PRISMIC ® Power Management System at Sangachal Terminal, Azerbaijan Introduction Sangachal terminal is one of the world’s largest integrated oil and gas processing terminals. Located 55km south of Baku, it is a vital link in Azerbaijan’s oil and gas industry. The terminal receives, processes, stores and exports crude oil and gas produced by Azerbaijan’s offshore oilfields in the Caspian Sea. Treated crude oil and gas at the terminal are pumped to storage tanks and finally exported via pipelines for onward shipment to the world’s markets. Sangachal Terminal covers an area of 500 square km, which makes it one of the world’s largest oil and gas terminals. Benefits of the PRISMIC ® Power Management System The PRISMIC ® Power Management System (PMS) consists of an integrated electrical power control system with intelligent control units located in seven locations around the site using Ethernet over fibre for communication. The PRISMIC ® PMS provides automatic supervisory control of the nine generators to ensure correct system voltage and frequency. Generator power is controlled by the PRISMIC ® PMS to ensure that turbine emissions are minimised by automatic operation according to turbine dry low emissions (DLE) requirements. The PRISMIC ® PMS also provides automatic generator start sequencing, generator VAr control, automatic transformer tap changer control and comprehensive intelligent load shedding for the 84 load feeders. Five dedicated HMI PCs are included with the system to allow full operator interaction at each outstation with operator control permissions being controlled according to a carefully defined hierarchy. Equipment Controlled by PRISMIC ® PMS Two 40MVA grid incomers Two 11/33kV tap changers. Four 22.2MW dual fuel gas turbine generators Two 21.4MW gas fuelled dry low emisson (DLE) machines gas turbine generators One 21.4MW DLE gas fuelled gas turbine generators with waste heat recovery. Two 1.8MW auxiliary diesel generators. Control and monitoring of over 250 circuit breakers. 84 motor loads. 44 transformers. 72 bus sections. PRISMIC ® Power Management System Sangachal Terminal, Azerbaijan BRUSH United Kingdom PRISMIC ® PMS Control Station BRUSH Czech Republic Sangachal Terminal at Sunset BRUSH The Netherlands

Transcript of Sangachal Terminal, Azerbaijan - BRUSH · Sangachal Terminal, Azerbaijan Introduction ... Email:...

PRISMIC® Power Management System at Sangachal Terminal, Azerbaijan

Introduction

Sangachal terminal is one of the world’s largest integrated oil and gas processing terminals. Located 55km south of Baku, it is a vital link in Azerbaijan’s oil and gas industry. The terminal receives, processes, stores and exports crude oil and gas produced by Azerbaijan’s offshore oilfields in the Caspian Sea. Treated crude oil and gas at the terminal are pumped to storage tanks and finally exported via pipelines for onward shipment to the world’s markets. Sangachal Terminal covers an area of 500 square km, which makes it one of the world’s largest oil and gas terminals.

Benefits of the PRISMIC® Power Management System

The PRISMIC® Power Management System (PMS) consists of an integrated electrical power control system with intelligent control units located in seven locations around the site using Ethernet over fibre for communication.

The PRISMIC® PMS provides automatic supervisory control of the nine generators to ensure correct system voltage and frequency. Generator power is controlled by the PRISMIC® PMS to ensure that turbine emissions are minimised by automatic operation according to turbine dry low emissions (DLE) requirements.

The PRISMIC® PMS also provides automatic generator start sequencing, generator VAr control, automatic transformer tap changer control and comprehensive intelligent load shedding for the 84 load feeders.

Five dedicated HMI PCs are included with the system to allow full operator interaction at each outstation with operator control permissions being controlled according to a carefully defined hierarchy.

Equipment Controlled by PRISMIC® PMS

Two 40MVA grid incomers• Two 11/33kV tap changers.• Four 22.2MW dual fuel gas turbine generators• Two 21.4MW gas fuelled dry low emisson (DLE) machines gas turbine generators• One 21.4MW DLE gas fuelled gas turbine generators with waste heat recovery.• Two 1.8MW auxiliary diesel generators.• Control and monitoring of over 250 circuit breakers.• 84 motor loads.• 44 transformers.• 72 bus sections.•

PRISMIC® Power Management SystemSangachal Terminal, Azerbaijan

BRUSH United Kingdom

PRISMIC® PMS Control Station

BRUSH Czech Republic

Sangachal Terminal at Sunset

BRUSH The Netherlands

07/2009SM0000293A

Key Points

Standard PRISMIC® PMS Functionality includes:

Frequency and real power control (base load and sharing) via engine governors.• Voltage and reactive power control via generator AVRs.• Operator initiated turbine starting and stopping • Generator base loading.• Grid incomer MW and MVAr target control• Tap changer control to maintain main voltage at nominal and to maintain VArs to a • target preset. Voltage of platforms without generation is also maintained at a preset target.Fast acting load shedding in the event of a generator tripping off. This included a • step load limit in situations where the turbines capability to accept load was limited.Gradual overload load shedding due to excessive increase in load demand.• Under frequency load shedding.• Load start inhibits to prevent loads being started during periods of insufficient • spinning reserve.Synchronizing of all 11kV bus ties and interconnectors.• Dead bus control of all 11kV bus ties and interconnectors.• Circuit breaker discrepancy for all 11kV breakers• Circuit breaker open/close control of all breakers.•

Special PRISMIC® PMS Functionality includes:

Shed excessive VAr to limit the flow through the grid incomers cable.• Generator dry low emmision (DLE) mode. DLE machines are prevented from • operating inside a preset area. Sharing set enables loading to be maintained outside this transition band.Emergency generator trip. If an emergency generator is connected, when the last • 11kV power source is lost, it will be tripped.

For further information on the BRUSH PRISMIC® Power Management please visit our website: www.brush.eu

Alternatively please contact your local BRUSH PRISMIC® sales team.

BRUSH SEM s.r.o.Edvarda Benese 39/564301 00 Plzeň, The Czech RepublicTel: +420 37 8210111Fax: +420 37 8210214Email: [email protected]: www.brush.eu

BRUSH Electrical Machines LtdFalcon Works, Nottingham Road,Loughborough, Leics. LE11 1EX EnglandTel: +44 (0)1509 611511 Fax: +44 (0)1509 610440E-mail: [email protected]: www.brush.eu

BRUSH HMA b.v.PO Box 3007, 2980 DA RidderkerkThe NetherlandsTel: +31 180 445500Fax: +31 180 445566Email: [email protected]: www.brush.eu

BRUSH Turbogenerators Inc.15110 Northwest Freeway, Suite 150,Houston, Texas 77040, USATel: +1281 580 1314Fax: +1281 580 5801Email: [email protected]: www.brush.eu

BRUSH TurbogeneratorsWorld Trade Tower, Suite 1803,500 Guangdong Road, Shanghai,P.R.ChinaTel: +86 21-63621313Fax: +86 21-63621690Email: [email protected]: www.brush.eu

BRUSH TurbogeneratorsPO Box 111209, Abu Dhabi,United Arab EmiratesTel: +971 4362 6391Fax: +971 2550 1920Email: [email protected]: www.brush.eu

BRUSH TurbogeneratorsLot 7 Jalan Majistret U1/26 HicomGlenmarie Ind. Park, 40150 ShahAlam, Selangor DE, MalaysiaTel: +60 (0) 3 7805 3736Fax: +60 (0) 3 7803 9625Email: [email protected]: www.brush.eu

BRUSH PRISMIC® Worldwide Locations

Sangachal Terminal Visitors Centre

Sangachal Terminal at Night

Panel Internals During Commisioning

Two of the Outstation Panels Configuration Diagram