APPENDIX-2

LIST OF PARAMETERS FOR WATER SYSTEMS TO BE MEASURED FROM VARIOUS PLANT UNITS

Tentative Location of RTU / RIOSl. No. Service MOC Remarks Location of PLC Type

Connectivity of signals to RTU

/ RIO

Page 37: SCADA spec  25331-00-08-ELA-0001

Measurement DN O/D Thk. parameters

( mm ) ( mm ) ( mm ) Max. Min. Avg. (Main header)

Pipe Details Process DataFlow Tentative Location

of RTU / RIOSl. No. Service MOC Remarks Location of PLC TypeConnectivity of

signals to RTU / RIO

21. DM water (Boiler) MSRL 50 60.33 2.77 10 0 1 F Under SCADA scope SCADA PLC Magnetic RTU5 Boiler Area

22. DM water (Hydrogen plant) MSRL 20 21.34 2.11 3 0 1 F Under SCADA scope SCADA PLC Magnetic RIO1 of RTU1 H2 Plant Area

23. RCPH 1 (ICW) MS 350 355.6 7.92 900 300 800 F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Magnetic RTU3 Utility ECR

24. RCPH 2 (ICW) MS 250 273.1 5.56 500 100 400 F Provided by LN, Signal regeneration the buyer's PLC

UECR (Buyer's PLC) Magnetic RTU3 Utility ECR

25. WWTP ( Treated water) MS 80 89.5 4 40 0 35 F Provided by THERMAX, Signal regeneration the buyer's PLC

THERMAX'S PLC (Buyer's PLC) Magnetic RIO2 of RTU5 DM Plant and WWTP Area

26. WWTP ( PH) MS 80 89.5 4 14 (pH) 0 (pH) NA pH Provided by THERMAX, Signal regeneration the buyer's PLC

THERMAX'S PLC (Buyer's PLC) Flow Through RIO2 of RTU5 DM Plant and WWTP Area

Note:- Provision of totalisation of data of DM water in different use.

Page 38: SCADA spec  25331-00-08-ELA-0001

FOR

TEND

ER PU

RPO

SE ON

LY

GIGABIT ETHERNET TCP/IP NETWORK

COMPR

ESSOR STN.

CLIENT

STATION

PLANT AREA

AT LBSSSAS

RIO AT

PLANT

AREAH GENE

RATION2

APPLI

CATION/D

ATABASE

FOFO

MCL AREA

CPL AREA

ATRTU

FO

ATRTU

GENERATIONAT RTU

2N

FO

STATION

REDUN

DANT SCADA

SERVERS

STATIONCLIENT

CLIENT

DM PL

ANT & WW

TP AREARIO AT

AREA

RIO AT

AREA

RIO AT

INCINE

RATOR

CONNE

CTIVITY TO

PRINTER

STOR. AREAPROPANE

FO

RTU

BUILDING

AT

FO

ATRTU

RTUAT

BOILER AREA

FO

FO

CLIENT

STATION

PRINTERLASER

DOT M

ATRIXMES

Page 39: SCADA spec  25331-00-08-ELA-0001

X + 450

X + 400

X + 350

X + 300

X + 250

X + 200

X + 150

X + 50

0.00

X + 100

Y -50

0.00

RS

Y +100

Y +50

Y +150

Y +300

Y +200

Y +250

Y +350

X + 650

X + 550

X + 600

X + 500

FOR

TEND

ER PU

RPO

SE ON

LY