Carbon Capture and Storage Initiatives
E X E C U T I V E S T R A T E G I C P L A N N I N G S E S S I O N
SASKPOWER CCS
@SaskPowerCCS
GHGT-12 M I K E M O N E A , P R E S I D E N T , C C S I N I T I A T I VE S
SASKPOWER’S C C S S T O R Y .
Why We Did It The Business Case
Construction (Learning Starts Here) Government Approval
SASKPOWER’S ENERGY MIX.
• 490,000 customers
• 151,000KM of
transmission line
• 3,513 MW generating capacity
COAL 50%
GAS 25%
HYDRO 20%
W I N D 3 %
O T H E R 2 %
D IVERS IF I ED POWER GENERAT ION.
5
• In 2013, invested $2B in our electrical system including a record $1.3B internally and $700M through a partnership with Northland Power.
• Forecasting to invest $1B annually for the foreseeable future.
• 3 key elements to SaskPower’s ongoing capital spending program:
1. Forecasted system growth; 2. Sustainment investments; and 3. Financial Impact.
CAPITAL SPENDING DRIVERS
6
CCS T IMEL INE .
Pre 2000 Canadian Clean Power Coalition Studies
2001 Coal-fired Generation Option Study
Today Commercial Operation
2006 Shand 1 Study
2007 “Clean Coal Project”
2007 Shand 2
2008 Retrofit Options
2009 Pre-Commitment Engineering Unit 3
2011 Detailed Engineering
2010 Go Decision: Refurbishment of Power Plant
7 © SASKATCHEWAN POWER CORPORATION. ALL RIGHTS RESERVED.
COMPARING COSTS .
BD3 Carbon Capture Cost of Electricity
Baseload Natural Gas Cost of Electricity
Capital Investment
Fuel Expense
O & M Figures from 2009 - 2010
8 © SASKATCHEWAN POWER CORPORATION. ALL RIGHTS RESERVED.
C O M P A R I N G R E G U L A T I O N S .
• USA – 1,100 lb/MWh gross *Approx 0.712 tonnes /MWh net factoring in 30% parasitic load for CCS equipment • Canada – 0.420 tonnes /
MWh
• USA – 1,000 lb/MWh gross *Approx 0.504 tonnes / MWh net • Canada – 0.420 tonnes /
MWh
Carbon Capture and Storage Initiatives
E X E C U T I V E S T R A T E G I C P L A N N I N G S E S S I O N
BOUNDARY DAM CCS PROJECT
BOUNDARY DAM UNIT 3 Emission Change Pre-CCS Post-CCS Reduction
CO2 1094 120 90% SO2 11 0 100% NO 1.5 1.1 27% PM10 .2 .02 90% PM2.5 .1 .03 70%
• Regina Saskatchewan- 210,000 people • One million tonnes of captured CO2 from coal:
• Removes CO2 emissions from all Regina cars • Also captures all the CO2 from home heating • Plus..keeps 50% of the lights on in Regina
• Or 250,000 cars off the road each year….
12 © SASKATCHEWAN POWER CORPORATION. ALL RIGHTS RESERVED. 12 © SASKATCHEWAN POWER CORPORATION. ALL RIGHTS RESERVED.
GENERAT ION COSTS .
$US /MWh
Data Source: 2010 Electrical Power Research Institute, Program on Technology Innovation: Integrated Generation Technology Options
$30
$50
$70
$90
$110
$130
$150
Coal Coal with CCS
Natural Gas
Nuclear Biomass Wind
Figures from 2009 - 2010
BOUNDARY DAM CCS PROJECT
CCS FACIL I TY .
BOUNDARY DAM CCS PROJECT
CO
2 AN
D SO
2 A
BSORBERS
BOUNDARY DAM CCS PROJECT
CO
2 STRIPPER
BOUNDARY DAM CCS PROJECT
SO2 A
BSO
RB
ER
AC
ID PLA
NT
CO 2 P IPEL INE .
BOUNDARY DAM CCS PROJECT
UNI T 3 TURB INE .
CCUS.
FULL SPECTRUM
SECURING OFF-TAKERS.
• Sale of flyash for concrete production 100%.
• Sale of sulphuric acid, used primarily for industrial purposes including fertilizer.
• Sale of CO2 to oil company for EOR.
E N H A N C E D O I L R E C O V E R Y .
0
5
10
15
20
25
30
35
1955 1961 1967 1973 1979 1985 1991 1997 2003
40
45
50
55
2009 2015
• Around 30,000 bl/day: a 35-year high
• 20,000 bl/day are due to the CO2 flood
Primary & Waterflood Vertical Infills
Pre CO2 Hz Infills
Current production at 35 year high CO2 EOR
Waterflood Improvement
bl/day
STORAGE. • Pure CO2 storage with SaskPower’s Carbon
Storage and Research Centre’s host project, Aquistore.
• Independent monitoring project that identifies
feasibility of injecting CO2 into a deep saline reservoir in an effort to reduce GHG emissions.
• Aquistore will receive approximately 350,000 tonnes of CO2 over its life. Storage is regulated by the Ministry of Environment.
• Will be measured, monitored, verified and audited. • Saskatchewan has experience with storage due to the Weyburn Midale project. Approximately 20 million tonnes of CO2 stored and monitored.
MAKING THE NEW REALITY.
Complex Commissioning Unprecedented Simulator Training
Vendor Contract Negotiations Detailed SOP
BOUNDARY DAM CCS PROJECT
WHERE WE ARE GOING
WHERE ARE WE GOING.
Boundary Dam 4+5
Amine Chemistry Lab
CCTF
University Collaboration
BOUNDARY DAM CCS PROJECT
TOURS
Carbon Capture and Storage Initiatives
E X E C U T I V E S T R A T E G I C P L A N N I N G S E S S I O N
SASKPOWER CCS
@SaskPowerCCS
GHGT-12 M I K E M O N E A , P R E S I D E N T , C C S I N I T I A T I VE S