SAVING COST IN 3P WAY - AIPMA

29
SAVING COST IN 3P WAY KAMAL AGARWAL CEO TECHNOVATION INTERNATIONAL TECHNOVATION

Transcript of SAVING COST IN 3P WAY - AIPMA

SAVING COST IN3P WAY

KAMAL AGARWALCEO

TECHNOVATION INTERNATIONAL

TECHNOVATION

3 P’s

• PLASTICS• Material and Processing (Screw-Barrel, Die, Design)

• POWER• EFFICIENT Power Management (Motor and Heaters)

• PRODUCTIVITY• Automation (QMCs and Robots)

TECHNOVATION

TECHNOVATION

TECHNOVATION

PLASTICS

TECHNOVATION

BIMETAL SCREW BARREL

TECHNOVATION

PLASTICS

BIMETAL SCREW BARREL

TECHNOVATION

PLASTICS

POWER

TECHNOVATION

POWERTECHNOVATION

• REDUCE POWER CONSUMPTION• EFFICIENT MOTOR AND PROCESS OPTIMISATION• POWER SAVING HEATERS

POWERTECHNOVATION

• HOLDING PRESSURE• 30~60% POWER CAN BE SAVED

• COOLING• 90~100% POWER CAN BE SAVED

POWERTECHNOVATION

• MOLDING CYCLE

POWERTECHNOVATION

• Power Consumption Sheet

1. Cycle: 18sec2. = actual system pressure during motion.3. Power-consumption (KW) : average of motion as input data.

Activity Time(s) Flow(%) Pressure 80T Normal 80T ServoPower KW

POWERTECHNOVATION

• HOW

• The output flow of fixed pump is 100% all the time no matter flow requirement of each motion is different that cause the power-consumption more.

• The unused flow of each motion goes back to the oil tank according the setting pressure. All the waste power transfers into the heat that increases the oil temperature.

MotorFixed Pump

0%Flow

50%

100%

Oil Tank

Motion

SERVOMotor

GEAR Pump

50%

Flow

50%

Oil Tank

Fixed Pump

Flow

100%Motor

Motion

Oil Tank

100%

50% of power wasted

0%

50%

FULL LOAD

HALF LOAD

HALF LOAD

POWERTECHNOVATION

• Case Study – 650T

1、 Economic Benefit Analysis Power unit price 10RS./KWH 650T Before (JSW) 650T After (JSW)

Cycle Time – Sec 40 36

Injection Time – Sec 3.84 2.52

Refilling Time – Sec 12.43 12.06

Cooling Time 20 20

Motor Power Consumption 612 294

Heater Power Consumption 96 96

Total Power Consumption/day

708 390

Savings/day 318 units

Savings INR/Month Rs 95,400

Savings INR/Year Rs 11,44,800

POWERTECHNOVATION

• Case Study – 2200T

POWERTECHNOVATION

• 2200T – Car Bumper

POWERTECHNOVATION

• POWER CONSUMPTION CHART

RUNNING COST

AFTER SERVO – 0.3~0.5 UNIT/KG PF PLASTIC PROCESSING

BEFORE SERVO – 0.8~1 UNIT/KG OF PLASTIC PROCESSING

PAYBACK IS WITHIN 1-1.5 YEARS OF PRODUCTION AT 20HOURS/DAY

PRODUCTIVITY

TECHNOVATION

PRODUCTIVITYTECHNOVATION

• HYD QUICK MOLD CHANGE SYSTEMS

PRODUCTIVITYTECHNOVATION

• HYD QUICK MOLD CHANGE SYSTEMS

PRODUCTIVITYTECHNOVATION

• HYD QUICK MOLD CHANGE SYSTEMS

PRODUCTIVITYTECHNOVATION

• HYD QUICK MOLD CHANGE SYSTEMS

• QMC System allows Machine User to Clamp and Declamp Mold within few minutes by means of Hydraulic Pressure

• With the push of one Button, clamping and declamping becomes very easy and turn reduce production down time

• It provides Hydraulic and Mechanical Safety

PRODUCTIVITYTECHNOVATION

• HYD QUICK MOLD CHANGE SYSTEMS Vs TRADITIONAL CLAMPING

Traditional Way QMCS

Waste Time and Manpower Timeand Manpower can be saved by 70%

Manual Operation can result in heavyor Loose tightening of Bolts and hence cause accident

Operators can just press buttons to change mold

Bolts are usually broken QMCS sets safe Hydraulic workinpressure and interlock with the machine

Possibility of thread/Tslot damages on the platen

Only one time installation of Clamps so No possibility of damages

It needs skilled operators to change Mold

Only one General Operator can change mold

PRODUCTIVITYTECHNOVATION

• CASE STUDY - QMCS

TOSHIBA 1300TON MACHINE (ONE MOLD CHANGE EVERY DAY) JOB INCOME AS RS 1950/HR ATLEAST (RS 1.5/TON)

COST OF CLAMPS – RS 11 LAKH APPROXPRODUCTION DOWNTIME SAVING – 90 MINS (FOR 1 MOLD)PRODUCTIVITY INCREASED – 90 MINS INCOME INCREASED – RS 2925/DAY I.E. RS 87,750/MONTHBREAK EVEN ACHIEVED IN NEARLY 1 YEAR 1 MONTH.

AFTER BREAK EVEN EVERY MONTH EXTRA INCOME IS RS 87,750AND WE HAVE NOT INCLUDED THE SAVING OF ONE OPERATOR

PRODUCTIVITYTECHNOVATION

• Video Comparisions

PRODUCTIVITYTECHNOVATION

• Auto Slide QMCS Video

Check Points to AskTECHNOVATION

• Which BiMetal Coating on Screw and Barrel?• For upto 40% Glass, It must be WC 30%• For Transparent Material, It must be Chrome Plated

• What is the Power Cost per KG of Material Processed?• It should not be more than 0.5 Unit/KG• Ideally should be 0.3 Unit/Kg

• How Much time consumed in one Die Change?• If Consuming more than 10 Min, Think of QMC

• How Much is Operator Take Out Time?• If more than 4 sec, Consider for Robots

ContactTECHNOVATION

• KAMAL AGARWALCEOTECHNOVATION [email protected] : 9910178880

WORKS : PLOT NO 11, NEPCO COMPOUND, 20/4, MATHURAROAD, FARIDABAD, HARYANA

REGD OFFICE : EXCEL 502, IMPERIAL ESTATE, SECTOR 82FARIDABAD, HARYANA

THANKS

QUESTIONS PLEASE

TECHNOVATION