Jan-08 22.01.08 24.01.08
Feb-08 - -
Mar-08 - -
Apr-08 - -
May-08 - -
Jun-08 - -
Jul-08 - -
Aug-08 - -
Sep-08 25.08.08 03.09.08
Oct-08 - -
Nov-08 12.11.08 17.11.08
08.12.08
10.12.08 13.12.08
Jan-09 - -
Feb-09 - -
09.03.09 10.03.09
12.03.09
Absentee Statement of Shri Sanjay Verma / FT
Dec-08
Mar-09
-
8/13/2019 Sanjay Verma Details of Payment
2/5
MONTHLY ACTUAL
FROM TO TOTAL REMUNERATION PAYABLE
1 SANJAY VERMA FT 2008-09 37000
Total 37000.00
DATE CONSTRUCTION MANAGER
BHEL : SITE OFFICE : NTPC/KORBA
PRP for 2008-09
PERIOD OF ABSENCE
S. NO. NAME DESIGNATION MONTH
-
8/13/2019 Sanjay Verma Details of Payment
3/5
MONTH MONTHLY ACTUAL
FROM TO TOTAL REMUNERATION PAYABLE
21240
11.04.09 17.04.09 04 days25.05.09 26.05.09 02 days
18.06.09 24.06.09 06 days
12 days
21240.00
ATTENDENCE CERTIFIED : PAYMENT AS ABOVE MAY BE RELEASED TO INDIVIDUAL
DATE CONSTRUCTION MANAGER
From To
Joined on 07.03.2009
Apr-09 11.04.09 17.04.09 07 days
May-09
25.05.09 26.05.09 02 days
18.06.09 24.06.09 06 days
Note :
Date of joining - 07.03.2009 at BHEL NTPC Korba Site
Photo copy of LPC attached.
1 FTJun 09 (25.05.09 to 24.06.09 )
Net Amount Payable
Month
Period of Absence
The Individual did not avail any leave during his previous place of posting (Nagothane) and his eligible leave works out to 19 days till his relief from
Nagothane. As such no recovery on A/c of leave.
The individual has completed one year of service with BHEL on 12.03.09. as the individual has not taken any unauthorised leave other than the normal
entitlement, he may be paid increased emolumets as per the terms w.e.f 13.03.2009
Jun-09
No of Absent
Leave Details.
PAYMENT ADVICE - FT
PERIOD OF ABSENCE
S. NO. NAME DESIGNATION
Sudin D. Pillewar
-
8/13/2019 Sanjay Verma Details of Payment
4/5
MONTH MONTHLY ACTUAL
FROM TO TOTAL REMUNERATION PAYABLE
04.08.09 07.08.09 4 21240
22.08.09 24.08.09 2
less : Total 06 days 4248
16992.00
ATTENDENCE CERTIFIED : PAYMENT AS ABOVE MAY BE RELEASED TO INDIVIDUAL
DATE CONSTRUCTION MANAGER
From To
Aug-09 04.08.09 07.08.09 04 days
22.08.09 24.08.09 02 days
Note :Date of joining - 07.03.2009 at BHEL NTPC Korba Site
Photo copy of LPC attached.
PAYMENT ADVICE - FT
PERIOD OF ABSENCE
S. NO. NAME DESIGNATION
Sudin D. Pillewar
Period of Absence
The Individual did not avail any leave during his previous place of posting (Nagothane) and his eligible leave works out to 19 days till his relief from
Nagothane. As such no recovery on A/c of leave.
The individual has completed one year of service with BHEL on 12.03.09. as the individual has not taken any unauthorised leave other than the normal
entitlement, he may be paid increased emolumets as per the terms w.e.f 13.03.2009
Leave Details.
Net Amount Payable
No of Absent
1 FTAug 09 (25.07.09 to 24.08.09 )
Month
-
8/13/2019 Sanjay Verma Details of Payment
5/5
MONTH MONTHLY ACTUAL
FROM TO TOTAL REMUNERATION PAYABLE
2534.00
ATTENDENCE CERTIFIED : PAYMENT AS ABOVE MAY BE RELEASED TO INDIVIDUAL
DATE CONSTRUCTION MANAGER
Note :
Date of joining - 07.03.2009 at BHEL NTPC Korba Site
Photo copy of LPC attached.
Sudin D. Pillewar
The Individual did not avail any leave during his previous place of posting (Nagothane) and his eligible leave works out to 19 days till his relief from
Nagothane. As such no recovery on A/c of leave.
The individual has completed one year of service with BHEL on 12.03.09. as the individual has not taken any unauthorised leave other than the normal
entitlement, he may be paid increased emolumets as per the terms w.e.f 13.03.2009
1 FT
PRP for the 2008-09 From 07.03.09
to 31.03.09 ie for 25 days
= 25 x 37000/365
Net Amount Payable
2534
PAYMENT ADVICE - FT
PERIOD OF ABSENCE
S. NO. NAME DESIGNATION