San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison...

17
1 San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014

Transcript of San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison...

Page 1: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

San Diego I-15 Integrated Corridor Management Project Update

Caltrans External Advisory Liaison (CEAL) July 16, 2014

Page 2: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

2

OUTLINE

1. Background – Project Overview and Vision

2. ICM System

3. What’s happening now

Page 3: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

3

• Utilize technology and partnerships• Manage corridor as system• Provide travelers decision quality information• Maximize corridor capacity

Arterial

Signals

Systems

Freeway

Systems

Bus

SystemsRail

Systems

USDOT ICM Vision Background

Page 4: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

4

USDOT ICM Selected Eight Pilot Sites

Seattle

San Diego

Oakland

Houston

Dallas

Montgomery County

Minneapolis

San Antonio

Page 5: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

5

Sabre Springs/Pen%asquitos Transit Center

I-15 Express Lanes

SR 56/Ted Williams Parkway

N

Direct Access Ramp (DAR)

I-15 Main Lanes

Express Lanes

DAR

BRT Stations

Arterial Network

Main Lanes1

2

3

4

5

ICM is about management of a corridor. Management implies more than monitoring. Management implies planning for, and responding to, what is happening across all networks.

5

1

2

3

4

Why ICM: Next Natural Step in TSM

Page 6: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

6

I-15 ICM Vision

Poway

San Diego

Escondido• Pro-actively Manage Congestion

• Provide Choices • Maximize System

Capacity • Improve

Coordination/ Interoperability

Page 7: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

7

ICMS Context Diagram

RAMS

Signal timing plans

• Arterial Congestion• Intersection status• System alarms• Local traffic advisories

Regional Arterial Mgmt System

RTMS

Service change request• Bus AVL• Schedule Adherence• Selected Stop/Route Data• Panic alarms

Regional Transit Mgmt System

FMS

CM

S p

lan

s

EL

CS

Re

qu

es

t

• Freeway Congestion• Freeway Incidents• Travel Times• Planned Events• CCTV Imagery• CMS Status

Freeway Mgmt SystemRamp Meter Information System

REMS

511

511 Usage Statistic

s

Incid

ent Dete

ction

Incid

ent Deta

ils

Intelligent Virtual Corridor TMC (User Screen)

XML Data (3rd Party Applications)

Alert messages

SPS

Free spaces

Area ID

CPS

RMISLCS M

eter Timing Plans

Congestion Pricing System• Toll• Travel Times• Events

Lane Closure System

Smart Parking System

Regional Event Mgmt System• CHP• Transit• Express Lanes• Congestion Pricing• Arterial Construction

ATTSArterial Travel Time System Arterial tra

vel times

WeatherNWS

Wea

ther

/NEX

RA

D

NPS RTSS

Network Prediction System Real-Time

Simulation System

Rea

l-T

ime

Dat

a

Pre

dic

tio

ns

Evalu

ation M

OE

Real-Tim

e Data

Construction/Maint

Status

Metering Status

Current Pricing/VTS signs

EL Congestion

One-way IMTMS interfaceTwo-way IMTMS interfaceDSS control interface

= New or Upgraded System

ICM

7

RTMS

Service change request• Bus AVL• Schedule Adherence• Selected Stop/Route Data• Panic alarms

Regional Transit Mgmt System

RAMS

Signal timing plans

• Arterial Congestion• Intersection status• System alarms• Local traffic advisories

Regional Arterial Mgmt System

FMS

CM

S p

lan

s

EL

CS

Re

qu

es

t

• Freeway Congestion• Freeway Incidents• Travel Times• Planned Events• CCTV Imagery• CMS Status

Freeway Mgmt System

Page 8: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

8

• En-Route Traveler Information • Pre-Trip Traveler Information • Corridor Ramp Metering • Signal Coordination on Arterials and Ramp Meters• Enhanced Transit Network Information• Pro-Active Corridor Congestion Management during

recurring and incidents

8

DSS Operational Strategies Employed on I-15 with ICM

Page 9: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

9

What’s Happening Now - DSS – ICM Response Plan Example

Page 10: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

10

What’s Happening Now –

– Established Weekly Operational Review Meetings

– Over 400 Response Plans Since April– Early May – Set to System Automation

Approval – Operational Corridor Threshold Initiated

18% then to 8% (May 21st) – Released 511 – ICM App (May 9th)

Page 11: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

11

Environment

Coordination

Getting to Integrated Operations

• Assets Network and

Routes Systems and

Capabilities Availability

• Response Plans Flexibility of

Postures Action Plans Interagency

Coordination

Ops

Postures

Availability

Assets

Page 12: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

12

Posture Availability

Page 13: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

13

Predict

Propose

Evaluate

Control

Monitor

• Micro-simulation in real-time to predict and evaluate the response plans

• Business Rules to propose and monitor

• Workflow engines to control

Decision Support System

Page 14: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

14

Prediction

Asset

Availability

Threshold

Response Plan

Evaluation

Decision Support System

System Supply/Demand

– Arterials – Freeway– Express Lanes – Bus

System Operations

– Signals– Ramps– DMS– Barrier– Toll – 511

Page 15: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

15

What’s Happening Now - DSS – ICM Response Plan Example

Page 16: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

16

Corridor Parameter ‘Tabs’

Regularly “Tweak” Corridor Score, Signal Response, Congestion Event Finder, Congestion Thresholds

Occasionally Modify

Global, Response Plan Expiration Timers, Asset Finder

Not anticipated to change (rare)

Strategy Matrix, Sim Q, Transit, Ramp Meter Simulation Hierarchy, Express Lanes Response

Require Agency Oversight

Asset Availability

ICMS Corridor ConfigurationTuning the System

Page 17: San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

17

511 Mobile Application - Release