SAVING CARBON, ENERGY AND MONEY. HEEPI Higher Education Environmental Performance Improvement () -...

22
SAVING CARBON, ENERGY AND MONEY

Transcript of SAVING CARBON, ENERGY AND MONEY. HEEPI Higher Education Environmental Performance Improvement () -...

SAVING CARBON, ENERGY AND MONEY

HEEPI • Higher Education Environmental Performance

Improvement (www.heepi.org.uk)- Green Gown Awards- 70+ events with 6000+ attendees- Benchmarking- Case studies, guidance and tools

• SusteIT• Sustainable laboratories (www.labs21.org.uk) • BREEAM Higher Education

SUSTEIT OUTPUTS• Strategic review

• Technical papers- data centres; desktop; printing

• Case studies

• Open source Excel tools- energy and carbon footprinting- thin client

• Event presentations

14%

18%

47%

8%

2%

10% 1%

HPC

Servers

PCs

Networks

Telephony

Imaging

AV

UNIVERSITY OF SHEFFIELD – ICT ENERGY BREAKDOWN

Analysis by Chris Cartledge, 2008

Non-residential ICT:18% electricity15% carbon

FOOTPRINTING RESULTS (kWh)University of Sheffield

University of Sheffield (ex HPC)

Lowestoft College

Total Electricity

8,680,806 (100%) 7,472,188 (100%) 453,714 (100%)

PCs & monitors

4,164,477 (48%) 4,164,477 (56%) 197,402 (44%)

Servers 1,520,736 (18%) 1,520,736 (20%) 135,999 (30%)

HPC 1,208,617 (14%) 0 0

Imaging 835,659 (10%) 835,659 (11%) 42,171 (9%)

Networks 687,362 (8%) 687,362 (9%) 68,538 (15%)

AV/Telephony 3% 4% 3%

HE HAS A LARGE FOOTPRINT

• 760,000 PCs• 215,000 servers• 147,000 networked printers• 512,000 Mwh of electricity• 275,000 tonnes of CO2

• Over £60 million in 2009- £1 million at Sheffield

• Reaches many students

WHY GREEN ICT? - ENERGY COSTS OF PCs

• High energy, high-usage PC with no power management could cost £61 per year in electricity (505 kWh/y @ 12p/kWh)

• Low energy, low-usage PC with power management could cost £3 per year (25 kWh/y @12p/kWh)

Whole life costing essential

QUEEN MARGARET UNIVERSITY

• Wanted greenest building in UK

• PCs main barrier

• 98% thin client

• 25-30% space savings

325,000 Coal-Powered Computers

Equipment/Systems

Buildings

Campus

Organisation

Building Certificates– DEC; EPC

Emission Trading Scheme

Inspection- Cooling

Codes of Conduct - Data Centres

BREEAM Higher Education

Environmental Management Systems- EcoCampus- 14001

HE Funding Body Requirements- BREAM;- Carbon- EMS

Universities That Count

Renewable & Low Carbon Requirements

Green League Table

Procurement- Quick Wins

Climate ChangeAct

Holistic – all impacts

Key

Energy & Carbon only

Current

Future

Inter-linked

U&C Climate Commitment for Scotland

Carbon Trust- HE CMP- Standard

Carbon Reduction Commitment

Building Regulations

THE CASE FOR CHANGE

• Sticks- Regulations- Energy and other costs- Stakeholder requirements

• Carrots- Financial and operational benefits- Teaching and research

UC SAN DIEGO

• Greenlight- $2.5 million- computing resource- testbed- monitor relationshipof computing tasksand load

A LARGE FOOTPRINT

Materials

Manufacture

Transport

UseDisposal

KEY LIFE CYCLE QUESTIONS• What balance of impacts across the life

cycle?

• Can we ever get a complete picture?- HP 1.5 million tonnes CO2 eq direct- 4.5 million tonnes from Tier 1 suppliers

• How can we influence upstream impacts?

LIFETIME IMPACTS• Energy (Carbon)

• Production:use energy - Williams/UN University 4:1- EU Commission study 1:4- SusteIT 1:1 as a working assumption

• Overall impacts are mainly use- energy; water; land take; chemicals;

PROCUREMENT• Quick Wins

- EU Energy Using Products Directive

• National Agreements

• Energy Star 5

• EPEAT

Server Load/ComputingOperations

Cooling Equipment

Power Conversion & Distribution

AlternativeEnergy Supply

High voltage distributionUse of DC powerHighly efficient UPS systemsEfficient redundancy strategies

Power efficiency & management

Load managementConsolidation/Virtualisation

Better air managementFree/efficient coolingEfficient liquid coolingFlexibility and control

On-site renewablesWaste heat for cooling‘Data centre as battery’Fuel cellsThermal storage

DATA CENTRE ENERGY EFFICIENCYAdapted from US EPA original

CARDIFF UNIVERSITY

• Low power servers

• Chilled water cooling

• Efficient layout

• Efficient UPS

• 30% support overhead

UNIVERSITY OF EDINBURGH

• High End Computing Terascale Resources- 60 Crays- 18-38 kW heat per rack

• 72% free cooling hours- £235,303 savings in 2008

• VSD - £128,650 savings pa

• Cooling overhead 16-31%

ICT BENEFITS – SMART 2020• Environmental

- Cut global CO2 emissions in 2020 by 15%, with $946 billion of cost savings- 5:1 es of CO2 emissions through applications for every tonne created by production, use & disposal of equipment

• Social- e.g. access; overcoming disability

21

AVE MARIA UNIVERSITY

IntrusionDetection

Fire AlarmSystemPower System

ElevatorMgmt.

LightingControls

HVACControl

EvacuationManagement

SecurityUsers

BuildingMaintenance Users

Access Control(security system)

CampusSecurity

THE FUTURE• JISC GreenIT Initiative

- research and innovation agendas conference- procurement; videoconferencing

• Far future- In the green cloud?- Zero carbon data centres?- Low impact personal devices- Transformed ways of working?