Sandymount / Merrion to Blackrock Corridor Study PUBLIC ...

60
Sandymount / Merrion to Blackrock Corridor Study PUBLIC CONSULTATION DOCUMENT

Transcript of Sandymount / Merrion to Blackrock Corridor Study PUBLIC ...

  • Sandymount / Merrion to Blackrock Corridor Study PUBLIC CONSULTATION DOCUMENT

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Documentii

    the proposed project would provide a high quality continuous pedestrian and cycle route extending from Irishtown to Seapoint

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 1

    CONTENTS01: Introduction

    Background Public Consultation Document Previous Studies Objectives Study Area

    02: Issues and Challenges

    Current Arrangements Environmental Considerations Non-environmental Considerations

    03: Options Considered

    Types of Options East Coast Trail (S2S) Rock Road / Merrion Road Corridor

    04: Methodology and Appraisal

    05: Emerging Preferred Scheme East Coast Trail

    Description Commentary on Emerging Preferred Option Environmental Considerations Merrion Bypass

    2

    2 3 3 4 4

    6

    6 7 9

    10

    10 13 15

    16

    17

    17 20 20 21

    06: Emerging Preferred Scheme Rock Road / Merrion Road

    Description Commentary on Emerging Preferred Option

    07: Benefits And Costs

    Benefits Costs

    08: Possible Implementation

    09: Public Consultation

    Appendix

    22

    22 24

    25

    25 25

    26

    27

    28

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document2

    1.1 Background

    It has been an objective for many years to develop a continuous coastal recreational promenade and cycleway from Sutton on the north side of Dublin to Sandycove on the south side. Significant sections of this route have been constructed, particularly along the northern portion of the corridor. However, despite several proposals being developed, there has been limited progress achieved on the delivery of the route on the south side of the city, due in large part to environmental and cost issues.

    01: INTRODUCTION

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 3

    Previously referred to as the Sutton to Sandycove (S2S) Promenade and Cycleway scheme, this route has been incorporated into the Cycle Network Plan for the Greater Dublin Area as the East Coast Trail.

    The purpose of the Sandymount /Merrion to Blackrock Corridor Study is to provide a fresh assessment of the possible layouts for a cycleway and walking route around Dublin Bay south, and to re-evaluate the environmental issues and cost factors.

    Because the route parallels closely, and effectively overlaps, the Rock Road and Merrion Road corridor between Blackrock and Merrion, this study also considers the transport needs along this road corridor walking, cycling, public transport and traffic in order to ensure a holistic approach to the development of an integrated transport proposal.

    1.2 Public Consultation DocumentThis Public Consultation Document is intended to provide information on the recent work that has been carried out as part of the Sandymount /Merrion to Blackrock Corridor Study. The information in this document sets out, in summary form, the various options that have been examined, some of the significant environmental constraints associated with this project, and describes an Emerging Preferred Option, which is the proposal identified as likely to be, subject to a public consultation process, the optimum scheme.

    The information provided represents a summary of the work undertaken. Further details are available in the full Feasibility Study and Options Assessment Report prepared as part of the Sandymount /Merrion to Blackrock Corridor Study. That report is available on the website of the National Transport Authority www.nationaltransport.ie.

    1.3 Previous StudiesThe most significant recent study was that carried out by Scott Wilson for Dublin City Council and Dun Laoghaire Rathdown County Council over the period 2006 to 2010. That study was carried out in two stages:

    i Stage 1 A Feasibility Report identifying a number of options was completed in September 2007; and

    i Stage 2 A Preliminary Design Report was completed in March 2010 providing a preliminary design for the proposed scheme.

    The final Preliminary Report completed by Scott Wilson proposed a scheme extending from Sean Moore Park in Ringsend to the East Pier in Dun Laoghaire. The overall cost was estimated at 75 million (2010 prices). This includes 2.8 kilometres of a promenade and cycleway from Merrion Gates southwards to Blackrock, constructed by infilling adjacent to the railway line at a cost of 32.75 million.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document4

    However, in a final section titled Recommendations, the report states:

    Following from advice from our specialist environmental sub-consultants Biosphere Environmental Services and also from meetings with the National Parks and Wildlife Section of the DEHLG and An Taisce, it is recommended that an inland route is further explored in parts of section B between, Merrion Gates and Seapoint Station. This would utilise the existing combined cycleway and footpath through Williamstown and Blackrock Parks which could be easily and cost effectively upgraded once practical access and egress points are identified.

    The East Coast Trail (formerly the S2S route) runs, for the purposes of this study, from Brighton Vale near Seapoint DART Station to Sean Moore Road in Irishtown, along an indicative corridor adjoining the coastline.

    1.5 Study AreaBecause of the interaction between Strand Road and Merrion Road / Rock Road, the study area includes both corridors and extends from Seapoint at the south end, to Sean Moore Road and the junction of Merrion Road and Ailesbury Road at the north end. The relevant study area is shown in the map on the following page.

    1.4 ObjectivesThe intent of the Sandymount /Merrion to Blackrock Corridor Study is to identify an environmentally acceptable and cost effective scheme that delivers the objectives of the East Coast Trail (S2S) between Ringsend and Sandycove, while also addressing the overlapping transport needs of the parallel Rock Road and Merrion Road between Blackrock and Merrion.

    There are two designated cycle routes within this overall transport corridor the Blackrock to City Centre Cycle Route (Cycle Route 13 in the NTAs Cycle Network Plan for the Greater Dublin Area) and the East Coast Trail (route previously known as Sutton to Sandycove S2S).

    The Blackrock to City Centre Cycle Route starts south of Blackrock at Stradbrook Road, runs along the indicative corridor of Rock Road and Merrion Road, and finishes at the Grand Canal.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 5

    UCDBelfield

    St StephensGreen

    RDS

    RTE

    Rock Road

    Temple Road

    RockRoad

    Merrion Road

    Strand Road

    Monkstown Road

    Harbour Road

    Beach Road

    Strand Rd

    Sandymount Rd

    N31N31

    Park Avenue

    Seapoint Avenue

    Boot

    erst

    own

    Aven

    ue

    RATHMINESBALLSBRIDGE

    IRISHTOWN

    BOOTERSTOWN

    STILLORGAN

    MILLTOWN

    SANDYMOUNT

    MONKSTOWN

    RINGSEND

    WINDY ARBOUR

    RATHGAR

    CHURCHTOWN

    PORTOBELLO

    DONNYBROOK

    RANELAGH

    GOATSTOWN

    CLONSKEAGH

    MOUNT MERRION

    MERRION

    DUNDRUM

    BLACKROCK

    DN LAOGHAIRE

    STUDY AREA

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document6

    02: ISSUES AND CHALLENGES

    2.1 Current Arrangements

    Currently Strand Road is a heavily trafficked route connecting the south city to Dublin Port, East Link Bridge and onwards to the Dublin Tunnel and the north city. Both Strand Road and Merrion Road also function as busy car commuter routes into and out of Dublin City Centre and the employment locations in the south-east business district.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 7

    Along Strand Road, cycling facilities are limited and it does not adequately perform as either a commuter cycling route or as an amenity coastal cycling route.

    Closures of the Merrion Gates level crossing impact fundamentally on how traffic movement functions in the area. Currently the railway gates at this crossing are down (closed) for approximately 20 minutes each hour at peak times. This road closure time is projected to rise considerably as the frequency of DART services increases.

    Along the Merrion Road / Rock Road corridor, while there are a considerable number of cyclists using the route, the facilities to accommodate those cyclists are inadequate. Cyclists do not have a dedicated track or cycle lane along the corridor, and share the bus lane with buses where a bus lane exists. Even along these sections, the arrangements result in difficult conditions for both cyclists and bus/taxi drivers, with cyclists frequently impeding bus flow and bus/taxi drivers having to undertake awkward passing manoeuvres to pass cyclists.

    Bus priority along this section of Merrion Road / Rock Road is inadequate with major discontinuities in bus lane provision. The benefits gained from the existing sections of bus lanes are eroded by the absence of such lanes at other critical sections of the route.

    2.2 Environmental Considerations2.2.1 Special Protection Area

    The areas of Dublin Bay and Booterstown Marsh are recognised as being of high environmental importance. Arising from this certain designations have been assigned to these areas in accordance with the relevant European directives.

    The map along side shows the areas designated as the South Dublin Bay and Tolka River Estuary Special Protection Area. This designation, under the provisions of Council Directive 2009/147/EC on the conservation of wild birds (more commonly known as the Birds Directive) provides for the protection of thirteen regularly occurring waterbird species as well as the wetland habitat that supports them. The area known as Booterstown Marsh also forms part of this Special Protection Area.

    UCDBelfield

    St StephensGreen

    Connolly Station

    BusrasBus Station

    RDS

    RTE

    Docklands

    Drumcondra

    Tara Street

    Pearse

    GrandCanal Dock

    Landsdowne Rd

    Sandymount

    SydneyParade

    Booterstown

    Blackrock

    Seapoint

    Salthill &Monkstown

    Dn Laoghaire

    Sandycove& Glasthule

    Glenagery

    Clontarf Road

    Rock Road

    Temple Road

    RockRoad

    Merrion Road

    Strand Road

    Monkstown Road

    Harbour Road

    Beach Road

    Strand Rd

    Sandymount Rd

    N31

    N31

    Park Avenue

    Seapoint Avenue

    Boot

    erst

    own

    Aven

    ue

    GALLOPING GREEN

    DOLLYMOUNT

    RATHMINES

    DRUMCONDRA

    BALLSBRIDGE

    PHIBSBOROUGH

    IRISHTOWN

    BOOTERSTOWN

    STILLORGAN

    CLONTARF

    MARINO

    MILLTOWN

    SANDYMOUNT

    MONKSTOWN

    RINGSEND

    WINDY ARBOUR

    RATHGAR

    CHURCHTOWN

    EAST WALL

    PORTOBELLO

    DOCKLANDS

    SMITHFIELD

    DONNYBROOK

    RANELAGH

    GOATSTOWN

    FAIRVIEW

    CLONSKEAGH

    MOUNT MERRION

    MERRION

    DUNDRUM

    BLACKROCK

    DN LAOGHAIRESouth Dublin Bay and Tolka River Special Protection Area

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document8

    2.2.2 Special Area of Conservation

    A broadly similar area of the southern part of Dublin Bay, but excluding Booterstown Marsh, has also been designated as a Special Area of Conservation (SAC) under the provisions of Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora, more commonly known as the Habitats Directive. A Special Area of Conservation is a prime wildlife conservation area, considered to be important on a European, as well as Irish, level.

    South Dublin Bay Special Area of Conservation extends from the South Wall to the west pier at Dun Laoghaire and was selected in view of the importance of its Tidal Mudflats and Sandflats habitat. A map of the designated area is below.

    2.2.3 Environmental Legislation

    Both the Birds Directive and the Habitats Directive have been transposed into Irish legislation and constitute binding European law focussed on ensuring the protection and conservation of important habitats and wild bird species. Of particular relevance is the Habitats Directive (Directive 92/43/EEC). This sets out obligations on member states of the European Union to identify and designate sites of particular significance and to ensure the protection and conservation of such sites.

    UCDBelfield

    St StephensGreen

    RDS

    RTE

    Pearse

    GrandCanal Dock

    Landsdowne Rd

    Sandymount

    SydneyParade

    Booterstown

    Blackrock

    Seapoint

    Salthill &Monkstown

    Dn Laoghaire

    Sandycove& Glasthule

    Glenagery

    Rock Road

    Temple Road

    RockRoad

    Merrion Road

    Strand Road

    Monkstown Road

    Harbour Road

    Beach Road

    Strand Rd

    Sandymount Rd

    N31

    N31

    Park Avenue

    Seapoint Avenue

    Boot

    erst

    own

    Aven

    ue

    GALLOPING GREEN

    RATHMINESBALLSBRIDGE

    IRISHTOWN

    BOOTERSTOWN

    STILLORGAN

    MILLTOWN

    SANDYMOUNT

    MONKSTOWN

    RINGSEND

    WINDY ARBOUR

    RATHGAR

    CHURCHTOWN

    PORTOBELLO

    DONNYBROOK

    RANELAGH

    GOATSTOWN

    CLONSKEAGH

    MOUNT MERRION

    MERRION

    DUNDRUM

    BLACKROCK

    DN LAOGHAIRESouth Dublin Area Special Area of Conservation

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 9

    Article 6(3) of the Habitats Directive states:

    Any plan or project not directly connected with or necessary to the management of the site but likely to have a significant effect thereon, either individually or in combination with other plans or projects, shall be subject to appropriate assessment of its implications for the site in view of the sites conservation objectives. In the light of the conclusions of the assessment of the implications for the site and subject to the provisions of paragraph 4, the competent national authorities shall agree to the plan or project only after having ascertained that it will not adversely affect the integrity of the site concerned and, if appropriate, after having obtained the opinion of the general public.

    Recent judgements in the European Court of Justice (ECJ) have clarified the meaning and operation of the above provision. A major decision by the ECJ in 2013 in relation to the Galway Bypass project found that where a plan or project will lead to the lasting and irreparable loss of the whole or part of a priority natural habitat type whose conservation was the objective that justified the designation of the site concerned as an SCI [site of Community importance], the view should be taken that such a plan or project will adversely affect the integrity of that site.

    This significance of this judgement is that it established that the loss of even part of a protected site precludes a development from being authorised except in very special cases. For those special cases to apply, there must be an absence of alternative solutions and the project must be for imperative reasons of overriding public interest. These conditions mean that circumstances where a project involving any loss of a site designated under the Habitats Directive can be authorised are very limited.

    2.3 Non-Environmental ConsiderationsAs well as environmental considerations, there are a considerable number of non-environmental issues to be addressed and considered as part of the development of an optimal solution for this overall scheme. These issues include:

    a) Road width constraints on Strand Road along with significant traffic flows;

    b) The need to provide safer facilities for vulnerable road users pedestrians and cyclists along these routes;

    c) Safety issues at Merrion Gates, which has a record of numerous safety incidents, often adversely affecting DART services;

    d) The impact of higher DART frequencies on road closures at Merrion Gates junction;

    e) The need to improve bus movement along Rock Road and Merrion Road; and

    f) Impacts on parking provision on both Strand Road and Merrion Road.

    These considerations, together with other relevant factors, have to be considered in determining the appropriate solution for these corridors.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document10

    03: OPTIONS CONSIDERED

    3.1 Types of Options

    In seeking to develop the optimal proposal, it was important that all viable alternatives were examined and assessed. The types of options that were considered along the coastal corridor were:

    1: Road layout revisions within the existing road corridors;

    2: Road layout revisions with widening of the road into adjacent properties;

    3: Construction of sections of boardwalk along the seafront;

    4: Construction of sections of infill along the seafront to create the walkway/cycleway;

    5: Closures of part of Strand Road;

    6: The introduction of one-way traffic flows; and

    7: Separation of cycleway and walkway in constrained areas.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 11

    PROPOSED BOARDWALK

    TWO WAYCYCLE TRACK

    BUFFERTRAFFIC LANE

    KERB

    EXISTING SEA WALL

    STRAND

    STRAND

    EXISTING SEA WALL

    FOOTPATHTRAFFIC LANE TWO WAYCYCLE TRACK

    FOOTPATH TRAFFIC LANE

    GARDENS

    EXISTING BOUNDARY WALL

    STRAND

    EXISTING SEA WALL

    FOOTPATHTRAFFIC LANE TWO WAYCYCLE TRACKFOOTPATH

    TRAFFIC LANE

    EXISTING BOUNDARY WALL

    NEW BOUNDARY WALL

    PROPERTY ACQUISITION

    PROPOSED BOARDWALK

    TWO WAYCYCLE TRACK

    BUFFERTRAFFIC LANE

    KERB

    EXISTING SEA WALL

    STRAND

    PIER

    In relation to the Rock Road / Merrion Road corridor, the alternatives considered included different combinations of bus and cycling facilities as well as traffic lane layouts. Generic examples of some of these solution types are shown below.

    Road layout within existing road corridor

    Road layout with widening of the road

    Boardwalk Cantilevered Type

    Boardwalk Pier Supports

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document12

    Infill Promenade Boardwalk on Piers Adjacent to Railway Line

    Promenade constructed on Rock Infill Adjacent to Railway Line

    STRANDORIGINAL BEACH LEVEL

    EXISTING SEA WALL SLOPE FROM PROMENADETO BEACH COVERED WITHROCK ARMOUR(LARGE ROCKS)AS WAVE PROTECTION

    FOOTPATHTWO WAYCYCLE TRACK

    EXISTINGFOOTPATH

    EXISTING ROAD

    PROMENADE AND CYCLEWAY

    INFILLED SECTION

    PROPOSED BOARDWALK

    SEA WALL

    STRANDRAILWAY

    PROPOSED PROMENADE AND CYCLEWAY

    SEA WALL

    RAILWAY

    INFILL

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 13

    3.2 East Coast Trail (S2S)To develop design options each of the two corridors was separately assessed. This section considers the corridor for the East Coast Trail (S2S).

    To assist the process of developing potential design solutions, this overall corridor was divided into six sections as set out in the map below.

    Irishtown toSandymount Strand

    SandymountPromenade

    Sandymount Strand

    Merrion Gates toBooterstown

    Booterstownto Blackrock

    Blackrock toSeapoint

    UCDBelfield

    St StephensGreen

    RDS

    RTE

    Pearse

    GrandCanal Dock

    Landsdowne Rd

    Sandymount

    SydneyParade

    Booterstown

    Blackrock

    Seapoint

    Salthill &Monkstown

    Dn Laoghaire

    Sandycove& Glasthule

    Glenagery

    Rock Road

    Temple Road

    RockRoad

    Merrion Road

    Strand Road

    Monkstown Road

    Harbour Road

    Beach Road

    Strand Rd

    Sandymount Rd

    N31

    N31

    Park Avenue

    Seapoint Avenue

    Boot

    erst

    own

    Aven

    ue

    GALLOPING GREEN

    RATHMINESBALLSBRIDGE

    IRISHTOWN

    BOOTERSTOWN

    STILLORGAN

    MILLTOWN

    SANDYMOUNT

    MONKSTOWN

    RINGSEND

    WINDY ARBOUR

    RATHGAR

    CHURCHTOWN

    PORTOBELLO

    DONNYBROOK

    RANELAGH

    GOATSTOWN

    CLONSKEAGH

    MOUNT MERRION

    MERRION

    DUNDRUM

    BLACKROCK

    DN LAOGHAIRE

    EAST COAST TRAIL

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document14

    Within each section, a careful examination was undertaken to establish the main feasible alternatives which could deliver the objectives of the project for that particular section. In many cases it was clear that there would be significant issues associated with particular options under consideration. However, for the completeness of the process, it was important that these options were also identified and brought forward for evaluation.

    The main options examined in each section are set out below.

    Section 1 Irishtown to Sandymount Strand:

    Five options were considered in detail. These are:

    a) Revised road layout with some property acquisition;

    b) Revised road layout with section of pedestrian boardwalk;

    c) Pedestrian boardwalk for full length;

    d) Widening of road corridor into Strand by infilling; and

    e) One-way traffic system on Strand Road to provide space for cycleway.

    Section 2 Sandymount Promenade:

    Three options were considered in detail. These are:

    a) Cycleway adjoining existing promenade;

    b) Conversion of east footpath to cycleway; and

    c) One-way traffic system on Strand Road to provide space for cycleway.

    Section 3 Merrion Strand:

    Five options were considered in detail. These are:

    a) Walkway and cycleway by infilling onto Strand;

    b) Boardwalk accommodating cycleway and walkway along edge of Strand;

    c) Widening of Strand Road by property acquisition to accommodate cycleway;

    d) One-way traffic system on Strand Road to provide space for cycleway; and

    e) Closure of Merrion Gates and construction of new link Merrion Bypass.

    Section 4 Merrion Gates to Booterstown:

    Five options were considered in detail. These are:

    a) Coastal walkway and cycleway by infilling on seaward side of railway;

    b) Boardwalk accommodating cycleway and walkway on seaward side of railway;

    c) Boardwalk accommodating cycleway and walkway on inland side of railway;

    d) Cycleway and walkway along Rock Road; and

    e) Cycleway on Rock Road with coastal footpath.

    Section 5 Booterstown to Blackrock:

    Four options were considered in detail. These are:

    a) Coastal walkway and cycleway by infilling adjacent to railway line;

    b) Boardwalk accommodating cycleway and walkway on seaward side of railway;

    c) Inland boardwalk alongside railway line;

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 15

    d) Cycleway and walkway through Blackrock Park; and

    e) Cycleway through Blackrock Park with coastal footpath.

    Section 6 Blackrock to Seapoint:

    Five options were considered in detail. These are:

    a) Coastal walkway and cycleway Variant 1;

    b) Coastal walkway and cycleway Variant 2;

    c) One-way traffic system on Seapoint Avenue to provide space for two-way cycleway;

    d) One-way traffic system on Seapoint Avenue to provide space for two-way cycleway plus a coastal footpath route; and

    e) Widening of Seapoint Avenue to provide space for two-way cycleway plus a coastal footpath route.

    3.3 Rock Road / Merrion Road CorridorThe objective for the Rock Road / Merrion Road corridor is to provide enhanced bus and cycling provision in addition to catering for traffic and pedestrian movements.

    Six options were developed and assessed in detail. These options are:

    i Option 1: Retain existing road width and overall lane layout;

    i Option 2: Provide segregated cycle lanes along with inbound bus priority;

    i Option 3: Provide segregated cycle lanes with bus priority in both directions;

    i Option 4: Provide segregated cycle lanes along with inbound bus priority and raised carriageway connections at side roads;

    i Option 5: Provide higher quality segregated cycle lanes and bus priority through additional land acquisition; and

    i Option 6: Provide segregated cycle lanes with bus priority in both directions plus accommodate the two-way cycle track of the East Coast Trail between Merrion Gates and Booterstown Park.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document16

    04: METHODOLOGY AND APPRAISAL

    A process was undertaken to identify the option considered to be the best option for implementation. This involves a process of balancing various factors to determine which alternative, on balance, is the optimum solution to take forward.

    A standardised process is used in transport assessment projects in Ireland, which considers relevant factors under five categories, which are:

    i) Economy;

    ii) Safety;

    iii) Environment;

    iv) Accessibility and Social Inclusion; and

    v) Integration.

    Under those five main categories a number of sub-criteria were identified against which various options were assessed. These included:

    i Under Economy, costs and the transport quality of service were considered;

    i Under Safety, pedestrian and cyclist safety were taken into account in addition to the road / rail safety issues at Merrion Gates;

    i Under Environment, the various environmental impacts were carefully assessed including designation impacts; and

    i Under integration, factors such as cycle network integration and displacement from a full coastal route for the East Coast Trail were considered.

    In relation to the standard assessment category of Accessibility and Social Inclusion, there was no material differentiation between the options.

    The application of the above evaluation process to the various scheme options has identified a proposed scheme which is considered likely to be, subject to a public consultation process, the optimum scheme the Emerging Preferred Scheme. The details of this Emerging Preferred Scheme are set out in the next section.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 17

    05: EMERGING PREFERRED SCHEME EAST COAST TRAIL

    5.1 Description

    Having undertaken a comprehensive assessment of the various options, the scheme that has been identified, for the purposes of a public consultation process, as the Emerging Preferred Scheme for the East Coast Trail section of the project is set out in indicative form on the following two pages.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document18

    UCDBelfield

    St StephensGreen

    RDS

    RTE

    Pearse

    GrandCanal Dock

    Landsdowne Rd

    Sandymount

    SydneyParade

    Booterstown

    Blackrock

    Seapoint

    Salthill &Monkstown

    Dn Laoghaire

    Sandycove& Glasthule

    Glenagery

    Rock Road

    Temple Road

    RockRoad

    Merrion Road

    Strand Road

    Monkstown Road

    Harbour Road

    Beach Road

    Strand Rd

    Sandymount Rd

    N31

    N31

    Park Avenue

    Seapoint Avenue

    Boot

    erst

    own

    Aven

    ue

    Cycle trackthrough park

    Cycleway andPedestrian Subwayunder railway

    New roadlink

    GALLOPING GREEN

    RATHMINESBALLSBRIDGE

    IRISHTOWN

    BOOTERSTOWN

    STILLORGAN

    MILLTOWN

    SANDYMOUNT

    MONKSTOWN

    RINGSEND

    WINDY ARBOUR

    RATHGAR

    CHURCHTOWN

    PORTOBELLO

    DONNYBROOK

    RANELAGH

    GOATSTOWN

    CLONSKEAGH

    MOUNT MERRION

    MERRION

    DUNDRUM

    BLACKROCK

    DN LAOGHAIRE

    SEA / BEACH

    FOOTPATHTRAFFIC LANE TWO WAYCYCLE TRACK

    FOOTPATH TRAFFIC LANE BUFFER

    FOOTPATHFOOTPATH SHARED SURFACE

    PROPOSEDBOARDWALK

    FOOTPATH PARKING TWO WAYCYCLE TRACK

    BUFFER

    SEA / BEACH

    TRAFFIC LANE TRAFFIC LANE

    PARK TWO WAYCYCLE TRACK

    BUFFER PROMENADE

    SEA / BEACH

    Coastal Route: Irishtown to Merrion Gates Indicative Layout

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 19

    UCDBelfield

    St StephensGreen

    RDS

    RTE

    Pearse

    GrandCanal Dock

    Landsdowne Rd

    Sandymount

    SydneyParade

    Booterstown

    Blackrock

    Seapoint

    Salthill &Monkstown

    Dn Laoghaire

    Sandycove& Glasthule

    Glenagery

    Rock Road

    Temple Road

    RockRoad

    Merrion Road

    Strand Road

    Monkstown Road

    Harbour Road

    Beach Road

    Strand Rd

    Sandymount Rd

    N31

    N31

    Park Avenue

    Seapoint Avenue

    Boot

    erst

    own

    Aven

    ue

    GALLOPING GREEN

    RATHMINESBALLSBRIDGE

    IRISHTOWN

    BOOTERSTOWN

    STILLORGAN

    MILLTOWN

    SANDYMOUNT

    MONKSTOWN

    RINGSEND

    WINDY ARBOUR

    RATHGAR

    CHURCHTOWN

    PORTOBELLO

    DONNYBROOK

    RANELAGH

    GOATSTOWN

    CLONSKEAGH

    MOUNT MERRION

    MERRION

    DUNDRUM

    BLACKROCK

    DN LAOGHAIRE

    Coastal Route: Merrion Gates to Seapoint Indicative Layout

    FOOTPATH FOOTPATHBUS LANE BUS LANECARRIAGEWAY CARRIAGEWAYTWO-WAY

    CYCLE TRACKCYCLETRACK

    FOOTPATH SINGLE TRAFFICLANE

    TWO-WAYCYCLE TRACK

    FOOTPATHBUFFERGREENWAY

    THROUGH PARK

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document20

    5.2 Commentary on Emerging Preferred OptionSome significant features of this emerging preferred route for the East Coast Trail include:

    i The construction of a boardwalk for pedestrians along approximately 250 metres of Strand Road between its junction with Newgrove Avenue and its junction with Gilford Avenue;

    i The provision of a new road link between Strand Road and Merrion Road north of the existing Merrion Gates junction which would cross over the railway line and would be unaffected by train movements;

    i The closure of the Merrion Gates level crossing and the conversion of the south end of Strand Road into a cul-de-sac;

    i The provision of an underpass for pedestrians and cyclists under the railway line at Merrion Gates;

    i The creation of a section of coastal walking route between Blackrock and Seapoint on the seaward side of the railway line; and

    i The provision of safe two-way cycling facilities on Seapoint Avenue through the introduction of a one-way traffic system along this road.

    At certain locations along the corridor, some land and property acquisition would be required in order to deliver the required road layout. In addition, existing on-street parking in certain areas would have to be removed because of space constraints.

    5.3 Environmental ConsiderationsThe identification of this option as the preferred option takes into account the environmental constraints associated with the South Dublin Bay Special Area of Conservation plus the South Dublin Bay and Tolka River Estuary Special Protection Area.

    Several of the options involved direct intrusion into these designated areas. As identified earlier, recent European case law has clarified the position regarding development in Special Areas of Conservation. Those judgements have clarified that the loss of even part of a protected site precludes a development from being authorised except in very special, and very limited, cases.

    Several of the options identified, particularly for the sections extending from the southern end of Strand Road to Blackrock, involve some level of intrusion into the South Dublin Bay Special Area of Conservation. This is particularly the case for the infill proposals to create a cycleway and walkway, but also applies in the case of other proposals such as the boardwalk adjoining the railway line incorporating a cycleway and walkway. The environmental impacts of these proposals, taken together with the recent European Court of Justice decisions, has meant that these proposals have not been recommended for inclusion in the emerging preferred option.

    Existing Strand Road at Merrion Gates Proposed Strand Road at Merrion Gates

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 21

    Instead, the section from Merrion Gates to Booterstown proposes to utilise a short section of inland route, along Merrion Road and Rock Road, before entering Blackrock Park at the southern end. This provides full route continuity while avoiding intrusion into the specially designated areas. Careful design of this section of the route will ensure that the high amenity value of the corridor will be maintained.

    5.4 Merrion BypassOne of the key features of this proposal is the provision of the Merrion Bypass. This is a short road link connecting the southern end of Strand Road to Merrion Road north of the existing Merrion Gates junction. It would pass through the grounds of Merrion Hall off Strand Road and the car park area of Our Lady Queen of Peace Church on Merrion Road.

    By incorporating a bridge over the DART railway line, the proposal would provide a road line that would be unaffected by train movements and would be available on a continuous basis. Aside from the transport connectivity benefits that this brings, it would allow the closure of the Merrion Gates level crossing, removing a major source of traffic delay and resolving existing safety risks at this location.

    One of the key features of this proposal is the provision of the Merrion Bypass. This is a short road link connecting the southern end of Strand Road to Merrion Road north of the existing Merrion Gates junction.

    Existing Strand Road at Merrion Hall Proposed Strand Road at Merrion Hall

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document22

    06: EMERGING PREFERRED SCHEME ROCK ROAD / MERRION ROAD

    6.1 Description

    Having undertaken a comprehensive assessment of the various options, the scheme that has been identified, for the purposes of a public consultation process, as the Emerging Preferred Scheme for the Rock Road/Merrion Road section of the project, is set out in indicative form on the following page.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 23

    UCDBelfield

    St StephensGreen

    RDS

    RTE

    Pearse

    GrandCanal Dock

    Landsdowne Rd

    Sandymount

    SydneyParade

    Booterstown

    Blackrock

    Seapoint

    Salthill &Monkstown

    Dn Laoghaire

    Sandycove& Glasthule

    Glenagery

    Temple Road

    Merrion Road

    Monkstown Road

    Harbour Road

    Beach RoadSandymount Rd

    N31

    N31

    Park Avenue

    Seapoint Avenue

    Boot

    erst

    own

    Aven

    ue

    GALLOPING GREEN

    DUNDRUM

    BLACKROCK

    DN LAOGHAIRE

    RATHMINESBALLSBRIDGE

    IRISHTOWN

    BOOTERSTOWN

    STILLORGAN

    MILLTOWN

    SANDYMOUNT

    MONKSTOWN

    RINGSEND

    WINDY ARBOUR

    RATHGAR

    CHURCHTOWN

    PORTOBELLO

    DONNYBROOK

    RANELAGH

    GOATSTOWN

    CLONSKEAGH

    MOUNT MERRION

    MERRION

    Cycletrackthrough park

    New roadlink

    Emerging Preferred Scheme Rock Road / Merrion Road Indicative Layout

    FOOTPATH FOOTPATHBUS LANE BUS LANECARRIAGEWAY CARRIAGEWAYCYCLETRACK

    CYCLETRACK

    FOOTPATH FOOTPATHBUS LANE BUS LANECARRIAGEWAY CARRIAGEWAYTWO-WAY

    CYCLE TRACKCYCLETRACK

    FOOTPATH FOOTPATHBUS LANECARRIAGEWAY CARRIAGEWAYCYCLETRACK

    CYCLETRACK

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document24

    6.2 Commentary on Emerging Preferred OptionSome significant features of this emerging preferred option for the Merrion Road / Rock Road:

    i It provides continuous cycle facilities along this corridor, either fully segregated from vehicular traffic or on a dedicated cycle lane on the road carriageway;

    i It provides largely continuous bus lanes along this important bus corridor; and

    i The Merrion Gates junction is removed and a new road link is provided a short distance further north which bridges over the railway line and removes all interactions between road and rail movements.

    At certain locations along the corridor, some land and property acquisition would be required in order to deliver the required road layout. In addition, existing on-street parking in certain areas would have to be removed because of space constraints. Several mature trees plus other vegetation would also require removal to enable the necessary road widening to be provided. Where feasible, replacement planting would be provided as part of the development of the scheme.

    Proposed layout at Merrion Gates Proposed Merrion Bypass road link through church car park

    Existing layout at Merrion Gates Existing church car park

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 25

    07: BENEFITS AND COSTS

    7.1 BenefitsThe implementation of the proposed project would deliver the following benefits:

    ii It would provide a high quality continuous pedestrian and cycle route extending from Irishtown to Seapoint, achieving the elements of the long-held objective to provide an recreational promenade and cycleway from Sutton on the north side of Dublin to Sandycove on the south side;

    ii It would resolve a major safety risk through the closure of the Merrion Gates level crossing, removing the road and rail conflicts and eliminating a problematic road junction;

    ii Through the provision of the new road link connecting Strand Road and Merrion Road and the closure of the Merrion Gates level crossing, it would address the traffic delay issues arising from increasing train frequencies and longer road closure periods at Merrion Gates junction;

    ii It would deliver safe segregated cycle facilities along the busy Rock Road / Merrion Road;

    ii It would provide fast and reliable bus movement in both directions along the sections of Rock Road and Merrion Road within the scheme ambit; and

    ii It would deliver a fully renewed road corridor along Merrion Road / Rock Road, with new road surfacing, lane markings, footpaths, pedestrian crossings and signage, benefiting all road users including car traffic.

    7.2 CostsThe estimated cost of the coastal scheme, inclusive of the new road link bypassing Merrion Gates, is in the range 22 million to 26 million.

    The estimated cost of the Rock Road / Merrion Road scheme is in the range 18 million to 22 million.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document26

    08: POSSIBLE IMPLEMENTATION

    If following the public consultation process, it is determined that the scheme should proceed to implementation, either in the form presented in this Public Consultation Document or in an amended form, the National Transport Authority would work in collaboration with Dublin City Council and Dun Laoghaire County Council to secure its implementation.

    While certain projects can be approved for development by the elected members of local authorities, given the scale and level of impacts of this proposed scheme it is likely that an Environmental Impact Statement would be required to be prepared for the project and that development consent would be required to be obtained from An Bord Pleanla.

    Prior to the submission of an application for development consent to An Bord Pleanla, additional design and planning work would be undertaken, encompassing mapping surveys, environmental studies, various ground and other investigations plus further design development.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 27

    09: PUBLIC CONSULTATION

    The National Transport Authority invites submissions in relation to the proposals set out in this Public Consultation Document.

    Written submissions and observations may be made by:

    On-line: Through the on-line form in the Public Consultations section of our website at www.nationaltransport.ie

    Or by Email to: [email protected]

    Or by post to: East Coast Consultation, National Transport Authority, Dn Scine, Iveagh Court, Harcourt Lane, Dublin 2, D02 WT20.

    The closing date for receipt of submissions and observations is set out in the Public Consultations section of our website.

    All submissions must include the full name and address of the person making the submission and where relevant the name of the body or organisation represented. Please note that submissions are subject to Freedom of Information Act. Submissions may be published in full on the website of the National Transport Authority.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document28

    UCDBelf

    ield

    St Steph

    ens

    Green

    Connoll

    y Station

    Busras

    Bus Sta

    tion

    RDS

    RTE

    Docklan

    ds

    Tara S

    treet

    PearseGrandCanal Dock

    Landsdowne Rd

    Sandymount

    SydneyParade

    Booterstown

    BlackrockSeapoint

    Salthill &Monkstown

    Dn Lao

    ghaire

    Sandyc

    ove

    & Glast

    hule

    Rock RoadTemple Road

    Merrion Road

    Merrion Road

    Monkstown R

    oad

    Harbour Road

    Beach RoadStrand Rd

    Boot

    erst

    own

    Ave

    N31

    RATHM

    INES

    DEANS G

    RANGE

    BALLSBRIDGE

    IRISHTOWN

    BOOTERSTOWN

    STILLOR

    GAN

    LEOPAR

    DSTOW

    N

    MILLTO

    WN

    SANDYMOUNT

    CABINTE

    ELY

    MONKSTOWN

    RINGSEND

    WINDY A

    RBOUR

    RATHGA

    R

    CORNEL

    SCOURT

    CHURCH

    TOWN

    EAST W

    ALL

    PORTOB

    ELLO

    DOCKLA

    NDS

    DONNYBROOKRAN

    ELAGH

    HAROLD

    'S CROS

    S

    GOATST

    OWN

    SALLYN

    OGGIN

    FAIRVIEW

    CLONSK

    EAGH

    TERENU

    RE

    MOUNT

    MERRIO

    N

    DUNDRU

    M

    BLACKROCK

    DN LAO

    GHAIRE

    12

    3

    4

    5

    6

    7

    8

    1011 12

    139

    1415

    16

    1721 22

    19

    2324

    252827

    2620

    18

    APPENDIX

    NOTE: The Emerging Preferred Route shown on the following drawings is indicative only and is subject to change following consultation and as part of the design development process.

    MAP KEY

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 29

    2170FOOTPATH

    3520TRAFFIC LANE

    SEAN MOOREPARK FENCE

    4500TRAFFIC LANE

    3170FOOTPATH

    VARIESSEAN MOORE PARK

    3200FOOTPATH

    3.5mCYCLE TRACK

    1.5mVERGE

    /BUFFERTYPICAL PROPOSED SECTION SEAN MOORRE PARKSCALE 1:100

    ch 0+100

    ch 0+200

    ch 0+300

    ch 0+000 SEAN

    MO

    OR

    E R

    OAD

    SEAN

    MOO

    RE RO

    AD

    BEACH ROAD

    CHUR

    CH AV

    ENUE

    LEAH

    Y'S

    TERR

    ACE

    BATH STREET

    PEMBROKE STREET

    CR

    ANFI

    ELD

    PLA

    CE

    BEAC

    H A

    VEN

    UE

    SEAN MOOREPARK PROPOSED TWO WAY

    CYCLE TRACK

    APPROXIMATE LINEOF OLD SEA WALL

    BEACH ROAD

    (DRG. NO.162)

    (DRG. NO.162)

    (DRG. NO.161)

    (DRG. NO.161)

    2170FOOTPATH

    3520TRAFFIC LANE

    TYPICAL EXISTING SECTION SEAN MOORRE PARKSCALE 1:100

    SEAN MOOREPARK FENCE

    4500TRAFFIC LANE

    3170FOOTPATH

    VARIESSEAN MOORE PARK

    3200FOOTPATH

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    161 162163

    164211

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 1 161-164.dwg Sep 05, 2016 - 10:03am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTION SECTION 1 - IRISHTOWN TO SANDYMOUNT PROMENADE

    SHEET 1.1

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 161

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    EMERGING PREFERRED ROUTE OPTIONSECTION 1 IRISHTOWN TO SANDYMOUNT PROMENADE

    MAP 1

  • 30

    ch 0+300

    ch 0+400

    ch 0+500

    ch 0+600

    BEAC

    H A

    VEN

    UE

    BEAC

    H D

    RIV

    E

    SEAN MOOREPARK

    SAN

    DYM

    OU

    NT

    CO

    UR

    T

    MARI

    NE D

    RIVE

    BEACH ROAD

    PROPOSEDPARKING BAY

    BEACH ROAD

    PROPOSED TWO WAYCYCLE TRACK

    (DRG. NO.162)

    (DRG. NO.162)

    (DRG. NO.161)

    (DRG. NO.161)

    2170FOOTPATH

    3520TRAFFIC LANE

    TYPICAL EXISTING SECTION SEAN MOORRE PARKSCALE 1:100

    SEAN MOOREPARK FENCE

    4500TRAFFIC LANE

    3170FOOTPATH

    VARIESSEAN MOORE PARK

    3200FOOTPATH

    2170FOOTPATH

    3520TRAFFIC LANE

    SEAN MOOREPARK FENCE

    4500TRAFFIC LANE

    3170FOOTPATH

    VARIESSEAN MOORE PARK

    3200FOOTPATH

    3.5mCYCLE TRACK

    1.5mVERGE

    /BUFFERTYPICAL PROPOSED SECTION SEAN MOORRE PARKSCALE 1:100

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    161 162163

    164211

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 1 161-164.dwg Sep 05, 2016 - 10:02am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTION SECTION 1 - IRISHTOWN TO SANDYMOUNT PROMENADE

    SHEET 1.2

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 162

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    (DRG.NO.162)

    (DRG. NO.161)

    (DRG. NO.161)

    (DRG. NO.162)

    EMERGING PREFERRED ROUTE OPTIONSECTION 1 IRISHTOWN TO SANDYMOUNT PROMENADE

    MAP 2

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 31

    3.635

    4.571

    3.546

    TYPICAL SECTION - SECTION 1 ch 0+622 - ch 1+300SCALE 1:100

    2000FOOTPATH

    3000TRAFFIC LANE

    3000TRAFFIC LANE

    500BUFFER

    3500TWO WAY

    CYCLE TRACK

    2500FOOTPATH

    SEA / BEACH

    EXISTING BOUNDARIES TO BE SET BACKEXISTING

    CENTRE LINE EXISTING KERB

    MHWS 1.59

    200 YEARTIDE 3.25m

    HAT 1.991.711

    2000FOOTPATH

    2000PARKING

    3000TRAFFIC LANE

    3000TWO WAY

    CYCLE TRACK

    VARIESSEA / BEACH

    3.635 3.546

    3000TRAFFIC LANE

    500BUFFER

    4000PROPOSED

    BOARDWALK

    EXISTING KERB

    EXISTINGCENTRE LINE

    EXISTING BOUNDARIES TO BE CUT BACK

    TYPICAL PROPOSED SECTION - SECTION 1 ch 0+622 - ch 1+300SCALE 1:100

    2.5%CROSSFALL

    MHWS 1.59

    200 YEAR TIDE 3.25m

    HAT 1.99

    1.2801.711

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    161 162163

    164211

    POSSIBLE LAND A

    CQUISITION

    POSSIBLE LAND A

    CQUISITION

    ch 0+700

    ch 0+800

    ch 0+900

    ch 1+000SANDYMOUNTSTRAND

    SEAF

    OR

    T AV

    ENU

    E

    NEW

    GR

    OVE AVEN

    UE

    BEACH ROAD

    STRAND ROAD

    ROSLYN PARK (REHAB)COLLEGE

    PROPOSEDPARKING BAY

    TWO WAYCYCLE TRACK

    EXISTINGSEA WALL

    FOOTPATH & CYCLE TRACKINSIDE OF SEA WALL

    PEDESTRIAN BOARDWALKOUTSIDE & CYCLE TRACKINSIDE OF SEA WALL

    FOOTPATH INSIDEOF SEA WALL

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 1 161-164.dwg Sep 05, 2016 - 10:05am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTION SECTION 1 - IRISHTOWN TO SANDYMOUNT PROMENADE

    SHEET 1.3

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 163

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    (DRG. NO.16

    2)

    (DRG. NO.163

    )

    (DRG. NO.163)

    (DRG. NO.162)

    (DRG.NO.164)

    (DRG.NO.164)

    (DRG. NO.162)

    PEDESTRIAN BOARDWALKOUTSIDE OF SEA WALL

    EMERGING PREFERRED ROUTE OPTIONSECTION 1 IRISHTOWN TO SANDYMOUNT PROMENADE

    MAP 3

  • 32

    ch 1+000

    ch 1+100 ch 1+200

    ch 1+300

    SANDYMOUNTPROMENADE

    SECTION 1(DRG. NO.164)

    SECTION 2(DRG. NO.211)

    SECTION 2(DRG. NO.211)

    LEA

    RO

    AD

    STRAND ROAD

    STRAND ROAD

    EXISTINGSEA WALL TWO WAY

    CYCLE TRACK

    SECTION 1(DRG. NO.164)

    END OF PEDESTRIANBOARDWALK & START OF

    SANDYMOUNT PROMENADE

    GIL

    FOR

    D A

    VEN

    UE

    3.635

    4.571

    3.546

    TYPICAL SECTION - SECTION 1 ch 0+622 - ch 1+300SCALE 1:100

    2000FOOTPATH

    3000TRAFFIC LANE

    3000TRAFFIC LANE

    500BUFFER

    3500TWO WAY

    CYCLE TRACK

    2500FOOTPATH

    SEA / BEACH

    EXISTING BOUNDARIES TO BE SET BACKEXISTING

    CENTRE LINE EXISTING KERB

    MHWS 1.59

    200 YEARTIDE 3.25m

    HAT 1.991.711

    2000FOOTPATH

    2000PARKING

    3000TRAFFIC LANE

    3000TWO WAY

    CYCLE TRACK

    VARIESSEA / BEACH

    3.635 3.546

    3000TRAFFIC LANE

    500BUFFER

    4000PROPOSED

    BOARDWALK

    EXISTING KERB

    EXISTINGCENTRE LINE

    EXISTING BOUNDARIES TO BE CUT BACK

    TYPICAL PROPOSED SECTION - SECTION 1 ch 0+622 - ch 1+300SCALE 1:100

    2.5%CROSSFALL

    MHWS 1.59

    200 YEAR TIDE 3.25m

    HAT 1.99

    1.2801.711

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    161 162163

    164211

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 1 161-164.dwg Sep 05, 2016 - 10:09am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTION SECTION 1 - IRISHTOWN TO SANDYMOUNT PROMENADE

    SHEET 1.4

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 164

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    (DRG.NO.163)

    (DRG. NO.164)

    (DRG. NO.164)

    (DRG.NO.163)

    EMERGING PREFERRED ROUTE OPTIONSECTION 1 IRISHTOWN TO SANDYMOUNT PROMENADE

    MAP 4

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 33

    4540TRAFFIC LANE

    4450TRAFFIC LANE

    3040FOOTPATH

    3.501 3.442

    4.0593.528 3.321 3.1773.210

    3.489

    1.838

    11344PARK

    3696PROMENADE

    SEA/BEACH

    SEASIDEWALL

    2380FOOTPATH

    3500TWO WAY

    CYCLE TRACK

    1500BUFFER

    TYPICAL PROPOSED SECTION - SECTION 2 SANDYMOUNT PROMENADESCALE 1:100

    MHWS 1.59

    200 YEARTIDE 3.25m

    1.269

    HAT 1.99

    4540TRAFFIC LANE

    TYPICAL EXISTING SECTION - SECTION 2 SANDYMOUNT PROMENADESCALE 1:100

    4450TRAFFIC LANE

    3040FOOTPATH

    3.501 3.442

    4.0593.528 3.321 3.1773.210

    3.489

    1.838

    16350PARK

    3690PROMENADE

    SEA/BEACH

    SEASIDEWALL

    2380FOOTPATH

    MHWS 1.59

    200 YEARTIDE 3.25m

    HAT 1.99

    1.269

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    164211

    212

    213

    371

    EXISTINGACCESS STEPS

    EXISTINGACCESS STEPS

    ACCESS RAMP FORBEECH MAINTENANCE

    SECTION 1(DRG. NO.164)

    SECTION 2(DRG. NO.211)

    SECTION 1(DRG. NO.164)

    EXISTING PROMENADEFOOTPATH

    PROPOSED TWOWAY CYCLE TRACK

    ch 1+300

    ch 1+400

    ch 1+500

    ch 1+700

    ch 1+600

    SECTION 2(DRG. NO.211)

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 2 211-213.dwg Sep 05, 2016 - 10:54am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTIONSECTION 2 - SANDYMOUNT PROMENADE

    SHEET 2.1

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 211

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    (DRG. NO.211) (DRG.NO.212)

    (DRG. NO.211)(DRG.NO.212)

    EMERGING PREFERRED ROUTE OPTIONSECTION 2 SANDYMOUNT PROMENADE

    MAP 5

  • 34

    EXISTING ACCESSSTEPS / RAMP

    EXISTING ACCESSSTEPS / RAMP

    75m

    ch 2+000

    ch 1+700 ch 1+800

    ch 1+900

    PROPOSED TWOWAY TRACK

    EXISTINGPROMENADE FOOTPATH

    PROPOSED CARPARK LAYOUT

    4540TRAFFIC LANE

    TYPICAL EXISTING SECTION - SECTION 2 SANDYMOUNT PROMENADESCALE 1:100

    4450TRAFFIC LANE

    3040FOOTPATH

    3.501 3.442

    4.0593.528 3.321 3.1773.210

    3.489

    1.838

    16350PARK

    3690PROMENADE

    SEA/BEACH

    SEASIDEWALL

    2380FOOTPATH

    MHWS 1.59

    200 YEARTIDE 3.25m

    HAT 1.99

    1.269

    4540TRAFFIC LANE

    4450TRAFFIC LANE

    3040FOOTPATH

    3.501 3.442

    4.0593.528 3.321 3.1773.210

    3.489

    1.838

    11344PARK

    3696PROMENADE

    SEA/BEACH

    SEASIDEWALL

    2380FOOTPATH

    3500TWO WAY

    CYCLE TRACK

    1500BUFFER

    TYPICAL PROPOSED SECTION - SECTION 2 SANDYMOUNT PROMENADESCALE 1:100

    MHWS 1.59

    200 YEARTIDE 3.25m

    1.269

    HAT 1.99

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    164211

    212

    213

    371

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 2 211-213.dwg Sep 05, 2016 - 10:56am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTIONSECTION 2 - SANDYMOUNT PROMENADE

    SHEET 2.2

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 212

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    (DRG. NO.212)(DRG. NO.213)

    (DRG. NO.212)

    (DRG. NO.212)

    (DRG.NO.211)

    (DRG. NO.212)

    EMERGING PREFERRED ROUTE OPTIONSECTION 2 SANDYMOUNT PROMENADE

    MAP 6

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 35

    EXISTINGACCESS STEPS

    SECTION 2(DRG. NO. 212)

    SECTION 3(DRG. NO. 371)

    EXISTINGACCESS RAMP

    ch 2+100

    ch 2+300ch 2+200

    ch 2+400EXISTINGPROMENADE FOOTPATH

    PROPOSEDTWO-WAYCYCLE TRACK

    PROPOSED CARPARK LAYOUT

    SECTION 2(DRG. NO. 212)

    SECTION 3(DRG. NO. 371)

    4540TRAFFIC LANE

    TYPICAL EXISTING SECTION - SECTION 2 SANDYMOUNT PROMENADESCALE 1:100

    4450TRAFFIC LANE

    3040FOOTPATH

    3.501 3.442

    4.0593.528 3.321 3.1773.210

    3.489

    1.838

    16350PARK

    3690PROMENADE

    SEA/BEACH

    SEASIDEWALL

    2380FOOTPATH

    MHWS 1.59

    200 YEARTIDE 3.25m

    HAT 1.99

    1.269

    4540TRAFFIC LANE

    4450TRAFFIC LANE

    3040FOOTPATH

    3.501 3.442

    4.0593.528 3.321 3.1773.210

    3.489

    1.838

    11344PARK

    3696PROMENADE

    SEA/BEACH

    SEASIDEWALL

    2380FOOTPATH

    3500TWO WAY

    CYCLE TRACK

    1500BUFFER

    TYPICAL PROPOSED SECTION - SECTION 2 SANDYMOUNT PROMENADESCALE 1:100

    MHWS 1.59

    200 YEARTIDE 3.25m

    1.269

    HAT 1.99

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    164211

    212

    213

    371

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 2 211-213.dwg Sep 05, 2016 - 10:58am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTIONSECTION 2 - SANDYMOUNT PROMENADE

    SHEET 2.3

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 213

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    (DRG. NO.213)(DRG.NO.212)

    (DRG. NO.213)

    EMERGING PREFERRED ROUTE OPTIONSECTION 2 SANDYMOUNT PROMENADE

    MAP 7

  • 36

    RAILW

    AY

    ch 2+500ch 2+400

    ch 2+600

    STRAND RO

    AD

    EXISTING SEA WALL

    PROPOSED TWO-WAYCYCLE TRACK

    SECTION 2(DRG. NO. 213)

    SECTION 2(DRG. NO. 213)

    SECTION 3(DRG. NO. 371)

    SECTION 3(DRG. NO. 371)

    MER

    RIO

    N RO

    AD

    CARPARK

    CARPARK

    PROPOSED NEWBRIDGE OVER RAILWAY

    PROPOSED TRAFFICBYPASS OF MERRION GATES

    PROPOSEDRETAINING WALLS

    PROPOSEDRETAINING WALLS

    POSSIBLE LAN

    D AC

    QU

    ISITION

    POSSIBLE LANDACQUISITION

    POSS

    IBLE

    LAN

    D AC

    QUIS

    ITIO

    N

    POSSIBLELAND

    ACQUISITION

    POSS

    IBLE

    LAN

    D AC

    QUI

    SITI

    ON

    TYPICAL PROPOSED SECTION - SECTION 3 MERRION STRANDSCALE 1:100

    7140SHARED SURFACE

    3532FOOTPATH

    4.139

    2925FOOTPATH

    3.952

    4000VERGE

    5.692

    PRIVATE PROPERTY

    3500TRAFFIC LANE

    3640TRAFFIC LANE

    3532FOOTPATH

    4.139

    2925FOOTPATH

    3.952

    4000VERGE

    5.692

    PRIVATE PROPERTY

    TYPICAL EXISTING SECTION - SECTION 3 MERRION STRANDSCALE 1:100

    ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    213

    371372

    551 552 553 554

    SECTION 4AECOM Job No:Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 3 371-373.dwg Sep 05, 2016 - 11:12am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTIONSECTION 3 - MERRION STRAND

    SHEET 3.1

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 371

    50m4030201050

    SCALE 1:250 @ A1 & 1:500 @ A3

    (DRG. NO.371)

    (DRG. NO.371)

    (DRG. NO.372)

    EMERGING PREFERRED ROUTE OPTIONSECTION 3 MERRION STRAND

    MAP 8

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 37

    PROPOSED SECTION 3 ch 2+706- SECTION 3 MERRION STRANDSCALE 1:100

    7030SHARED SURFACE

    2520FOOTPATH

    1900FOOTPATH

    4.608

    2.610 2.789 2.661

    RAILW

    AY

    MERR

    ION

    ROAD

    FLOOD RAMP WITHCONTROLLED ACCESS

    ch 2+500

    ch 2+600

    ch 2+700

    ch 2+800

    ch 2+900

    STRAND RO

    AD

    UPDERPASS FOR CYCLISTS &PEDESTRIANS POSSIBLE

    LOCATION No.2

    RAILW

    AY

    OLD S

    TATIO

    N

    HOUS

    E

    MERRION GATES LEVELCROSSING

    SECTION 3(DRG. No. 372)

    SECTION 3(DRG. No. 372)

    PROPOSED TRAFFICBYPASS OF MERRION GATES

    UPDERPASS FOR CYCLISTS &PEDESTRIANS POSSIBLE

    LOCATION No.1

    POSSIBLE LAN

    D AC

    QU

    ISITION

    POSSIBLE LANDACQUISITION

    POSS

    IBLE

    LAN

    D AC

    QUIS

    ITIO

    N

    POSSIBLELAND

    ACQUISITIONSECTION 4(AECOM DRAWINGS)

    3380TRAFFIC LANE

    3650TRAFFIC LANE

    2520FOOTPATH

    1900FOOTPATH

    4.608

    EXISTING SECTION ch 2+706- SECTION 3 MERRION STRANDSCALE 1:100

    2.610 2.789 2.661ONE WAY OFF ROAD CYCLE TRACK

    PROPOSED ISLAND / FOOTWAY/PROMENADE

    ON ROAD CYCLE LANE

    EXISTING TREE LOCATION

    EXISTING BOUNDARY

    BUS FACILITY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED OFF ROAD SURFACE &

    KEY:

    PROPOSED CARRIAGEWAY

    SHARED ON ROAD SURFACE

    PROPOSED CONNECTIONS

    POSSIBLE LAND ACQUISITION

    PROPOSED PARKING

    EXISTING SEA WALL

    PROPOSED CYCLE UNDERPASS

    213

    371372

    551 552 553 554

    SECTION 4AECOM Job No:Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\ROD Drawings\14225 Preferred Route Option ROD\14225 C3 Section 3 371-373.dwg Sep 05, 2016 - 11:13am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.comwww.rod.ie

    SANDYMOUNT & MERRION TO BLACKROCK CYCLE ROUTE CORRIDOR STUDY

    C3 - EMERGING PREFERRED ROUTE OPTIONSECTION 3 - MERRION STRAND

    SHEET 3.2

    JMK 14.225

    1:500 (A1) 1:1000 (A3) OCT '15SMG SMG SMG FEASIBILITY REPORT 372

    50m4030201050

    SCALE 1:250 @ A1 & 1:500 @ A3

    (DRG. NO.371)

    (DRG. NO.371

    )

    (DRG. NO.372)

    (DRG. NO.372)

    EMERGING PREFERRED ROUTE OPTIONSECTION 3 MERRION STRAND

    MAP 9

  • 38

    AILESBURY ROAD

    AILESBURY ROAD

    NOTE:MANY TREES WITHIN THE VERGE BETWEEN AILESBURYROAD AND MERRION GATES, WILL NEED TO BE REMOVED

    OUTBOUND SEGREGATEDCYCLE TRACK

    NO RIGHT TURN EXCEPT BUSES

    BUS LANES CONVERTED TO 24HOUR OPERATION

    POSSIBLE LAND ACQUISITION

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3ORDNANCE SURVEY IRELAND LICENCE NO AR0064215

    ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:43am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B SK_150.1 A

    EMERGING PREFERRED SCHEME SHEET 1 OF 11

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 10

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 39

    NUTLEY

    LANE

    NOTE:MANY TREES WITHIN THE VERGE BETWEEN AILESBURYROAD AND MERRION GATES, WILL NEED TO BE REMOVED

    OUTBOUND SEGREGATEDCYCLE TRACK

    ADVANCED STOP LINE

    TOUCAN CROSSING

    EXISTING PARKING REMOVED

    NO RIGHT TURN EXCEPT BUSES

    BUS LANES CONVERTED TO 24HOUR OPERATION

    POSSIBLE LAND ACQUISITION

    POSSIBLE LAND

    ACQUISITION

    A

    A

    B

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    PROPOSED SECTION A-AMERRION SHOPPING CENTRE MERRION ROAD

    1.8FOOTPATH

    3.05CARRIAGEWAY

    3BUS LANE

    19.7

    3BUS LANE

    1.5CYCLE LANE

    2FOOTPATH

    HA

    TCH

    ING

    0.873

    CARRIAGEWAY

    1.5CYCLE LANE

    EX

    ISTI

    NG

    BO

    UN

    DA

    RY

    ORDNANCE SURVEY IRELAND LICENCE NO AR0064215ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:44am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B SK_150.2 A

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    EMERGING PREFERRED SCHEME SHEET 2 OF 11

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 11

  • 40

    MERRION ROAD

    PROPOSED OVERBRIDGE

    GOWAN MOTORS

    ADVANCED STOP LINE

    TOUCAN CROSSING

    EXISTING PARKING REMOVED

    LEFT TURN SLIP LANE REMOVED TO IMPROVECYCLIST AND PEDESTRIAN SAFETY

    EXISTING OUTBOUNDBUS/TRAFFIC LANE REMOVED

    EXISTING BUS STOPS REMOVED

    POSSIBLE LAN

    D ACQUISITION

    POSSIBLE LANDACQUISITION

    POSSIBLE LAND ACQUISITION

    POSSIBLE LAND ACQUISITION

    B

    B

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    PROPOSED SECTION B-BMERRION COURT MERRION ROAD

    2FOOTPATH

    28.06

    3CARRIAGEWAY

    3BUS LANE

    1.5MEDIAN

    3CARRIAGEWAY

    3BUS LANE

    5.05FOOTPATH

    2.25CYCLE TRACK

    3CARRIAGEWAY

    2.25CYCLE TRACK

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3ORDNANCE SURVEY IRELAND LICENCE NO AR0064215

    ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:44am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B SK_150.3 A

    EMERGING PREFERRED SCHEME SHEET 3 OF 11

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 12

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 41STR

    AND

    RO

    AD

    PROPOSED SHARED RAMPED ACCESS TO UNDERPASS

    EXISTING BUILDINGS

    OFF PEAK PARKING REMOVED

    BARRIER TO BE PLACED ALONG CENTREMEDIAN TO PREVENT CROSSING MOVEMENTS

    EXISTING BUILDINGS

    PROPOSED TOUCAN CROSSING PROPOSED PARKING

    DART

    DART

    PROPOSED STAIRWAY ACCESS TO UNDERPASS

    PROPOSED STAIRWAYACCESS TO UNDERPASS

    PROPOSED UNDERPASS

    PROPOSED SHARED RAMPED ACCESS TO UNDERPASS

    POSSIBLE LAND ACQUISITION

    POSSIBLELAND

    ACQUISITION

    C

    C

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    PROPOSED SECTION C-CMERRION GATES MERRION ROAD

    1.86FOOTPATH

    19.17

    3BUS LANE

    2FOOTPATH

    3CARRIAGEWAY

    1.5CYCLE TRACK

    HA

    TCH

    ING

    CL

    1.5CYCLE TRACK

    3BUS LANE

    3CARRIAGEWAY

    EX

    ISTI

    NG

    BO

    UN

    DA

    RY

    ORDNANCE SURVEY IRELAND LICENCE NO AR0064215ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:45am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B A

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    EMERGING PREFERRED SCHEME SHEET 4 OF 11

    SK_150.4

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 13

  • 42

    MERRIO

    N ROAD

    PROPOSED TOUCAN CROSSING

    EXISTING BOUNDARY SETBACK TOPROVIDE IMPROVED CYCLE FACILITIES

    RIGHT TURN LANE REDUCED IN LENGTH

    EXISTING SLIP LANES REMOVED TO MAKE THE JUNCTION MOREPEDESTRIAN AND CYCLE FRIENDLY

    EXISTING BOUNDARY SET BACK TO PROVIDEIMPROVED CYCLE FACILITIES

    POSSIBLE LAND ACQ

    UISITION

    D

    D

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    PROPOSED SECTION D-DTEXACO SERVICE STATION MERRION ROAD

    2FOOTPATH

    27.2

    3CARRIAGEWAY

    3BUS LANE

    4.02MEDIAN

    3BUS LANE

    3.45FOOTPATH

    3CARRIAGEWAY

    2.25CYCLE TRACK

    3.5CYCLE TRACK

    ORDNANCE SURVEY IRELAND LICENCE NO AR0064215ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:45am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B A

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3

    EMERGING PREFERRED SCHEME SHEET 5 OF 11

    SK_150.5

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 14

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 43

    BELVIEW AVE

    NUE

    MERRIO

    N ROAD

    CONNECTION TO UCD

    EXISTING BOUNDARY SETBACK TOPROVIDE IMPROVED CYCLE FACILITIES

    DROPPED KERB TO ACCESS CYCLE LANE

    ADVANCED STOP LINE

    PROPOSED TOUCAN CROSSING

    PROPOSED CITYBOUND BUS LANE

    EXISTING BOUNDARY SET BACK TO PROVIDEIMPROVED CYCLE FACILITIES

    POSSIBLE LAND ACQ

    UISITION

    POSSIBLE LAND ACQ

    UISITION

    E

    E

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    2.25CYCLE TRACK

    PROPOSED SECTION E-ETARA TOWERS HOTEL MERRION ROAD

    2FOOTPATH

    21.75

    3CARRIAGEWAY

    CL

    3BUS LANE

    3CARRIAGEWAY

    3.5CYCLE TRACK

    3BUS LANE

    2FOOTPATH

    EX

    ISTI

    NG

    BO

    UN

    DA

    RY

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3ORDNANCE SURVEY IRELAND LICENCE NO AR0064215

    ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:46am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B A

    EMERGING PREFERRED SCHEME SHEET 6 OF 11

    SK_150.6

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 15

  • 44

    HELEN

    'S RO

    AD

    CONNECTION TO UCD

    TWO WAY CYCLE TRACK BETWEENBOOTERSTOWN AND MERRION GATES

    BUS LANES CONVERTED TO 24 HOUROPERATION

    ADVANCED STOP LINE

    PROPOSED TOUCAN CROSSING

    F

    F

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    PROPOSED SECTION F-FROSSMORE MERRION ROAD

    2.25CYCLE TRACK

    2FOOTPATH

    22.2

    3CARRIAGEWAY

    CL

    3BUS LANE

    3CARRIAGEWAY

    3.5CYCLE TRACK

    3BUS LANE

    2.45FOOTPATH

    EX

    ISTI

    NG

    BO

    UN

    DA

    RY

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3ORDNANCE SURVEY IRELAND LICENCE NO AR0064215

    ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:48am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B A

    PROPOSED LAYOUT - OPTION 3 SHEET 7 OF 11

    SK_150.7

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 16

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 45

    BOO

    TERSTO

    WN

    AVENU

    E

    BOOTERSTOWN

    DART STATION

    EXISTING TRAFFIC LANE CONVERTED TO 24 HOUR BUS LANE

    CITYBOUND SEGREGATED CYCLE TRACK

    BUS LANES CONVERTED TO 24 HOUROPERATION

    EXISTING PARKING

    EXISTING PARKING

    RIGHT TURN ONLYTRAFFIC SIGNAL

    CYCLE PARKING

    RIGHT TURN LANE BANNED

    G

    G

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    PROPOSED SECTION G-GBOOTERSTOWN COURT ROCK ROAD

    26.7

    3CARRIAGEWAY

    3CARRIAGEWAY

    0.85MEDIAN

    3CARRIAGEWAY

    2.15PARKING

    1.8FOOTPATH

    3CARRIAGEWAY

    3BUS LANE

    2CYCLE TRACK

    1.8FOOTPATH

    3.1CYCLE LANE

    EX

    ISTI

    NG

    BO

    UN

    DA

    RY

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3ORDNANCE SURVEY IRELAND LICENCE NO AR0064215

    ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:48am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS JS PART_B A

    EMERGING PREFERRED SCHEME SHEET 8 OF 11

    SK_150.8

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 17

  • 46

    BLACKROCKCOLLEGE

    SEGREGATED CYCLE FACILITIES

    PROPOSED CENTRAL ISLAND

    RIGHT TURN LANE BANNED

    OUTBOUND BUS LANEREDUCED IN LENGTH

    EXISTING PARKING

    OUTBOUND BUS LANE BETWEEN BOOTERSTOWN &BLACKROCK PARK REMOVED TO PROVIDE WIDER CYCLEFACILITIES

    SEGREGATED CYCLE FACILITIES

    POSSIBLE LAND ACQUISITION

    H

    H

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROAD CYCLE TRACK

    ON ROAD CYCLE LANE

    EXISTING BOUNDARY

    EXISTING TREE LOCATION

    BUS FACILITY

    GREENWAY

    TWO WAY OFF ROAD CYCLE TRACK

    SHARED SURFACE

    POSSIBLE LAND ACQUISITION

    PROPOSED SECTION H-HBLACKROCK COLLEGE ROCK ROAD

    4.1FOOTPATH

    3BUS LANE

    19.85

    2.25CYCLETRACK

    2.25FOOTPATH

    3CARRIAGEWAY

    CL

    3CARRIAGEWAY

    2.25CYCLETRACK

    50m4030201050

    SCALE 1:500 @ A1 & 1:1,000 @ A3ORDNANCE SURVEY IRELAND LICENCE NO AR0064215

    ORDNANCE SURVEY IRELAND / GOVERNMENT OF IRELANDc

    SANDYMOUNT TO BLACKROCKCORRIDOR STUDY

    Job No:

    Date:Status:

    Drawing No: Rev:

    Approved:

    Drawn:

    Project Title

    DateStage

    RevisionNo.

    PRELIMINARY

    CONSTRUCTION

    APPROVAL

    DateChk'dBy

    App'dApp'd

    Drawing Title

    Scale:Checked:Designed:

    TENDER

    DO NOT SCALE USE FIGURED DIMENSIONS ONLYDrawing Location: F:\Projects\Traffic - Sandymount-Blackrock Corridor\CAD\20-SHEETS\Proposed A1 Layouts\60336416_SK_150_A.dwg Sep 05, 2016 - 10:50am

    AECOM - Roughan & O'DonovanAlliance AECOM- Roughan & O'Donovan

    4th Floor Adelphi Plaza,George's Street Upper,

    Dun Laoghaire,Co DublinTel:+353 (0)1 2383100Fax:+353(0)1 2383199

    www.aecom.com

    1:500 @ A1 & 1:1,000 @ A3

    RH 60336416

    OCT_2015RH JS PART_B AJS

    EMERGING PREFERRED SCHEME SHEET 9 OF 11

    SK_150.9

    EMERGING PREFERRED ROUTE OPTIONSECTION 4 MERRION GATES TO BOOTERSTOWN

    MAP 18

    Provision of a continuous outbound bus lane will be reassessed at the next design stage.

  • Sandymount / Merrion to Blackrock Corridor StudyPublic Consultation Document 47

    INSET

    "A"

    INSET

    "A"

    EXISTING CAR PARK

    UNALTERED

    POSSIBLE LAND ACQUISITION

    POSSIBLE LAND ACQUISITION

    I

    I

    BOUNDARY WALL TO BE SET BACK TOFACILITATE PROVISION OF CYCLE LANES

    BOUNDARY TO BE SET BACK TO FACILITATE PROVISION OF CYCLE LANESAND RIGHT TURN LANE TO BLACKROCK CLINIC AND SEAFORT PARADE

    EXISTING PARKING

    EXISTING PARKING

    WIDEN EXISTING SHAREDPEDESTRIAN/CYCLE WAY TO 4.5m

    KEY:

    PROPOSED ISLAND / FOOTWAY

    ONE WAY OFF ROA