SBIR Quad Chart & Examples

4
1 Project/technology title Overall Risk: HIGH X MEDIUM LOW SBIR/STTR Topic Number: Date: mm/dd/yy CONCEPT REQUIREMENT REQUIREMENT/PAYOFF: Identify and describe the need driving technology development as well as its benefit to the target Agency DELIVERABLE: Description of product to be developed for use and how it meets customer requirement OBJECTIVE: Short statement explaining the technology and its principal features TRANSITION(S): Succinct strategy/plan for this project that addresses how the technology will transition into a system or platform CONTACTS Company: name website email Company lead: phone Technologist: Fiscal POC: Concept Picture

Transcript of SBIR Quad Chart & Examples

Page 1: SBIR Quad Chart & Examples

1

Project/technology titleOverall Risk: HIGH X MEDIUM LOW SBIR/STTR Topic Number: Date: mm/dd/yy

CONCEPT REQUIREMENT

REQUIREMENT/PAYOFF: Identify and describe the need

driving technology development as well as its benefit to the

target Agency

DELIVERABLE: Description of product to be developed for

use and how it meets customer requirement

OBJECTIVE: Short statement explaining the technology

and its principal features

TRANSITION(S): Succinct strategy/plan for this project

that addresses how the technology will transition into a

system or platform

CONTACTSCompany: name website email

Company lead: “ phone “

Technologist: “ “ “

Fiscal POC: “ “ “

Concept Picture

Page 2: SBIR Quad Chart & Examples

First item planned. Add more text as necessary.

Second item planned. Add more text as necessary.

•Add other points as necessary

Project/technology title

First key insight. Add more text as necessary.

Second key insight. Add more text as necessary.

•Add other points as necessary

Company name and website, your name/title and contact information

MAIN ACHIEVEMENT:

Placeholder explanatory text. Replace with text and diagrams as necessary.

HOW IT WORKS:

Placeholder explanatory text paragraph. Replace with text and diagrams as necessary.

ASSUMPTIONS AND LIMITATIONS:

• Limitation or assumption

• Another limitation or assumption

Primary answer here. Add more text as necessary.

•First bullet point

•Additional as necessary

Primary answer here. Add more text as necessary.

•First key point

•Additional as necessary

What is the state of the art and what are its limitations? (DELETE THIS BOX OF TEXT AND INSERT DIAGRAM(S)

What are the key new insights? (REPLACETHIS BOX AND INSERT DIAGRAM(S))

What is the impact of the project? (DELETE THIS BOX OF TEXT AND INSERT TABLE, GRAPH, OR OTHER SUITABLE VISUALIZATION)

What are the end-of-phase goals?(REPLACE WITH DIAGRAM/TEXT/THRESHOLD CRITERIA)

QU

AN

TITA

TIV

E IM

PA

CT

EN

D-O

F-P

HA

SE

G

OA

L

STA

TU

S Q

UO

NE

W IN

SIG

HT

S

Page 3: SBIR Quad Chart & Examples

RIF Commercialization: The Last Mile

Page 4: SBIR Quad Chart & Examples

4

Cloud Safety Systems TMThe Protection Cloud TM

Overall Risk: HIGH X MEDIUM LOW SBIR/STTR Topic Number: Date: 11/11/2014

CONCEPT REQUIREMENT

REQUIREMENT/PAYOFF:

• Wounded soldiers are most vulnerable to re-injury during rehab.

This device provides protection not previously available, to any

veteran who is at increased risk of injury from falls, significantly

reducing re-injuries.

• Additionally, there are large commercial markets for geriatric fall

protection and industrial fall protection that will save significant

medical cost for Medicare/Medicaid and in workers

compensation claims.

DELIVERABLE:

• Final fall detection algorithm analyzing accelerometer output

to initiate inflation of bladders

• Proof of concept, fully functional fall protection belt

• High resolution video of fall protection belt being deployed

OBJECTIVE:

Patent pending. Fall protection with circuitry that detects when a

fall is initiated and, using airbag technology, inflates a protective

cushion before a person reaches the floor or ground.

Substantially reducing injuries from falls.

TRANSITION(S):

• Contract with University of Texas at Arlington for development of

final algorithm and circuit integration.

• SSR&A to build 5 belts using current suppliers to provide ‘proof of

concept’ prototypes.

• Contract with Daicel Corp to use their test facility to test and video

the ‘proof of concept’ prototypes.

CONTACTS

Company: S.S. Richards & Associates LLC ssrichardsnassociates.com email

Company lead: Scott S. Richards PE, CSP 512 921-7067 [email protected]

Technologist: Scott S. Richards PE, CSP 512 921-7067 [email protected]

Fiscal POC: Scott S. Richards PE, CSP 512 921-7067 [email protected]