MFD ProjectPeter Nicholls28 Feb 2012
Introduction
In Feb 2011 :
• We removed 25 Copiers from old supplier• We installed 50 MFDs from Datasharp.
In May 2011 :
• We removed c 300 printersHow did we go about it?
The Reality….
The Reality
• Printers were mostly black and white
• Photocopiers were old and frequently out of action
• Hardly any printers or copiers were networked
• Copiers were relatively few and far between – 24
• Very few scanners – 3?
• Copiers and printers were very expensive• Toner costs were high and extra• Prices raised 10% p.a.• High levels of waste• Minimal duplex printing• No real idea who was incurring what costs
• IT team’s time wasted maintaining 300 printers
The Perception of the old way…
Perception v Reality of the New Way
• My printer is convenient right by my desk
• I need secure printing
• The pupils need to print in class• SEN• Early Years
• I need to print:• Envelopes and labels• Invitations• Quality colour
• If the network goes down we are doomed
• I will end up wasting time queuing
Addressing the Objections
Addressing the Objections
Addressing the Objections
Addressing the Objections
• Learning best practice from visits to other schools
• Engaging an industry consultant
• Consulting with a representative User Group• Reps agreed/ compromised on e.g. MFD locations
• Consulting with Heads of Departments
• Consulting at staff meetings
• Responding to every query and objection … we were listening
• Making reasonable exceptions
• Leaving Art / Boarding out of scope
The Process
• Communication
• Industry consultant and tender process• Print audit• Design solution• Tender
• Weekly project management meetings with IT team and supplier
• Conference calls and shared area• Project plans, owners and actions• Decisions required
• Training
• Transition between installation and removal of printers
The Problem….
• Printers were mostly black and white
• Photocopiers were old and often out of action
• Hardly any printers or copiers were networked
• Copiers were relatively few - 24
• Very few scanners
• Copiers and printers were very expensive
• Toner costs were high and extra
• Prices raised 10% p.a.
• High levels of waste
• Minimal duplex printing
• Colour only printers
• No idea who was incurring what costs
• IT team’s time wasted maintaining 300 printers
• All colour MFDs
• New MFDs, SLA with teeth
• All networked MFDs
• Now have 50 MFDs
• All MFDs scan to email
• All inclusive pence per copy
• Capped at RPI
• Code input at MFD
• Default duplex
• Default black and white
• On-line management reports
• Printers removed
The Solution….
Something must have worked ….
• Art department saw the quality and switched over
• Boarding Houses jumped on the bandwagon
• Our survey said….
• 72% agree / completely agree the solution has been to their benefit
• 3% completely disagree
Key Messages – Datasharp v Old Supplier
(NB Excluding Lease Costs) Total % Var £k Var
• Total Annual Volumes 3.7m ↓11%
• Total Annual Costs £41k ↓39% 26
• Total Colour Volumes 565k ↑65%
• Total Colour Costs £25k ↓22% 7
• Colour Volumes as % of Total 15% ↑7% pts
• Colour Costs as % of Total 62% ↑13% pts
(Including Lease Costs, assuming 4 year life)
• Total Annualised Costs £99k ↓ 43% 75
• Total Cost per Copy 2.7p ↓36%
A Saving of £300k
over 4 Year Life
Lessons learnt – what worked
• Communication
• Working out the best solution - iteratively
• General training
• Commercial arrangements
• Service levels
• Exceptions
• Transition – retaining printers for a while
• Quality and functionality
• Reporting• identifying training needs• re-positioning MFDs with low usage• Avoiding unnecessary spend
Highest Spenders
Network User PagesPages %
TotalColor Pages
Color Pages %
Total BW
PagesColor
Pages %Colour Cost BW Cost
Total Cost
Total Cost %
Cum Cost
%1incents\jc2 63,027 2.10% 10,018 2.7% 53,009 16% £451 £239 £689 2.4% 2.4%2incents\ldo 17,713 0.59% 13,889 3.7% 3,824 78% £625 £17 £642 2.2% 4.6%3incents\crw 19,401 0.65% 12,615 3.4% 6,786 65% £568 £31 £598 2.1% 6.7%4incents\new starters 26,809 0.89% 8,962 2.4% 17,847 33% £403 £80 £484 1.7% 8.4%5incents\exams 83,697 2.79% 2,616 0.7% 81,081 3% £118 £365 £483 1.7% 10.1%6incents\kg 16,420 0.55% 9,247 2.5% 7,173 56% £416 £32 £448 1.6% 11.6%7incents\ja 43,443 1.45% 5,559 1.5% 37,884 13% £250 £170 £421 1.5% 13.1%8incents\js 30,113 1.00% 6,707 1.8% 23,406 22% £302 £105 £407 1.4% 14.5%9incents\cc 41,826 1.40% 4,769 1.3% 37,057 11% £215 £167 £381 1.3% 15.8%
10incents\nb 9,080 0.30% 8,180 2.2% 900 90% £368 £4 £372 1.3% 17.1%11incents\english 43,093 1.44% 4,183 1.1% 38,910 10% £188 £175 £363 1.3% 18.4%12incents\politics 13,674 0.46% 7,258 1.9% 6,416 53% £327 £29 £355 1.2% 19.6%13incents\rel.studies 52,836 1.76% 2,395 0.6% 50,441 5% £108 £227 £335 1.2% 20.8%14incents\history 45,980 1.53% 3,067 0.8% 42,913 7% £138 £193 £331 1.2% 22.0%15incents\ss2 18,158 0.61% 5,447 1.5% 12,711 30% £245 £57 £302 1.1% 23.0%16incents\kjp 13,500 0.45% 5,845 1.6% 7,655 43% £263 £34 £297 1.0% 24.0%17incents\ng2 25,397 0.85% 4,517 1.2% 20,880 18% £203 £94 £297 1.0% 25.1%18incents\sixth form 17,407 0.58% 5,299 1.4% 12,108 30% £238 £54 £293 1.0% 26.1%19incents\ng 19,970 0.67% 4,797 1.3% 15,173 24% £216 £68 £284 1.0% 27.1%20jc2\physics 30,699 1.02% 3,527 0.9% 27,172 11% £159 £122 £281 1.0% 28.1%
• Top 20 spenders account for 28% of spend• Some high spenders need training on use of colour…
Highest Colour Volume Users
Network User PagesPages % Total
Color Pages
Color Pages
% Total BW
Pages
Color Pages
%Colour Cost BW Cost
Total Cost
Total Cost %
Cum Cost
%
1incents\ldo 17,713 0.59% 13,889 3.7% 3,824 78% £625 £17 £642 2.2% 2.2%
2incents\crw 19,401 0.65% 12,615 3.4% 6,786 65% £568 £31 £598 2.1% 4.4%
3incents\jc2 63,027 2.10% 10,018 2.7% 53,009 16% £451 £239 £689 2.4% 2.4%
4incents\kg 16,420 0.55% 9,247 2.5% 7,173 56% £416 £32 £448 1.6% 4.1%
5incents\new starters 26,809 0.89% 8,962 2.4% 17,847 33% £403 £80 £484 1.7% 6.1%
6incents\nb 9,080 0.30% 8,180 2.2% 900 90% £368 £4 £372 1.3% 7.6%
7incents\politics 13,674 0.46% 7,258 1.9% 6,416 53% £327 £29 £355 1.2% 8.8%
8incents\js 30,113 1.00% 6,707 1.8% 23,406 22% £302 £105 £407 1.4% 10.3%
9incents\kjp 13,500 0.45% 5,845 1.6% 7,655 43% £263 £34 £297 1.0% 11.6%
10incents\ja 43,443 1.45% 5,559 1.5% 37,884 13% £250 £170 £421 1.5% 13.1%
11incents\ss2 18,158 0.61% 5,447 1.5% 12,711 30% £245 £57 £302 1.1% 14.2%
12incents\basecampcopy 6,314 0.21% 5,374 1.4% 940 85% £242 £4 £246 0.9% 15.5%
13incents\sixth form 17,407 0.58% 5,299 1.4% 12,108 30% £238 £54 £293 1.0% 16.6%
14incents\ng 19,970 0.67% 4,797 1.3% 15,173 24% £216 £68 £284 1.0% 17.7%
15incents\cc 41,826 1.40% 4,769 1.3% 37,057 11% £215 £167 £381 1.3% 19.0%
16incents\ng2 25,397 0.85% 4,517 1.2% 20,880 18% £203 £94 £297 1.0% 20.3%
17incents\english 43,093 1.44% 4,183 1.1% 38,910 10% £188 £175 £363 1.3% 21.6%
18incents\srh 7,079 0.24% 4,112 1.1% 2,967 58% £185 £13 £198 0.7% 22.5%
19incents\bnoithip 14,986 0.50% 3,693 1.0% 11,293 25% £166 £51 £217 0.8% 23.3%
20jc2\physics 30,699 1.02% 3,527 0.9% 27,172 11% £159 £122 £281 1.0% 24.4%
Value for MoneyDeviceSerialNo Location 1 TotalCounter Total %
Cum Total % B&W % Colour % Sheets/Day
Capital Cost £
Capital Cost per Copy (p)
V9612500534 P43-Churchill Staff Room 94,691 6% 6% 90% 10% 631 6,946 0.76V7212600003 C12-Reprographics 180,099 12% 18% 100% 0% 1,201 13,294 0.77V9612500551 O25-Overton House 85,954 6% 23% 73% 27% 573 6,946 0.84V9313701985 C4-Thorn Lobby 43,654 3% 26% 83% 17% 291 3,542 0.85S7213700733 C18-Music Block 23,359 2% 28% 83% 17% 156 1,896 0.85S7213700859 C21-Newcroft Biology 23,165 1% 29% 96% 4% 154 1,896 0.85V7701000150 C13-Reprographics 185,163 12% 41% 70% 30% 1,234 16,162 0.91V9313702217 P40-Beeches Staff Room 44,260 3% 44% 87% 13% 295 4,253 1.00S7213700727 P47-Russell Stairwell Room 16,902 1% 45% 86% 14% 113 1,896 1.17
V9313701989C6-Deans Hall Performing Arts 31,462 2% 47% 86% 14% 210 3,542 1.17
V9612500538 P41-Prep Reception 64,615 4% 51% 89% 11% 431 7,283 1.17V9313701939 K31-Kings Reception 38,696 2% 54% 82% 18% 258 4,590 1.24V7701000153 C23-Newcroft Print Area 131,884 8% 62% 95% 5% 879 16,162 1.28
V7701000201K32-Nash Harris Reprographics 130,967 8% 71% 78% 22% 873 16,162 1.29
S7213700161 K29-Kings Library 14,768 1% 72% 73% 27% 98 1,896 1.34S7213700728 K27-Sports Centre 13,006 1% 72% 72% 28% 87 1,896 1.52V9512519613 C10-West Wing 44,188 3% 75% 86% 14% 295 6,511 1.53V9612500522 K26-Cork Prep Room 45,416 3% 78% 95% 5% 303 6,946 1.59S7213700740 P45-End Cupboard 12,970 1% 79% 87% 13% 86 1,986 1.60S7213700844 C8-Castle Library 12,662 1% 80% 74% 26% 84 1,986 1.63V7212600006 K30-Reprographics 81,690 5% 85% 100% 0% 545 13,294 1.70V9313701996 C3-Armoury 22,901 1% 87% 89% 11% 153 3,899 1.77
V9314000040C48-Chadwick Centre 1st Floor 20,232 1% 88% 57% 43% 135 4,590 2.36
V9313702288 C7-Cloisters 16,461 1% 89% 89% 11% 110 3,880 2.46V9313701980 C1-Reception 17,455 1% 90% 83% 17% 116 4,236 2.53
S7213900560C49-West Wing 6th Form PA's Office 7,469 0% 90% 87% 13% 50 1,896 2.64
S7213700738 C22-Newcroft Physics 6,622 0% 91% 94% 6% 44 1,896 2.98V9313701988 C9-East Wing Lobby 11,140 1% 92% 94% 6% 74 3,542 3.31S7213700759 C14-Wingrave DT Office 5,911 0% 92% 43% 57% 39 1,896 3.34V9313702281 C16-Wingrave Lobby 10,451 1% 93% 96% 4% 70 3,542 3.53V9313701956 K35-Outside KG-226 10,415 1% 93% 99% 1% 69 3,542 3.54S7213900580 P42-Beeches 5,441 0% 94% 88% 12% 36 1,896 3.63V9313701979 K38-Green Room 10,153 1% 94% 87% 13% 68 3,542 3.63V9313701991 C11-Estates Office 10,693 1% 95% 68% 32% 71 3,880 3.78V9313701918 C2-IT Room 9,334 1% 96% 92% 8% 62 3,542 3.95
Lessons learnt – what could have been better
• Paper and toner re-fill process
• Print server queue congestion
• Communication to pupils
• Faxes
• Top up training when printers were
removed
• Training for less frequently used printing
functionality
• On-line monitoring + Rota
• Set up pooled print queues
• No scanning to email
• Wasted money
• Done by exception
• Done by exception