Sarasota US 41 North Trail transportation concepts

1
Goal Statement: The goal of the City of Sarasota is to have a US 41 Corridor that is context sensitive to the fabric of the surrounding neighborhoods and land uses. To achieve this goal, the City has set the following parameters and goals for the roadway: Requesting a corridor with design speeds of 25 to 30 miles per hour from the US 301 intersection north to City Limits, and design speeds of 30-35 miles per hour from the US 301 intersection south to Bee Ridge Road; Design a roadway cross-section that accommodates various transit modes; Provide intersection improvements at key intersections, with a focus on multimodal transportation, including transit. Overall, the plan should link land use with transportation and facilitate a shift from an auto-centric system to one that allows for a variety of modal choices, including walking, biking and transit. Land Uses immediately along the corridor should include 3-4 story buildings with commercial, tourist accommodations, multi- family and mixed-use structures. The roadway cross-section should be designed for slower speeds and safely accommodate bicyclists, pedestrian crossings, and transit stops. Wider sidewalks are needed, particularly near parks, schools, attractions, and other pedestrian traffic areas. Two roundabouts are under design for the intersections of 14th Street and 10th Street, with submission to FDOT in January 2011. Intersection improvements may include possible roundabouts, intersection treatments, or other multi-modal intersection im- provements.

description

Visioning for a US 41 corridor with smoother, safer, multi-modal traffic flow sensitive to neighborhoods and land se uses... accommodating walking,biking, & transit.

Transcript of Sarasota US 41 North Trail transportation concepts

Page 1: Sarasota US 41 North Trail transportation concepts

Goal Statement: The goal of the City of Sarasota is to have a US 41 Corridor that is context sensitive to the fabric of the surrounding neighborhoods and land uses. To achieve this goal, the City has set the following parameters and goals for the roadway:

Requesting a corridor with design speeds of 25 to 30 miles per hour from the US 301 intersection north to City Limits, and design speeds of 30-35 miles per hour from the US 301 intersection south to Bee Ridge Road; Design a roadway cross-section that accommodates various transit modes; Provide intersection improvements at key intersections, with a focus on multimodal transportation, including transit.

Overall, the plan should link land use with transportation and facilitate a shift from an auto-centric system to one that allows for a variety of modal choices, including walking, biking and transit.

Land Uses immediately along the corridor should include 3-4 story buildings with commercial, tourist accommodations, multi-family and mixed-use structures.

The roadway cross-section should be designed for slower speeds and safely accommodate bicyclists, pedestrian crossings, and transit stops.

Wider sidewalks are needed, particularly near parks, schools, attractions, and other pedestrian traffic areas.

Two roundabouts are under design for the intersections of 14th Street and 10th Street, with submission to FDOT in January 2011.

Intersection improvements may include possible roundabouts, intersection treatments, or other multi-modal intersection im-provements.