CONSTRUCTION OF DAMATURU MAIN DRIANAGE CHANNELYOBE STATE2010-2011Contributions of Adamu Sariki
Excavation works
Excavation and taking level along 4km from Kandaha 00km
Challenges in the construction and solutions provided
Buckling of the channel walls due to excess water settlement behind the rip rap
Excess rain water in the channel and sectional pumping out to continue work
Working under an Existing Bridge
Demolition of existing bridge, inside creating a temporary way for water flow
SURVEY and EXCAVATION WORKS
Inside taking of Level for channel walls, surveyor using a GPS to locate the centre line and direction of channel flowTemporary water flow
Stabilization Blinding and Laying of Rebar
Laying of Geotextile for stabilization and blinding
Casting and Construction works
Casting of Walls
Excavation and Casting of RIP RAP
FINISHED SECTION OF BRIDGE AND CHANNEL
NATIONAL SECURITY COMMUNICATION PROJECT CONTRIBUTIONS OF SARIKI ADAMU TO THE PROJECT IN ENGINEERING IMPLEMENTATION SECTION
SARIKI ADAMUID: 10122888Civil EngineerEngineering Implementation sectionRegion (Abuja, Enugu, Bayelsa, Imo, Abia, Rivers, Kogi, Cross River, Akwa Ibom)
Abuja Switch room Fndn Rebar
Abuja P1 Fndn Casting
Abuja Maitama, Zuba Sites, inside Picture with ZTE IT Guys
Abuja Temp. Switch room Fndn
Pictures of Abia switch room
Pictures of Abia Switch room challenges
REGIONS COVERED IN ENUGUEnugu BTS sites with Mr wangEnu-p4Enu-P10Enu-P1 TOWER
Enugu-P10 foundation casting and Enu-P1Fndn on the hill
Abia BTS sites and switch room (18 sites)
Curing 35m tower foundationIron work in Foundation35m, setting of template
Some pictures of Rivers state, Imo, Bayelsa, Abia state works progress
Casting of Riv-N8Fixing of Abia N10 cable tray Abia state university uturu
Some pictures of Rivers state, Imo, Bayelsa, Abia state works progress
Casting of River-P8 and Rivers_p19 pile cap
Fixing of Abia state switch room suspended floor works progress
Some pictures of Rivers state, Imo, Bayelsa, Abia state works progress
Compaction of Umuahia switch room tower fnd.Rumukpakani pile fdn 1
24
Pictures of challenges at site
Resolving communityIssuesCollapsed excavated wallRemoval of existing foundation Abia state switch room
Tower Integrity test
Tower Integrity test
Tower earthing Integrity test
Tower Foundation Construction
Rivers N7 state model primary school rukpoku portharcortFndn rebar, fixing form work and casting
Thank you
Sariki Adamu10122888
Brains and Hammers Real Estate Development, Life campEstate.
Construction of Duplex and 4 Bedroom terrace Buildings with facilities
FEB. 2014 - DATE
Exc. and blinding of trench and pits
Fixing and alignment of columns
Fixing of reinforcements for base and columns alignment
Fixing of reinforcements for base and columns alignment Casting of conc. In fndn
Casting of conc. In fndn
Laying of block work in fndn.
Block work in foundation
Casting of starter columns
Casting of tie beams, and block work to FGL
Casting of ring beams, and block work to FGL40
Casting of tie beams, and block work to FGLGround floor block work
Fixing form work for lintels
Ground floor block work, form work to lintels
External plaster and screeding, lifecamp phase 1
Brains and Hammers Galadimawa
Block work in foundation, Hollow filling, casting of starter columns
Substructure galadimawa project
Ground floor kicker and block forming, 1st floor column alignment
Ground floor block work
Iron work in first floor slabs and beams
Form work and iron work in beams and slab
First and Second floor column alignment and casting
Column alignment
Second floor column alignment and block work
Block work to second floor
Scaffoldings/Roofbeam iron workColumn alignment
Scaffolding and roof parapet fixing
Fixing roof tiles in galadimawa
VITALVOX PROJECTLand reclamationConstruction of estate roads and line drainsConstruction of Box culverts
COMPANYFOUNTAIN CONSTRUCTION COMPANYLocation: Warewa Ogun State(lagos-Ibadan express way)
Using a swamp buggy
Using a swamp buggy to clear and sandfill to reclaim the land for the project 40hecters
FCC yard and batching plant, vitalvox project WAWA Ogun stateReclaimed land for Vitalvox projectFilled area ready for compaction
Dry mix Blinding for laying of line drainsExcavation for line drainsLaying of line drains
Connection of line drain to Box culvertConnection of line drain to Box culvert
Casting of base for precast box culvert
Swamp buggy working on the canal and embankment to the line drainsLaying of precast line drains
Sub-Base along C1 vitalvox prjectLaying of stone-BaseStone-Base and cover slab vitalvox project
Stone base first layer @ vitalvox projectSub-Base along C4 vitalvox prject
Line drain connections through intersections and round about
Work way and roundabout drains
Kerbs at intersections, vitalvox project (the gardens estate)