Sayres Hanging Gardens

186
Sayres Hanging Garden

description

A project of Maziar Behrooz Architecture

Transcript of Sayres Hanging Gardens

Page 1: Sayres Hanging Gardens

Sayres Hanging Garden

Page 2: Sayres Hanging Gardens
Page 3: Sayres Hanging Gardens

for myparents

and toM-E & M & A & A

Page 4: Sayres Hanging Gardens

Published by BlurbTo purchase copies, go to www.blurb.com

© 2012All rights reserved

No part of this book may be used or reproduced in any manner without permission from the author, except in the context of reviews.

Page 5: Sayres Hanging Gardens
Maziar
Text Box
Sayres House & Hanging Gardens I- Introduction pp. 8-9 II- Process Images: sketches, drawings, photographs of the design and construction phase pp. 10-121 III- Prelude to Cornell sketches pp. 122-123 IV- Cornell sketches pp. 124-148 V- Photographs of completed house pp. 151-185 VI- Credits p. 180
Page 6: Sayres Hanging Gardens
Page 7: Sayres Hanging Gardens
Page 8: Sayres Hanging Gardens

The following pages contain a cross-sectional chronicle of the thousands of JPEGs, TIFFs, DWGs, PDFs, drawings & sketches that together take up 30 gigabytes of space on my office hard-drives, under the folder BERTY. The sampling is abbreviated but not random. On the whole we chose to select images that, when seen in sequence, form a textural tapestry of a process.¶ Rather than opting for descriptive images of the final building, we preferred those that allude to a particular moment in time; a moment when an idea or thought was first drawn or seen in construction. Even the few formal drawings included represent a crystallization, a point of pause, in the process of generating construction documents.¶ By the end of the three years of working on the Berty house, we had all learned to speak its language using its particular vocabulary: non-orthogonal in plan, spatial rather than formal with a tendency away from plain geometry and an inclination for interrupted movement. These forms yielded pocket of space that, once realized and furnished, offered a surprising sense of calm and reverence. Within them, one wants to be still.¶ Against the backdrop of a rigorously geometric existing house, our addition hops and leaps, dancing around it. Its narrative isn’t linear, nor does it end with a crisp conclusion.¶ In the same manner, this presentation jumps across phases, time and ideas. In fact, in the process of pulling these images together, I noticed that this project may have started long ago in Ithaca, New York. While resisting the impulse to couch the fluidity of it into a discursive framework and force a connection, I have simply attached some of the sketches from that period as an addendum, with a few words, in the back.¶ Undoubtedly what you see is the result of a collaboration between many individuals both within and outside of my office. Marie-Eve and Michel Berty’s steadfast love of art and architecture kept us inspired and enabled me to do that which I love. Maziar Behrooz

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 9: Sayres Hanging Gardens

The following pages contain a cross-sectional chronicle of the thousands of JPEGs, TIFFs, DWGs, PDFs, drawings & sketches that together take up 30 gigabytes of space on my office hard-drives, under the folder BERTY. The sampling is abbreviated but not random. On the whole we chose to select images that, when seen in sequence, form a textural tapestry of a process.¶ Rather than opting for descriptive images of the final building, we preferred those that allude to a particular moment in time; a moment when an idea or thought was first drawn or seen in construction. Even the few formal drawings included represent a crystallization, a point of pause, in the process of generating construction documents.¶ By the end of the three years of working on the Berty house, we had all learned to speak its language using its particular vocabulary: non-orthogonal in plan, spatial rather than formal with a tendency away from plain geometry and an inclination for interrupted movement. These forms yielded pocket of space that, once realized and furnished, offered a surprising sense of calm and reverence. Within them, one wants to be still.¶ Against the backdrop of a rigorously geometric existing house, our addition hops and leaps, dancing around it. Its narrative isn’t linear, nor does it end with a crisp conclusion.¶ In the same manner, this presentation jumps across phases, time and ideas. In fact, in the process of pulling these images together, I noticed that this project may have started long ago in Ithaca, New York. While resisting the impulse to couch the fluidity of it into a discursive framework and force a connection, I have simply attached some of the sketches from that period as an addendum, with a few words, in the back.¶ Undoubtedly what you see is the result of a collaboration between many individuals both within and outside of my office. Marie-Eve and Michel Berty’s steadfast love of art and architecture kept us inspired and enabled me to do that which I love. Maziar Behrooz

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 10: Sayres Hanging Gardens
Page 11: Sayres Hanging Gardens
Page 12: Sayres Hanging Gardens
Page 13: Sayres Hanging Gardens
Page 14: Sayres Hanging Gardens
Page 15: Sayres Hanging Gardens
Page 16: Sayres Hanging Gardens
Page 17: Sayres Hanging Gardens

shape-shifts

Page 18: Sayres Hanging Gardens
Page 19: Sayres Hanging Gardens
Page 20: Sayres Hanging Gardens

226 SF

Roof (1)

239 SF

Roof (1)

288 SF

Roof (2)

Area Legend

Roof (1)

Roof (2)

1827 SF

REDCOMMONAREA 1ST

FLOOR

Building Area Legend

1ST FLOOR EAST PATIO

BEIGE COLOR BEDROOM #2

GREY CARETAKER

RED COMMON AREA 1STFLOOR

WHITE 1ST FLOOR WESTPATIO

YELLOW BEDROOM #1

EXTG. HOUSESUNKEN COURTYARD

GRASS TERRACE

GRASS TERRACE

GRASS TERRACE

GRADE STEPS W/. MOSS

GRASS TERRACE

LIVING ROOM

BEDROOM #3

BEDROOM #4

W.I.CW.I.C ?

CLOSET

ENTRY HALL

COAT CL.

BATH #3SHWR.

LN.

W.I.C

OUTDOOR SHOWER

BATH #1

BEDROOM #1

BATH #2

333 SF

YELLOWBEDROOM

#1

2519 SF

WHITE 1STFLOOR

WEST PATIO

683 SF

GREYCARETAKER

BEDROOM #2

340 SF

BEIGECOLOR

BEDROOM#2

44 SF

1ST FLOOREAST PATIO

1459 SF

Roof (3)

Building Area Legend

Roof (3)

475 SF

Roof (4)

Building Area Legend

Roof (4) 2454 SF

Roof (5)&(6)

Building Area Legend

Roof (5)&(6)

1868 SF

GARAGEFLOOR

Area Legend

GARAGE FLOOR

GREY CELLAR FLOOR

1465 SF

GREYCELLARFLOOR

GARAGE

MECHANICALROOM

LAUNDRY ROOM

CELLAR GALLERY

LOUNGE

WINE STORAGESTORAGE

WINE BAR

CELLAR GALLERY

586 SF

SMOOTHWHITE 2ND

FLOOR

367 SF

SMOOTHWHITE 2ND

FLOORTERRACE

644 SF

REDSECONDFLOOR

Building Area Legend

RED SECOND FLOOR

SMOOTH WHITE 2ND FLOOR

SMOOTH WHITE 2ND FLOORTERRACE

BEDROOM #5

BATHROOM #5

ELEVATOR

W.I.C (HIS)

MASTERBATHROOM #6

SHWR #6

HALLWAY

W.I.C (HERS)

STORAGE

TOILET#4

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

As indicated

11

/3/2

00

9 4

:16

:26

PM

A.105.

Area Calculation

09.30.08

Fred

1/16" = 1'-0"1

1st PL (1)

1" = 20'-0"2

1st FL Resin Area Calculation

1/16" = 1'-0"3

Roof Area Calculation @ 1st PL(2) 1/16" = 1'-0"4

Roof Area Calculation @ 1st PL(3)

1/16" = 1'-0"5

Roof Area Calculation @ 2nd Fl. Plate 2

1/16" = 1'-0"6

Cellar Resin Area Calculation 1" = 20'-0"

72nd Floor Finish Area Plan

Revision Schedule

RevisionNumber

RevisionDate Issued to Issued by

RevisionDescription

19 04.29.09 PCH FD/MB A.105

46 10.19.09 PCH FD/MB Revision 46

46

Page 21: Sayres Hanging Gardens

226 SF

Roof (1)

239 SF

Roof (1)

288 SF

Roof (2)

Area Legend

Roof (1)

Roof (2)

1827 SF

REDCOMMONAREA 1ST

FLOOR

Building Area Legend

1ST FLOOR EAST PATIO

BEIGE COLOR BEDROOM #2

GREY CARETAKER

RED COMMON AREA 1STFLOOR

WHITE 1ST FLOOR WESTPATIO

YELLOW BEDROOM #1

EXTG. HOUSESUNKEN COURTYARD

GRASS TERRACE

GRASS TERRACE

GRASS TERRACE

GRADE STEPS W/. MOSS

GRASS TERRACE

LIVING ROOM

BEDROOM #3

BEDROOM #4

W.I.CW.I.C ?

CLOSET

ENTRY HALL

COAT CL.

BATH #3SHWR.

LN.

W.I.C

OUTDOOR SHOWER

BATH #1

BEDROOM #1

BATH #2

333 SF

YELLOWBEDROOM

#1

2519 SF

WHITE 1STFLOOR

WEST PATIO

683 SF

GREYCARETAKER

BEDROOM #2

340 SF

BEIGECOLOR

BEDROOM#2

44 SF

1ST FLOOREAST PATIO

1459 SF

Roof (3)

Building Area Legend

Roof (3)

475 SF

Roof (4)

Building Area Legend

Roof (4) 2454 SF

Roof (5)&(6)

Building Area Legend

Roof (5)&(6)

1868 SF

GARAGEFLOOR

Area Legend

GARAGE FLOOR

GREY CELLAR FLOOR

1465 SF

GREYCELLARFLOOR

GARAGE

MECHANICALROOM

LAUNDRY ROOM

CELLAR GALLERY

LOUNGE

WINE STORAGESTORAGE

WINE BAR

CELLAR GALLERY

586 SF

SMOOTHWHITE 2ND

FLOOR

367 SF

SMOOTHWHITE 2ND

FLOORTERRACE

644 SF

REDSECONDFLOOR

Building Area Legend

RED SECOND FLOOR

SMOOTH WHITE 2ND FLOOR

SMOOTH WHITE 2ND FLOORTERRACE

BEDROOM #5

BATHROOM #5

ELEVATOR

W.I.C (HIS)

MASTERBATHROOM #6

SHWR #6

HALLWAY

W.I.C (HERS)

STORAGE

TOILET#4

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

As indicated

11

/3/2

00

9 4

:16

:26

PM

A.105.

Area Calculation

09.30.08

Fred

1/16" = 1'-0"1

1st PL (1)

1" = 20'-0"2

1st FL Resin Area Calculation

1/16" = 1'-0"3

Roof Area Calculation @ 1st PL(2) 1/16" = 1'-0"4

Roof Area Calculation @ 1st PL(3)

1/16" = 1'-0"5

Roof Area Calculation @ 2nd Fl. Plate 2

1/16" = 1'-0"6

Cellar Resin Area Calculation 1" = 20'-0"

72nd Floor Finish Area Plan

Revision Schedule

RevisionNumber

RevisionDate Issued to Issued by

RevisionDescription

19 04.29.09 PCH FD/MB A.105

46 10.19.09 PCH FD/MB Revision 46

46

226 SF

Roof (1)

239 SF

Roof (1)

288 SF

Roof (2)

Area Legend

Roof (1)

Roof (2)

1827 SF

REDCOMMONAREA 1ST

FLOOR

Building Area Legend

1ST FLOOR EAST PATIO

BEIGE COLOR BEDROOM #2

GREY CARETAKER

RED COMMON AREA 1STFLOOR

WHITE 1ST FLOOR WESTPATIO

YELLOW BEDROOM #1

EXTG. HOUSESUNKEN COURTYARD

GRASS TERRACE

GRASS TERRACE

GRASS TERRACE

GRADE STEPS W/. MOSS

GRASS TERRACE

LIVING ROOM

BEDROOM #3

BEDROOM #4

W.I.CW.I.C ?

CLOSET

ENTRY HALL

COAT CL.

BATH #3SHWR.

LN.

W.I.C

OUTDOOR SHOWER

BATH #1

BEDROOM #1

BATH #2

333 SF

YELLOWBEDROOM

#1

2519 SF

WHITE 1STFLOOR

WEST PATIO

683 SF

GREYCARETAKER

BEDROOM #2

340 SF

BEIGECOLOR

BEDROOM#2

44 SF

1ST FLOOREAST PATIO

1459 SF

Roof (3)

Building Area Legend

Roof (3)

475 SF

Roof (4)

Building Area Legend

Roof (4) 2454 SF

Roof (5)&(6)

Building Area Legend

Roof (5)&(6)

1868 SF

GARAGEFLOOR

Area Legend

GARAGE FLOOR

GREY CELLAR FLOOR

1465 SF

GREYCELLARFLOOR

GARAGE

MECHANICALROOM

LAUNDRY ROOM

CELLAR GALLERY

LOUNGE

WINE STORAGESTORAGE

WINE BAR

CELLAR GALLERY

586 SF

SMOOTHWHITE 2ND

FLOOR

367 SF

SMOOTHWHITE 2ND

FLOORTERRACE

644 SF

REDSECONDFLOOR

Building Area Legend

RED SECOND FLOOR

SMOOTH WHITE 2ND FLOOR

SMOOTH WHITE 2ND FLOORTERRACE

BEDROOM #5

BATHROOM #5

ELEVATOR

W.I.C (HIS)

MASTERBATHROOM #6

SHWR #6

HALLWAY

W.I.C (HERS)

STORAGE

TOILET#4

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

As indicated

11

/3/2

00

9 4

:16

:26

PM

A.105.

Area Calculation

09.30.08

Fred

1/16" = 1'-0"1

1st PL (1)

1" = 20'-0"2

1st FL Resin Area Calculation

1/16" = 1'-0"3

Roof Area Calculation @ 1st PL(2) 1/16" = 1'-0"4

Roof Area Calculation @ 1st PL(3)

1/16" = 1'-0"5

Roof Area Calculation @ 2nd Fl. Plate 2

1/16" = 1'-0"6

Cellar Resin Area Calculation 1" = 20'-0"

72nd Floor Finish Area Plan

Revision Schedule

RevisionNumber

RevisionDate Issued to Issued by

RevisionDescription

19 04.29.09 PCH FD/MB A.105

46 10.19.09 PCH FD/MB Revision 46

46

Page 22: Sayres Hanging Gardens
Page 23: Sayres Hanging Gardens
Page 24: Sayres Hanging Gardens
Page 25: Sayres Hanging Gardens
Page 26: Sayres Hanging Gardens
Page 27: Sayres Hanging Gardens
Page 28: Sayres Hanging Gardens
Page 29: Sayres Hanging Gardens
Page 30: Sayres Hanging Gardens

DH 6 DH 6

VS 104.14

DH 6 DH 6

DH 6

DH 6 DH 6

DH 6

25' - 2"

90°

2' -

9 3

/4"

2' -

1 5

/8"

5' -

1 1

/2"

2' -

6 1

/2"

90°

90°

6' -

6 1

/2"

6' -

10 1

/8"

3' -

0 3

/8"

4' - 1"

3' -

4 3

/4"

2' -

11

1/2

"5

' - 3

1/2

"3

' - 1

1/2

"

4' -

5 1

/4"

90°

90°

CEILING SOFFIT LINEFLUSH W/. RAILING

ROOF LINE ABOVETO

FR

AM

E7' -

9 3

/4"

5' - 5 5/8"

14' - 8 5/8"

11' - 7 1/2"

7' - 2 3/8"

5' - 0" 4' - 4 1/4"

6' - 5 3/8" 9' - 3 1/4" 10' - 0 1/4"

10' - 5 1/8"

COR-TEN METALPLANTER

90°

ALIGN W/. BEAM BELOW

90°

90°

1' - 11 3/8"

7' - 2"

7' - 0 3/4"

7' - 1 3/4"

7' - 1 1/4"

7' - 2 1/2"

DOUBLE SLIDERSEE SECTION #1

ON A.355

TA

KE

N IN

FIE

LD

7' -

7 1

/4"

1 1

/2"

SID

ING

CL

CT. TO CT. W/.INTERIOREXTG. COLUMN

AL

IGN

V.I.F LOCATIONOF EXTG.COLUMN.

6' -

0 3

/8"

4' -

3"

12' -

9 3

/4"

5' -

7"

10' -

1 1

/4"

2' -

5 1

/2"

9' -

11 3

/8"

90°

90°

90°

13' - 8 1/2"

16' -

5 1

/4"

11' -

5 1

/2"

5' - 6"

7' - 9 1/2"

3' - 8 3/4"

2' - 3 1/4"

ALIG

N

CEILING.LINE

90°

4' -

10 3

/8"

2' -

7 5

/8"

6' -

3 1

/8"

4' -

4 7

/8"

3' - 9"

7' - 11 3/4"

0' - 0"

EQ

.

EQ

.

CL

28' - 1 1/4"

3' - 7 1/2"

3' -

5 5

/8"

90°

90°

90°

90°

16

' - 5

1/8

"

90°

90°

11' - 0 3/4"

5' - 8 3/4"

8' - 4"

4' - 8"

4' - 1 1/2"4' - 4 1/4"

90°

0' - 10" 2' - 3

1/2"

4' -

7"

7' -

1 1

/4"

3' -

3 1

/2"

2' -

3 1

/8"2' -

3 1

/2"

1' - 1 1/2"

7' - 8 1/2"

3' - 9 3/4"

1' - 11 3/4"

1' - 6 1/2"

0' -

4 1

/8"

2' -

9 5

/8"

CL

15

' - 2

3/4

"

7' - 1 1/4"8' - 6 1/2"

2' - 1"

9' - 1 1/2"

EQ

EQ

ALIG

N

3' - 1"

2' - 7 1/2"

7' - 4 3/4"

CL

CL

CL

CL

CL

3' - 0

3/4

"

3' -

0 3

/4"

13

' - 1

0 1

/4"

REMOVE EXISTINGWINDOWS ANDREPLACE WITHOPENING

FLUSH FINISHFLOOR

CL

CL

CL

CL

CL

CL

90°

4' - 8 3/4"4' - 10 1/2"

9' - 0 1/2"

ALIGN

EQ

EQ

ALIGN

ALIG

N

14' -

11 3

/4"

FIREPLACE TBD.

//

EDGE OF PATIO

//

LINE OF SECONDFLOOR WALL EXT.

FINISH

4' -

4 7

/8"

ALIG

N

OPEN TOBELOW

//

ALIG

N

2' -

6 3

/4"

LINE OF CLG.SOFFIT

STEEL BRACING

STEELBRACING

LINE OFCLG.SOFFIT

90°

CL

AL

IGN

CO

LU

MN

S

LINE OF SOFFIT

LINE OF HIP

AL

IGN

ALIG

N

MILLWORK

90°

STEEL BRACING

TO CT. STL.

0' - 10 7/8"6' - 10 1/4"

6' - 10 1/2"1' - 5"

17' - 7 5/8"

CLCL

36"HIGH TEMPERED GLASS RAILING

11' - 4

3/8

"

CL

CL

CL

CL

CL

3' - 6 1/4"

CL

4' -

1 3

/4"

2' -

3 5

/8"

6' - 3 1/4"

3' - 1

0 3

/4" CL

CL

2' -

11 3

/8"CL

EQ

EQ

CL

3' - 4

5/8

"

CL

CL

8' - 0 3/4"

8' - 4 3/8"

CL

CL

CL

CL

CL

EXT. ALUM. CLADDING MATCH WDW.

REMOVABLE CORNER TOREPLACE SASH

LINE OFSOFFIT

13' - 5 5/16" STUCCO TO STUCCO

90°

NOTES:-ALL DIMENSIONS ARE FROM FRAMING UNLESS INDICATED FROM STEEL(NOT FROM SHEATHING-NOT FROM CONCRETE EXCEPT INDICATED-NOTFROM GYSUM BOARD)

90°

//

//

//

//

//

ALIGN W/. BEAM BELOW

//

EQCL

CL

EQ

EQ

EQ

EQ

90°4' -

0 5

/8"

CL //

// //

6' - 6 3/4"1' - 9" 2' - 10 1/2"

7' - 5 5/8"

COORDINNATEWALL/DOORPLACEMENT

W/. ELEVATOR

2' - 0

1/4

"

7' - 9 7/8"

2' - 9 3/4"

//

90°

3' -

9 3

/4"

3' - 1 3/4"

0' -

10

3/8

"2

' - 6

"

CL

CL

CL

4' -

3 3

/8"

CL

//

//

0' - 11 3/8"

2' - 10 5/8"

90°

90°

90°

NICHE (SEEFLOOR PLAN)

2' -

5 7

/8"

//

//

90°

90°

//

LINE OFSOFFIT

WALLS ALIGNEDW/. CELLAR WALLS

DIM. WALL ON R.F.5' - 3 7/8"

3' - 0

"

3' - 1

1/8

"

10 7

/8"

CL

CT. TO STL.

1' - 0 5/8"

91°

SOUND INSUL.

10' -

1 1

/4"

2' -

5 1

/2"

8' -

4"

6' - 2 1/4"

28' - 9"

4 1/4"

4 1/4"

25' - 6 1/4"

LOW WALL

SOUND INSUL.IN POCKET

DOOR

SOUND INSUL. INPOCKET DOOR

NICHE

EQEQ

BUILD PITCHFLOOR

BUILDPITCHFLOOR

CT

. ST

L. B

LW

TO

FR

AM

E5"

CT. STL. B

LW TO FRAME

3 1/2"

CT

. ST

L. T

O F

RA

ME

4 1

/4"

CL

CT. STL. TO FRAME5 1/4"

CT. STL. T

O FRAME

3 1/2"

CT. STL. TO FRAME

11"

CONC. FND. T

O FRAME

5' - 0 5/8"

3 1/4" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEE#3 ON A.276 & #8 ON A.355

1 1/2" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEEA.276

1 1/2" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEEA.276

LINE OF SOFFIT

7 7/8" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEEA.276

1' - 5

1/4

"

DIM. WALL ON R.F.9' - 2 3/4"

EQEQ

EQEQ

AL

IGN

CL

G.

SO

FF

IT W

/.D

OO

RO

PE

NIN

G

0' - 10 3/8"

WD

WC

LA

DD

ING

AN

DS

IDIN

G F

LU

SH

6' - 1

7/8

"

2' - 4 1/2"

7' - 4

3/8

"

90°

90°CL

FRAME TO FRAME

13' - 5 3/4"

ALIGN

4' - 4 3/8"

ALIG

N

2' -

3 1

/4"

SKYLIGHT

1"

A.357

10

A.357

11

2' - 11 3/4" VIF W/. W

/D

CL

TRIANGULATEDCUSTONWINDOW

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

1/4" = 1'-0"

9/1

/20

10

5:2

0:2

2 P

M

A.102D

1st Floor Framing Plan

09.30.08

FRED

MZ

1/4" = 1'-0"1

First Floor Plan A

Revision Schedule

RevisionNumber Revision Date Issued to Issued by

RevisionDescription

3 09.12.08 PCH MB/FD Bid Set

4 09.30.08 Town Of EH MB/FD Permit Set

5 10.14.08 PCH MB/FD Window AndDoor Schedule

44 10.04.09 PCH FD/MB Revision 44

45 10.06.09 PCH/ELECCONSULT.

FD/MB Revision 45

46 10.19.09 PCH FD/MB Revision 46

48 12.07.09 PCH FD/MB LibraryWall+Chimney

69 04.30.10 PCH/Shine/Berty FD Elec plans

73 06.07.10 PCH FD/MZ Int doorschedule, fl plan,framing

81 08.22.10 PCH FD/MZ W/D 1st Floor,Bridge GallerySoffit

Page 31: Sayres Hanging Gardens

DH 6 DH 6

VS 104.14

DH 6 DH 6

DH 6

DH 6 DH 6

DH 6

25' - 2"

90°

2' -

9 3

/4"

2' -

1 5

/8"

5' -

1 1

/2"

2' -

6 1

/2"

90°

90°

6' -

6 1

/2"

6' -

10 1

/8"

3' -

0 3

/8"

4' - 1"

3' -

4 3

/4"

2' -

11

1/2

"5

' - 3

1/2

"3

' - 1

1/2

"

4' -

5 1

/4"

90°

90°

CEILING SOFFIT LINEFLUSH W/. RAILING

ROOF LINE ABOVE

TO

FR

AM

E7' -

9 3

/4"

5' - 5 5/8"

14' - 8 5/8"

11' - 7 1/2"

7' - 2 3/8"

5' - 0" 4' - 4 1/4"

6' - 5 3/8" 9' - 3 1/4" 10' - 0 1/4"

10' - 5 1/8"

COR-TEN METALPLANTER

90°

ALIGN W/. BEAM BELOW

90°

90°

1' - 11 3/8"

7' - 2"

7' - 0 3/4"

7' - 1 3/4"

7' - 1 1/4"

7' - 2 1/2"

DOUBLE SLIDERSEE SECTION #1

ON A.355

TA

KE

N IN

FIE

LD

7' -

7 1

/4"

1 1

/2"

SID

ING

CL

CT. TO CT. W/.INTERIOREXTG. COLUMN

AL

IGN

V.I.F LOCATIONOF EXTG.COLUMN.

6' -

0 3

/8"

4' -

3"

12' -

9 3

/4"

5' -

7"

10' -

1 1

/4"

2' -

5 1

/2"

9' -

11 3

/8"

90°

90°

90°

13' - 8 1/2"

16' -

5 1

/4"

11' -

5 1

/2"

5' - 6"

7' - 9 1/2"

3' - 8 3/4"

2' - 3 1/4"

ALIG

N

CEILING.LINE

90°

4' -

10 3

/8"

2' -

7 5

/8"

6' -

3 1

/8"

4' -

4 7

/8"

3' - 9"

7' - 11 3/4"

0' - 0"

EQ

.

EQ

.

CL

28' - 1 1/4"

3' - 7 1/2"

3' -

5 5

/8"

90°

90°

90°

90°

16

' - 5

1/8

"

90°

90°

11' - 0 3/4"

5' - 8 3/4"

8' - 4"

4' - 8"

4' - 1 1/2"4' - 4 1/4"

90°

0' - 10" 2' - 3

1/2"

4' -

7"

7' -

1 1

/4"

3' -

3 1

/2"

2' -

3 1

/8"2' -

3 1

/2"

1' - 1 1/2"

7' - 8 1/2"

3' - 9 3/4"

1' - 11 3/4"

1' - 6 1/2"

0' -

4 1

/8"

2' -

9 5

/8"

CL

15

' - 2

3/4

"

7' - 1 1/4"8' - 6 1/2"

2' - 1"

9' - 1 1/2"

EQ

EQ

ALIG

N

3' - 1"

2' - 7 1/2"

7' - 4 3/4"

CL

CL

CL

CL

CL

3' - 0

3/4

"

3' -

0 3

/4"

13

' - 1

0 1

/4"

REMOVE EXISTINGWINDOWS ANDREPLACE WITHOPENING

FLUSH FINISHFLOOR

CL

CL

CL

CL

CL

CL

90°

4' - 8 3/4"4' - 10 1/2"

9' - 0 1/2"

ALIGN

EQ

EQ

ALIGN

ALIG

N

14' -

11 3

/4"

FIREPLACE TBD.

//

EDGE OF PATIO

//

LINE OF SECONDFLOOR WALL EXT.

FINISH

4' -

4 7

/8"

ALIG

N

OPEN TOBELOW

//

ALIG

N

2' -

6 3

/4"

LINE OF CLG.SOFFIT

STEEL BRACING

STEELBRACING

LINE OFCLG.SOFFIT

90°

CL

AL

IGN

CO

LU

MN

S

LINE OF SOFFIT

LINE OF HIP

AL

IGN

ALIG

N

MILLWORK

90°

STEEL BRACING

TO CT. STL.

0' - 10 7/8"6' - 10 1/4"

6' - 10 1/2"1' - 5"

17' - 7 5/8"

CLCL

36"HIGH TEMPERED GLASS RAILING

11' - 4

3/8

"

CL

CL

CL

CL

CL

3' - 6 1/4"

CL

4' -

1 3

/4"

2' -

3 5

/8"

6' - 3 1/4"

3' - 1

0 3

/4" CL

CL

2' -

11 3

/8"CL

EQ

EQ

CL

3' - 4

5/8

"

CL

CL

8' - 0 3/4"

8' - 4 3/8"

CL

CL

CL

CL

CL

EXT. ALUM. CLADDING MATCH WDW.

REMOVABLE CORNER TOREPLACE SASH

LINE OFSOFFIT

13' - 5 5/16" STUCCO TO STUCCO

90°

NOTES:-ALL DIMENSIONS ARE FROM FRAMING UNLESS INDICATED FROM STEEL(NOT FROM SHEATHING-NOT FROM CONCRETE EXCEPT INDICATED-NOTFROM GYSUM BOARD)

90°

//

//

//

//

//

ALIGN W/. BEAM BELOW

//

EQCL

CL

EQ

EQ

EQ

EQ

90°4' -

0 5

/8"

CL //

// //

6' - 6 3/4"1' - 9" 2' - 10 1/2"

7' - 5 5/8"

COORDINNATEWALL/DOORPLACEMENT

W/. ELEVATOR

2' - 0

1/4

"

7' - 9 7/8"

2' - 9 3/4"

//

90°

3' -

9 3

/4"

3' - 1 3/4"

0' -

10

3/8

"2

' - 6

"

CL

CL

CL

4' -

3 3

/8"

CL

//

//

0' - 11 3/8"

2' - 10 5/8"

90°

90°

90°

NICHE (SEEFLOOR PLAN)

2' -

5 7

/8"

//

//

90°

90°

//

LINE OFSOFFIT

WALLS ALIGNEDW/. CELLAR WALLS

DIM. WALL ON R.F.5' - 3 7/8"

3' - 0

"

3' - 1

1/8

"

10 7

/8"

CL

CT. TO STL.

1' - 0 5/8"

91°

SOUND INSUL.

10' -

1 1

/4"

2' -

5 1

/2"

8' -

4"

6' - 2 1/4"

28' - 9"

4 1/4"

4 1/4"

25' - 6 1/4"

LOW WALL

SOUND INSUL.IN POCKET

DOOR

SOUND INSUL. INPOCKET DOOR

NICHE

EQEQ

BUILD PITCHFLOOR

BUILDPITCHFLOOR

CT

. ST

L. B

LW

TO

FR

AM

E5"

CT. STL. B

LW TO FRAME

3 1/2"

CT

. ST

L. T

O F

RA

ME

4 1

/4"

CL

CT. STL. TO FRAME5 1/4"

CT. STL. T

O FRAME

3 1/2"

CT. STL. TO FRAME

11"

CONC. FND. T

O FRAME

5' - 0 5/8"

3 1/4" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEE#3 ON A.276 & #8 ON A.355

1 1/2" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEEA.276

1 1/2" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEEA.276

LINE OF SOFFIT

7 7/8" CONC. FROM EDGEFLINGE TO CONC. STEP

BELOW FRAMING WALL-SEEA.276

1' - 5

1/4

"

DIM. WALL ON R.F.9' - 2 3/4"

EQEQ

EQEQ

AL

IGN

CL

G.

SO

FF

IT W

/.D

OO

RO

PE

NIN

G

0' - 10 3/8"

WD

WC

LA

DD

ING

AN

DS

IDIN

G F

LU

SH

6' - 1

7/8

"

2' - 4 1/2"

7' - 4

3/8

"

90°

90°CL

FRAME TO FRAME

13' - 5 3/4"

ALIGN

4' - 4 3/8"

ALIG

N

2' -

3 1

/4"

SKYLIGHT

1"

A.357

10

A.357

11

2' - 11 3/4" VIF W/. W

/D

CL

TRIANGULATEDCUSTONWINDOW

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

1/4" = 1'-0"9

/1/2

010

5:2

0:2

2 P

M

A.102D

1st Floor Framing Plan

09.30.08

FRED

MZ

1/4" = 1'-0"1

First Floor Plan A

Revision Schedule

RevisionNumber Revision Date Issued to Issued by

RevisionDescription

3 09.12.08 PCH MB/FD Bid Set

4 09.30.08 Town Of EH MB/FD Permit Set

5 10.14.08 PCH MB/FD Window AndDoor Schedule

44 10.04.09 PCH FD/MB Revision 44

45 10.06.09 PCH/ELECCONSULT.

FD/MB Revision 45

46 10.19.09 PCH FD/MB Revision 46

48 12.07.09 PCH FD/MB LibraryWall+Chimney

69 04.30.10 PCH/Shine/Berty FD Elec plans

73 06.07.10 PCH FD/MZ Int doorschedule, fl plan,framing

81 08.22.10 PCH FD/MZ W/D 1st Floor,Bridge GallerySoffit

Page 32: Sayres Hanging Gardens

TO FRAME4' - 0 1/2"

14' - 7"

TO FRAME10' - 1 1/2"

6" STEELCOLUMN

EXPOSED

CL

EQEQ

2' - 3 1/2"

3' - 11 3/4"

90°

9' -

8 5

/8"

2' -

3"

4' -

2"

29' -

10 3

/4"

FLOORGRILL

FLOOR GRILL TBD.

SLO

PE

AT

1/8

" PE

R F

T.

SLOPE AT 1/8" PER FT.

ROOF LINE

RESIN FLOOR W/.RUBBER ON 3/4"

PITCHED PLYWOOD

FLOOR GRILL

CL

TO FRAME1' - 9 1/8"

FRAME TO FRAME11' -

10"

FRAME TO FRAME1' -

5 3/4"

2' -

5 3

/4"

9' -

2 1

/8"

7' - 5 5/8"

90°

90°

90°

90°

90°

90°

1' -

8 7

/8"

3' -

10 1

/8"

1' -

1 3

/8"

MED.CAB.

LOC. TBD

3' - 3 1/2" 3' - 3 5/8"

CT

. T

O S

TL.

0' -

4 1

/8" //

ALIG

N

CL

CT. S

TL.

0' - 8

"

CL

CT. TO STL.

0' - 7 1/2"

CT. STL. T

O FRAME1' -

9 7/8"

CL

ALIGN

ALIG

N

0' -

9 1

/2"

4' -

10 1

/4"

CL

CL

7' - 10 3/4"

1' - 0 3/8"

90°

11' -

4 3

/4"

90°

90°

90°

3' -

2 3

/4"

3' -

9 1

/4"

CABINETRY AROUNDCOLUMN

8' - 6

7/8

"

CL

LINE OFSOFFIT

9' -

11

1/4

"6

' - 1

1 1

/4"

CL

CL

4' - 9 7/8"

14' - 0 1/4"CL

CL

CL

CL

CL

CL

CL

ALIGN/CT. WALL W/. W8X13 ON 1ST FL.

ROOF LINE.

ROOF LINE

PULL SIDE SHADE

ELEC. CONCEALEDROLL DOWN SHADE

ELEC.CONCEALED ROLL

DOWN SHADE

1' - 6 7/8"

1' - 1

0 7

/8"

CL

CL

3' -

1 5

/8"

7' -

9 3

/4"

10

' - 7

"

5' - 10 1/2"

5' - 8 3/4"

CL

CL

CL

13' - 4 5/8"

3' - 10 3/4" 2' -

8 1/8"

CL

CL

TO

FR

AM

E8' -

6 3

/4"

FR

AM

E T

O F

RA

ME

8' -

1 1

3/1

6"

TO

FR

AM

E2' -

0 5

/16"

RAILING @ 36" ABV. FINISHFLOOR TERRACE TBD.

REMOVABLECORNER TO

REPLACE SASH

73°

104°

49 3/4"

14' - 5 1/16"

12"

SOUND INSUL.

SOUND INSUL.

1S

T R

ISE

R F

.T.F

3' -

6 5

/8"

OPEN TO BELOW

90°

90°

CT. S

TL. TO

FR

AM

E1' -

8 1

5/1

6"

CL

1' - 6 3/4"

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

16' - 11"

1' -

5 3/

8"

18' - 8 3/8"

3' - 5 1/8"

8' - 0 1/8"

SHOWER GLASS BETWWENWDW MULLION

4' - 2

1/8

"

2' - 4 7/8"

5' - 10 1/2"

4' -

0"

1' - 11 5/8"

3' -

2 3

/4"

7' -

11 5

/8"

2' -

6 5

/8"

2' -

7 7

/8" 9

COORDINNATEWALL/DOORPLACEMENT

W/. ELEVATOR

SOUND INSUL.

WALLS ALIGNED W/.1ST FLOOR WALLS

7' - 8 3/8"

CL

6' - 11 3/8"

3' - 3 5/8"

CL

5' - 6 7/8"

1' - 0"

TO

FR

AM

E

10' -

11 1

/8"

4' -

0 1

/2"

90°

90°

90°

90°

6' - 8

1/2

"

2' - 8 3/4"

7' - 3 1/8"

1' -

5 1

/4"

90°

2' - 3 1/8"

6' -

11 3

/4"

12' -

7 3

/8"

70°

71°

EQ

EQ

6' - 1

3/8

"

6' -

8 7

/8"

CL

2' - 3"

11' - 8"

90°

2' - 3

1/2

"

CT. TO STL.

7 1/8"

OPEN TOGALLERY BELOW

90°

9' - 2 1/4"

//

//

//

//

//

//

//

//

LOW WALL

LOWWALL

//

//

//

SOUNDINSUL. INPOCKETDOOR

SOUND INSUL.

SOUNDINSUL.

SOUNDINSUL. INPOCKET

DOOR

NICHE (SEEFLOOR PLAN)

NICHE

OPEN TOBEDROOM #1

BELOW

8 3

/4"

89°

FRAME TO EXT. FINISH

0' - 9"

FR

AM

E T

O E

XT. F

INIS

H

9 1

/16"

3' - 4"

90°

2' - 0

"

//

5' - 6

5/8

"5

' - 4 3

/4"

5' - 9"

NOTE:-ATTACHED TO STUD WALL FORCISTERN @ ALL WALL MOUNTED TOILET-ALL DIMENSIONS ARE FROM FRAMING

1' - 0 5/8"

5' - 1 7/8"

2' -

9 3

/8"

1' - 2 1/8" TO FRAME11' - 7 1/4"

CONFIRMDIM. W/.CLIENT

1' - 6 3/4"

SAFE TO BEMOUNTED ON

CONCRETE FLOORVERIFY LOCATION

WITH ARCH.

SAFE

90°

9' -

3 1

/2"

1' -

10 1

/2"

4' -

4 5

/8" 90°

2' -

2"

52 5

/8"

10"

EDGE OFBEAM BELOW

CONCRETEFLOOR

MIN

.

14 5

/8"

3/4" PLYWOODWALL

90°

CHIMNEY FLUE W/.2" SPACE AROUND-

LOCATION TBD

3' -

5 1

/2"

78 5

/8"

3' - 0 1/8"

61"

A.357

12

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

1/4" = 1'-0"

9/3

/20

10

1:0

9:4

5 A

M

A.103B

2nd Floor Framing Plan

09.30.08

FRED

Maz

1/4" = 1'-0"1

2nd Floor Framing Plan

Revision Schedule

RevisionNumber Revision Date Issued to Issued by

RevisionDescription

3 09.12.08 PCH MB/FD Bid Set

4 09.30.08 Town Of EH MB/FD Permit Set

5 10.14.08 PCH MB/FD Window AndDoor Schedule

44 10.04.09 PCH FD/MB Revision 44

46 10.19.09 PCH FD/MB Revision 46

51 01.14.10 PCH FD/MB 2nd Fl. FramingPlan

52 01.19.10 PCH FD/MB 2nd Fl.FramingPlan

55 02.01.10 PCH/Tracey FD Framing Plan2nd FL.

Page 33: Sayres Hanging Gardens

TO FRAME4' - 0 1/2"

14' - 7"

TO FRAME10' - 1 1/2"

6" STEELCOLUMN

EXPOSED

CL

EQEQ

2' - 3 1/2"

3' - 11 3/4"

90°

9' -

8 5

/8"

2' -

3"

4' -

2"

29' -

10 3

/4"

FLOORGRILL

FLOOR GRILL TBD.

SLO

PE

AT

1/8

" PE

R F

T.

SLOPE AT 1/8" PER FT.

ROOF LINE

RESIN FLOOR W/.RUBBER ON 3/4"

PITCHED PLYWOOD

FLOOR GRILL

CL

TO FRAME1' - 9 1/8"

FRAME TO FRAME11' -

10"

FRAME TO FRAME1' -

5 3/4"

2' -

5 3

/4"

9' -

2 1

/8"

7' - 5 5/8"

90°

90°

90°

90°

90°

90°

1' -

8 7

/8"

3' -

10 1

/8"

1' -

1 3

/8"

MED.CAB.

LOC. TBD

3' - 3 1/2" 3' - 3 5/8"

CT

. T

O S

TL.

0' -

4 1

/8" //

ALIG

N

CL

CT. S

TL.

0' - 8

"

CL

CT. TO STL.

0' - 7 1/2"

CT. STL. T

O FRAME1' -

9 7/8"

CL

ALIGN

ALIG

N

0' -

9 1

/2"

4' -

10 1

/4"

CL

CL

7' - 10 3/4"

1' - 0 3/8"

90°

11' -

4 3

/4"

90°

90°

90°

3' -

2 3

/4"

3' -

9 1

/4"

CABINETRY AROUNDCOLUMN

8' - 6

7/8

"

CL

LINE OFSOFFIT

9' -

11

1/4

"6

' - 1

1 1

/4"

CL

CL

4' - 9 7/8"

14' - 0 1/4"CL

CL

CL

CL

CL

CL

CL

ALIGN/CT. WALL W/. W8X13 ON 1ST FL.

ROOF LINE.

ROOF LINE

PULL SIDE SHADE

ELEC. CONCEALEDROLL DOWN SHADE

ELEC.CONCEALED ROLL

DOWN SHADE

1' - 6 7/8"

1' - 1

0 7

/8"

CL

CL

3' -

1 5

/8"

7' -

9 3

/4"

10

' - 7

"

5' - 10 1/2"

5' - 8 3/4"

CL

CL

CL

13' - 4 5/8"

3' - 10 3/4" 2' -

8 1/8"

CL

CL

TO

FR

AM

E8' -

6 3

/4"

FR

AM

E T

O F

RA

ME

8' -

1 1

3/1

6"

TO

FR

AM

E2' -

0 5

/16"

RAILING @ 36" ABV. FINISHFLOOR TERRACE TBD.

REMOVABLECORNER TO

REPLACE SASH

73°

104°

49 3/4"

14' - 5 1/16"

12"

SOUND INSUL.

SOUND INSUL.

1S

T R

ISE

R F

.T.F

3' -

6 5

/8"

OPEN TO BELOW

90°

90°

CT. S

TL. TO

FR

AM

E1' -

8 1

5/1

6"

CL

1' - 6 3/4"

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

16' - 11"

1' -

5 3/

8"

18' - 8 3/8"

3' - 5 1/8"

8' - 0 1/8"

SHOWER GLASS BETWWENWDW MULLION

4' - 2

1/8

"

2' - 4 7/8"

5' - 10 1/2"

4' -

0"

1' - 11 5/8"

3' -

2 3

/4"

7' -

11 5

/8"

2' -

6 5

/8"

2' -

7 7

/8" 9

COORDINNATEWALL/DOORPLACEMENT

W/. ELEVATOR

SOUND INSUL.

WALLS ALIGNED W/.1ST FLOOR WALLS

7' - 8 3/8"

CL

6' - 11 3/8"

3' - 3 5/8"

CL

5' - 6 7/8"

1' - 0"

TO

FR

AM

E

10' -

11 1

/8"

4' -

0 1

/2"

90°

90°

90°

90°

6' - 8

1/2

"

2' - 8 3/4"

7' - 3 1/8"

1' -

5 1

/4"

90°

2' - 3 1/8"

6' -

11 3

/4"

12' -

7 3

/8"

70°

71°

EQ

EQ

6' - 1

3/8

"

6' -

8 7

/8"

CL

2' - 3"

11' - 8"

90°

2' - 3

1/2

"

CT. TO STL.

7 1/8"

OPEN TOGALLERY BELOW

90°

9' - 2 1/4"

//

//

//

//

//

//

//

//

LOW WALL

LOWWALL

//

//

//

SOUNDINSUL. INPOCKETDOOR

SOUND INSUL.

SOUNDINSUL.

SOUNDINSUL. INPOCKET

DOOR

NICHE (SEEFLOOR PLAN)

NICHE

OPEN TOBEDROOM #1

BELOW

8 3

/4"

89°

FRAME TO EXT. FINISH

0' - 9"

FR

AM

E T

O E

XT. F

INIS

H

9 1

/16"

3' - 4"

90°

2' - 0

"

//

5' - 6

5/8

"5

' - 4 3

/4"

5' - 9"

NOTE:-ATTACHED TO STUD WALL FORCISTERN @ ALL WALL MOUNTED TOILET-ALL DIMENSIONS ARE FROM FRAMING

1' - 0 5/8"

5' - 1 7/8"

2' -

9 3

/8"

1' - 2 1/8" TO FRAME11' - 7 1/4"

CONFIRMDIM. W/.CLIENT

1' - 6 3/4"

SAFE TO BEMOUNTED ON

CONCRETE FLOORVERIFY LOCATION

WITH ARCH.

SAFE

90°

9' -

3 1

/2"

1' -

10 1

/2"

4' -

4 5

/8" 90°

2' -

2"

52 5

/8"

10"

EDGE OFBEAM BELOW

CONCRETEFLOOR

MIN

.

14 5

/8"

3/4" PLYWOODWALL

90°

CHIMNEY FLUE W/.2" SPACE AROUND-

LOCATION TBD

3' -

5 1

/2"

78 5

/8"

3' - 0 1/8"

61"

A.357

12

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

1/4" = 1'-0"

9/3

/20

10

1:0

9:4

5 A

M

A.103B

2nd Floor Framing Plan

09.30.08

FRED

Maz

1/4" = 1'-0"1

2nd Floor Framing Plan

Revision Schedule

RevisionNumber Revision Date Issued to Issued by

RevisionDescription

3 09.12.08 PCH MB/FD Bid Set

4 09.30.08 Town Of EH MB/FD Permit Set

5 10.14.08 PCH MB/FD Window AndDoor Schedule

44 10.04.09 PCH FD/MB Revision 44

46 10.19.09 PCH FD/MB Revision 46

51 01.14.10 PCH FD/MB 2nd Fl. FramingPlan

52 01.19.10 PCH FD/MB 2nd Fl.FramingPlan

55 02.01.10 PCH/Tracey FD Framing Plan2nd FL.

Page 34: Sayres Hanging Gardens
Page 35: Sayres Hanging Gardens
Page 36: Sayres Hanging Gardens
Page 37: Sayres Hanging Gardens
Page 38: Sayres Hanging Gardens
Page 39: Sayres Hanging Gardens
Page 40: Sayres Hanging Gardens
Page 41: Sayres Hanging Gardens
Page 42: Sayres Hanging Gardens
Page 43: Sayres Hanging Gardens
Page 44: Sayres Hanging Gardens
Page 45: Sayres Hanging Gardens
Page 46: Sayres Hanging Gardens
Page 47: Sayres Hanging Gardens
Page 48: Sayres Hanging Gardens
Page 49: Sayres Hanging Gardens
Page 50: Sayres Hanging Gardens
Page 51: Sayres Hanging Gardens
Page 52: Sayres Hanging Gardens
Page 53: Sayres Hanging Gardens
Page 54: Sayres Hanging Gardens
Page 55: Sayres Hanging Gardens
Page 56: Sayres Hanging Gardens
Page 57: Sayres Hanging Gardens
Page 58: Sayres Hanging Gardens
Page 59: Sayres Hanging Gardens
Page 60: Sayres Hanging Gardens
Page 61: Sayres Hanging Gardens
Page 62: Sayres Hanging Gardens
Page 63: Sayres Hanging Gardens
Page 64: Sayres Hanging Gardens

TO FRAME4' - 0 1/2"

14' - 7"

TO FRAME10' - 1 1/2"

6" STEELCOLUMN

EXPOSED

CL

EQEQ

2' - 3 1/2"

3' - 11 3/4"

90°

9' -

8 5

/8"

2' -

3"

4' -

2"

29' -

10 3

/4"

FLOORGRILL

FLOOR GRILL TBD.

SLO

PE

AT

1/8

" PE

R F

T.

SLOPE AT 1/8" PER FT.

ROOF LINE

RESIN FLOOR W/.RUBBER ON 3/4"

PITCHED PLYWOOD

FLOOR GRILL

CL

TO FRAME1' - 9 1/8"

FRAME TO FRAME11' -

10"

FRAME TO FRAME1' -

5 3/4"

2' -

5 3

/4"

9' -

2 1

/8"

7' - 5 5/8"

90°

90°

90°

90°

90°

90°

1' -

8 7

/8"

3' -

10 1

/8"

1' -

1 3

/8"

MED.CAB.

LOC. TBD

3' - 3 1/2" 3' - 3 5/8"

CT

. T

O S

TL.

0' -

4 1

/8" //

ALIG

N

CL

CT. S

TL.

0' - 8

"

CL

CT. TO STL.

0' - 7 1/2"

CT. STL. T

O FRAME1' -

9 7/8"

CL

ALIGN

ALIG

N

0' -

9 1

/2"

4' -

10 1

/4"

CL

CL

7' - 10 3/4"

1' - 0 3/8"

90°

11' -

4 3

/4"

90°

90°

90°

3' -

2 3

/4"

3' -

9 1

/4"

CABINETRY AROUNDCOLUMN

8' - 6

7/8

"

CL

LINE OFSOFFIT

9' -

11

1/4

"6

' - 1

1 1

/4"

CL

CL

4' - 9 7/8"

14' - 0 1/4"CL

CL

CL

CL

CL

CL

CL

ALIGN/CT. WALL W/. W8X13 ON 1ST FL.

ROOF LINE.

ROOF LINE

PULL SIDE SHADE

ELEC. CONCEALEDROLL DOWN SHADE

ELEC.CONCEALED ROLL

DOWN SHADE

1' - 6 7/8"

1' - 1

0 7

/8"

CL

CL

3' -

1 5

/8"

7' -

9 3

/4"

10

' - 7

"

5' - 10 1/2"

5' - 8 3/4"

CL

CL

CL

13' - 4 5/8"

3' - 10 3/4" 2' -

8 1/8"

CL

CL

TO

FR

AM

E8' -

6 3

/4"

FR

AM

E T

O F

RA

ME

8' -

1 1

3/1

6"

TO

FR

AM

E2' -

0 5

/16"

RAILING @ 36" ABV. FINISHFLOOR TERRACE TBD.

REMOVABLECORNER TO

REPLACE SASH

73°

104°

49 3/4"

14' - 5 1/16"

12"

SOUND INSUL.

SOUND INSUL.

1S

T R

ISE

R F

.T.F

3' -

6 5

/8"

OPEN TO BELOW

90°

90°

CT. S

TL. TO

FR

AM

E1' -

8 1

5/1

6"

CL

1' - 6 3/4"

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

16' - 11"

1' -

5 3/

8"

18' - 8 3/8"

3' - 5 1/8"

8' - 0 1/8"

SHOWER GLASS BETWWENWDW MULLION

4' - 2

1/8

"

2' - 4 7/8"

5' - 10 1/2"

4' -

0"

1' - 11 5/8"

3' -

2 3

/4"

7' -

11 5

/8"

2' -

6 5

/8"

2' -

7 7

/8" 9

COORDINNATEWALL/DOORPLACEMENT

W/. ELEVATOR

SOUND INSUL.

WALLS ALIGNED W/.1ST FLOOR WALLS

7' - 8 3/8"

CL

6' - 11 3/8"

3' - 3 5/8"

CL

5' - 6 7/8"

1' - 0"

TO

FR

AM

E

10' -

11 1

/8"

4' -

0 1

/2"

90°

90°

90°

90°

6' - 8

1/2

"

2' - 8 3/4"

7' - 3 1/8"

1' -

5 1

/4"

90°

2' - 3 1/8"

6' -

11 3

/4"

12' -

7 3

/8"

70°

71°

EQ

EQ

6' - 1

3/8

"

6' -

8 7

/8"

CL

2' - 3"

11' - 8"

90°

2' - 3

1/2

"

CT. TO STL.

7 1/8"

OPEN TOGALLERY BELOW

90°

9' - 2 1/4"

//

//

//

//

//

//

//

//

LOW WALL

LOWWALL

//

//

//

SOUNDINSUL. INPOCKETDOOR

SOUND INSUL.

SOUNDINSUL.

SOUNDINSUL. INPOCKET

DOOR

NICHE (SEEFLOOR PLAN)

NICHE

OPEN TOBEDROOM #1

BELOW

8 3

/4"

89°

FRAME TO EXT. FINISH

0' - 9"

FR

AM

E T

O E

XT. F

INIS

H

9 1

/16"

3' - 4"

90°

2' - 0

"

//

5' - 6

5/8

"5

' - 4 3

/4"

5' - 9"

NOTE:-ATTACHED TO STUD WALL FORCISTERN @ ALL WALL MOUNTED TOILET-ALL DIMENSIONS ARE FROM FRAMING

1' - 0 5/8"

5' - 1 7/8"

2' -

9 3

/8"

1' - 2 1/8" TO FRAME11' - 7 1/4"

CONFIRMDIM. W/.CLIENT

1' - 6 3/4"

SAFE TO BEMOUNTED ON

CONCRETE FLOORVERIFY LOCATION

WITH ARCH.

SAFE

90°

9' -

3 1

/2"

1' -

10 1

/2"

4' -

4 5

/8" 90°

2' -

2"

52 5

/8"

10"

EDGE OFBEAM BELOW

CONCRETEFLOOR

MIN

.

14 5

/8"

3/4" PLYWOODWALL

90°

CHIMNEY FLUE W/.2" SPACE AROUND-

LOCATION TBD

3' -

5 1

/2"

78 5

/8"

3' - 0 1/8"

61"

A.357

12

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

1/4" = 1'-0"

9/3

/20

10

1:0

9:4

5 A

M

A.103B

2nd Floor Framing Plan

09.30.08

FRED

Maz

1/4" = 1'-0"1

2nd Floor Framing Plan

Revision Schedule

RevisionNumber Revision Date Issued to Issued by

RevisionDescription

3 09.12.08 PCH MB/FD Bid Set

4 09.30.08 Town Of EH MB/FD Permit Set

5 10.14.08 PCH MB/FD Window AndDoor Schedule

44 10.04.09 PCH FD/MB Revision 44

46 10.19.09 PCH FD/MB Revision 46

51 01.14.10 PCH FD/MB 2nd Fl. FramingPlan

52 01.19.10 PCH FD/MB 2nd Fl.FramingPlan

55 02.01.10 PCH/Tracey FD Framing Plan2nd FL.

ROOF LINE

FLOOR GRILL

CLCLC

TOSTL.

0'

1' -9

8'

PITCH STUCCO 1/4"/FTPITCH STUCCO 1/4"/FT

FRAME TO EX0' -9"

Page 65: Sayres Hanging Gardens

TO FRAME4' - 0 1/2"

14' - 7"

TO FRAME10' - 1 1/2"

6" STEELCOLUMN

EXPOSED

CL

EQEQ

2' - 3 1/2"

3' - 11 3/4"

90°

9' -

8 5

/8"

2' -

3"

4' -

2"

29' -

10 3

/4"

FLOORGRILL

FLOOR GRILL TBD.

SLO

PE

AT

1/8

" PE

R F

T.

SLOPE AT 1/8" PER FT.

ROOF LINE

RESIN FLOOR W/.RUBBER ON 3/4"

PITCHED PLYWOOD

FLOOR GRILL

CL

TO FRAME1' - 9 1/8"

FRAME TO FRAME11' -

10"

FRAME TO FRAME1' -

5 3/4"

2' -

5 3

/4"

9' -

2 1

/8"

7' - 5 5/8"

90°

90°

90°

90°

90°

90°

1' -

8 7

/8"

3' -

10 1

/8"

1' -

1 3

/8"

MED.CAB.

LOC. TBD

3' - 3 1/2" 3' - 3 5/8"

CT

. T

O S

TL.

0' -

4 1

/8" //

ALIG

N

CL

CT. S

TL.

0' - 8

"

CL

CT. TO STL.

0' - 7 1/2"

CT. STL. T

O FRAME1' -

9 7/8"

CL

ALIGN

ALIG

N

0' -

9 1

/2"

4' -

10 1

/4"

CL

CL

7' - 10 3/4"

1' - 0 3/8"

90°

11' -

4 3

/4"

90°

90°

90°

3' -

2 3

/4"

3' -

9 1

/4"

CABINETRY AROUNDCOLUMN

8' - 6

7/8

"

CL

LINE OFSOFFIT

9' -

11

1/4

"6

' - 1

1 1

/4"

CL

CL

4' - 9 7/8"

14' - 0 1/4"CL

CL

CL

CL

CL

CL

CL

ALIGN/CT. WALL W/. W8X13 ON 1ST FL.

ROOF LINE.

ROOF LINE

PULL SIDE SHADE

ELEC. CONCEALEDROLL DOWN SHADE

ELEC.CONCEALED ROLL

DOWN SHADE

1' - 6 7/8"

1' - 1

0 7

/8"

CL

CL

3' -

1 5

/8"

7' -

9 3

/4"

10

' - 7

"

5' - 10 1/2"

5' - 8 3/4"

CL

CL

CL

13' - 4 5/8"

3' - 10 3/4" 2' -

8 1/8"

CL

CL

TO

FR

AM

E8' -

6 3

/4"

FR

AM

E T

O F

RA

ME

8' -

1 1

3/1

6"

TO

FR

AM

E2' -

0 5

/16"

RAILING @ 36" ABV. FINISHFLOOR TERRACE TBD.

REMOVABLECORNER TO

REPLACE SASH

73°

104°

49 3/4"

14' - 5 1/16"

12"

SOUND INSUL.

SOUND INSUL.

1S

T R

ISE

R F

.T.F

3' -

6 5

/8"

OPEN TO BELOW

90°

90°

CT. S

TL. TO

FR

AM

E1' -

8 1

5/1

6"

CL

1' - 6 3/4"

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

16' - 11"

1' -

5 3/

8"

18' - 8 3/8"

3' - 5 1/8"

8' - 0 1/8"

SHOWER GLASS BETWWENWDW MULLION

4' - 2

1/8

"

2' - 4 7/8"

5' - 10 1/2"

4' -

0"

1' - 11 5/8"

3' -

2 3

/4"

7' -

11 5

/8"

2' -

6 5

/8"

2' -

7 7

/8" 9

COORDINNATEWALL/DOORPLACEMENT

W/. ELEVATOR

SOUND INSUL.

WALLS ALIGNED W/.1ST FLOOR WALLS

7' - 8 3/8"

CL

6' - 11 3/8"

3' - 3 5/8"

CL

5' - 6 7/8"

1' - 0"

TO

FR

AM

E

10' -

11 1

/8"

4' -

0 1

/2"

90°

90°

90°

90°

6' - 8

1/2

"

2' - 8 3/4"

7' - 3 1/8"

1' -

5 1

/4"

90°

2' - 3 1/8"

6' -

11 3

/4"

12' -

7 3

/8"

70°

71°

EQ

EQ

6' - 1

3/8

"

6' -

8 7

/8"

CL

2' - 3"

11' - 8"

90°

2' - 3

1/2

"

CT. TO STL.

7 1/8"

OPEN TOGALLERY BELOW

90°

9' - 2 1/4"

//

//

//

//

//

//

//

//

LOW WALL

LOWWALL

//

//

//

SOUNDINSUL. INPOCKETDOOR

SOUND INSUL.

SOUNDINSUL.

SOUNDINSUL. INPOCKET

DOOR

NICHE (SEEFLOOR PLAN)

NICHE

OPEN TOBEDROOM #1

BELOW

8 3

/4"

89°

FRAME TO EXT. FINISH

0' - 9"

FR

AM

E T

O E

XT. F

INIS

H

9 1

/16"

3' - 4"

90°

2' - 0

"

//

5' - 6

5/8

"5

' - 4 3

/4"

5' - 9"

NOTE:-ATTACHED TO STUD WALL FORCISTERN @ ALL WALL MOUNTED TOILET-ALL DIMENSIONS ARE FROM FRAMING

1' - 0 5/8"

5' - 1 7/8"

2' -

9 3

/8"

1' - 2 1/8" TO FRAME11' - 7 1/4"

CONFIRMDIM. W/.CLIENT

1' - 6 3/4"

SAFE TO BEMOUNTED ON

CONCRETE FLOORVERIFY LOCATION

WITH ARCH.

SAFE

90°

9' -

3 1

/2"

1' -

10 1

/2"

4' -

4 5

/8" 90°

2' -

2"

52 5

/8"

10"

EDGE OFBEAM BELOW

CONCRETEFLOOR

MIN

.

14 5

/8"

3/4" PLYWOODWALL

90°

CHIMNEY FLUE W/.2" SPACE AROUND-

LOCATION TBD

3' -

5 1

/2"

78 5

/8"

3' - 0 1/8"

61"

A.357

12

MB Architecture

CONSTRUCTION SET

Scale

Date

Drawn by

Checked by

PROPOSED NEW ADDITIONFOR: MICHEL AND MARIE EVE BERTY

PROJECT:

OWNER ADDRESS:

ARCHITECT:

maziar behrooz,AIA

7A Newtown LaneEast Hampton, NY 11937

T: 631-329-2983F: 631-329-4878E: [email protected]: mbarchitecture.com

SHEET TITLE:

CONSULTANTS:

40 Sayres pathWainscott, NY11975

Jeff StrattonGILSANZ MURRAY STEFICEK LLPStructural Engineers129 West 27th Street, 5th FloorNew York, NY 10001212-254-0030212-477-5978 Faxwww.gmsllp.com <http://www.gmsllp.com>

REQUEST UPDATED DRAWING FROMARCHITECT PRIOR CONSTRUCTION

1/4" = 1'-0"

9/3

/20

10

1:0

9:4

5 A

M

A.103B

2nd Floor Framing Plan

09.30.08

FRED

Maz

1/4" = 1'-0"1

2nd Floor Framing Plan

Revision Schedule

RevisionNumber Revision Date Issued to Issued by

RevisionDescription

3 09.12.08 PCH MB/FD Bid Set

4 09.30.08 Town Of EH MB/FD Permit Set

5 10.14.08 PCH MB/FD Window AndDoor Schedule

44 10.04.09 PCH FD/MB Revision 44

46 10.19.09 PCH FD/MB Revision 46

51 01.14.10 PCH FD/MB 2nd Fl. FramingPlan

52 01.19.10 PCH FD/MB 2nd Fl.FramingPlan

55 02.01.10 PCH/Tracey FD Framing Plan2nd FL.

2' 3 1/

3' - 11 3/4"""

90°

9'-

85/8

"

3"

29

-10

3/4

"

FLOOR GRILL TBD.

SLO

PE

AT

1/8" PR FT.

RESIN FLOOR W/.RESIN FLOOR W/.RESIN FLOOR W/.RESIN FLOOR W/.

CLCLC

TO FAMMME1' --

9 1/888""

O FRAME11' -

10"

EE T

2' -

9' -

2

"

7

90

90

90°

90°

1'

/8"

3''-

1° 1°0

1/8

"1'-

13333/////8888

"""

ALIGG

N

CCT.T

0

TO FFRAME9 7/8"

ALIGN

ALIG

N

-9

1/2

"

4'-

10

1/4

"

CCCCCCCCCCCLLCLCCLCCLCCLC

CLCLC

11'-

43/4

"

99990°°

CABINETRY AROUNDCOLUMN

CCLLCLCCLC

PULL SIDE SHADE

1' -6 7/8"

07/8

"

13' -4 5/8

3333333''' -1110 333///////4444""" 2' -

8 1/8"

TO

8

FR

AM

ETO

FR

AAMM

E1

13/1

6"

TTO

FR

A2

-0

5/1

66

RAILING @ 36" ABV. FINISHRAILING @ 36" ABV. FINISHFLOOR TERRACE TBD.FLOOR TERRACE TBD.

REMOVABLECORNER TO

REPLACE SASH

14' -5 1/1

12"

SOUND INSUL.

90°°

90

CT.S

TTO

FFR

AM

E111'-

85/1

6"

CCLCLCCLC

PITCH STUCCO 1/4"/FTPITCH STUCCO 1/4"/FT

PITCH STUCCO 1/4"/FT

16' -11"

1''- 5

3//8888""

8' -8 3/8"

3' -5 1/8

8' -0 1/8""

SHOWER GLASS BETWWENSHOWER GLASS BETWWENWDW MULLIONWDW MULLION

4' -2

1/8"

5'

4''---

0000"

2'

65/8

"

2' -

77/8

" 90°

WALL/DOORPLACEMENTPLACEMENT7PLACEMENT7'PLACEMENT' -PLACEMENT- 5PLACEMENT5 5PLACEMENT5

W/. ELEVATORW/. ELEVATOR

1ST FLOOR WALLS

7-83/8"

CLLCLC

6' - 1919191919190103°3°/8"

3' - 3 5/8 '8 '

" 1" 1

LL

5' -- 6 96 9

7777777///////88888888888888888888888""""

1' - 0"

90 00 0° 0° 0

90°

999990000°

222''-'--'- -6-6 89890

8

0

787

33 33 3'3''3'-3

-

3 33 3'3''3'33///3/34444

"""

7' - 3 1/8"

11111111111111111111111111111111111111111111--5555

1//44

8

4

8 "8 "8

Q

6' -

87/88

"

CLLCLCCLC

/////

//////////

////////4/44/4 ///4 /4//////4/4 /4/4

/////

/////

//////

/////////////////

SOUNDINSUL. ININSUL. INPOCKETPOCKETPOCKETPOCKETPOCKETPOCKETDOORDOOR

NICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEENICHE (SEEFLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)FLOOR PLAN)

XT. FINNNIISSSHHH

ETTO

EX

T.FIN

ISH

991/1

6"

SAFE TO BEMOUNTED ON

CONCRETE FLOORVERIFY LOCATION

WITH ARCH.

SAFESAFESAFE

99999999900000°°°°

9' -

3

1' -

10

1/22

"4' -

45/8

" 999990000°°

2' -

2"

52

5/88

"

110"

EDGE OFBEAM BELOW

CONCRETEFLOOR

MIN

14

5/83/4" PLYWOOD

WALL

900°°

CHIMNEY FLUE W/.2" SPACE AROUND-

LOCATION TBD

3' -

555/2

"

78

5/8

"

3' - 0 1///8"

12

RESIN FLOOR W/.RESIN FLOOR W/. PITCH STUCCO 1/4"/FTPITCH STUCCO 1/4"/FTPITCH STUCCO 1/4"/FTRESIN FLOOR W/.

Page 66: Sayres Hanging Gardens
Page 67: Sayres Hanging Gardens
Page 68: Sayres Hanging Gardens
Page 69: Sayres Hanging Gardens
Page 70: Sayres Hanging Gardens
Page 71: Sayres Hanging Gardens
Page 72: Sayres Hanging Gardens
Page 73: Sayres Hanging Gardens
Page 74: Sayres Hanging Gardens
Page 75: Sayres Hanging Gardens
Page 76: Sayres Hanging Gardens
Page 77: Sayres Hanging Gardens
Page 78: Sayres Hanging Gardens
Page 79: Sayres Hanging Gardens
Page 80: Sayres Hanging Gardens
Page 81: Sayres Hanging Gardens
Page 82: Sayres Hanging Gardens
Page 83: Sayres Hanging Gardens
Page 84: Sayres Hanging Gardens
Page 85: Sayres Hanging Gardens
Page 86: Sayres Hanging Gardens
Page 87: Sayres Hanging Gardens
Page 88: Sayres Hanging Gardens
Page 89: Sayres Hanging Gardens
Page 90: Sayres Hanging Gardens
Page 91: Sayres Hanging Gardens
Page 92: Sayres Hanging Gardens
Page 93: Sayres Hanging Gardens
Page 94: Sayres Hanging Gardens
Page 95: Sayres Hanging Gardens
Page 96: Sayres Hanging Gardens
Page 97: Sayres Hanging Gardens
Page 98: Sayres Hanging Gardens
Page 99: Sayres Hanging Gardens
Page 100: Sayres Hanging Gardens
Page 101: Sayres Hanging Gardens
Page 102: Sayres Hanging Gardens
Page 103: Sayres Hanging Gardens
Page 104: Sayres Hanging Gardens
Page 105: Sayres Hanging Gardens
Page 106: Sayres Hanging Gardens
Page 107: Sayres Hanging Gardens
Page 108: Sayres Hanging Gardens
Page 109: Sayres Hanging Gardens
Page 110: Sayres Hanging Gardens
Page 111: Sayres Hanging Gardens
Page 112: Sayres Hanging Gardens
Page 113: Sayres Hanging Gardens
Page 114: Sayres Hanging Gardens
Page 115: Sayres Hanging Gardens
Page 116: Sayres Hanging Gardens
Page 117: Sayres Hanging Gardens
Page 118: Sayres Hanging Gardens
Page 119: Sayres Hanging Gardens
Page 120: Sayres Hanging Gardens
Page 121: Sayres Hanging Gardens
Page 122: Sayres Hanging Gardens

In 1990 while enrolled at the Cornell School of Architecture, I set out to extract the subtle ingredients, buried in the sheer mass of Architecture, that constitute our perceptions of home. My goal wasn’t pedantic even though it was conducted under the auspices of a Master’s thesis project. The formality of it was a ruse. More practically, I sought to capture and hold the very essence of a home, only to be able to recreate it at will wherever I chose to live. ¶ Very quickly, and undoubtedly, the journey became personal as it crossed out of Architecture and into the myriad dimensions that make for each of us the sense and non-sense of a house. ¶ The exegesis required an alchemist’s approach. I had to distill matter and memory to their nearly pure state - anymore and they would vanish into thin abstraction. ¶ In the end, they did. And I was left with a residue that has settled in my coat pocket all these years. ¶ Had I succeeded in capturing that essential ingredient, that potion, that like fairy dust would magically transform any place into some place, I would be free to be anywhere. The obviousness of anywhere being nowhere eluded me at the time; and I convinced myself that the way out of the labyrinth was to claim the self-evident truth that home is where the heart is. ¶ As a spatial expression, I described a smaller and smaller, eventually a portable habitat. It would be worn and carried like the tools of a medieval travelling cobbler or an astronaut’s suit - close to the skin. ¶ This was my Architecture of an instant home: projections of images within dark space, urban or rural; and their cross projections, creating intersecting horizontal pyramids of domestic imagery and a refuge for memory. ¶ In the intervening years, I have built many houses. But this last one, shown in the preceding and final pages, found its way back to the labyrinth -casting a Borgesian doubt over whether I had ever left it. Made from nested projections and intersecting triangulated spaces, it unfolds, paper-like, as you cross its interstices and thresholds. It is made of steel and glass and earth and eventually claims that Architecture, built, has the power to extinguish time.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 123: Sayres Hanging Gardens

In 1990 while enrolled at the Cornell School of Architecture, I set out to extract the subtle ingredients, buried in the sheer mass of Architecture, that constitute our perceptions of home. My goal wasn’t pedantic even though it was conducted under the auspices of a Master’s thesis project. The formality of it was a ruse. More practically, I sought to capture and hold the very essence of a home, only to be able to recreate it at will wherever I chose to live. ¶ Very quickly, and undoubtedly, the journey became personal as it crossed out of Architecture and into the myriad dimensions that make for each of us the sense and non-sense of a house. ¶ The exegesis required an alchemist’s approach. I had to distill matter and memory to their nearly pure state - anymore and they would vanish into thin abstraction. ¶ In the end, they did. And I was left with a residue that has settled in my coat pocket all these years. ¶ Had I succeeded in capturing that essential ingredient, that potion, that like fairy dust would magically transform any place into some place, I would be free to be anywhere. The obviousness of anywhere being nowhere eluded me at the time; and I convinced myself that the way out of the labyrinth was to claim the self-evident truth that home is where the heart is. ¶ As a spatial expression, I described a smaller and smaller, eventually a portable habitat. It would be worn and carried like the tools of a medieval travelling cobbler or an astronaut’s suit - close to the skin. ¶ This was my Architecture of an instant home: projections of images within dark space, urban or rural; and their cross projections, creating intersecting horizontal pyramids of domestic imagery and a refuge for memory. ¶ In the intervening years, I have built many houses. But this last one, shown in the preceding and final pages, found its way back to the labyrinth -casting a Borgesian doubt over whether I had ever left it. Made from nested projections and intersecting triangulated spaces, it unfolds, paper-like, as you cross its interstices and thresholds. It is made of steel and glass and earth and eventually claims that Architecture, built, has the power to extinguish time.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 124: Sayres Hanging Gardens
Page 125: Sayres Hanging Gardens
Page 126: Sayres Hanging Gardens
Page 127: Sayres Hanging Gardens
Page 128: Sayres Hanging Gardens
Page 129: Sayres Hanging Gardens
Page 130: Sayres Hanging Gardens
Page 131: Sayres Hanging Gardens
Page 132: Sayres Hanging Gardens
Page 133: Sayres Hanging Gardens
Page 134: Sayres Hanging Gardens
Page 135: Sayres Hanging Gardens
Page 136: Sayres Hanging Gardens
Page 137: Sayres Hanging Gardens
Page 138: Sayres Hanging Gardens
Page 139: Sayres Hanging Gardens
Page 140: Sayres Hanging Gardens
Page 141: Sayres Hanging Gardens
Page 142: Sayres Hanging Gardens
Page 143: Sayres Hanging Gardens
Page 144: Sayres Hanging Gardens
Page 145: Sayres Hanging Gardens
Page 146: Sayres Hanging Gardens
Page 147: Sayres Hanging Gardens
Page 148: Sayres Hanging Gardens
Page 149: Sayres Hanging Gardens
Page 150: Sayres Hanging Gardens

2012

Page 151: Sayres Hanging Gardens
Page 152: Sayres Hanging Gardens
Page 153: Sayres Hanging Gardens
Page 154: Sayres Hanging Gardens
Page 155: Sayres Hanging Gardens
Page 156: Sayres Hanging Gardens
Page 157: Sayres Hanging Gardens
Page 158: Sayres Hanging Gardens
Page 159: Sayres Hanging Gardens
Page 160: Sayres Hanging Gardens
Page 161: Sayres Hanging Gardens
Page 162: Sayres Hanging Gardens
Page 163: Sayres Hanging Gardens
Page 164: Sayres Hanging Gardens
Page 165: Sayres Hanging Gardens
Page 166: Sayres Hanging Gardens
Page 167: Sayres Hanging Gardens
Page 168: Sayres Hanging Gardens
Page 169: Sayres Hanging Gardens
Page 170: Sayres Hanging Gardens
Page 171: Sayres Hanging Gardens
Page 172: Sayres Hanging Gardens
Page 173: Sayres Hanging Gardens
Page 174: Sayres Hanging Gardens
Page 175: Sayres Hanging Gardens
Page 176: Sayres Hanging Gardens
Page 177: Sayres Hanging Gardens
Page 178: Sayres Hanging Gardens
Page 179: Sayres Hanging Gardens
Page 180: Sayres Hanging Gardens

Project Credits

Architect:Maziar Behrooz ArchitectureEast Hamtpon and New York, NY

Architect’s Team: Maziar Behrooz, AIA, principal architectFrederic Debackere, drawing & designMichael Cafiero, book designMarybeth Finegan, administrative

Client: Mrs. Marie-Eve & Mr. Michel Berty

Project Location: Wainscott, NY

Project Type: Addition to existing house

Project Size: 9500 sf

Mechanical Engineer: Chaleff & Rogers

Structural Engineer:Gilsanz, Murray, Steficek,

Contractor: Joel Bass

Interior Design: Tracey Garrett, library & officeMarie-Eve Berty, colors & finishes

Lighting Design:Caitlin Faron, Shine

Photography:Matthew Carbone

Craftspeople: Cy Ross, library shelves & fireplaceMichael Hastalis, bar

Floors:Fusion Floors

Pool:Pristine Pools

Garden:Steve Torch

HVAC:Temp-ArtFlanders

Windows:Panoramic

Stair:Kitty Hawk Stair

Tiles:Alan Court AssociatesUrban Archeology

Steel:Tebbens Steel

Green Roof:Green Living Roofs

Page 181: Sayres Hanging Gardens
Page 182: Sayres Hanging Gardens
Page 183: Sayres Hanging Gardens
Page 184: Sayres Hanging Gardens
Page 185: Sayres Hanging Gardens

Maziar Behrooz Architecture is a studio of architecture and planning founded in 1990 in New York City, and since 1996, with an office in East Hampton, New York.

Our geographic location has given us a critical opportunity and challenge to carefully observe the interdependent relationship of human settlement with nature and the long-term impact of buildings on the environment.

We start our process by redefining outmoded terminologies that perpetuate non-existent relationships. We don’t design buildings but create integrated environments. In fact the built (or the building) in our work, in particular in our recent design projects, is a mere component, albeit a vital one, of a total environment. This fundamental shift in attitude, a reversal of the conventional relationship between buildings and nature whereby buildings are a component of much larger Architecture of the Environment, characterizes our approach to design.

As architects our specific role is to demonstrate alternative methods of planning and construction that promote this philosophy while helping preserve, sustain and regenerate the environment.

As practitioners, our challenge is to apply this attitude to every project, large or small, affordable or luxurious. While the physical results vary, we consistently aim for the maximization, wherever possible, of contiguous natural habitats. By clustering buildings and increasing managed landscapes, we leave nature to perform its self-healing, self-cleaning processes. We like to explore site layouts that reduce or otherwise draw attention to the impact of buildings on the environment.

The use of passive systems which take advantage of solar orientation, wind direction, and landscaping are fundamental to our decision making process while the examination of efficient and alternative materials and building technologies is a fulfillment of that promise.

Page 186: Sayres Hanging Gardens