Saudi-Building-Code-Requirements-for-Soils-and-Foundations

79

Transcript of Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Page 1: Saudi-Building-Code-Requirements-for-Soils-and-Foundations
Page 2: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

السعودي كودمتطلبات البناءواألساسات لـلـ تربة

SAUDI BUILDING CODE REQUIREMENTS FOR SOILS AND FOUNDATIONS

. الشمراني. علي بن مصلح د أ - سعود الملك جامعة الهندسة كلية

SBC303

Page 3: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

SAUDI BUILDING CODE NATIONAL COMMITTEESAUDI BUILDING CODE NATIONAL COMMITTEE

CONSULTATION COMMITTEECONSULTATION COMMITTEE

Structural

Mechanical

Plumbing

Administrative

Electrical

Architectural

Fire Safety

Seismicity

TECHNICALCOMMITTEES

TECHNICALCOMMITTEES

Page 4: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

: من لكل مستفيضة بدراسة يخصـــه فيما كل الفنية اللجان قامت

األساس ICC الكـــودة األساس ICC الكـــودة

الجامعات عن الصادرة الصلة ذات والبحوث الـدراساتفي الصلة ذات والهيئات والوزارات البحوث ومراكز

Relevant local studiesالمملكة .

الجامعات عن الصادرة الصلة ذات والبحوث الـدراساتفي الصلة ذات والهيئات والوزارات البحوث ومراكز

Relevant local studiesالمملكة . اإلسكان وزراء مجلس عن الصادرة العربية الكودات

. العربية الدول لجامعة التابع العرب Arab والتعميرleague codes

اإلسكان وزراء مجلس عن الصادرة العربية الكودات. العربية الدول لجامعة التابع العرب Arab والتعمير

league codesالبنود أو الفصول أو األبواب تحديد إلى الدراسة تهدفو الملحقات وكذا تعديلها أو إضافتها أو حذفها يجب التي . يكون أن على إضافتها تلزم التي التوضيحية األشكالأو بالمراجـع Lمدعما الفنية اللجنة من المقدم الفني الرأي

. العلمية الحقائق

الفنية اللجان مهام

Page 5: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

كودة األساسكودة

األساس

International Building Code® International Residential Code® International Existing Building Code® International Fire Code® International Mechanical Code® International Plumbing Code® International Fuel Gas Code® …… …..

Page 6: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

/شريم بخيت أحمد د) (LL رئيسا

/ حامد. صالح د أالســـــــــيد

/الله عبد فيصل دالمشاري

/ كامل. مجدي د أمصطفى

/القحطاني سعد نبيل د /ابراهيم العزيز عبد د

النغيمش / علي. مصلح د أ

الشمراني

/ الغامدي عبود سعيد د / عبد يوسف الله د

السلوم /عبد السالم عبد د

الشقير المحسن /الشريف محمد خالد م / هاشم هاني م رائد

النابلسي /صديق بن عمر فيصل م /القصبي عثمان أحمد د

اإلنشائية الفنية اللجنة اإلنشائية أعضاء الفنية اللجنة أعضاء

Page 7: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Chapters reviewed by the structural committee

في االنشائية الفصولاالساس كودة

Page 8: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

CRITERIA FOR DEVELOPING RATIONAL AND APPLICABLE CODE

SCIENTIFIC BASES

COMPACT NOT VOLUMINOUS

RELEVANT TO LOCAL ISSUES

SIMPLIFIED WITHOUT UNWARRANTED COMPLEXTIES

MINIMUM SHORTCOMINGS AND DEFICIENCIES

Page 9: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

اللجنة عمل من االولى المرحلةالنتائج: وبعض المعايير االنشائية

اللجنة عمل من االولى المرحلةالنتائج: وبعض المعايير االنشائية

Saudi Building CodeStructural Committee workshop

Towards rational and applicable code (s)

Criteria for developing anapplicable code

OutputDivisions

Major problems thathinder applicability

Proposals forenhancing

applicability

Needed researchand data

Compact not voluminous

Relevant to national/ localissues

Simplified withoutunwarranted complexity

Minimum shortcomingsand deficiencies

ReinforcedConcrete

Loadingand forces

Steel

Testing andinspection

Masonry

Scientific bases

Aluminum wood

Soils andFoundations

Page 10: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

GENERAL (0.25) FOUNDATION AND SOILS (1.5) EXCAVATION, GRADING AND FILL (1) ALLOWABLE LOAD-BEARING VALUES

OF SOILS (0.75) FOOTINGS AND FOUNDATIONS (8) RETAINING WALLS (0) DAMPPROOFING AND WATERPROOFING (1.5) PIER AND PILE FOUNDATIONS )12.5( DRIVEN PILE FOUNDATIONS CAST-IN-PLACE CONCRETE PILE

FOUNDATIONS COMPOSITE PILES PIER FOUNDATIONS

Out of the 8 pages for shallow footings, footings are covered in one page, Foundation walls in about 5 pages

The one page for footings covers concrete, masonry, and timber footings

of IBCof IBC

Page 11: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

GENERAL REMAR KS ON CHAPTER 18

Site investigations need more guidelines

No provisions for collapsible soils

The section of retaining walls is merely one statement

Extensive emphasis is put on pile foundations

Insufficient coverage of shallow foundations

Coverage of shallow foundations devoted largely to foundation walls

Most provisions for seismic loading pertains to Categories D, E, and F

Some irrelevant materials are scattered throughout the Chapter

Page 12: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

CONCERNS WITH THE IBC

INSUFFICIENCY (e.g. SITE INVESTIGATION)

NEGLECTION (e.g. COLLAPSIBLE SOILS)

PREFERENCE (e.g. SHALLOW VS. DEEP)

PRACTICE (e.g. DESIGN FOR EXPANSIVE SOILS)

OMISSION (e.g. RETAINING WALLS)

IRRELEVANCY (e.g. WOOD)

DEFICIENCY (e.g. IMPACT & VIBRATORY LOADS)

Page 13: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1802.2 Where Required. The owner or applicant shall submit a foundation and soils investigation to the building official where required in Sections 1802.2.1 through 1802.2.7. Geotechnical reports shall be prepared by a registered design professional. Recommendations included in the report and approved by the building official shall be incorporated in the construction documents.

INSUFFICIENCY (Site Investigation)

1802.4 Investigation. .. …….. studies shall be made as necessary to evaluate ……….. compressibility, liquefaction, expansiveness, and Collapsibility.

Page 14: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1802.5 Soil boring and sampling. The soil boring and sampling procedure and apparatus shall be in accordance with generally

accepted engineering practice. The registered design professional shall have a fully qualified representative on the site during boring and sampling operations.

INSUFFICIENCY (Site Investigation)…….(Cont.)

1802.4.1 Exploratory boring. The scope of the soil investigation

Including the number and types of borings or soundings, the

equipment used to drill and sample, the in-situ equipment and the laboratory testing program shall be determined by a registered design professional.

Page 15: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

PREFERENCE (Foundation System)

Page 16: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

RELEVANCY (Foundation System)…………..Cont.

Page 17: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1805.4.5 Timber footings. Timber footings are permitted for buildings of Type V construction …………… 1805.4.6 Wood foundations. Wood foundation systems shall be designed and installed in accordance with AFPA Technical Report No. 7. …………………………….1809.1 Timber piles. Timber piles shall be designed in accordance with the AFPA NDS.

RELEVANCY (Foundation Material& Environment)…(Cont.)

1805.2.1 Frost protection. Except where otherwise protected from frost, foundation walls, piers and….. Shall be protected from frost by one of the following ……….

Page 18: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1806.1 General.Retaining walls shall be designed to ensure stability against overturning,sliding,excessive foundation pressure and water uplift.Retaining walls shall be designed for a safety factor of 1.5 against lateral sliding and overturning.

OMISSION (Structure)

Page 19: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1802.3.2 Expansive soilsSubsection 1802.3.2 is amended by adding a new paragraph after item 4 to read as follows:

…………… When the standard 60 pounds per square foot swell test is performed on any soil with a swell greater than 4 percent, it shall be considered expansive. ………………………

PRACTICE (Expansive Soils/Characterization)

Page 20: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

PRACTICE (Expansive Soils/Foundation System)

Page 21: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

DEFICIENCY (Loads)

1805.4.2.2 Footing seismic ties. Where a structure is assigned to Seismic Design Category D, E, or F in accordance with Section 1616, individual spread footings founded on soil defined in Section 1615.1.1 as Site Class E or F shall be interconnected by ties.

1805.4.1.2 Vibratory loads. Where machinery operations or other vibrations are transmitted through the foundation, consideration shall be given in the footing design to prevent detrimental disturbances of the soil.

Page 22: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

RULES AND PROVISIONS OF MUNICIPALITIES

THE ARAB CODE

BEYOND THE IBCBEYOND THE IBC

THE JORDANIAN CODE

SEMI-GOVERMENTAL COMPANIES AND AGENCIES

Page 23: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

TEN PARTS (1470 pages)

IN GENERAL TAKES THE FORM OF A MANUAL

NO REFERRAL TO OTHER STANDARDS OR SPECIFICATIONS

OVERLAPPING BETWEEN SOME CHAPTERS

DEEP FOUNDATIONS IS THOROUGHLY COVERED

WHAT ABOUT THE ARAB CODE?WHAT ABOUT THE ARAB CODE?

COVERS IRRELEVANT AREAS OF GEOTECH. ENGINEERING

CONSIDERS INSTRUMENTATIONS AND REMEDIES

Page 24: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

NEW TOPICSENHANCED TOPICS

SITE INVESTIGATION

ISOLATED FOOTINGS

DESIGN FOR EXPANSIVESOILS

DESIGN FOR COLLAPSIBLEAND SABKHA SOILS

RETAINING WALLS

SPECIAL SHALLOW FOOTINGS

DESIGN FOR IMPACT AND VIBRATORY LOADS

EXCAVATIONS, GRADING AND FILL

NEEDS BEYOND THE IBCNEEDS BEYOND THE IBC

Page 25: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

OMISSIONS AND ABBREVIATIONS

THOROUGHNESS

CONTEMPLATED ISSUES

CONCERNED PROFESSIONALS AND AGENCIES

ONE OR SEVERAL CODES

REFERRALS TO OTHER STANDARDS

STANDARDS AND SPECIFICATIONS FOR PROPOSED NEW SECTIONS

LENIENCY VS STRINGENCY

LOCAL PRACTICE AND TECHNOLOGICAL COMPETENCY

Page 26: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

كودة بلد عن المملكة في البناء لمواد اختالف أهمفي يتمثل . األساس أن فالمتوقع لذلك التربة تكوينات

كود في تميز فيه سيكون ما أهم السعودي من البناءواألساسات .IBCعن بالتربة الخاص الجزء في هو

كودة بلد عن المملكة في البناء لمواد اختالف أهمفي يتمثل . األساس أن فالمتوقع لذلك التربة تكوينات

كود في تميز فيه سيكون ما أهم السعودي من البناءواألساسات .IBCعن بالتربة الخاص الجزء في هو

وتقارير مرضية غير تعتبر المملكة في المهنة ممارسةالضرورية المعلومات على تحتوي وال كافية غير التربةوليس البلدية باالشتراطات للوفاء الغالب في وت�قدم ،

الفني . لالستخدام

وتقارير مرضية غير تعتبر المملكة في المهنة ممارسةالضرورية المعلومات على تحتوي وال كافية غير التربةوليس البلدية باالشتراطات للوفاء الغالب في وت�قدم ،

الفني . لالستخدام

المنشآت من كثير في ظهرت التي المشاكل من كثير ، التصميم في Lسواء التربة مشاكل إلى سببها يعزى

ما أو المنشأة . اإلنشاء تشغيل بعد

المنشآت من كثير في ظهرت التي المشاكل من كثير ، التصميم في Lسواء التربة مشاكل إلى سببها يعزى

ما أو المنشأة . اإلنشاء تشغيل بعد

مدركة غير زالت ال البناء مجال في العامة ثقافةللموقع استكشاف دراسات عمل تزايد ألهمية رغم

وأهلية سالمة على وأثرها التربة بمشاكل الشعور المنشآت .

مدركة غير زالت ال البناء مجال في العامة ثقافةللموقع استكشاف دراسات عمل تزايد ألهمية رغم

وأهلية سالمة على وأثرها التربة بمشاكل الشعور المنشآت .

واألساسات للتربة سعودي لكود لحاجة ا مدى

Page 27: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

العنوان Title متعريفات Definitions 1

وردم وتسوية استطالعالموقع

Site Investigation, Grading & Backfilling 2

الضحلة األساسات Shallow Foundations 3

العميقة األساسات Deep Foundations 4االنتفاخية التربة وصف

عليها والبناءCharacterization & Building on Expansive Soils 5

اإلنهيارية التربة وصفعليها والبناء

Characterization & Building on Collapsible Soils 6

والحوائط الحفرياتالساندة

Excavation & Retaining Walls 7

لألحمال أساساتاإلهتزازية

Foundations for Vibratory Loads 8

والماء الرطوبة عزل Dampprofing & Waterprofing 9

ENVSIONED CONTENTS FOR THE SAUDI BUILDING CODE REQUIREMENTS FOR SOILS AND FOUNDATIONS

Page 28: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

األردني ال IBC الكود عربيالكود

أخرى وخبرات دراساتمحلية

كودمتطلبات السعودي البناء

تربة لل واألساسات

MAIN SOURCES FOR THE SAUDI BUILDING CODE REQUIREMENTS FOR SOILS AND FOUNDATIONS

Page 29: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

REINFORCED CONCRETEWORKGROUP

WORKGROUPS OF STRUCTURAL COMMITTEEWORKGROUPS OF STRUCTURAL COMMITTEE

SOILS AND FOUNDATIONSWORKGROUP

STEEL STRUCTURESWORKGROUP

LOADING AND FORCESWORKGROUP

MASONRY WORKGROUP

TESTING AND INSPECTIONSWORKGROUP

Page 30: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

تم التي المعايير وفق االنشائية اللجنة لعمل متمم . االولى المرحلة في اقرارها

تم التي المعايير وفق االنشائية اللجنة لعمل متمم . االولى المرحلة في اقرارها

مجموعات دور هو ما؟ العمل

اقرته الذي العام التوجه نفس في المجموعة عمل: يلي فيما ويتلخص ، اللجنة

اقرته الذي العام التوجه نفس في المجموعة عمل: يلي فيما ويتلخص ، اللجنة

اإلنشائية المجاالت في متخصصة كودات إصدارمع عربيا، و عالميا علية متعارف هو كما المختلفةاسس وفق موضوع، لكل اساسي مصدر تحديد

علمية.

اإلنشائية المجاالت في متخصصة كودات إصدارمع عربيا، و عالميا علية متعارف هو كما المختلفةاسس وفق موضوع، لكل اساسي مصدر تحديد

علمية. باستبعاد وذلك الصادر الكود في االختصار توخي

الكود في المعقدة االختيارية الفنية االمور. الكود من ضخما حيزا تشغل والتي االساس

باستبعاد وذلك الصادر الكود في االختصار توخيالكود في المعقدة االختيارية الفنية االمور

. الكود من ضخما حيزا تشغل والتي االساس

Page 31: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

الفهم قابلية اجل من التبسيط اهمية على التأكيد. التطبيق و

الفهم قابلية اجل من التبسيط اهمية على التأكيد. التطبيق و

مع الحاالت غالبية تعالج الصادرة الكودات تكون ان. التدريجي التطور بضرورة االدراك

مع الحاالت غالبية تعالج الصادرة الكودات تكون ان. التدريجي التطور بضرورة االدراك

وثيقة و عالقة ذات الكود محتويات تكون انتطغى وأال الكود، نوعية حسب المملكة بظروف

. البحثية و النظرية االهتمامات عليها

وثيقة و عالقة ذات الكود محتويات تكون انتطغى وأال الكود، نوعية حسب المملكة بظروف

. البحثية و النظرية االهتمامات عليها

؟ العمل مجموعات دور هو ما

Page 32: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

. سعود. الملك جامعة الشمراني علي بن مصلح د أ L رئيسا

.سعود الملك جامعة القصبي عثمان بن أحمد د

L عضوا .عثمان محمد والتعليم د التربية وزارة فضل

L عضوا .الله دفع معاوية كردي د نزار المهندس مكتب

L عضوا .مدينة لتطوير العليا الهيئة الفاتح محمد د

L عضوا الرياض . سعود. الملك جامعة الرفيعي عبيد بن طالل د أ

L عضوا .للبترول فهد الملك جامعة بدر عبدالعزيز بن طلعت د

L عضوا والمعادن .القرى ام جامعة الفي عدنان بن العزيز عبد د

L عضوا .المصموم أحمد بن علي القرى د ام جامعة

L عضوا . سعود. الملك جامعة المهيدب إبراهيم بن الله عبد د أ

L عضوا .التربة لهندسة الرشبد مكتب توما فضلو د

L عضوا والمواد .علي بن عوض سعود د الملك جامعة القرني

L عضوا .سعود الملك جامعة الشيناوي عمر بن الحفيظ عبد د

L عضوا

السعودي الكود عمل مجموعةواألساسات للتربة

Page 33: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Some Examples of Deletions, Revisions, and Additions to

the IBC

Some Examples of Deletions, Revisions, and Additions to

the IBC

Page 34: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Active zone. The upper few meters of the soil deposit, which is affected by the seasonal moisture content variations.

1.3 DEFINITIONS. The following words and terms shall, for the purposes of this code, have the meanings shown herein. Borehole. Borehole is a hole made by boring into the ground

to study stratification, to obtain natural resources, or to release underground pressures.

Expansion Index. Expansion index is the percent volume change determined in accordance with ASTM-D4829 multiplied by fraction passing No. 4 sieve of the soil multiplied by 100.

New

GENERALGENERAL

Page 35: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

SITE INVESTIGATIONSSITE INVESTIGATIONS

Exception: The building official need not require a foundation or soils investigation where satisfactory data from adjacent areas is available that demonstrates an investigation is not necessary for any of the conditions in Sections 1802.2.1 through 1802.2.7.

No site investigation report is needed if the building meet the following combined criteria:

1) The net applied load on the foundation is less than 50kPa

2) There are no dynamic or vibratory loads on the building

3) The footprint area of the building is less than 4x4 m2

4) Questionable soil is not suspected underneath the building

5) Cavities are not suspected under the footing of the building

New

Page 36: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Subsection 1802.2.3 is amended by deleting its exception without replacement.

Exception. A subsurface soil investigation shall not be required

where waterproofing is provided in accordance with Section 1807.

SITE INVESTIGATIONSSITE INVESTIGATIONS

2.2.4.1 Rock cavities. In areas likely to have rock cavities, the building official shall require site investigation to determine the sizes and locations of such cavities.

2.2.3 Ground-water table……….. ……………

New

Page 37: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

SITE INVESTIGATIONSSITE INVESTIGATIONS

1802.2.2 Expansive soils. In areas likely to have expansive soil, the building official shall require soil tests to determine where such soils do exist.

2.2.2 Problematic soils. In areas likely to have expansive, collapsing, or sabkha soils, the building official shall require soil tests to determine where such soils do exist.

IBC

SBC303

Page 38: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

2.3.3 Collapsible soils. Soils meeting all four of the following provisions shall be considered collapsible. Compliance with Items 1, 2 and 3 shall not be required if the test prescribed in Item 4 is conducted:

SITE INVESTIGATIONSSITE INVESTIGATIONS

New

2.4.2 Number of boreholes. The minimum number of boreholes in a given site shall be taken in accordance Table 2.1 and its provisions. The values included in Table 2.1 shall be considered as minimum guideline.

2.4.3 Depth of boreholes. The depth of boreholes shall cover all strata likely to be affected by the loads from the building and adjacent buildings. The minimum depth of boreholes shall be taken from Table 2.1.

Page 39: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

SITE INVESTIGATIONSSITE INVESTIGATIONS

2.6 REPORTS

Introduction that shows the site location map, any other adjacent buildings, and utility lines.

Elevation of the water table, if encountered and recommended procedures for dewatering, if necessary.

Suitability of onsite soils for use as fill material .

Address, if applicable, the possible impacts on adjoining properties and mitigating measures to be undertaken.

Page 40: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

SITE INVESTIGATIONSSITE INVESTIGATIONS

A record of the soil profile. With the SPT values at the corresponding depths if soil is encountered. RQD and TCR values of rock core samples should be included in case rock is encountered.

Recommendations for foundation type and design criteria, including but not limited to: ………. provisions to mitigate the effects of problematic soils (expansive, collapsible, sabkha, etc.); mitigation of ……... The recommendations for foundation design must be based on the facts stated in the report, i.e. on the borehole records and test data. They must not be based on conjecture.

Page 41: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

3.2 Commencement. Excavation, grading and fill shall not be commenced without first having obtained a permit from the building official.

EXCAVATION, GRADING AND FILLEXCAVATION, GRADING AND FILL

Exception: Permit shall not be required for the following:

1. Grading in an isolated, self-contained area if there is no apparent danger to private or public property.

2. Exploratory excavations under the direction of geotechnical engineers.

3. ………….

New

Page 42: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

EXCAVATION, GRADING AND FILLEXCAVATION, GRADING AND FILL

3.10.1 Oversized materials. No rock or similar irreducible material with a maximum dimension greater than 300 mm shall be buried or placed in fills within 1500 mm, measured vertically, from the bottom of the footing or lowest finished floor elevation, whichever is lower, within the building pad. Oversized fill material shall be placed so as to assure the filling of all voids with well-graded soil. Specific placement and inspection criteria shall be stated and continuous special inspections shall be carried out during the placement of any oversized fill material.

New

Page 43: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

ALLOWABLE LOAD-BEARINGALLOWABLE LOAD-BEARING

4.2 Presumptive load-bearing values. The maximum allowable foundation pressure for supporting soils shall not exceed the values specified in Table 1804.2 unless data to substantiate the use of a higher value are submitted and approved by the building official.

4.4 Computed load-bearing values. It shall be permitted to obtain the ultimate bearing capacity from appropriate laboratory and/or field tests including, but need not be limited to, standard penetration test conforming to ASTM 1586 and plate load test conforming to ASTM 1194. ………………… ………… ……… …… ……..

New

Page 44: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Subject to the approval of the building official, it shall be permitted to use formulae in the computations of ultimate bearing capacity that are of common use in geotechnical engineering practice or based on a sound engineering judgment and subject to approval to the building official.

4.4.1 Effect of water table. The submerged unit weight shall be used as appropriate to determine the actual influence of the groundwater on the bearing capacity of the soil. The foundation design shall consider the buoyant forces when groundwater is above or expected to rise above the foundation level.

ALLOWABLE LOAD-BEARINGALLOWABLE LOAD-BEARING

New

New

Page 45: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

5.2 Depth of footings. The minimum depth of footing below the natural ground level shall not be less than 1200 mm for cohesionless soils, 1500 mm for silty and clay soils and 600 mm to 1200 mm for rocks depending on strength and integrity of the rock formations.

SPREAD FOOTINGSSPREAD FOOTINGS

1805.2 Depth of footings. The minimum depth of footings below the undisturbed ground surface shall be 12 inches (305

mm).

IBC

SBC303

Page 46: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

5.4.1.2 Eccentric loads. When the footings are subjected to moments or eccentric loads, the maximum stresses shall not exceed the allowable bearing capacity of the soil specified in Chapter 4. The centeroid of

5.4.1.3 Inclined loads. For design of footings subjected to inclined loads, it shall be permitted to use the following simplified formula or any method of analysis, subject to the approval of the building official.

5.4.1.4 Adjacent loads. Where footings are placed at varying elevations the effect of adjacent loads shall be included in the footing design.

SPREAD FOOTINGSSPREAD FOOTINGS

New

Page 47: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1805.4.1 Design. Footings shall be so designed that the allowable bearing capacity of the soil is not exceeded, and that differential settlement is minimized.

54 pages in AC

1808.2.12 Settlement analysis. The settlement of piers, individual piles or groups of piles shall be estimated based on approved methods of analysis.

IBC

SPREAD FOOTINGSSPREAD FOOTINGS

Page 48: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

5.4.1.5 Design settlements. Settlements shall be estimated by a registered design professional based on methods of analysis approved by the building official. The least value found from Tables 5.1 and 5.2 shall be taken as the allowable differential settlement.

TABLE 5.1MAXIMUM ALLOWABLE TOTAL SETTLEMENT

FOOTING TYPE

TOTAL SETTLEMENT)mm(

CLAY SAND

Spread Footings 60 40

Mat Foundations 80 60

SBC303

SPREAD FOOTINGSSPREAD FOOTINGS

Page 49: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1808.2.8.6 Load-bearing capacity. Piers, individual piles and groups of piles ………….. Analysis shall show that no soil layer underlying

the designated load-bearing layers causes the load-bearing

capacity safety factor to be less than two.

SPREAD FOOTINGSSPREAD FOOTINGS

5.4.1.6 Factor of safety. Factor of safety shall not be less than 3 for permanent structures and 2 for temporary structures. Consideration shall be given to all possible circumstances including, but not limited to, flooding of foundation soil, removal of existing overburden by scour or excavation, and change in groundwater table level.

New

IBC

Page 50: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

1806.1 General. Retaining walls shall be designed to ensure stability against overturning, sliding, excessive foundation pressure and water uplift.Retaining walls shall be designed for a safety factor of 1.5 against lateral sliding and overturning.

RETAINING WALLSRETAINING WALLS

CHAPTER: 7 RETAINING WALLS

IBC

NewBased, in part )with appropriate modifications( on Design Manual 7.02, “Foundations and Earth Structures” Naval Facilities Engineering Command, 1986, and EM 1110-2-2502, “Design and Construction of Retaining and Flood Walls”, US Corps of Engineers, 1989.

Page 51: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

CHAPTER: 8 COMBINED FOOTINGS AND MATS

CHAPTER: 10 DESIGN FOR COLLAPSIBLE SOILS

New

New

Based )with appropriate modifications( on ACI Committee 336.2R-88 “Suggested Analysis and Design Procedures for Combined Footings and Mats” .

Based )with appropriate modifications( on BREA “Building Regulations for Eastern Arriyadh Sensitive Soils” Arriyadh Development Authority, 1996.

Page 52: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

CHAPTER: 12 DESIGN FOR VIBRATORY LOADS

CHAPTER: 11 DESIGN FOR SABKHA SOILSNew

New

Based )with appropriate modifications( on “Structural Code”, Royal Commission for Jubail and Yanbu, 1986 as well as on some published technical papers and reports.

Based )with appropriate modifications( on SAES-Q-007 “Foundations and Supporting Structures for Heavy Machinery”, Saudi Aramco Engineering Standards, Onshore Standards Committee, 2003.

Page 53: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

10.1.1 Approval of special systems of design or construction. Sponsors of any system of design or construction within the scope of Chapter 10,

the adequacy of which has been shown by successful use or by analysis or test, but which

does not conform to or is not covered by Chapter 10, shall have the right to present that

data on which their design is based to the building official or to a board of examiners

appointed by the building official.

New

Page 54: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

10.1.1 Approval of special systems of design or construction. ……………… This board shall be

composed of competent geotechnical and structural engineers and shall have authority to

investigate the data so submitted, to require tests, and to formulate rules governing design and construction of such systems to meet the

intent of Chapter 10. These rules when approved by the building official and promulgated shall be

of the same force as the provisions of Chapter 10.

New

Page 55: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

9.3.2.1 Foundations……… Footing or foundation design need not comply with Section 9.3.2.1, 9.3.2.2, or 9.3.2.3 where the soil is removed in accordance with Section 9.3.3, nor where the building official approves stabilization of the soil in accordance with Section 9.3.4, nor where the superstructure is design by a registered design professional to accommodate the potential heave.

DESIGN FOR EXPANSIVE SOILSDESIGN FOR EXPANSIVE SOILS

9.3.2.1 Shallow foundations. Continuous or spread footings shall not be used on expansive soils unless the soil deposit has a low expansion potential, as determined in accordance with Table 9.1 or the superstructure is designed to account for the potential foundation movement. …..

New

Page 56: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

TABLE 9.1 CLASSIFICATION OF EXPANSION POTENTIAL

Expansion Index )EI(a Expansion Potential

0 – 20 Very low

21– 50 Low

51 – 90 Medium

91 –130 High

> 130 Very high

a. EI as per ASTM D 4829.

DESIGN FOR EXPANSIVE SOILSDESIGN FOR EXPANSIVE SOILS

Page 57: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

9.3.2.2 Slab-on-grade foundations. Slab-on-grade (Slab-on-ground) foundations on expansive soils shall be designed and constructed in accordance with WRI/CRSI Design of Slab-on-Ground Foundations.

A conventionally reinforced slab-on-grade foundation shall conform to applicable provisions of SBC 304, where applicable. …….

All slab-on-grade foundations, ………… shall be designed by a registered design professional having sufficient knowledge and experience in structural and foundation engineering.

DESIGN FOR EXPANSIVE SOILSDESIGN FOR EXPANSIVE SOILS

Page 58: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

9.3.2.3 Beam-on-drilled pier. The design provisions of Chapter 17 shall be expanded to include, but need not be limited to, the requirements of Sections 9.3.2.3.1 and 9.3.2.3.2.

DESIGN FOR EXPANSIVE SOILSDESIGN FOR EXPANSIVE SOILS

9.3.3 Removal of expansive soil. Where expansive soil is removed in lieu of designing footings or foundations ………… If the expansive strata are not entirely removed, the fill material shall be impermeable enough not to provide access for water into expansive grades or foundation soils.

New

Page 59: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

DESIGN FOR EXPANSIVE SOILSDESIGN FOR EXPANSIVE SOILS

9.3.4 Stabilization. Where the active zone of expansive soils is stabilized in lieu of designing footings or foundations in accordance with Section 9.3.2.1, 9.3.2.2, or 9.3.2.3, the soil shall be stabilized by chemical, installation of moisture barriers, pre-wetting or other techniques designed by a geotechnical engineer knowledgeable in unsaturated soil mechanics and approved by the building official. In pre-wetting technique, the effect of strength loss shall be evaluated to ensure that strength criteria are met. Limitations and implementation procedures of the contemplated stabilization technique shall receive careful consideration and thorough evaluation.

Page 60: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

13.5 Underground water-retention structures. Underground water-retention structures shall meet the provisions of Sections 13.5.1 through 13.5.4.

13.5.1 General requirements. All underground water-retention structures shall meet the following requirements:13.5.2 Design and construction. For design and constructions of underground water-retention structures, provisions of SBC 304 and ACI 350 Environmental Engineering Concrete Structures shall govern, where applicable.

13.5.3 Waterproofing. All internal faces of an underground water-retention structure shall be waterproofed ……….

DAMPPROOFING AND WATERPROOFING DAMPPROOFING AND WATERPROOFING

New

Page 61: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

14.11 Piles in subsiding and calcareous areas

14.11.1 Piles in subsiding areas. Where piles are driven through subsiding fills or other subsiding strata and derive support from underlying firmer materials, consideration shall be given to the downward frictional forces that may be imposed on the piles by the subsiding upper strata………………….

14.11.2 Piles in calcareous soils. Where piles are driven through calcareous soils and derive support from frictional forces developed between ………

PIER AND PILE FOUNDATIONSPIER AND PILE FOUNDATIONS

New

Page 62: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Materials: Timber footings, Timber Foundations, Timber Piles.

EXAMPLES OF DELETED ITEMSEXAMPLES OF DELETED ITEMS

Environment: Frost protection

Local Practice: Post-tension foundation on expansive soils

Page 63: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

14.8.3.1 Load test evaluation. It shall be permitted to evaluate pile load tests with any of the following methods:1. Davison Offset Limit.2. ………………….3. …………………….

4. Other methods approved by the building official.

SPECILIATIES AND AUTHORITIESSPECILIATIES AND AUTHORITIES

9.3.4 Stabilization. Where the active zone of expansive soils is stabilized in lieu of designing footings or ……. the soil shall be stabilized by chemical, installation of moisture barriers, pre-wetting or other techniques designed by a geotechnical engineer knowledgeable in unsaturated soil mechanics and approved by the building official.

Page 64: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

SPECILIATIES AND AUTHORITIESSPECILIATIES AND AUTHORITIESBuilding official Registered design professionalQualified inspectorApproved agencyAccepted engineering practice Acceptable principle of engineeringApproved method of analysisApproved formulaApproved methods or materials

Approved report

Approved manner

Approved construction document

Page 65: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

THE SAUDI BUILDING CODE

PART 3:Structural

SBC 301 Design Loads for Buildings and Structures

SBC 302 Structural Tests and Inspections

SBC 303 Soils and Foundations

SBC 304 Concrete Structures

SBC 305 Masonry Construction

SBC 306 Steel Structures

Page 66: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

. الشمراني. علي بن مصلح د أ

Lرئيسا

.القصبي عثمان بن أحمد د

Lعضوا

.الفاتح محمد د

Lعضوا

. الرفيعي. عبيد بن طالل د أ

Lعضوا

. المهيدب. إبراهيم بن الله عبد د أ

L عضوا

األولى المسودة وإخراج وصياغة مراجعةكود للتربة لمتطلبات السعودي البناء

SBC 303واألساسات

األولى المسودة وإخراج وصياغة مراجعةكود للتربة لمتطلبات السعودي البناء

SBC 303واألساسات

Page 67: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

CHAPTER: 1 GENERAL

CHAPTER: 2 SITE INVESTIGATIONS

CHAPTER: 3 EXCAVATION, GRADING, FILL AND FILL

CHAPTER: 4 ALLOWABLE LOAD-BEARING VALUES OF SOILS

CHAPTER: 5 SPREAD FOOTINGS

CHAPTER: 6 FOUNDATION WALLS

CHAPTER: 7 RETAINING WALLS

CHAPTER: 8 COMBINED FOOTINGS AND MATS

CHAPTER: 9 DESIGN FOR EXPANSIVE SOILS

THE SAUDI BUILDING CODE SBC 303: Soils and Foundations THE SAUDI BUILDING CODE

SBC 303: Soils and Foundations

Page 68: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

CHAPTER: 10 DESIGN FOR COLLAPSIBLE SOILS

CHAPTER: 11 DESIGN FOR SABKHA SOILS

CHAPTER: 12 DESIGN FOR VIBRATORY LOADS

CHAPTER: 13 DAMPPROOFING AND WATERPROOFING

CHAPTER: 14 GENERAL REQUIREMENTS FOR PIER AND PILE FOUNDATIONS

CHAPTER: 15 DRIVEN PILE FOUNDATIONS

CHAPTER: 16 CAST-IN-PLACE CONCRETE PILE FOUNDATIONS

CHAPTER: 17 CAST-IN-PLACE CONCRETE PILE FOUNDATIONS

THE SAUDI BUILDING CODE SBC 303: Soils and Foundations THE SAUDI BUILDING CODE

SBC 303: Soils and Foundations

Page 69: Saudi-Building-Code-Requirements-for-Soils-and-Foundations
Page 70: Saudi-Building-Code-Requirements-for-Soils-and-Foundations
Page 71: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

The Draft of SBC 303 was developed based on Chapter 18 of the )IBC( 2003 edition and by inclusions of excerpts from a number of national and international documents.

The committee included professionals from academia, governmental and semi-governmental agencies, and consulting firms.

Development of the SBC 303 draft followed the methodology approved by the Saudi Building Code National Committee.

CONCLUDING REMARKS

Page 72: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Modifications to the IBC document were intended to draft a comprehensive set of provisions that are consistent with and inclusive of Chapter 18 of the IBC, and in the meantime accounts, to the best possible extent, for

•Materials•Environmental conditions•Construction practices

prevailing in the Kingdom.

Throughout the development of the draft, several key aspects were considered, among of which are

The current local practice of geotechnical engineering.

CONCLUDING REMARKS )Cont.(

Page 73: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Causes of building damages in the Kingdom are in many instances attributed to foundation-related problems.

Inappreciative realization of the need and importance of geotechnical information.

Elaborate discussions preceded any modification or augmentation of any portion of the IBC document.

The necessity for revision or addition, the reliability of the to-be added materials, and their conformity and consistency with the provisions of the IBC document, all were given due considerations.

CONCLUDING REMARKS )Cont.(

Page 74: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Most topics of the IBC document have been substantially revised, with the exception of pile and pier foundations.

Main revisions were for parts pertaining to site investigation, excavation, grading and backfill, shallow footings, and and waterproofing.

Number of provisions scattered throughout the IBC document have been revised to reflect the local practice, as viewed by the committee members.

Provisions included in the IBC that are considered irrelevant on the basis of environment, materials, local practice have been deleted and not included in the SBC 303 draft.

CONCLUDING REMARKS )Cont.(

Page 75: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Some sections in the IBC have been extended to become entire new chapters in the SBC 303

Design for expansive soils have thoroughly been enhanced with the additions of foundation systems and by emphasizing pre- and post-construction detailing.

Provisions relevant to identification and testing of Collapsing and sabkha formations have been added to “Site Investigations”, and entire chapter has been devoted for each soil type

CONCLUDING REMARKS )Cont.(

Page 76: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Out of the seventeen chapters that comprise the SBC 303 document, six were entirely new and five were substantially revised.

The newly-introduced materials account for almost sixty percent of the SBC 303 document, and excluding the pile and pier portion this proportion approaches about seventy five percent.

One-half of the IBC document was devoted to pile and pier foundations, on the contrary materials pertaining to those foundation systems represent only about twenty percent of the SBC 303 document.

CONCLUDING REMARKS )Cont.(

Page 77: Saudi-Building-Code-Requirements-for-Soils-and-Foundations

Where the recommendations in this code vary from published methods or codes, the differences represent the experience and judgment of the majority of the committee members.

Although the adopted provisions presume the existence of certain standard conditions, more often than not every project has a unique combination of variables, and for that reason all attempts have been made to make this code flexible.

CONCLUDING REMARKS )Cont.(