San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans...

13
San Francisco Mayor’s 2030 Transportation Task Force urrent & Near Term Transportation Plans April 30, 2013

Transcript of San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans...

Page 1: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

San Francisco Mayor’s 2030 Transportation Task Force

Current & Near Term Transportation Plans

April 30, 2013

Page 2: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

Presentation Outline

• Joint Powers Agreement• Historical Revenues and Ridership• State of Good Repair• Capital Funding Source• San Francisco Projects• Caltrain Modernization

2

Page 3: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

Joint Powers Agreement

• 3 Member Agencies:

City and County of San Francisco (CCSF), SamTrans, and VTA• Operating based on boarding formula• Capital split 3 ways• FY2014 Operating budget balanced• FY2014 Capital budget under discussion

3

Page 4: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

Caltrain Service

Caltrain service is in demand more than ever before• Historic ridership• More than half take Caltrain to avoid traffic• Historic-level revenues • Farebox recovery ratios:

• FY2013 YTD (Jun – Mar) = 61.60%• FY2014 Projection = 54.84%

• Capacity problems/Over crowded

4

Page 5: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

8.099.45

10.1510.98

11.9612.69

11.9712.67

14.1315.25 15.25

$19.26$23.04

$30.38

$34.84

$40.13$43.27 $42.73

$49.03

$58.89

$64.78

$66.07

0

5

10

15

20

25

30

$0

$10

$20

$30

$40

$50

$60

$70

FY2004 FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014

MillionsM

illion

s

Ridership Revenue

Revenues & Ridership

5

Projected Preliminary

Page 6: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

Caltrain State of Good Repair• Ongoing station, track, structures, signal

and rolling stock needs• Limited Federal Transit Administration

(FTA) and local funds to cover maintenance of the existing system

• Deferred maintenance due to limited funding for prior years

6

Page 7: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

5 year State of Good Repair Needs ($ millions)

Track & Stations; $67.5

Rolling Stock, $75.1 2

Signal & Sys-

tems; $27.0

Bridges Rehab; $54.3

Total SOGR needs1: $223.9 million → $71.8 million in FTA funds1 represents projected needs 2014 to 2018, from Countywide Transportation Plan Nov. 20122 local share of Rolling Stock needs is approximately $70 million

7

Page 8: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013Members 5.00 9.50 12.25 16.60 13.70 8.20 11.63Other 58.80 31.65 28.10 86.30 1.00 3.45 1.37State 5.30 4.00 67.20 58.00 7.30 8.29 6.79Federal 38.80 17.50 28.30 45.00 17.30 41.54 19.30

0

50

100

150

200

250

millions

Capital Funding by Source

8

Page 9: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

Caltrain Modernization (Electrification)

• Distance: 51 miles (4th & King to Tamien)

• Speed: Up to 79mph• Service: 6 trains per

peak hour per direction

• Infrastructure/Vehicles– Poles and Wires (OCS)

– Traction Power Facilities (TPF)

– Electric Powered Vehicle/Electric Multiple Units (EMU)

9

Page 10: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

Caltrain Modernization• Blended System

• Concept– Electrify / Upgrade railroad as an early

investment in High Speed Rail– Maximize use of existing tracks– Caltrain and HSR on shared tracks– Support freight and other passenger services

• Key Benefits– Minimize community impact– Lower project cost– Advance project delivery

10

Page 11: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

Early Investment ProgramSources of Funds (in millions):

• Local - JPB (1) $ 195• State - Prop 1 A & 1B 730• Federal - FTA 500• Regional - BAQMD, Tolls

31 Total $1,456

Uses of Funds• CBOSS/Positive Train Control $ 231• Electrification 785• 96 EMU (railcars) 440

Total $1,456Note:(1) Member Agency Contributions consist of: $60M from San Mateo and Santa

Clara, $20M from San Francisco ($40M TBD) ($180M Total), $11M from currently available balance, and $4M from Caltrain PTC. 11

Page 12: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

EMUs (Electric Multiple Units)Trainset Characteristics

• Typically 6-cars per trainset• Operating speed up to 79 mph• 100 seats per EMU• 96 EMUs• 16 Train Sets• 9,600 seats

12

Page 13: San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.

QUESTIONS

13