SC-225 SITE SC-10SC 1-66 US 221 Chao & Associates,...

5
396.41 396.49 396.50 396.47 L C BIG CURL TAIL CREEK L SURVEY CONTROL POINT - NAIL EL. = 398.54 NAVD88 DATUM SCSP COORDINATES N:831806.1970' E:1604639.6139' WOODED WOODED WOODED WOODED INV. 18" RCP = 401.68 (SILTED IN) INV. 18" RCP = 399.51 (SILTED IN) TRAIL TRAIL SURVEY CONTROL POINT - REBAR EL. = 395.76 NAVD88 DATUM SCSP COORDINATES N:831626.8334' E:1604390.7851' TREE LINE TREE LINE TREE LINE TREE LINE FLOW FLOW REMOVE EXISTING BRIDGE AND GUARDRAIL CLEARING AND GRUBBING FOR EQUIPMENT STAGING/STORAGE AREA C CURLTAIL ROAD (GRAVEL) LOCATION MAP NOT TO SCALE SC-10 US 221 SC-505 SC 1-66 SC-225 SITE PRELIMINARY Revised: Drawn: Date Sheet Number File: Checked: Project No.: Chao & Associates, Inc. Civil - Structural - Survey 7 Clusters Court Columbia, SC 29210 Voice: (803) 772-8420 Fax: (803) 772-9120 Email: [email protected] 583759C - R3.dwg & LAND SURVEYORS CONSULTING ENGINEERS C1.0 June 9, 2016 Existing Condition & Demolition Plan US Forest Service Road 505 Bridge Over Big Curltail Creek Sumter National Forest In Abbeville County, South Carolina HMC GAL 583759 3 DAYS BEFORE DIGGING IN SOUTH CAROLINA Palmetto Utility Protection Service FIRE HYDRANT WATER VALVE POWER POLE & GUY OVERHEAD ELECTRIC DROP INLET (DI) CURB INLET (CI) LEGEND LIGHT POLE STORM DRAIN PIPE GAS VALVE SANITARY SEWER MANHOLE CONCRETE SIDEWALK SANITARY SEWER LINE (MATERIAL UNKNOWN) NATURAL GAS LINE UNDERGROUND TELEPHONE WATER LINE FENCE CONC. CURB & GUTTER ELEC BOX CLEANOUT (CO) JUNCTION BOX (JB) YARD INLET (YI) WATER METER TELEPHONE PED EROSION CONTROL MATTING UNDERGROUND FIBER OPTIC LINE UNDERGROUND CABLE TV Construction notes: 1. Contractor is cautioned that the location and/or elevation of existing utilities shown herein are based on records provided by the utility company and information obtained from the field. Contractor shall verify all existing field conditions and utilities prior to beginning work. 2. Contractor is required to contact Palmetto Utility Protection Service (811) three days prior to any digging or commencing construction. 3. Provide silt fence and other erosion control devices, as may be required, to control soil erosion during construction. All disturbed areas shall be cleaned, graded and stabilized with grassing immediately after completion of construction in the area. 4. Contractor shall repair any damage caused to any existing site features to remain including, but not limited to, buildings, pavement, curb and gutter, storm drains, underground utilities, fencing, etc. in their entirety. Repairs shall be at the contractor's expense. 5. Sod shall be installed in all areas disturbed by construction that are not intended to be covered by impervious material, unless otherwise indicated. 6. If necessary, slopes which exceed four vertical feet or 4:1 slopes should be stabilized with an approved turf reinforcing mat in addition to hydroseeding. It may be necessary to install temporary slope drains during construction. Temporary berms may be needed daily until slope is brought to grade. 7. Contractor shall take necessary action to minimize the tracking of mud onto the paved roadway from construction areas. Contractor to daily remove mud/soil from pavement as required. 8. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and/or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized to the satisfaction of Abbeville County. 9. Contractor shall abide by all provisions of the applicable city and or county storm drainage and erosion control ordinances as well as the South Carolina Sediment Reduction Act. 10. All excavation is unclassified. Excess material is to be removed from the site and disposed of in a legal manner. 11. All construction staking shall be provided at the contractor's expense.

Transcript of SC-225 SITE SC-10SC 1-66 US 221 Chao & Associates,...

396.41

396.49

396.50

396.47

L

C

B

IG

C

U

R

L

T

A

IL

C

R

E

E

K

L

SURVEY CONTROL POINT - NAIL

EL. = 398.54 NAVD88 DATUM

SCSP COORDINATES

N:831806.1970'

E:1604639.6139'

WOODED

WOODED

WOODED

WOODED

INV. 18" RCP = 401.68

(SILTED IN)

INV. 18" RCP = 399.51

(SILTED IN)

TR

AIL

T

R

A

I

L

SURVEY CONTROL POINT - REBAR

EL. = 395.76 NAVD88 DATUM

SCSP COORDINATES

N:831626.8334'

E:1604390.7851'

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

F

L

O

W

F

L

O

W

REMOVE EXISTING BRIDGE AND GUARDRAIL

CLEARING AND GRUBBING

FOR EQUIPMENT

STAGING/STORAGE AREA

C C

UR

LT

AIL

RO

AD

(GR

AV

EL)

LOCATION MAP

NOT TO SCALE

S

C

-

1

0

U

S

2

2

1

S

C

-5

0

5

S

C

1

-

6

6

S

C

-

2

2

5

SITE

PR

ELIM

IN

AR

Y

Re

vise

d:

Dra

wn

:

Date

Sheet Number

File

:

Ch

ecke

d:

Pro

je

ct N

o.:

Ch

ao

&

A

sso

cia

te

s, In

c.

Civil - S

tructural - S

urvey

7 C

lusters C

ourt

Colum

bia, S

C 29210

Voice: (803) 772-8420

Fax: (803) 772-9120

Em

ail: consult@

chaoinc.com

58

37

59

C - R

3.d

wg

& LA

ND

S

UR

VE

YO

RS

CO

NS

ULT

IN

G E

NG

IN

EE

RS

C1.0

June 9, 2016

Existin

g C

on

ditio

n &

D

em

olitio

n P

lan

US

F

orest S

ervice R

oad 505

Bridge O

ver B

ig C

urltail C

reek

Sum

ter N

ational F

orest

In A

bbeville C

ounty, S

outh C

arolina

HM

CG

AL

58

37

59

3 DAYS BEFORE DIGGING IN

SOUTH CAROLINA

Palmetto Utility Protection Service

FIRE HYDRANT

WATER VALVE

POWER POLE & GUY

OVERHEAD ELECTRIC

DROP INLET (DI)

CURB INLET (CI)

LEGEND

LIGHT POLE

STORM DRAIN PIPE

GAS VALVE

SANITARY SEWER

MANHOLE

CONCRETE

SIDEWALK

SANITARY SEWER LINE

(MATERIAL UNKNOWN)

NATURAL GAS LINE

UNDERGROUND

TELEPHONE

WATER LINE

FENCE

CONC. CURB &

GUTTER

ELEC BOX

CLEANOUT (CO)

JUNCTION BOX (JB)

YARD INLET (YI)

WATER METER

TELEPHONE PED

EROSION CONTROL

MATTING

UNDERGROUND

FIBER OPTIC LINE

UNDERGROUND

CABLE TV

Construction notes:

1. Contractor is cautioned that the location and/or elevation of existing

utilities shown herein are based on records provided by the utility

company and information obtained from the field. Contractor shall

verify all existing field conditions and utilities prior to beginning work.

2. Contractor is required to contact Palmetto Utility Protection Service

(811) three days prior to any digging or commencing construction.

3. Provide silt fence and other erosion control devices, as may be

required, to control soil erosion during construction. All disturbed

areas shall be cleaned, graded and stabilized with grassing

immediately after completion of construction in the area.

4. Contractor shall repair any damage caused to any existing site

features to remain including, but not limited to, buildings, pavement,

curb and gutter, storm drains, underground utilities, fencing, etc. in

their entirety. Repairs shall be at the contractor's expense.

5. Sod shall be installed in all areas disturbed by construction that are

not intended to be covered by impervious material, unless otherwise

indicated.

6. If necessary, slopes which exceed four vertical feet or 4:1 slopes

should be stabilized with an approved turf reinforcing mat in addition

to hydroseeding. It may be necessary to install temporary slope

drains during construction. Temporary berms may be needed daily

until slope is brought to grade.

7. Contractor shall take necessary action to minimize the tracking of

mud onto the paved roadway from construction areas. Contractor to

daily remove mud/soil from pavement as required.

8. All erosion control devices shall be properly maintained during all

phases of construction until the completion of all construction

activities and all disturbed areas have been stabilized. Additional

control devices may be required during construction in order to

control erosion and/or offsite sedimentation. All temporary control

devices shall be removed once construction is complete and the site

is stabilized to the satisfaction of Abbeville County.

9. Contractor shall abide by all provisions of the applicable city and or

county storm drainage and erosion control ordinances as well as the

South Carolina Sediment Reduction Act.

10. All excavation is unclassified. Excess material is to be removed from

the site and disposed of in a legal manner.

11. All construction staking shall be provided at the contractor's expense.

L

C

B

IG

C

U

R

L

T

A

IL

C

R

E

E

K

L

SURVEY CONTROL POINT - NAIL

EL. = 398.54 NAVD88 DATUM

SCSP COORDINATES

N:831806.1970'

E:1604639.6139'

WOODED

WOODED

WOODED

WOODED

INV. 18" RCP = 401.68

(SILTED IN)

INV. 18" RCP = 399.51

(SILTED IN)

TR

AIL

T

R

A

I

L

SURVEY CONTROL POINT - REBAR

EL. = 395.76 NAVD88 DATUM

SCSP COORDINATES

N:831626.8334'

E:1604390.7851'

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

F

L

O

W

F

L

O

W

BRIDGE

C C

UR

LT

AIL

RO

AD

(GR

AV

EL)

3

9

2

3

9

4

3

9

9

4

0

0

393

3

9

6

3

9

5

3

9

5

3

9

9

399

395

3

9

6

395

400

400

394

394

4

0

1

400

3

9

5

3

9

9

4

0

0

400

395

3

8

9

3

9

9

4

0

0

3

9

9

3

9

2

393

3

9

0

3

9

5

2

0

'

3

4

'

4

0

5

3

4

'

2

0

'

INV. 15"RCP = 397.00

2

4

'

1

2

'

2

4

'

1

2

'

TEMPORARY CONSTRUCTION TURNAROUND

Profile View of Alignment -Road Centerline

375

380

385

390

395

400

405

410

415

375

380

385

390

395

400

405

410

415

1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 8+39.31

TOP OF GUARDRAIL

TOP BARRIER CURB

TOP BRIDGE DECK

ST

A. 0

+0

0 B

EG

IN

B

RID

GE

EL

. =

3

96

.5

0

ST

A. 0

+0

0 B

EG

IN

B

RID

GE

EL

. =

3

96

.5

0

TOP OF DECK = 400.3'

100-YR Flood Elevation = 395.97

50-YR Flood Elevation = 395.21

2-YR Flood Elevation = 391.55

30' 30' 30'

Re

vise

d:

Dra

wn

:

Date

Sheet Number

File

:

Ch

ecke

d:

Pro

je

ct N

o.:

Ch

ao

&

A

sso

cia

te

s, In

c.

Civil - S

tructural - S

urvey

7 C

lusters C

ourt

Colum

bia, S

C 29210

Voice: (803) 772-8420

Fax: (803) 772-9120

Em

ail: consult@

chaoinc.com

58

37

59

C - R

3.d

wg

& LA

ND

S

UR

VE

YO

RS

CO

NS

ULT

IN

G E

NG

IN

EE

RS

C2.0

June 9, 2016

Grad

in

g, D

rain

ag

e, &

R

oad

P

ro

file

US

F

orest S

ervice R

oad 505

Bridge O

ver B

ig C

urltail C

reek

Sum

ter N

ational F

orest

In A

bbeville C

ounty, S

outh C

arolina

HM

CG

AL

58

37

59

LOCATION MAP

NOT TO SCALE

S

C

-

1

0

U

S

2

2

1

S

C

-5

0

5

S

C

1

-

6

6

S

C

-

2

2

5

SITE

PR

ELIM

IN

AR

Y

3 DAYS BEFORE DIGGING IN

SOUTH CAROLINA

Palmetto Utility Protection Service

3 DAYS BEFORE DIGGING IN

SOUTH CAROLINA

Palmetto Utility Protection Service

LEGEND

PROPOSED GRADE

EXISTING GRADE

BRIDGE

Re

vise

d:

Dra

wn

:

Date

Sheet Number

File

:

Ch

ecke

d:

Pro

je

ct N

o.:

Ch

ao

&

A

sso

cia

te

s, In

c.

Civil - S

tructural - S

urvey

7 C

lusters C

ourt

Colum

bia, S

C 29210

Voice: (803) 772-8420

Fax: (803) 772-9120

Em

ail: consult@

chaoinc.com

58

37

59

C - R

3.d

wg

& LA

ND

S

UR

VE

YO

RS

CO

NS

ULT

IN

G E

NG

IN

EE

RS

C2.1

June 9, 2016

Cu

rltail R

oad

S

ectio

ns

US

F

orest S

ervice R

oad 505

Bridge O

ver B

ig C

urltail C

reek

Sum

ter N

ational F

orest

In A

bbeville C

ounty, S

outh C

arolina

HM

CG

AL

58

37

59

PR

ELIM

IN

AR

Y

LEGEND

PROPOSED GRADE

EXISTING GRADE

BRIDGE

L

C

B

IG

C

U

R

L

T

A

IL

C

R

E

E

K

L

SURVEY CONTROL POINT - NAIL

EL. = 398.54 NAVD88 DATUM

SCSP COORDINATES

N:831806.1970'

E:1604639.6139'

WOODED

WOODED

WOODED

WOODED

INV. 18" RCP = 401.68

(SILTED IN)

INV. 18" RCP = 399.51

(SILTED IN)

TR

AIL

T

R

A

I

L

SURVEY CONTROL POINT - REBAR

EL. = 395.76 NAVD88 DATUM

SCSP COORDINATES

N:831626.8334'

E:1604390.7851'

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

T

R

E

E

L

I

N

E

F

L

O

W

F

L

O

W

BRIDGE

LIMIT OF DISTURBED AREA, TYP.

(CONSTRUCTION LIMIT)

SILT FENCE, TYP.

HYDROSEEDING AND MATTING

C C

UR

LT

AIL

RO

AD

(GR

AV

EL)

DOUBLE ROW OF SILT FENCE

3

9

2

3

9

4

3

9

9

4

0

0

393

3

9

6

3

9

5

3

9

5

3

9

9

399

395

3

9

6

395

400

400

394

394

4

0

1

400

3

9

5

3

9

9

4

0

0

400

395

3

8

9

3

9

9

4

0

0

3

9

9

3

9

2

393

3

9

0

3

9

5

4

0

5

FIRE HYDRANT

WATER VALVE

POWER POLE & GUY

OVERHEAD ELECTRIC

DROP INLET (DI)

CURB INLET (CI)

LEGEND

LIGHT POLE

STORM DRAIN PIPE

GAS VALVE

SANITARY SEWER

MANHOLE

CONCRETE

SIDEWALK

SANITARY SEWER LINE

(MATERIAL UNKNOWN)

NATURAL GAS LINE

UNDERGROUND

TELEPHONE

WATER LINE

FENCE

CONC. CURB &

GUTTER

ELEC BOX

CLEANOUT (CO)

JUNCTION BOX (JB)

YARD INLET (YI)

WATER METER

TELEPHONE PED

EROSION CONTROL

MATTING

UNDERGROUND

FIBER OPTIC LINE

UNDERGROUND

CABLE TV

LOCATION MAP

NOT TO SCALE

S

C

-

1

0

U

S

2

2

1

S

C

-5

0

5

S

C

1

-

6

6

S

C

-

2

2

5

SITE

Re

vise

d:

Dra

wn

:

Date

Sheet Number

File

:

Ch

ecke

d:

Pro

je

ct N

o.:

Ch

ao

&

A

sso

cia

te

s, In

c.

Civil - S

tructural - S

urvey

7 C

lusters C

ourt

Colum

bia, S

C 29210

Voice: (803) 772-8420

Fax: (803) 772-9120

Em

ail: consult@

chaoinc.com

58

37

59

C - R

3.d

wg

& LA

ND

S

UR

VE

YO

RS

CO

NS

ULT

IN

G E

NG

IN

EE

RS

C3.0

June 9, 2016

Ero

sio

n P

reven

tio

n &

S

ed

im

en

t C

on

tro

l P

lan

US

F

orest S

ervice R

oad 505

Bridge O

ver B

ig C

urltail C

reek

Sum

ter N

ational F

orest

In A

bbeville C

ounty, S

outh C

arolina

HM

CG

AL

58

37

59

3 DAYS BEFORE DIGGING IN

SOUTH CAROLINA

Palmetto Utility Protection Service

Area of disturbance: 0.7 acre

PR

ELIM

IN

AR

Y

STANDARD NOTES

1. If necessary, slopes, which exceed eight (8) vertical feet should be stabilized with synthetic

or vegetative mats, in addition to hydroseeding. It may be necessary to install temporary

slope drains during construction. Temporary berms may be needed until the slope is

brought to grade.

2. Stabilization measures shall be initiated as soon as practicable in portions of the site where

construction activities have temporarily or permanently ceased, but in no case more than

fourteen (14) days after work has ceased, except as stated below.

Where stabilization by the 14th day is precluded by snow cover or frozen ground

conditions stabilization measures must be initiated as soon as practicable.

Where construction activity on a portion of the Site is temporarily ceased, and

earth-disturbing activities will be resumed within 14 days, temporary stabilization measures

do not have to be initiated on that portion of the Site.

3. All sediment and erosion control devices shall be inspected once every calendar week. If

periodic inspection or other information indicates that a BMP has been inappropriately or

incorrectly installed, the Permittee must address the necessary replacement or modification

required to correct the BMP within 48 hours of identification.

4. Provide silt fence and/or other control devices, as may be required, to control soil erosion

during utility construction. All disturbed areas shall be cleaned, graded, and stabilized with

grassing immediately after the utility installation. Fill, cover, and temporary seeding at the

end of each day are recommended. If water is encountered while trenching, the water

should be filtered to remove any sediments before being pumped back into any waters of

the State.

5. All erosion control devices shall be properly maintained during all phases of construction

until the completion of all construction activities and all disturbed areas have been

stabilized. Additional control devices may be required during construction in order to control

erosion and/or offsite sedimentation. All temporary control devices shall be removed once

construction is complete and the site is stabilized.

6. The contractor must take necessary action to minimize the tracking of mud onto paved

roadway(s) from construction areas and the generation of dust. The contractor shall daily

remove mud/soil from pavement, as may be required.

7. Residential subdivisions require erosion control features for infrastructure as well as for

individual lot construction. Individual property owners shall follow these plans during

construction or obtain approval of an individual plan in accordance with S.C Reg. 72-300 et

seq. and SCR100000.

8. Temporary diversion berms and/or ditches will be provided as needed during construction

to protect work areas from upslope runoff and/or to divert sediment-laden water to

appropriate traps or stable outlets.

9. All waters of the State (WoS), including wetlands, are to be flagged or otherwise clearly

marked in the field. A double row of silt fence is to be installed in all areas where a 50-foot

buffer can't be maintained between the disturbed area and all WoS. A 10-foot buffer should

be maintained between the last row of silt fence and all WoS.

10. Litter, construction debris, oils, fuels, and building products with significant potential for

impact (such as stockpiles of freshly treated lumber) and construction chemicals that could

be exposed to storm water must be prevented from becoming a pollutant source in storm

water discharges.

11. A copy of the SWPPP, inspections records, and rainfall data must be retained at the

construction site or a nearby location easily accessible during normal business hours, from

the date of commencement of construction activities to the date that final stabilization is

reached.

12. Initiate stabilization measures on any exposed steep slope (3H:1V or greater) where

land-disturbing activities have permanently or temporarily ceased, and will not resume for a

period of 7 calendar days.

13. Minimize soil compaction and, unless infeasible, preserve topsoil.

14. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash

water, and other wash waters. Wash waters must be treated in a sediment basin or

alternative control that provides equivalent or better `treatment prior to discharge;

15. Minimize the discharge of pollutants from dewatering of trenches and excavated areas.

These discharges are to be routed through appropriate BMPs (sediment basin, filter bag,

etc.).

16. The following discharges from sites are prohibited:

Wastewater from washout of concrete, unless managed by an appropriate control;

Wastewater from washout and cleanout of stucco, paint, form release oils, curing

compounds and other construction materials;

Fuels, oils, or other pollutants used in vehicle and equipment operation and

maintenance; and

Soaps or solvents used in vehicle and equipment washing.

17. After construction activities begin, inspections must be conducted at a minimum of at least

once every calendar week and must be conducted until final stabilization is reached on all

areas of the construction site.

18. If existing BMPs need to be modified or if additional BMPs are necessary to comply with

the requirements of this permit and/or SC’s Water Quality Standards, implementation must

be completed before the next storm event whenever practicable. If implementation before

the next storm event is impracticable, the situation must be documented in the SWPPP and

alternative BMPs must be implemented as soon as reasonably possible.

19. A Pre-Construction Conference must be held for each construction site with an approved

On-Site SWPPP prior to the implementation of construction activities. For non-linear

projects that disturb 10 acres or more this conference must be held on-site unless the

Department has approved otherwise.

Temporary Seeding

Permanent Seeding

Browntop

Millet (Alone)

Species lbs./ac Jan Mar Apr May Jun Jul AugFeb Sep Oct Nov Dec

40

10

56

10

50

8

Browntop

Millet (Mix)

Rye Grain

(Alone)

Rye Grain

(Mix)

Rye Grain

(Alone)

Rye Grain

(Mix)

Weeping

Lovegrass

(Alone)

Weeping

Lovegrass

(Mix)

4

2

For Steep Slopes / Cut Slopes

Species

Jan Mar Apr May Jun Jul AugFeb Sep Oct Nov DecLbs/Ac

Bahia Grass

(Alone)

40

Bahia Grass

(Mix)

30

Bermuda Grass

(Hulled) (Alone)

Bermuda Grass

(Hulled) (Mix)

8-12

46

40

20

40

2

Fescue, Tall

(KY31) Alone

Sericea Lespedeza

(Scarified) Alone

or Mix (inoculate

with EL Innoculant

Fescue, Tall

(KY31) mix

Ladino Clover

(mix only)

Innoculate with AB

Innoculant

Weeping

Lovegrass (Alone)

4

2

8-10

Weeping

Lovegrass (Mix)

Crownvetch (Mix)

(Inoculate with

Type M Innoculant

For Steep Slopes / Cut Slopes

Seeding Schedule

M

a

x

i

m

u

m

s

p

a

c

i

n

g

=

6

'

8"

4"

18"

(minimum)

18"

(minimum)

8"

18" TO 24"18" TO 24"

V-shaped trench detailFlat-bottom trench detail

Runoff

Runoff

Compacted earth

Filter fabric

Compacted earth

Filter fabric

Wire mesh

Wire tie

12" of filter fabric

Wire tie

12" of filter fabric

Fabric attachment detail

1.25 LB./linear ft. steel post

Filter fabric

14 gage

6" x 6" wire mesh

Heavy duty wire tie

spaced 6" max.

R

u

n

o

f

f

Use either flat-bottom or V-bottom

trench shown below

Backfill trench with

compacted earth

Fabric attachment

see detail

Bury fabric and mesh

14 gage wire fence

with 6" x 6" mesh

Silt fence installation

1.33 LB./linear ft.

steel post

Wire tie

Reinforced Silt Fence Construction

Not to scale

Note:

Contractor shall remove sediment accumulated along the fence when it

reaches 1/3 the height of the fence

Wire mesh

1.

3B.

12"

6"

3A.

2"-5"

4.

5.

3"

2.

1. Prepare soil before installing rolled erosion control products (RECP's), Including any

necessary application of lime, fertilizer, and seed.

Note: When using cell-o-seed do not seed prepared area. Cell-o-seed must be installed

with paper side down.

2. Begin at the top of the slope by anchoring the RECP's In a 6" (15 cm) deep x 6" (15 cm)

wide trench with approximately 12" (30cm) of RECP's Extended beyond the up-slope

portion of the trench. Anchor the RECP's with a row of staples/stakes approximately 12"

(30 cm) apart in the bottom of the trench. backfill and compact the trench after stapling.

Apply seed to compacted soil and fold remaining 12" (30 cm) portion of RECP's back over

seed and compacted soil. Secure RECP's over compacted soil with a row of staples/stakes

spaced approximately 12" (30 cm) apart across the width of the RECP's.

3. Roll the RECP's (a.) down or (b.) horizontally across the slope. RECP's will unroll with

appropriate side against the soil surface. all recp's must be securely fastened to soil

surface by placing staples/stakes in appropriate locations as shown in the staple pattern

guide. when using the dot system, staples/stakes should be placed through each of the

colored dots corresponding to the appropriate staple pattern.

4. The edges of parallel RECP's must be stapled with approximately 2" - 5" (5 cm - 12.5 cm)

overlap depending on RECP's type.

5. Consecutive RECP's spliced down the slope must be placed end over end (shingle style)

with an approximate 3" (7.5 cm) overlap. Staple through overlapped area, approximately 12"

(30 cm) apart across entire RECP's WIDTH.

Note: *In loose soil conditions, the use of staple or stake lengths greater than 6" (15 cm)

may be necessary to properly secure the RECP's.

6"

Rolled Turf Reinforcement Matting

Erosion Control Detail

NOT TO SCALE

Slope installation

Sediment Basin Slope Tracking Detail

Not To Scale

Applicant's Certification:

"I (we) hereby certify that all clearing, grading, construction and/or development will be done

pursuant to this plan and I (we) are responsible for the land disturbance and related

maintenance thereof. SCDHEC & Abbeville County authorities will be allowed to enter the

project site for the purpose of on-site inspections."

Owner / Person Financially Responsible Date

Designer's Certification:

"I hereby certify that this plan is designed to contain soil on the property concerned to the

maximum extent, to provide for the protection of the property and the proposed improvements

theron from the effects of flooding, to provide for the control of the runoff from the property, and

that all provisions for sediment control and storm drainage are in accordance with the

stormwater management and sediment control ordinance for SCDHEC & Bamberg County"

Signature Date

S.C. Registration Number: 21629

Gerald A. Lee, P.E.

Dozer treads create cleat

imprints parallel to the slope

contour

Note:

Should be seeded and stabilized immediately.

S

l

o

p

e

Temporary Construction Turnaround

Not To Scale

6" SCDOT CR-14 Crusher Run

12" Compacted subgrade compacted to

98% standard proctor

Construction sequence

1. Receive NPDES coverage from SCDHEC.

2. Pre-construction meeting with engineer.

3. Notify Abbeville County and SCDHEC at least 48 hours prior to beginning land disturbing

activities.

4. Clearing and grubbing only as necessary for installation of silt fence.

5. Installation of silt fence.

6. Clearing and grubbing of site or demolition.

7. Rough grading.

8. Begin installation of bridge.

9. Perform site stabilization.

10. Remove temporary sediment & erosion control measures after entire area draining to

device is stabilized.

11. Submit notice of termination (NOT) to SCDHEC.

Re

vise

d:

Dra

wn

:

Date

Sheet Number

File

:

Ch

ecke

d:

Pro

je

ct N

o.:

Ch

ao

&

A

sso

cia

te

s, In

c.

Civil - S

tructural - S

urvey

7 C

lusters C

ourt

Colum

bia, S

C 29210

Voice: (803) 772-8420

Fax: (803) 772-9120

Em

ail: consult@

chaoinc.com

58

37

59

C - R

3.d

wg

& LA

ND

S

UR

VE

YO

RS

CO

NS

ULT

IN

G E

NG

IN

EE

RS

C4.0

June 9, 2016

Co

nstru

ctio

n D

etails

US

F

orest S

ervice R

oad 505

Bridge O

ver B

ig C

urltail C

reek

Sum

ter N

ational F

orest

In A

bbeville C

ounty, S

outh C

arolina

HM

CG

AL

58

37

59

PR

ELIM

IN

AR

Y