SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal...

67
SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT Illustrative Evolution of Project Changes March 2, 2016 March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 1 of 67

Transcript of SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal...

Page 1: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT

Illustrative Evolution of Project ChangesMarch 2, 2016

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 1 of 67

Page 2: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FERRY LANDING NEEDS TO BE REPLACED

• To keep facilities structurally sound• To bring passenger access to vessels into compliance with current ADA requirements• To bring passenger access to vessels into compliance with current ADA requirements• Improve operational efficiencies• Upgrade emergency preparedness

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 2 of 67

Page 3: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

MAY 3, 2011 ‐ CITY COUNCIL MEETING

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 3 of 67

Page 4: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

December 2, 2014 – CITY COUNCIL MEETING

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 4 of 67

Page 5: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

December 2, 2014 – CITY COUNCIL MEETING

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 5 of 67

Page 6: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

December 2, 2014 – CITY COUNCIL MEETING

Float length = 150’

Access Pier idth 25’

Gangway length = 90’

Float width = 53’

width = 25’

GangwayGangway width ≈ 21’

Max gangwayMax gangway height = 12’

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 6 of 67

Page 7: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

December 2, 2014 – CITY COUNCIL MEETING

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 7 of 67

Page 8: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

December 2, 2014 – CITY COUNCIL MEETING

SUMMARY• Proposed Float – 150 feet long x 53 feet wide• Proposed Gangway – Curved arched truss 90 feet long x 21 feet wide x 12 feet high• Proposed Access Pier – 96 feet long x 25 feet wide• Proposed Gate Roll up doors• Proposed Gate – Roll up doors• Proposed Railing – Same as on existing Landside Pier• Proposed Colors – White and blue• Proposed Belvederes – per BCDC request

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 8 of 67

Page 9: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE

l ’ dAlternative 1 – 25’ Wide Access Pier

Alternative 2 – 21’ Wide Access Pier

Preferred by PC/HLBPreferred by PC/HLB

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 9 of 67

Page 10: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE

Alternative 1 – 12’ Tall Arched Top ChordChord

Alternative 2 – 10.8’ Tall Arched Top Chord & Lowered

Alternative 3 – 9’ Tall Flat Top Chord Truss

Preferred by PC/HLB

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 10 of 67

Page 11: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE

Alternative 1 – Swing Gate with Curved Roof Structure Cover

Alternative 2 – Swing Gate with Curved Top Alternative 3 – Simple Swing GatePreferred By PC/HLB

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 11 of 67

Page 12: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE

Alternative 1 ‐White

Alternative 2 – Gray

Preferred by PC/HLB

Alternative 3 BlueAlternative 3 ‐ Blue

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 12 of 67

Page 13: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

APRIL 1, 2015 – APRIL 29, 2016 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION

– From PC/HLB Joint Study Session, PC’s, HLB’s, and Sausalito Residents’ comments of discretionary items were taken into considerationcomments of discretionary items were taken into consideration

• Reduce width of access pier – Reduced from 25’ to 21’• Reduce height of gangway – Reduced from 12’ to 9’

B t St d S i d M h 24 b itt l GGBHTD bl t d– Between Study Session and March 24 submittal, GGBHTD was able to reduce height to 8’

• Gray or darker color is preferred by most • Use simple gate• Keep railing similar to existing

– March 24, 2015 – GGBHTD submitted drawings and renderings of preferred g g pproject option

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 13 of 67

Page 14: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 14 of 67

Page 15: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

APRIL 1, 2015 – APRIL 29, 2015PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 15 of 67

Page 16: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 16 of 67

Page 17: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 17 of 67

Page 18: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

APRIL 1, 2015 – APRIL 29, 2015PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 18 of 67

Page 19: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION

SUMMARY• Proposed Float – 150 feet long x 53 feet wide• Proposed Gangway – Flat top chord truss 90 feet long x 18.3 feet wide x 8 feet high• Proposed Access Pier – 96 feet long x 21 feet wide• Proposed Gate Simple swing gate• Proposed Gate – Simple swing gate• Proposed Railing – Same as on existing Landside Pier• Proposed Colors – Gray• Proposed Belvederes – per BCDC request

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 19 of 67

Page 20: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

JUNE 24, 2015 – NOVEMBER 14, 2015 COMMUNITY MEETINGS

• Marin County Supervisor Kate Sears, y p ,Mayor Thomas Theodores, Vice Mayor Jill Hoffman, City Residents, and GGBHTD participated in stakeholder meetings

• June 27, 2015 @ Bay Model, Sausalito• October 10, 2015 @ City Hall, Sausalito• November 14 2015 @ City Hall Sausalito• November 14, 2015 @ City Hall, Sausalito

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 20 of 67

Page 21: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGES

Simple Steel Girder GangwaySimple Steel Girder Gangway

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 21 of 67

Page 22: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGES

Simple Steel Girder Gangway – Low Tide

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 22 of 67

Page 23: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGES

Simple Steel Girder Gangway – High Tide

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 23 of 67

Page 24: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGESTransparent Swing Gate

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 24 of 67

Page 25: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGESTransparent Swing Gate

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 25 of 67

Page 26: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

GUIDE TO RENDERINGS:

Vi i d bView points requested by community 

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 26 of 67

Page 27: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 1‐ EXISTING (EDGE OF GABRIELSON PARK)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 27 of 67

Page 28: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 1 – PROPOSED (EDGE OF GABRIELSON PARK)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 28 of 67

Page 29: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 2 – EXISTING & PROPOSED (GABRIELSON PARK)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 29 of 67

Page 30: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 3 – EXISTING (YACHT CLUB)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 30 of 67

Page 31: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 3 – PROPOSED (YACHT CLUB)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 31 of 67

Page 32: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 4 – EXISTING (YACHT CLUB PARKING LOT)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 32 of 67

Page 33: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 4 – PROPOSED (YACHT CLUB PARKING LOT)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 33 of 67

Page 34: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 5 – EXISTING (PLAZA NORTH END)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 34 of 67

Page 35: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 5 – PROPOSED (PLAZA NORTH END)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 35 of 67

Page 36: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 6 – EXISTING (MID PLAZA)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 36 of 67

Page 37: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 6 – PROPOSED (MID PLAZA)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 37 of 67

Page 38: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 7 – EXISTING (PLAZA SOUTH END)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 38 of 67

Page 39: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 7 – PROPOSED (PLAZA SOUTH END)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 39 of 67

Page 40: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 8 – EXISTING (BRIDGEWAY)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 40 of 67

Page 41: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

VIEW 8 – PROPOSED (BRIDGEWAY)

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 41 of 67

Page 42: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

EXISTING LIGHTING

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 42 of 67

Page 43: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

PROPOSED LIGHTING – OVERVIEW

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 43 of 67

Page 44: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

PROPOSED LIGHTING – EYE LEVEL: DOORS OPEN

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 44 of 67

Page 45: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

PROPOSED LIGHTING – EYE LEVEL: DOORS CLOSED & LIGHTS OFF

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 45 of 67

Page 46: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

COLOR OPTIONS – GRAY (GALVANIZED STEEL) 

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 46 of 67

Page 47: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

COLOR OPTIONS – DARK GRAY

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 47 of 67

Page 48: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

COLOR OPTIONS – WHITE

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 48 of 67

Page 49: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

COLOR OPTIONS – BLUE

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 49 of 67

Page 50: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

COLOR OPTIONS – GREEN

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 50 of 67

Page 51: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

COLOR OPTIONS – BLACK

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 51 of 67

Page 52: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

COLOR OPTIONS – INTERNATIONAL ORANGE

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 52 of 67

Page 53: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

NOVEMBER 14, 2015 – COMMUNITY MEETING PROPOSED DESIGNPROPOSED DESIGN

SUMMARY• Proposed Float – 150 feet long x 53 feet widep g• Proposed Gangway – Steel Girder 90 feet long x 16 feet wide x 6.7 feet high• Proposed Access Pier – 96 feet long x 21 feet wide

P d G t Si l t t i t• Proposed Gate – Simple transparent swing gate• Proposed Railing – Same as on existing Landside Pier• Proposed Colors – Gray• Proposed Belvederes – per BCDC request

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 53 of 67

Page 54: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

NEW RENDERINGS

• After Community Meetings, the GGBHTD continued to produce more renderings to help clarify the float operations. 

• Float length decreased from 150’‐0” to 146’‐6”Float length decreased from 150 0  to 146 6

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 54 of 67

Page 55: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

PROPOSED FLOAT

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 55 of 67

Page 56: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FLOAT – MAIN COMPONENTS

Hydraulic Gangplank

Hydraulic Gangplank

Boarding Platform

Boarding ApronGangway

Fixed Landing

Hydraulic Gangplank

Hydraulic Gangplankgp gp

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 56 of 67

Page 57: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FLOAT – ADA COMPONENTS

Flat Landing

Ramp Ramp Flat Landing

Ramp Ramp

Flat Landing

RampRamp

RAMPS NO MORE THAN 1:12 SLOPE AT ALL TIDES AND FERRY BOARDING CONFIGURATIONS

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 57 of 67

Page 58: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FLOAT – LOWERED FOR ARRIVAL OF SPAULDING CLASS

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 58 of 67

Page 59: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FLOAT – RAISED FOR ARRIVAL OF CATAMARAN CLASS

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 59 of 67

Page 60: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FLOAT OPERATIONS – SPAULDING CLASS VESSELFLOAT OPERATIONS – SPAULDING CLASS VESSEL

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 60 of 67

Page 61: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FLOAT OPERATIONS – CATAMARAN CLASS VESSELFLOAT OPERATIONS – CATAMARAN CLASS VESSEL

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 61 of 67

Page 62: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

FLOAT DIMENSIONS – LENGTH SHORTENED• Float length shortened from 150 feet to 145 feet 6 inches• Float length shortened from 150 feet to 145 feet 6 inches

145’–6”

53’–0”

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 62 of 67

Page 63: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

SUMMARY

Existing Float’ l ’ d110’ long x 42’ wide

March 2016 

Proposed Float

145.5’ long x 53’ wide

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 63 of 67

Page 64: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

SUMMARY

Existing Gangway70’ long x 5 9’ wide x 3 5’ above walking surface

December 2014 Proposed Gangway90’ long x 21’ wide x 9 1’ above walking surface70  long x 5.9  wide x 3.5  above walking surface 90  long x 21  wide x 9.1  above walking surface

March 2016 Proposed Gangway90’ long x 16’ wide x 3.5’ above walking surface

March 2015 Proposed Gangway90’ long x 18.3’ wide x 5.1’ above walking surface

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 64 of 67

Page 65: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

SUMMARY

Existing Access Pierg96.5’ long x 8.5’ wide

December 2014 Proposed Access Pier

96’ long x 25’ wide

March 2016 Proposed Access Pier

96’ long x 21’ wide

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 65 of 67

Page 66: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

SUMMARY

Existing GateSteel Swing Gate with Diamond Pattern Grating

December 2014 Proposed GateRollup DoorsSteel Swing Gate with Diamond Pattern Grating Rollup Doors

March 2016 Proposed GateSimple Transparent Swing Gate

March 2015 Proposed GateSimple Swing Gate with Grating

March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 66 of 67

Page 67: SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT · 2019-06-12 · March 2, 2016 Ferry Terminal Improvements Project Page 19 of 67. JUNE 24, 2015 –NOVEMBER 14, 2015 COMMUNITY MEETINGS

SUMMARYEXISTING PROPOSED

DECEMBER 2014PROPOSED MARCH 2015

PROPOSED MARCH 2016

FLOAT 110’ long x 42’ wide 150’ long x 53’ wide 150’ long x 53’ wide 145.5’ long x 53’ wide

GANGWAY 70’ long x 5 9’ wide x 90’ long x 21’ wide x 90’ long x 18 3’ wide x 90’ long x 16’ wide xGANGWAY 70  long x 5.9  wide x 5.8’ high

90  long x 21  wide x 12’ high

90  long x 18.3  wide x 8’ high

90  long x 16  wide x 6.7’ high

ACCESS PIER 96.5’ long x 8.5’ wide 96’ long x 25’ wide 96’ long x 21’ wide 96’ long x 21’ wide

LANDSIDE PIER 95’ long x 20.5’ wide No change to existing No change to existing No change to existing

BELVEDERES None Yes, per BCDC Yes, per BCDC Yes, per BCDC

GATE Swing gate with steel grating

Roll up doors Simple swing gate with steel grating

Simple transparentswing gate

• Color, lighting and bench design to be determined by City

COLOR Gray, blue White, blue Gray Gray

Color, lighting and bench design to be determined by City