Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts...

33
Sanitary Sewer System

Transcript of Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts...

Page 1: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Sanitary Sewer System

Page 2: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Summary

• Sanitary Sewer Basics

• Town of West Seneca Sewer Districts

• Consent Order

• Inflow Evaluation

• Slip Lining

• System Capacity Issues

• Leydecker Pump Station

• Recommendations

Page 3: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

One Person, One Day:

Flush Toilet

Shower/Bath

Brush Teeth

Wash Hands

15 gal

35 gal

4 gal

6 gal

60 gallons/person*

JUNE20, 2011

* Typical estimate for design is 100 gallons/person/day

Town of West Seneca has approximately 32,000 people connected to the Town’s system. At 60 gallons/person, that is approximately 1.9 million gallons per day (mgd). We would design the system for 100 gallons/person (3.2 mgd). Actual flow data from 2006-2010 shows the system averages 3.74 mgd (approximately 120 gallons/person).

Page 4: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

What Happens to Water That’s

Not Consumed (and 95% of the water

is not consumed)?

Goes down the drain

Dirty

Smelly

Hidden}Out of site/ Out of mind&and becomes

wastewater

Page 5: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Where does the wastewater go?

S E W E R S

Page 6: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

What is a SEWER?

• Series of pipes

• Below ground

• Conveys wastewater

• Sewer has access points

– House connections

– Manholes

Page 7: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Wastewater Flow in Sewers

Why is the sewer pipe tilted downward?– Water flows by gravity– From high point to low point

Page 8: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

How Do We Get Wastewater

Up a Hill ?

Sewer Pump

Pumped

Wastewater

(Uphill)

Gravity

Wastewater Flow

(Downhill)Hill

Sewer

It needs to be PUMPED !

Page 9: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Sewer View From Above

ManholeManhole

Manhole

JoiningPipe

IncreasingPipe Size

Changing PipeDirection

IncreasingPipe Size

8”

8” 12”

12”

14”

Page 10: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Why Not Discharge to a

River or Lake?

• River/Lake

– Untreated wastewater will make humans sick

– Untreated wastewater will kill fish and other aquatic life.

– Impacts water quality

• Bacteria/pathogens are harmful

– Humans

– Fish

• Low Oxygen Level

– Fish cannot survive

Page 11: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Regulatory Compliance -

Consent Order

• Imposed by New York State Department of Environmental Conservation (NYSDEC) in 2004, with an amendment in 2008 requiring a number of items, notably:

- Generate a schedule for elimination of Sanitary Sewer Overflows (SSO’s) into Cazenovia Creek

- Provide an approvable program for control of private sources of inflow and infiltration (I/I)

Page 12: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Infiltration and Inflow

• Inflow

– Storm water

• Infiltration

– Ground water

• Due to:

– breaks, cracks, holes, joint failures, connection failures

• Infiltration and Inflow effects size of Sewer System

Page 13: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Private Laterals

§ 97-23 Prohibited Connections

Non-Sanitary Connections. No person shall make connection of roof downspouts, foundation drains, areaway drains, sump pumps, floor drains, such as garage or basement, or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. Any such connection now in existence shall be removed.

Inspection prior to transfer of title. No person shall transfer title to another person nor accept from any other person the transfer of title to any structure or parcel of land upon which a structure is located until the Town of West Seneca Code Enforcement Officer or his designee shall have inspected the sump pump system, footing drains, yard drains and downspouts of such structure or parcel of land and issued a certificate of compliance stating that the same is found to be in compliance with the provisions of Town Code § 97-23A (Non-Sanitary Connections) and § 97-26 (Certain wastes excluded from sanitary sewers). This section shall not apply to transfers of property by gift, intestacy or testamentary disposition, transfers pursuant to the Bankruptcy Code, partition or matrimonial settlement.

Waiver of Certificate of Compliance. The Town of West Seneca Code Enforcement Officer may temporarily waive the requirement for a certificate of compliance as a prerequisite to transfer of title, provided that the purchaser:

• Shall file with the Code Enforcement Officer a written agreement to correct any deficiencies to the sump pump system, foot drains, yard drains and downspouts within a period of time to be specified by the Code Enforcement Officer; and

• Shall provide a sum of $2,000 which shall be held in escrow by the Town of West Seneca and which sum shall be returned to the purchaser if the corrections are completed within the time specified in the agreement. Such sum will be forfeited to the Town if the corrections are not completed within the time specified in the agreement.

– In the event that the connections are not completed with the time specified in the written agreement, the temporary waiver shall immediately expire and the purchaser shall be subject to the penalties as prescribed in Article IX (Enforcement) § 97-46 (Penalties for offenses).

§ 97-34 Improper usage of sewers.

The Town Engineer, Town Code Enforcement Officer, or one of their designees that are employees of the Town, shall have the right to inspect and/or test any building sewer and building drain and appurtenances or private sewers that discharge wastewater directly or indirectly to the Town’s wastewater conveyance system. This includes the authority to inspect basements for illegal connections, such as sump pumps. In the case of basement inspection, the Town Engineer or Code Enforcement Officer shall give notice of no less than 12 hours nor more than 48 hours if requested by the owner. If it is found that such sewers or drains are used or maintained in such a way as to cause any discharge that violates this chapter, the Town Code Enforcement Officer will initiate enforcement actions in accordance with Article IX (Enforcement).

Page 14: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245
Page 15: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Summary of System

In addition, there are 3 County Sewer Districts – ECSD #1 – 54 miles, ECSD #3 – 11 miles, and ECSD #4 – 2.5 miles. Total of 245 miles. 8 pump stations and 5 permitted SSO’s and 1 non-permitted SSO.

Page 16: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Summary of System

• Average Daily flows are approximately 3.74 mgd.

• To put the I/I problem in context, the average daily flow just from District #13 was 9.5 mgdin May 2011!

Page 17: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Sewer Evaluation Map

Page 18: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Inflow/Infiltration Evaluation

• 2010 Phase I was

studied Only 50% of the area was

evaluated

• Conclusion

– $2.5 Million of

Construction for amount

studied

– Assumed $3.5 Million to

reconstruct Phase I fully

• Project is split into 10

phases

– One phase per year

– Phase based on highest

priority identified by

testing

– Each Phase consisting of

60,000 to 70,000 Linear

Foot of pipe replacement

(approximately 7% of

system annually)

Page 19: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Slip Lining

From 2000 to 2010, approximately 60,000 linear feet (lf) of sanitary sewer (noted in orange) was sliplined. Approximately 6,000 lf is scheduled for 2011 (blue), and approximately 11,000 lf remains (green). The cost is approximately $250,000/mile.

Page 20: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245
Page 21: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Review of OverflowsJanuary 2011 – May 2011

• SSO #1 – Mineral Springs (Plant 6)

14 times – 13 million gallons (Buffalo Creek)

• SSO #2 – Ashmund (Plant 5)

60 times – 132 million gallons

• SSO #3 – West Seneca West

34 times – 74 million gallons

• SSO #4 – Cranwood (1 overflow – result of sliplining)

• SSO #5 – Elmsford

18 times – 7 million gallons

Page 22: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Why do we have Overflows?

• The Town discharges into the Buffalo Sewer Authority System. The Agreement requires that the Town does not exceed 12.8 mgd (as a rate). They also discharge into ECSD #4 at a not to exceed rate of 2.17 mgd. This limits the flow that can discharge out of the Town system.

• There are several areas where the pipe capacity downstream is less than upstream.

Page 23: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

System Capacity Issues

Page 24: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

System Capacity Issues

Page 25: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

System Capacity Issues

Page 26: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

System Capacity Costs

• Junction on the 24” interceptor near Mill Rd along Cazenovia Creek - $3 million

• Near Emerald Dr. and West Dr. - $5 million

• Seneca St. near Main St. - $7 million

• Orchard Park connection to the 36” interceptor - $1 million

• East and West Rd. near Union - $1 million

Page 27: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Overflow at Leydecker Pump Station

Overflow at Leydecker pump station has discharged approximately 15 times since January 2011. Working on a program to eliminate this non-permitted SSO. Estimated cost - $300,000.

Page 28: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Other Items to Consider

• Overflow Retention Facility requires repairs. Estimated cost - $200,000.

• Pump stations require general upgrade and maintenance. Estimated cost - $400,000.

• Additional Miscellaneous items - $100,000.

Page 29: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Existing Sanitary Sewer Rate Structureit’s complicated

• Rates are composed of various components:- “Footage” charge for linear footage of road frontage- “Water Consumption” charge per thousand gallons used- “O&M” charge based on a rate per thousand of taxable assessed property value- “Area” charge based on a rate per thousand of the property’s square footage- “Flat Fee” per property depending on the property’s classification- “Debt Service” charge based on a rate per thousand of taxable assessed property value

The Town does not charge “footage” if the developer installed the facilities with in a subdivision

Page 30: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Annual Sewer Cost for Typical Residential Property - 2007

Rates vary from approximately $300 to $700 per unit per year

Total revenue generated from rates in 2010 was approximately $7.5 million

Page 31: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Overall Costs – Phase I

• I/I (Consent Order – 3 phases) - $10.5 million

• Sliplining - $800,000

• System Capacity Issues - $17 million

• Leydecker pump station - $300,000

• Other Items - $700,000

• Total Phase I – say $30 million

Page 32: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Recommended Phase I Project

Impact on Rates• Phase I project impacts Districts 5 and 13 only• However, O&M “Major Repairs” budget line should be

increased in all other Districts

• Districts 5 & 13 rate increase is projected to be $50/quarter or $200 annually

• In all other Districts, the projected rate increase is $10/quarter or $40 annually

• In a year, the average household spends $500 for bottled water• In a month, the average household spends $70 for cable• In a day, the average person spends $1.50 for a cup of coffee

Page 33: Sanitary Sewer System - West Seneca of West... · In addition, there are 3 County Sewer Districts –ECSD #1 –54 miles, ECSD #3 –11 miles, and ECSD #4 –2.5 miles. Total of 245

Recommendations

• Town Board should adopt a Bond Resolution for $30 million to accelerate addressing Sanitary Sewer issues in the Town. Bond Resolution subject to Permissive Referendum.

• If passed, work can begin next Spring on the Phase I project.