San Pablo Rapid Bus Stops - actransit.org

48
San Pablo Rapid Bus Inventory 2004 D R A F T Costs are at planning level only. San Pablo Rapid Bus Stops Inventory 2004 Alameda County CMA AC Transit Local jurisdictions

Transcript of San Pablo Rapid Bus Stops - actransit.org

Page 1: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo Rapid Bus StopsInventory 2004

Alameda County CMAAC TransitLocal jurisdictions

Page 2: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Emeryville – 40th Street NorthboundIMPROVEMENTS

Existing•Bus Shelter

•Seat Bench w/o backs

•Trash Bin

•Light Pole

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Tree Grate

•Pedestrian Push Button

•Real Time Information

Desired•Benches w/ backs

•Information Kiosk

•Pedestrian Countdowns

•Bus Pads

•Audio Announce

•Ticket Machine

•Electrical Connections

•Bus Stop Flag Sign

COSTS$823

$6,420

$803

U/C

$2,006

$15,000

$2-$15,000

$1,800

UNDER CONTRACT:Bus pads

TOTAL: $28,852-$41,852

CONSTRAINTS:•High volume of boarding's and high vandalism at this site

•Potential future residential/commercial development of adjacent property

•“No advertising” sign ordinance in the City of Emeryville

Page 3: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Emeryville – 40th Street SouthboundIMPROVEMENTS

Existing•Trash Bin

•Light Poles

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Tree Grate

•Real Time Information

Desired•Bus Shelter

•Benches w/ backs

•Pedestrian Countdowns

•Real Time Information

•Bus Pad

•Audio Announce

•Ticket Machine

•Electrical Connections

•Bus Stop Flag SignUNDER CONTRACTBus Pad

Real Time Information

CONSTRAINTS•Adjacent property awnings limit vertical space for shelter installation•Closest PG&E electrical connection is across San Pablo Avenue•“No advertising” sign ordinance in the City of Emeryville

TOTAL: $35,472-$48,472

Costs$13,040

$823

$803

U/C

U/C

$2,006

$15,000

$2-$15,000

$1,800

Page 4: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland – Alcatraz Northbound

Existing•Bus Shelter

•Benches w/ backs

•Trash & Recycle Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Pedestrian Countdown

Desired•Seat Benches w/o backs

•Light Pole

•Concrete Unit Pavers

•Crosswalk Treatments

•Lean-On Rails

•Tree Grate

•Information Kiosk

•Audio Announce

•Real Time Information

•Ticket Machine

•Bus Pad

•Electrical Connections

•Bus Stop Flag Sign

UNDER CONTRACT:Bus Pads

Real Time Information

CONSTRAINTS:•Connected Oakland streetlight system for maximum 150 watts of power

Costs$702

$1,655

$4,633

$55,000

$602

$1,500

$6,420

$2006

Under Contract

$15,000

Under Contract

$2-$15,000

$1,800

TOTAL: $91,318-$104,318

IMPROVEMENTS

Page 5: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland – Alcatraz SouthboundExisting•Trash Bin

•Recycle Bin

•Seat Bench w/o back

•Bus Stop Flag Sign

•Street Trees

•Pedestrian Countdown

Desired•Bus Shelter

•Bench w/ back

•Seat Bench w/o back

•Light Pole

•Bus Stop System Map

•Custom Logo & Signage

•Concrete Unit Pavers

•Crosswalk Treatment

•Lean on Rails

•Tree Grate

•Information Kiosk

•Audio Announce

•Real Time Information

•Ticket Machine

•Electrical Connection

•Bus Pad

•Bus Stop Flag Sign

UNDER CONTRACT:Bus Pad

CONSTRAINTS:•Transit shelter could not be installed because adjacent property is residential with front landscaping•Sidewalk at this site is too narrow for additional street furniture; unable to post transit information or Next bus digital displays

IMPROVEMENTSCosts$13,040

$ 823

$702

$1,655

$1,304

$500

$4,633

See Alcatraz NB

$602

$1,500

$6,420

$2,006

See Constraints

$15,000

$2-$15,000

Under contract

$1,800

TOTAL: $51,985-$64,985

Page 6: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland – Stanford Northbound

Existing•Bus Shelter

•Benches w/ backs

•Trash & Recycle Bin

•Bus Stop Flag Sign

•Custom Logo & Signage

•Street Trees

•Audible & Ped Buttons

Desired•Seat Benches w/o backs

•Light Pole

•Concrete Unit Pavers

•Crosswalk Treatment

•Lean-on Rails

•Tree Grate

•Audio Announce

•Real Time Information

•Ticket Machine

•Electrical Connection

•Bus Pad

•Bus Stop Flag Sign

UNDER CONTRACT:Bus pad

Real Time Information

TOTAL: $84,898- $97,898CONSTRAINTS:•Adjacent church originally opposed bus stop relocation and street furniture•City of Oakland agreed to relocate bus stop from NS to FS and have it contractor install transit shelter with Rapid Branding•Connected Oakland streetlight system for maximum 150 watts of power

IMPROVEMENTSCosts:$702

$1,655

$4,633

$55,000

$602

$1,500

$2,006

Under Contract

$15,000

$2-15,000

Under Contract

$1,800

Page 7: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland – Stanford Southbound

Existing•Bus Shelter

•Benches w/ backs

•Seat Benches w/o backs

•Trash & Recycle Bins

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

Desired•Light Pole

•Concrete Unit Pavers

•Crosswalk Treatment

•Lean-on Rails

•Tree Grate

•Audio Announce

•Real Time Information

•Ticket Machine

•Electrical Connection

•Bus Pad

•Bus Stop Flag Sign

TOTAL

Cost$1.655

$4,633

See Stanford NB

$602

$1,500

$2,006

Under Contract

$15,000

$2-$15,000

Under Contract

$1,800

$29,196-$42,196

UNDER CONTRACT:Bus pad

Real Time Information

IMPROVEMENTS

CONSTRAINTS:•Narrow sidewalk not wide enough for additional street furniture•Connected Oakland streetlight system for maximum 150 watts of power

Page 8: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland – 30th Street NorthboundIMPROVEMENTS

Existing•Benches w/ backs

•Bus Stop Flag Sign

•Pay Phone

•Audible & Ped Push Button

Desired•Bus Shelter

•Seat Benches w/o backs

•Trash Bin

•Recycle Bin

•Light Pole

•Bus Stop System Map

•Custom Logo & Signage

•Concrete Unit Pavers

•Lean-on Rails

•Street Trees & Grate

•News Rack

•Pedestrian Countdowns

•Audio Announce

•Real Time Information

•Ticket Machine

•Bus Pad

•Bus Stop Flag Sign

•Electrical connections

UNDER CONTRACT:Bus Pad

CONSTRAINTS:•Narrow sidewalk not wide enough for any street furniture•Shelter also cannot be installed due to storefront windows•No place to post transit information or Nextbus digital displays

Costs$13,040

$702

$1,404

$1,404

$1,655

$1,304

$500

$4,633

$602

$2,200

$1,103

$803

$2,006

See Constraints

$15,000

Under Contract

$1,800

$2-15,000

TOTAL: $50,156-$63,156

Page 9: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland 30th Street SouthboundIMPROVEMENTS

Existing•Bus Shelter

•Bench w/ backs

•Custom Logo & Signage

•Bus Stop Flag Sign

Desired•New Bus Shelter

•Benches w/ backs

•Seat Benches w/o backs

•Trash Bin

•Recycle Bin

•Light Pole

•Bus Stop Flag Sign

•Bus Stop System Map

•Lean-on Rails

•Street Trees & Grate

•Audio Announce

•Real Time Info

•Ticket Machine

•Electrical Connection

•Bus Pad

UNDER CONTRACT:Bus Pads

Real Time Information

CONSTRAINTS:•Additional street furniture poses a safety hazard due to open adjacent parking lot•Connected Oakland streetlight system for maximum 150 watts of power

Costs$13,040

$823

$702

$1,404

$1,404

$1,655

$1,800

$1,304

$602

$2,200

$2,006

Under Contract

$15,000

$2-$15,000

Under Contract

TOTAL: $43,438-$56,438

Page 10: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland – Grand Northbound

Existing•Bus Shelter

•Benches w/ backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Audio Announce

Desired•Seat benches w/o backs

•Recycle Bin

•Light Pole

•Concrete Unit Pavers

•Lean-on Rails

•Street Tree & Grate

•Pedestrian Countdowns

•Real Time Info

•Ticket Machine

•Electrical Connection

•Bus Pad

•Bus Stop Flag Sign

Costs$702

$1,404

$1,655

$4,633

$602

$2,200

$803

Under Contract

$15,000

$2-$15,000

Under Contract

$1,800TOTAL: $ 30,298-$43,298CONSTRAINTS:

•Adjacent property owner is opposed to transit shelter and additional street furniture•Bus shelter requires high level of maintenance and monitoring•AC Transit is working with City of Oakland to relocate shelter and reduce its size to minimize loitering in shelter•Connected Oakland streetlight system for maximum 150 watts of power

UNDER CONTRACT:•Bus Pads•Real Time Information

IMPROVEMENTS

Page 11: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland Grand SouthboundIMPROVEMENTS

Existing•Benches w/ backs

•Trash & Recycle Bin

•Bus Stop Flag Sign

•Audio Announce

Desired•Bus Shelter

•Seat Bench w/o backs

•Light Pole

•Bus Stop System Map

•Custom Logo & Signage

•Concrete Unit Pavers

•Lean-on Rails

•Street Tree & Grate

•Ped Countdown

•Real Time Info

•Ticket Machine

•Electrical Connection

•Bus Pad

•Bus Stop Flag Sign

UNDER CONTRACT:Bus Pads

Real Time Information

CONSTRAINTS:•Street furniture of any type not appropriate for site due to high maintenance and vandalism possibilities•Oakland shelter contractor would not install a shelter at this site due to potential maintenance issues•No place to post transit information or Nextbus digital displays

Costs$13,040

$702

$1,655

$1,304

$500

$4,633

$602

$2,200

$803

See Constraints

$15,000

$2-$15,000

Under Contract

$1,800

TOTAL: $43,737-$56,737

Page 12: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland - 20th and Broadway NorthboundIMPROVEMENTS

Existing•Bus Shelter

•Benches with & w/o backs

•Trash Bin

•Bus Stop System Map

•Custom Logo & Signage

•Pedestrian Push Buttons

Desired•Recycle Bin

•Light Pole

•Bus Stop Flag Sign

•Concrete Unit Pavers

•Crosswalk Treatment

•Lean-on Rails

•Street Tree & Grate

•Audio Announce

•Real Time Info

•Ticket Machine

•Electrical Connection

•Bus Pad

UNDER CONTRACT:Bus Pads

Real Time Information

Costs$1,404

$1,655

$1,800

$4,633

$55,000

$602

$2,200

$2,006

Under Contract

$15,000

$2,000-$15,000

Under Contract

TOTAL: $85,798-$98,798• Sidewalk width and ground vaults prevent the installation of additional furniture and bus pole•High volume of boarding's and high maintenance requirement at this site

CONSTRAINTS:

•Adjacent property owner is greatly opposed to bus stop and street furniture due to potential for loiterers and increase in litter•AC Transit is working with City on creating bus bulb for stop to alleviate conflicts with adjacent property owner•Connected Oakland streetlight system for maximum 150 watts of power

Page 13: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Oakland – 20th Street & Broadway SouthboundIMPROVEMENTS

Existing•Bus Shelter

•Benches with & w/o backs

•Trash Bin

•Bus Stop System Map

•Custom Logo & Signage

•Pedestrian Push Button

Desired•Recycle Bin

•Light Pole

•Bus Stop Flag Sign

•Concrete Unit Pavers

•Crosswalk Treatment

•Lean-on Rails

•Street Tree & Grate

•Audio Announce

•Real Time Information

•Ticket Machine

•Electrical Connection

•Bus Pad

Cost$1,404

$1,655

$1,800

$4,633

See 20th St NB

$602

$2,200

$2,006

Under Contract

$15,000

$2,000-$15,000

Under Contract

UNDER CONTRACT:Bus pads

Real Time Information

TOTAL: $30,798-$43,798CONSTRAINTS:•Sidewalk width and ground vaults prevent the installation of additional furniture•Connected Oakland streetlight system for maximum 150 watts of power

Page 14: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – Ashby Northbound

IMPROVEMENTS

Existing•Bus Shelter

•Benches with & w/o backs

•Trash Bins

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•News Rack

•Real Time Information

Desired•Recycle Bin

•Light Pole (2)

•Bus Stop Flag Sign

•Tree Grate (6)

•Audio Announce

•Ticket Machine

•Electrical Connection

•Bus Pad

•Concrete Unit Pavers

•Crosswalk Treatments

•Bus Stop Flag Sign

UNDER CONTRACT:Bus Pads

Real Time Information

Bus Stop Flag Sign

CONSTRAINTS:•No PG&E connection; shelter is powered by private Walgreen’s power TOTAL: $93,651-$106,351

Costs$1,404

$3,310

U/C

$9,000

$2,006

$15,000

$2,000-15,000

Under Contract

$4,633

$55,000

$1,800

Page 15: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – Ashby Southbound

Existing•Bus Shelter

•Bench without Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Tree Grate

•Pedestrian countdowns

•Real Time Information

Desired•Recycle Bin

•Light Pole (2)

•Audio Announce

•Ticket Machine

•Electrical Connection

•Bus Pad

•Concrete Unit Pavers

•Crosswalk Treatments

•New Tree Grates (2)

•Bus Stop Flag Sign

Costs$1,404

$3,310

$2,006

$15,000

$2-$15,000

Under Contract

$4,633

See Ashby NB

3,000

$1,800

TOTAL $32,651-$45,691

IMPROVEMENTS

UNDER CONTRACT:Bus PadsReal Time Information

CONSTRAINTS:•No PG&E connection; shelter is powered through SMART Corridors power draw

Page 16: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – Dwight NorthboundIMPROVEMENTS

Desired•Recycle Bin

•Light Pole (2)

•Tree Grates (4)

•Audio Announce

•Ticket Machine

•Electrical Connection

•Bus Pad

•Concrete Unit Pavers

•Crosswalk Treatment

•Bus Stop Flag Sign

Existing•Bus Shelter

•Bench without Backs

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Pedestrian Countdown

•Real Time InformationUNDER CONTRACT:Bus Pads

Real Time Information

CONSTRAINTS:•Adjacent liquor store owner is highly opposed to bus stop relocation and

installation of transit shelter due to potential for loiterers around his

business entrance

Costs$1,404

$3,310

$6,000

$2,006

$15,000

$2-$15,000

U/C

$4,633

$55,000

$1,800

TOTAL $90,651-$103-651

Page 17: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – Dwight SouthboundIMPROVEMENTS

Desired•Light Pole (2)

•Tree Grates (3)

•Audio Announce

•Real Time Information

•Ticket Machine

•Electrical Connection

•Bus Pad

•Bus Stop Flag Sign

Existing•Bench with Backs

•Trash Bin

•Recycle Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Information Kiosk

•Pedestrian Countdown TOTAL: $28,114-40,114

Costs$3,310

$4,500

$2,006

Under Contract

$15,000

$2-$15,000

Under Contract

$1,800

CONSTRAINTS:•Adjacent property owner and businesses highly opposed to bus shelter

installation because it will block storefront windows

•Some adjacent businesses are opposed to bus stop relocation

UNDER CONTRACT:Bus PadsReal Time Information

Page 18: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – University NorthboundIMPROVEMENTS

Desired•Light Pole (2)

•Tree Grate (3)

•Audio Announce

•Ticket Machine

•Electrical Connections

•Bus Pad

•Concrete Unit Pavers

•Crosswalk Treatment

•Bus Stop Flag Sign

Existing•Bus Shelter

•Bench without Backs

•Trash Bin

•Recycling Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Pedestrian & Audible Countdowns

•Real Time Information

UNDER CONTRACT:Bus PadsReal Time Information

CONSTRAINTS:Bus stop is in between two driveways

TOTAL: $87,747-100,747

Costs$3,310

$4,500

$2,006

$15,000

$2-$15,000

Under

Contract

$4,633

$55,000

$1,800

Page 19: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – University SouthboundIMPROVEMENTS

Costs$3,310

$1,304

$2,200

$2,006

$15,000

$2-$15,000

U/C

$500

$4,633

See University NB

$1,800

Desired•Light Pole (2)

•Bus Stop System Map

•Tree & Grate

•Audio Announce

•Ticket Machine

•Electrical Connections

•Bus Pad

•Custom Logo and Signage

•Concrete Unit Pavers

•Crosswalk Treatment

•Bus Stop Flag Sign

Existing•Bench with Backs

•Trash Bin

•Recycle Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•News Rack 4 unit

•Information Kiosk

•Pedestrian & Audible Countdowns

•Real Time Information

UNDER CONTRACT:Bus PadsReal Time InformationCONSTRAINTS:•City opposed shelter installation due to storefront windows

•Bus pole blocks State speed limit sign

•High pedestrian traffic

TOTAL: $32,753-$45,753

Page 20: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – Gilman NorthboundIMPROVEMENTS

Desired•Recycle Bin

•Tree Grate

•Audio Announce

•Ticket Machine

•Electrical Connections

•Bus Pad

•Concrete Unit Pavers

•Crosswalk Treatment

•Light Pole (2)

•Bus Stop Flag Sign

Existing•Bus Shelter

•Bench without Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•News Rack 4 unit

•Pedestrian & Audible Countdowns

•Real Time Information

CONSTRAINTS:•Additional street furniture causes potential safety hazard with adjacent open parking lot•Bus pole blocks State Highway sign

TOTAL: $86,653-$99,653

UNDER CONTRACT:Bus PadsReal Time Information

Costs$1,404

$1,500

$2,006

$15,000

$2-$15,000

U/C

$4,633

$55,000

$3,310

$1,800

Page 21: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Berkeley – Gilman SouthboundIMPROVEMENTS

Costs$3,310

$3,000

$2,006

$15,000

$2-$15,000

U/C

$4,633

See Gilman NB

$1,800

Desired•Light Pole (2)

•Tree Grate (2)

•Audio Announce

•Ticket Machine

•Electrical Connection

•Bus Pad

•Concrete Unit Pavers

•Crosswalk Treatment

•Bus Stop Flag Sign

Existing•Bus Shelter

•Seat Bench without Backs

•Trash Bin

•Recycle Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Tree

•News Rack 4 unit

•Pedestrian Countdown

•Real Time Information

UNDER CONTRACT:Bus PadsReal Time Information

CONSTRAINTS:•Bus stop near gas station entry way•Bus stop relocated further south for better placement and opposition from gas station owner of bus stop and street furniture

TOTAL: $31,247-$43,247

Page 22: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Albany – Solano NorthboundIMPROVEMENTS

Costs$823

$1,404

$1,655

$1,304

$500

$1,800

$4,633

$55,000

$1,500

$802

$2,006

$4,013

$15,000

$2-$15,000

Under Contract

TBD

Desired•Bench with Backs

•Recycle Bin

•Light Pole

•Bus Stop System Map-new

•Custom Logo & Signage

•Bus Stop Flag Sign

•Concrete Unit Pavers

•Crosswalk Treatment

•Tree Grate

•Pedestrian Countdown

•Audio Announce

•Security Camera

•Ticket Machine

•Electrical Connection

•Bus Pad

•Secure Utility Box

Existing•Bus Shelter

•Bench without Backs

•Trash Bin

•Bus Stop System Map

•Real Time Information

CONSTRAINTS:•Bus stop is nearside and shorter than desired. The City Chamber of Commerce opposed the relocation of the stop to the far side•Bus stop pole is not new and cannot be replaced due to potential visual conflict with the traffic signal

UNDER CONTRACT:•Bus Pad

TOTAL: $92,440 - $105,440

Page 23: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Albany – Solano SouthboundIMPROVEMENTS

Costs$823

$1,404

$1,404

$1,655

$1,304

$500

$4,633

$1,500

$803

$2,006

$4,012

Under Contract

$15,000

$2-$15,000

Under Contract

$1,800

Desired•Bench with Backs

•Trash Bin

•Recycle Bin

•Light Pole (Pedestrian scale)

•Bus Stop System Map

•Custom Logo & Signage (street name & site identification)

•Concrete Unit Pavers

•Tree Grate

•Pedestrian Countdown

•Audio Announce

•Security Camera

•Real Time Information

•Ticket Machine

•Electrical Connection

•Bus Pad

•Bus Stop Flag Sign

Existing•Bus Shelter

•Seat Bench without Backs

•Bus Stop Flag Sign

•Bus Stop System Map (illegible due to condensation)

UNDER CONTRACT:Bus PadsReal Time Information

TOTAL: $38,844-$51,844

Page 24: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito – Carlson Northbound

Costs$1,404

$4,633

$602

$1,103

$803

$15,000

$2-$15,000

$1,800

Desired•Recycle Bin

•Concrete Unit Pavers

•Lean on Rails

•News Rack 4 unit

•Pedestrian Countdowns

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

Existing•Bus Shelter

•Seat Bench without Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Tree Grate

•Audio Announce & Pedestrian Countdown

•Real Time InformationUNDER CONTRACT:Bus PadsReal Time Information

TOTAL: $26,110-38,110

IMPROVEMENTS

CONSTRAINTS:•New sidewalk not necessary for this site because sidewalk was newly replaced as part of new development•Sidewalk is too narrow for additional street furniture•“No advertising” sign ordinance in the City of El Cerrito

Page 25: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito – Carlson Southbound

Costs$13,040

$702

$1,404

$1,800

$1,304

$500

$700

$2,006

$803

U/C

$15,000

$2-$15,000

Desired•Bus Shelter

•Seat Bench without Backs (NEW)

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Audio Announce & Pedestrian Countdown

•Real Time Information

•Ticket Machine

•Electrical Connection

Existing•Bus Shelter

•Seat Bench without Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Trees

•Audible and Pedestrian Countdown

•Real Time Information

UNDER CONTRACT:Bus PadsReal Time Information

IMPROVEMENTS

TOTAL: $39,259-$52,259

Page 26: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito – Moeser Northbound

Costs$1,404

$4,633

$602

$2,200

$1,103

$803

$15,000

$2-$15,000

$1,800

Desired•Recycle Bin

•Concrete Unit Pavers

•Lean on Rails

•Street Tree & Grate

•News Rack – 4 unit

•Pedestrian Countdown

•Ticket Machine

•Electrical Connections

•Bus Stop Flag Sign

Existing•Bus Shelter

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Audio Announce

•Real Time Information

IMPROVEMENTS

TOTAL: $29,545-42,545

CONSTRAINTS:•Sidewalk is too narrow for additional street furniture

•“No advertising” sign ordinance in the City of El Cerrito

Page 27: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito – Moeser SouthboundIMPROVEMENTS

Desired•Recycle Bin

•Concrete Unit Pavers

•News Rack-4 units

•Pedestrian Countdown

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

n

CONSTRAINTS:•No space for proper placement of shelter or additional street furniture

due to storefront windows

•“No advertising” sign ordinance in the City of El Cerrito

TOTAL: $26,743-39,743

Existing•Bench w/ Backs

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Tree

•Pedestrian Countdow

•Audio Announce

•Real Time Information

Costs$1,404

$4,633

$1,103

$803

$15,000

$2-$15,000

$1,800

Page 28: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito – Potrero Northbound

Existing•Bus Shelter

•Seat Bench w/o backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Tree

•Real Time Informati

•Bus Pad

IMPROVEMENTS

Desired•Recycle Bin

•Concrete Unit Pavers

•Lean On Rails

•Tree Grate

•News Rack-4 unit

•Pedestrian Countdowns

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

on

Costs$1,404

$4,633

$602

$1,500

$1,103

$803

$15,000

$2-$15,000

$1,800

TOTAL: $28,845-$41,845

CONSTRAINTS:•“No advertising” sign ordinance in the City of El Cerrito

Page 29: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito – Potrero SouthboundIMPROVEMENTS

Existing•Bus Shelter

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Tree

•Real Time Information

•Bus Pad

DesiredRecycle Bin

Concrete Unit Pavers

Lean On Rails

Tree Grate

News Rack – 4 unit

Pedestrian Countdowns

Ticket Machine

Electrical Connection

Bus Stop Flag Sign

Costs$1,404

$4,633

$602

$1,500

$1,103

$803

$15,000

$2-$15,000

$1,800

UNDER CONTRACT:Bus Pads

Real Time Information

CONSTRAINTS:•“No advertising” sign ordinance in the City of El Cerrito

TOTAL: $28,845-$41,845

Page 30: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito del Norte - Northbound

Existing•Bus Shelter

•Bench w/ Backs

•Real Time Informati

CONSTRAINTS:•BART jurisdiction; BART needs to agree to any additional street furniture installations and

ongoing maintenance

TOTAL: $19,702-$32,402

IMPROVEMENTS

Desired•Recycle Bin

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

on

Costs$1,404

$15,000

$2-$15,000

$1,800

Page 31: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

El Cerrito del Norte - SBIMPROVEMENTS

Existing•Bus Shelter

•Bench w/ Backs

•Trash Bin

•Real Time Informatio

Desired•Recycle Bin

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Signn

Costs$1,404

$15,000

$2-$15,000

$1,800

TOTAL: $19,702-$32,402

CONSTRAINTS:•BART jurisdiction; BART needs to agree to any additional street furniture installations and ongoing maintenance

Page 32: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Richmond – MacDonald Northbound

Desired•Light Pole

•Bus Pad

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

Existing•Bus Shelter

•Bench with Backs

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo &

Signage

•Street Tree

•Pedestrian Countdown

•Real Time Information

CONSTRAINTS:•Sidewalk is too narrow for additional street furniture

TOTAL: $44,455-$57,455

IMPROVEMENTS

Cost$1,655

$24,000

$15,000

$2-$15,000

$1,800

Page 33: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Richmond – MacDonald SouthboundIMPROVEMENTS

Costs$24,000

$15,000

$2-$15,000

$1,800

Desired•Bus Pad

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

Existing•Bus Shelter

•Bench w/ Backs

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Street Tree

•Pedestrian Countdown

•Real Time Information

CONSTRAINTS:•Stop is in between driveways

TOTAL: $42,800-55,800

Page 34: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Richmond – Garvin Northbound

Existing•Bench w/ Backs

•Bus Stop Flag Sign

•Bus Stop System Map

•Information Kiosk

•Real Time Information

IMPROVEMENTS

Desired•Bus Pad

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

Costs$24,000

$15,000

$2-$15,000

$1,800

TOTAL: $42,800-55,800

CONSTRAINTS:•No advertising shelter due to adjacent residential property

Page 35: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Richmond – Garvin Southbound

Existing•Bench w/ Backs

•Bus Stop Flag Sign

•Bus Stop System Map

•Pay Phone

•Street Tree

•Information Kiosk

•Real Time Information

IMPROVEMENTS

Desired•Bus Pad

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

Costs$24,000

$15,000

$2-$15,000

$1,800

TOTAL: $42,800-$55,800

CONSTRAINTS:•No advertising shelter due to adjacent storefront windows.

Page 36: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – San Pablo Dam Northbound IMPROVEMENTS

Desired•Light Pole

•Bus Stop Flag Sign

• Pedestrian Countdown

•Tree Grate

•Ticket Machine

•Electrical Connection

Costs$1,655

$1,800

$803

$1,500

$15,000

$2-$15,000

Existing•Bus Shelter

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Tree

•Audio Announce

•Real Time Information

•Bus Pad

TOTAL: $22,758-$35,758

Page 37: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – Tulare Southbound

Existing•Bus Shelter

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo and Signage

•Real Time Information

•Bus PadTOTAL: $21,258-$34,258

IMPROVEMENTS

Desired•Light Pole

•Bus Stop Flag Sign

•Pedestrian Countdowns

•Ticket Machine

•Electrical Connection

Cost$1,655

$1,800

$ 803

$15,000

$2-$15,000

Page 38: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – Vale NorthboundIMPROVEMENTS

Costs$24,000

$1,800

$1,655

$15,000

$2-$15,000

Desired•Bus pad

•Bus Stop Flag Sign

•Light Pole

•Ticket Machine

•Electrical Connection

Existing•Bus Shelter

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Tree

•Pedestrian Countdown

UNDER CONTRACT:Real Time Information

TOTAL: $44,455-$57,455

Page 39: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – Vale SouthboundIMPROVEMENTS

Desired•Light Pole

•Bus Stop Flag Sign

•Ticket Machine

•Electrical Connection

Existing•Bus Shelter

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo & Signage

•Street Tree

•Tree Grate

•Pedestrian Countdown

• Real Time Information

•Bus Pad

CONSTRAINTS:•Light Pole may be difficult to install due to a

number of vaults in the sidewalk

TOTAL: $20,455-$33,455

Costs$1,655

$1,800

$15,000

$2-$15,000

Page 40: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – Van Ness NorthboundIMPROVEMENTS

Desired•Bus Shelter

•Light Pole

•Bus Pad

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

Existing•Bus Stop Flag Sign

•Street Trees

Costs$13,040

$1,655

$24,000

$15,000

$2-$15,000

$1,800

TOTAL: $56,993-$69,993

UNDER CONTRACT:Real Time Information – To be confirmed by AC Transit

CONSTRAINTS:•Power for light pole will need to come from adjacent property private

power source

Page 41: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – Van Ness SouthboundIMPROVEMENTS

Costs$13,040

$1,655

$1,800

$24,000

$15,000

$2-$15,000

Desired•Bus Shelter

•Light Pole

•Bus Stop Flag Sign

•Bus Pad

•Ticket Machine

•Electrical Connection

Existing•Bus Stop Flag Sign

•Street Trees

UNDER CONTRACT:Real Time Information – to be confirmed by AC Transit

CONSTRAINTS:•Power for light pole will need to come from adjacent property

private power source

TOTAL: $57,495-$70,495

Page 42: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – El Portal NorthboundIMPROVEMENTS

Existing•Bus Stop Flag Si

•Street Trees

•Tree Grate

•Audio Announce

TOTAL: $56,993-$69,993

Desired•Bus Shelter

•Light Pole

•Bus Pad

•Ticket Machine

•Electrical Connection

•Bus Stop Flag Sign

gn

Costs$13,040

$1,655

$24,000

$15,000

$2-$15,000

$1,800

UNDER CONTRACT:Real Time Information – To be confirmed by AC Transit

CONSTRAINTS:•Final stop before end of line; no boardings at this stop

•Narrow sidewalk for street furniture installations

Page 43: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – El Portal SouthboundIMPROVEMENTS

Desired•Light Pole

•Bus Stop Flag Sign

•Bus Pad

•Ticket Machine

•Electrical Connection

Existing•Bus Shelter

•Seat Bench w/o Backs

•Trash Bin

•Bus Stop Flag Sign

•Bus Stop System Map

•Custom Logo and Signage

•Real Time Information

•Bus Pad

TOTAL: $44,455-$57,455

Costs$1,655

$1,800

$24,000

$15,000

$2-$15,000

UNDER CONTRACT:Real Time Information

CONSTRAINTS:•Stop is in between two driveways with limited sidewalk length for

additional street furniture

•Sidewalk adjacent to restaurant parking lot

Page 44: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

San Pablo – Contra Costa CollegeIMPROVEMENTS

Existing•Bus Shelter

•Bench w/ Backs

•Trash Bin

•Light Pole

•Bus Stop Flag Sign

•Custom Logo & Signage

•Real Time Information

UNDER CONTRACT:Real Time Information

TOTAL: $42,800-$55,800

Desired•Bus Stop Flag Sign

•Bus Pad

•Ticket Machine

•Electrical Connection

Costs$1,800

24,000

$15,000

$2-$15,000

Page 45: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Alameda County Costs• Emeryville $ 64,324 - $90,324• Oakland $ 541,622 - $671,622• Berkeley $ 484,467 - $585,207• Albany $ 131,284 - $157,284

Subtotal $1,221,697 - $1,504,437

25% Contingency$ 305,424 - $ 376,10920% Soft Costs $ 244,339 - $ 300,887

TOTAL $1,771,461 - $2,181,434

Page 46: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Contra Costa County Costs• El Cerrito $218,751 - $321,151• Richmond $172,855 - $224,855• San Pablo $367,662 - $484,662

Subtotal $759,268 - $1,030,668

25% Contingency $189,817- $257,667

20% Soft Costs $157,854- $206,134

TOTAL $1,100,939 - $1,494,469

Page 47: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Total Costs of Improvements

Alameda County $1,771,461-$2,181,434Contra Costa County $ 1,100,939-$1,494,469Ticket Machine Start Up Cost $ 750,000 TOTAL $3,622,400 - $4,425,903

Page 48: San Pablo Rapid Bus Stops - actransit.org

San Pablo Rapid Bus Inventory 2004

D R A F T Costs are at planning level only.

Site Constraints Identified by AC Transit

• Proof of Payment and Ticket Machines• Bus Shelters• Trash receptacles• Concrete Unit Pavers• Information Kiosks• Real Time Information• Stop Flag Signs• Light Poles (ownership, maintenance, liability issues)• Benches, Recycling Receptacles, Lean-on Rails and Freestanding

System Maps (ownership, maintenance, liability Issues)• Street Trees and Tree Grates• Pedestrian Countdowns, Security Cameras and Audio Announce