SAN ANTONIO WATER SYSTEM CENTRAL WATER INTEGRATION ...
Transcript of SAN ANTONIO WATER SYSTEM CENTRAL WATER INTEGRATION ...
SAN ANTONIO WATER SYSTEM
CENTRAL WATER INTEGRATION PIPELINE
SEGMENT 5-2
SAWS Job No. 18-8615
SAWS Solicitation No. CO-00180
ADDENDUM No. 1
August 14, 2018
To Bidder of Record:
This addendum, applicable to work referenced above, is an amendment to the bidding documents and as such will be made a part of and included in the Contract Documents. Acknowledge receipt of this addendum by entering the addendum number and issue date in the space provided in submitted copies of the proposal.
CLARIFICATIONS
1. The cave stability analysis bid item has been deleted and removed from the bid proposaland the measurement and payment technical specification. See below for the changes tothe contract documents.
QUESTIONS AND ANSWERS
1. Question: I am the Victaulic Infrastructure specialist here in central and south Texas I haveVictaulic option for the test cap/Bulkhead option on this job that would make the capreusable as we as easier to remove and install and would like to discuss its use on thisproject.
Answer: The Contractor may submit a substitution request for review and approval per theContract Documents.
REVISIONS TO CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
CONTRACT DOCUMENTS TABLE OF CONTENTS
a) Under final item “SAWS SPECIFICATIONS FOR WATER & SANITARY SEWERCONSTRUCTION (Latest Edition)” add list of items, as follows:
Flexible Base
Valve Box Adjustments
Gate Valves
Butterfly Valves
A1 - 2
Anchorage/Thrust Blocking and Joint Restraint
Gate, Fencing and Property Marker Details
Air Release Assemblies
PRICE PROPOSAL
a) Delete the PRICE PROPOSAL in its entirety and replace with the attached version included as part of this Addendum. Bidder’s should us this version when submitting a bid for this project.
WAGE DECISIONS
a) Remove the Building Wage Decision in its entirety and replace with the revised version dated 8/3/18 included in this Addendum. All other wage decisions remain unchanged.
SUPPLEMENTAL CONDITIONS
a) GENERAL CONDITIONS
Article V. CONTRACT RESPONSIBILITIES
Remove Section 5.7.1.1.7.8 in its entirety and replace with the following:
Installation Floater - Physical Damage Insurance which insures SAWS and the City for damages to all Property Purchased for, or Assigned to, the Project commencing on the start date through completion. Policy limits shall be in an amount equal to the total contract cost contracted herewith. The policy form shall be an All Risk form and shall include coverage for both during transit and while stored at the work site.
SECTION 01010 – SUMMARY OF WORK
a) 1.05 CONTRACTOR’S USE OF PREMISES, Subparagraph A, delete the following in its entirety
A. CONTRACTOR shall have access to the Terminus Site as shown on the drawings. The Contractor may use the Terminus site for staging and storage in accordance with the defined areas shown on Drawing G-3008. The CONTRACTOR shall not impact the work by other Contractors and/or the OWNER at the Terminus site
and replace with
A. CONTRACTOR shall have access to the Terminus Site as shown on the drawings. The CONTRACTOR shall not impact the work by other Contractors and/or the OWNER at the Terminus site
b) 1.05 CONTRACTOR’S USE OF PREMISES, Subparagraph E, delete the following in its entirety
E. CONTRACTOR shall obtain and pay for the use of additional staging/storage areas beyond what is being provided by SAWS based on the Contractor’s needs to successful construct the project.
A1 - 3
And replace with
E. CONTRACTOR shall obtain and pay for the use staging/storage areas based on the Contractor’s needs to successful construct the project.
SECTION 01015 – USE OF PREMISES
a) 1.02 CONSTRUCTION AREA, Subparagraph B, delete the following in its entirety
B. CONTRACTOR may not store equipment or material within the street right-of-way or SAWS easements or property. The CONTRACTOR is responsible for obtaining any additional equipment and material staging area in excess of that provided by SAWS. The location must be acceptable to SAWs. All costs for obtaining a storage and staging area will be borne by the Contractor. The site security will be the responsibility of the Contractor.
And replace with
B. CONTRACTOR may not store equipment or material within the street right-of-way or SAWS easements or property, except for within the limits of the temporary construction easement between the Terminus Site and Silver Knoll (cul-de-sac). The CONTRACTOR may store equipment or material only within the limits of this temporary construction easement. The CONTRACTOR is responsible for obtaining any additional equipment and material staging area in excess of that provided by SAWS. The location must be acceptable to SAWs. All costs for obtaining a storage and staging area will be borne by the Contractor. The site security will be the responsibility of the Contractor.
SECTION 01025 – MEASUREMENT AND PAYMENT
a) Delete SECTION 01025 – MEASUREMENT AND PAYMENT in its entirety and replace with the attached version included as part of this Addendum.
SECTION 01400 – QUALITY CONTROL
a) Section 1.07 TESTING LABORARTORY SERVICES, subparagraph b, delete the following sentence:
Sampling and field testing shall be performed at the expense of the OWNER.
And replace with the following:
Sampling and field testing will be performed at the expense of the CONTRACTOR.
b) Section 1.08 CONTRACTOR RESPONSIBILITIES, subparagraph B, add the following:
4. All field testing
SECTION 01510 – VOID MITIGATION
a) Under PART 1 General 1.01 SUMMARY D. Related Sections: 1. Special Conditions, delete:
Geotechnical Data Report, Geotechnical Baseline Report
A1 - 4
with and replace with:
Geotechnical Data Report
b) Section 4.03 PAYMENT WHEN INCLUDED AS A CONTRACT PAY ITEM WILL BE MADE UNDER ONE OF THE FOLLOWING, delete the following row in its entirety:
Pay Item No. 01510-J Cave Stability Analysis LS
c) ATTACHMENT C: CAVE STABILITY ANALYSIS, 1.3 STRUCTURAL REQUIREMENTS, subparagraph C, delete the second to last sentence in its entirety:
The methodology must be approved by the City of Austin in order to approve the void mitigation submittal.
And replace with:
The methodology must be approved by SAWS and the City of San Antonio in order to approve the void mitigation submittal.
SECTION 02200 – EARTHWORK
a) Section 2.01 MATERIALS, subparagraph A, delete the fourth sentence in its entirety:
Select fill materials must be submitted to Geotechnical Engineer for testing and evaluation prior to use.
And replace with the following:
Select fill materials must be tested by an independent testing laboratory paid for by the Contractor for conformance with the specifications and the test results submitted to the ENGINEER for evaluation prior to use.
SECTION 03300 – CAST-IN-PLACE CONCRETE
a) Section 1.04 SUBMITTALS, subparagraph A, add the following to the end of the paragraph:
The CONTRACTOR shall bear all costs for the testing laboratory for testing of the mixes prior to placement, field work for obtaining samples and testing of concrete placed on the project.
SECTION 03600 – GROUT
a) Section 3.03 FIELD TESTS, subparagraph A, Item 10 delete this in its entirety:
10. OWNER will pay costs for the independent test laboratory work to prepare, transport, store, cure, and test the strength samples. The CONTRACTOR shall assist the independent test laboratory staff during this work, with cost included in the lump sum bid item.
And replace with:
10. CONTRACTOR will pay costs for the independent test laboratory work to prepare, transport, store, cure, and test the strength samples. The CONTRACTOR shall assist
A1 - 5
the independent test laboratory staff during this work, with cost included in appropriate bid item. No separate payment for this item will be made.
b) Section 3.03 FIELD TESTS, subparagraph B, this in its entirety:
B. Evaluation and Acceptance of Other Grout. The OWNER will test and evaluate other grout with samples furnished by the CONTRACTOR.
And replace with:
B. Evaluation and Acceptance of Other Grout. The CONTRATOR will test other grout and will submit a test report to the OWNER to evaluate other grout with conformance with the specifications.
SECTION 15055 – STEEL PIPE (AWWA C200 MODIFIED)
a) Page 15055-12 Paragraph 2.01. Replace 2.01 in its entirety with:
2.01 General
A. The following pipe materials will be authorized for use in this project in the sizes shown below and as indicated in the Plans:
1. Steel Pipe – Pipe diameters equal to 6” and greater
B. Potable water main pipe, fittings, couplings, and appurtenant items shall be new, free from defects or contamination, and wherever possible, shall be the standard product of the manufacturer. All buried potable water main pipe shall be connected together using mechanical or push-on joints, except as otherwise specified. All potable water main pipes shall be manufactured in the USA.
C. Repair of Defects. Patching inserts, overlays or pounding out of dents will not be permitted. Repair of notches or lamination on second ends shall not be permitted. Damaged ends shall be removed as a cylinder, and the end properly prepared. Distorted or flattened lengths shall be rejected. A buckled section shall be replaced as a cylinder.
D. Steel piping shall have a pressure classification of at least 150 psi unless otherwise shown in the Plans. The pipe weight and classification shall be clearly indicated on the bell of each pipe section. In addition, all potable water main pipes shall be designed to withstand the service conditions shown in Table 1 – Design Service Conditions.
A1 - 6
Table 1
Design Service Conditions
Service Parameter Design Condition
(a) Maximum depth of cover As shown in plans
(c) Maximum interior working
Pressure (Design Pressure)
All Steel Piping: 150 psi
(d) Field test pressure 225 psi
(e) Maximum vacuum pressure
-10 pounds per square inch
(f) Surge pressure Maximum Surge Pressure to be 150% of the operating pressure
(h) Fluid temperature 70 degrees (F) with ∆ t = 30 degrees F
(i) Soil unit weight 120 pounds per cubic foot
E. The pipe shall be of the inside diameter as shown on Drawings. Unless indicated otherwise, the inside diameter shall be considered the finished diameter after lining.
F. Pipe Wall Thickness. The pipe wall thickness shall be in accordance with ANSI/AWWA M11, except with a minimum wall thickness of 0.25”, with zero minus tolerances or unless otherwise noted on the drawings. Pipe wall thickness shall be constant for the entire length of pipe section. In restrained lengths, the steel cylinder area shall not be progressively reduced from the point of maximum thrust to the end of the restrained length. The cement mortar lining shall not be used in the pipe wall stiffness calculations.
For pipe diameters up to 12-inches, the Contractor may substitute steel pipe ASTM A53 “Welded and Seamless Steel Pipe” with a thickness known as Schedule 40 (standard weight).
G. Design (Working) Pressure. Unless otherwise indicated, the working (maximum steady state) and field hydrostatic test pressures shall be as indicated on the Drawings. The transient pressure (maximum total unsteady state) shall be 1.5 times the working pressure. Design in accordance with ANSI/AWWA C200 except that the design stress (using a safety factor of 2.0 to yield strength) shall not be greater than 21,000 psi at design working pressure nor shall the design stress (using a safety
A1 - 7
factor of 1.5 to yield strength) be greater than 75 percent of 42,000 psi or 31,500 psi for 42,000 psi steel pipe at design transient pressure. In restrained lengths, design hoop stresses shall not exceed 21,000 psi.
H. Modulus of Soil Reaction. Design calculations which require a modulus of soil reaction (E’) shall assume an E’ of 1500 psi for trench backfill.
I. Bedding Constant. The bedding constant, K shall be 0.10.
b) Page 15055-13, Paragraph 2.02.A., Delete the following:
Minimum wall thickness shall not be less than ¼” or the standard wall thickness for each pipe diameter, whichever is more stringent. Pipe sizes are to be nominal to the outside diameters conforming to AWWA C200.
And replace with,
The pipe wall thickness shall be in accordance with ANSI/AWWA M11, except with a minimum wall thickness of 0.25”, with zero minus tolerances or unless otherwise noted on the drawings.
c) Page 15055-13, Paragraph 2.02.A., ADD the following sentence “Alternatively, pipe diameters up to 12-inches in diameter, shall conform to the requirements of ASTM A53, Type E or S, or ASTM A106, Grade B.”
d) Page 15055-14, Paragraph 2.02. ADD the following paragraphs “N. Pipe Deflection. The requirements of Section 02200 EARTHWORK govern for the excavation and backfilling of trenches for laying steel pipe, fittings, and specials. Conformance with pipe deflection requirements shall be as set forth below.
1. Average allowable pipe deflection is limited to 2% for polyurethane and tape coated steel pipe. In no case shall a single measurement in any direction exceed 1.5 times the average allowable deflection. These measurements include the allowable tolerance for lining thickness.
2. Deflection measurements shall be made by the CONTRACTOR in the presence of the OWNER’s representative. Method for taking measurements shall be agreed to by the OWNER and CONTRACTOR in writing prior to installing the first joint of pipe.
3. Average deflection shall be determined by averaging the pipe’s measured vertical deflection as indicated below. Locations where measurements are taken shall be clearly marked on the interior of the pipe.
a. For pipe joints 36 feet in length or less, measurements shall be taken at two locations, 1/4-distance from each pipe end.
b. For pipe joints longer than 36 feet, measurements shall be taken at three locations including 1/4-distance from each pipe end and at the pipe midpoint.
A1 - 8
4. If the average measured deflection at any joint or any single measurement fails to meet specifications, the entire joint shall be reworked in accordance with the manufacturer’s recommendations and as directed by the ENGINEER at no additional cost to the OWNER. This may include uncovering the pipe and re-compaction of the pipe bedding, and repair of coating.
5. Installed pipe joints will also be examined for flat spots and internal lining stress cracks by the OWNER’s representative. A flat spot is anything flat enough to cause lining damage. Lining damage shall be repaired in accordance with the manufacturer’s recommendations and as directed by the OWNER at no additional cost to the OWNER. Repair of flat spots may include uncovering the pipe and re-compaction of the pipe bedding, and repair of the coating.
6. Where pipe has been reworked to comply with the deflection requirements, CONTRACTOR shall re-measure for deflection no earlier than seven days after the repaired pipe is backfilled. OWNER’s representative will re-inspect for flat spots at this time.
7. No pipe installation shall be accepted until the entire installation is in compliance with the above deflection requirements.
8. All costs associated with measuring for pipe deflection and any repairs or rework associated with meeting these requirements shall be borne by the CONTRACTOR.”
e) Page 15055-16, Paragraph 2.02.K., ADD the following “7. Provide epoxy lining in accordance with AWWA C210 (Liquid Epoxy Coating Systems of the Interior and Exterior of Steel Water Pipelines). Interior epoxy lining shall be applied and inspected prior to installation of the pipe. Epoxy lining shall be Tnemec 140 Pota Pox. Lining system shall be NSF 61 approved. Total interior lining system shall be a minimum of 14 mils DFT.”
f) Page 15055-17, Paragraph 3.02.A., DELETE the following sentence “The single lap welded joint dimensions shall be in conformance with detail 2 of Drawing C3902.”
g) Page 15055-17, Paragraph 3.02.A., ADD the following after the sentence in thrust restrained areas the first joint at either side of the thrust point. “(e.g., Fitting greater than 5 degrees, tees, crosses, dead ends, valves, etc.).”
h) Page 15055-17, Paragraph 3.02.A., ADD the word “lap” after the text “shall be double”.
i) Section 2.02 WELDED STEEL PIPE AND FITTINGS, subparagraph D., Item 1., delete:
Field welded joints for 36 inch diameter pipe and larger shall be single lap-welded joints except in thrust restraint areas the first joint at either side of the thrust point shall be double-lap welded (welded from inside and outside.
A1 - 9
And replace with:
Field welded joints for 36 inch diameter pipe and larger shall be single lap-welded joints. In open cut thrust restrained areas the first joint at either side of the thrust point (eg. fitting greater than 5 degrees, tees, crosses, dead ends, valves, etc) shall be double lap welded from inside and outside.
j) Page 15055-16, Paragraph 2.02., add Item N:
N. Temperature Control Joint Design. Where restrained joints are used, a special longer bell or butt strap joint (temperature control joint) shall be provided at a maximum spacing of 250 feet to account for movement of the installed pipe due to temperature changes. The PIPE MANUFACTURER shall determine joint depth requirement based on anticipated temperature change. The joint shall have a rust inhibitive primer. The pipe shall be homed to mid-way of the joint to allow either expansion or contraction to occur. The PIPE MANUFACTURER shall determine the length required for the longer bell or butt strap as defined by the CONTRACTOR’S pipe laying procedures and the location of the special joint.
Section 16640, IMPRESSED CURRENT CATHODIC PROTECTION
a) Section 2.04 CATHODIC PROTECTION RECTIFIERS, subparagraph A, delete the following sentence:
Power unit shall be air cooled, standard (non-automatic) rectifier suitable for operation on 115/230 volt, 60 Hz. single phase alternating current input. Direct current output shall be as shown on the Plans. Efficiency shall be not less than 70 percent at full load. Rectifiers shall be Super Custom model as manufactured by Universal Rectifiers, Good-All Electric or approved equal, conforming to NEMA MR-20-1958 and listed and labeled by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). Rectifiers shall be installed in pad mounted aesthetic enclosures.
And replace with:
Power unit shall be air cooled, standard (non-automatic) rectifier suitable for operation on 115/230 volt, 60 Hz. single phase alternating current input. Direct current output shall be as shown on the Plans. Efficiency shall be not less than 70 percent at full load. Rectifiers shall be standard air-cooled model as manufactured by Universal Rectifiers, Integrated Rectifier Technologies or approved equal, conforming to NEMA MR-20-1958 and listed and labeled by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). Rectifiers shall be installed in pad mounted aesthetic enclosures.
b) Section 2.05 RECTIFIER ENCLOSURES, subparagraph B, delete the following sentence:
“Enclosure to be floor mounted as shown on the drawings, rated NEMA 4X, 36” wide x 48” high x 24” deep, 12 gauge, type 304 stainless steel with lifting eyes.”
A1 - 10
And replace with:
“Enclosure to be floor mounted as shown on the drawings, rated NEMA 3R, 36” wide x 48” high x 24” deep, 12 gauge, type 304 stainless steel with lifting eyes.”
REVISIONS TO DRAWINGS
SHEET G-3001 – DRAWING INDEX, LEGEND & ABBREVIATIONS
a) In the ‘SHEET LIST TABLE’, delete the following entry:
G-3008 9 CONTRACTOR LAYDOWN AREAS
And replace with the following:
G-3008 9 TERMINUS SITE ACCESS PLAN
SHEET G-3002 – GENERAL NOTES (SHEET 1 OF 2)
a) Add note 16A to ‘SAWS GENERAL WATER NOTES’ which reads “All valves shall open to the right.”
SHEET G-3003 – GENERAL NOTES (SHEET 2 OF 2)
a) Delete ‘SUPPLEMENTARY’ Note 55 which reads:
No more than 200 linear feet of trench excavation in advance of the utility will be allowed at a time.
And replace with the following:
See Specifications Section 02200 for the maximum allowed length of open trench excavation in advance of the utility.
SHEET G-3008 – CONTRACTOR LAYDOWN AREAS
a) Delete Sheet G-3008 in its entirety and replace with the revised version included in this Addendum titled “TERMINUS SITE ACCESS PLAN”
SHEET C-3210 – 36” PIPELINE PLAN & PROFILE STA 733+00 TO 734+50
a) Revise ‘ESTIMATED QUANTITIES’ Table by adding line item 49 shown below:
49 01025 Item 49
FURNISH AND INSTALL CONNECTION TO 36” PIPELINE AT TERMINUS SITE (STA 734+50), IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, COMPLETE IN PLACE
LS 1
A1 - 11
SHEET C-3902 – STEEL PIPE DETAILS
a) Delete Note 2 in its entirety from Detail 2 (Single Lap Weld Detail) and replace with “NotUsed.”
b) Delete Note 3 in Detail 2 (Single Lap Weld Detail) which reads:
In open cut thrust areas, the first joint at either side of the fitting shall be double lap weldedper dtl 6 on this sheet.
And replace with the following:
In open cut thrust restrained areas the first joint at either side of the thrust point (eg. fittinggreater than 5 degrees, tees, crosses, dead ends, valves, etc) shall be double lap welded frominside and outside per dtl 6 on this sheet.
c) Delete the call-out in Detail 5 (Steel Flanged Outlets) which reads:
Steel Reinforcing per Table
And replace with the following:
Steel Reinforcing per Specification
d) Additional Note 4 in Detail 5 (Steel Flanged Outlets) to read as:
Reinforcement type and dimensions shall be designed by the pipe manufacturer perSpecification Section 15056.
e) Delete the table shown in Detail 5 (Steel Flanged Outlets) in its entirety.
f) Delete Note 3 in Detail 6 (Double Lap Weld Detail) which reads:
In open cut thrust areas, the first joint at either side of the fitting shall be double lap welded.
And replace with the following:
In open cut thrust restrained areas the first joint at either side of the thrust point (eg. fittinggreater than 5 degrees, tees, crosses, dead ends, valves, etc) shall be double lap welded frominside and outside.
SHEET C-3903 – MISCELLANEOUS DETAILS
a) Revise the anchor block wall height dimension in Detail 4 (Anchor Block) from 6’-0” to
7’-0”.
SHEET S-3201 – GENERAL STRUCTURAL NOTES
a) Revise General Note 8 to read “Soil properties used for design values are based on preliminarysoil investigations performed during design. Contractor to verify actual conditions and notifyengineer of any discrepancies.”
b) Revise note “Soil Design Parameters” to read “The Allowable Soil Bearing of 3,000 psf usedas a basis of design is from a preliminary soil investigation. Contractor to verify actualconditions and notify engineer of any discrepancies.”
A1 - 12
c) Revise the first note beneath the Geotechnical Design Parameters table which reads “Thesegeotechnical design parameters were provided by Arias GeoProfessional on June 6, 2018.”
To read, “These geotechnical design parameters are based on preliminary soil investigationsperformed during design. Contractor to verify actual conditions and notify engineer of anydiscrepancies.”
d) Delete the second note beneath the Geotechnical Design Parameters table which reads “Pleasenote that the vaults will be backfilled with a granular material which will have an at-restpressure.”
e) In reinforcing note number five, replace the reference to “C.B.C.” with “I.B.C.”.
The remainder of the bid documents remain unchanged.
This addendum is comprised of a total of 45 pages (including attachments).
Mark W. Bush, P.E.
Tetra Tech, Inc.
END OF ADDENDUM No. 1
8/14/2018
General Decision Number: TX180280 08/03/2018 TX280
Superseded General Decision Number: TX20170280
State: Texas
Construction Type: Building
County: Bexar County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family
homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage
of $10.35 for calendar year 2018 applies to all contracts
subject to the Davis-Bacon Act for which the contract is
awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor
must pay all workers in any classification listed on this wage
determination at least $10.35 per hour (or the applicable wage
rate listed on this wage determination, if it is higher) for
all hours spent performing on the contract in calendar year
2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types
of contracts entered into by the federal government that are
subject to the Davis-Bacon Act itself, but it does not apply to
contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(2)-(60). Additional
information on contractor requirements and worker protections
under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/05/2018
1 01/12/2018
2 03/23/2018
3 04/20/2018
4 07/06/2018
5 08/03/2018
ASBE0087-014 01/01/2018
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Duct, Pipe and
Mechanical System Insulation)....$ 22.72 10.02
----------------------------------------------------------------
BOIL0074-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 28.00 22.35
----------------------------------------------------------------
ELEC0060-003 06/01/2016
Rates Fringes
ELECTRICIAN (Communication
Technician Only).................$ 21.57 9%+4.65
----------------------------------------------------------------
ELEC0060-004 06/01/2018
Rates Fringes
ELECTRICIAN (Excludes Low
Voltage Wiring)..................$ 28.30 13%+5.05
----------------------------------------------------------------
ELEV0081-001 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 39.32 32.645+a+b
FOOTNOTES:
A. 6% under 5 years based on regular hourly rate for all
hours worked. 8% over 5 years based on regular hourly rate
for all hours worked.
B. Holidays: New Year's Day; Memorial Day; Independence Day;
Labor Day; Thanksgiving Day; Friday after Thanksgiving Day;
Christmas Day; and Veterans Day.
----------------------------------------------------------------
ENGI0450-002 04/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes......................$ 34.85 9.85
----------------------------------------------------------------
IRON0066-013 06/01/2017
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 21.55 6.73
----------------------------------------------------------------
IRON0084-011 06/01/2017
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 23.27 7.12
----------------------------------------------------------------
PLUM0142-009 07/01/2017
Rates Fringes
HVAC MECHANIC (HVAC
Electrical Temperature
Control Installation Only).......$ 30.25 11.80
HVAC MECHANIC (HVAC Unit
Installation Only)...............$ 30.25 11.80
PIPEFITTER (Including HVAC
Pipe Installation)...............$ 30.25 11.80
PLUMBER (Excludes HVAC Pipe
Installation)....................$ 30.25 11.80
----------------------------------------------------------------
SFTX0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.03 15.84
----------------------------------------------------------------
* SHEE0067-004 04/01/2018
Rates Fringes
Sheet metal worker
Excludes HVAC Duct
Installation................$ 26.35 15.29
HVAC Duct Installation Only.$ 26.10 15.25
----------------------------------------------------------------
SUTX2014-006 07/21/2014
Rates Fringes
BRICKLAYER.......................$ 22.15 0.00
CARPENTER (Acoustical Ceiling
Installation Only)...............$ 17.83 0.00
CARPENTER (Form Work Only).......$ 13.63 0.00
CARPENTER, Excludes
Acoustical Ceiling
Installation, Drywall
Hanging, Form Work, and Metal
Stud Installation................$ 16.86 4.17
CAULKER..........................$ 15.00 0.00
CEMENT MASON/CONCRETE FINISHER...$ 22.27 5.30
DRYWALL FINISHER/TAPER...........$ 13.81 0.00
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 15.18 0.00
ELECTRICIAN (Low Voltage
Wiring Only).....................$ 20.39 3.04
IRONWORKER, REINFORCING..........$ 12.27 0.00
LABORER: Common or General......$ 10.75 0.00
LABORER: Mason Tender - Brick...$ 11.88 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 12.00 0.00
LABORER: Pipelayer..............$ 11.00 0.00
LABORER: Roof Tearoff...........$ 11.28 0.00
LABORER: Landscape and
Irrigation.......................$ 8.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 15.98 0.00
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 14.00 0.00
OPERATOR: Bulldozer.............$ 14.00 0.00
OPERATOR: Drill.................$ 14.50 0.00
OPERATOR: Forklift..............$ 12.50 0.00
OPERATOR: Grader/Blade..........$ 23.00 5.07
OPERATOR: Loader................$ 12.79 0.00
OPERATOR: Mechanic..............$ 18.75 5.12
OPERATOR: Paver (Asphalt,
Aggregate, and Concrete).........$ 16.03 0.00
OPERATOR: Roller................$ 12.00 0.00
PAINTER (Brush, Roller and
Spray), Excludes Drywall
Finishing/Taping.................$ 13.07 0.00
ROOFER...........................$ 12.00 0.00
TILE FINISHER....................$ 11.32 0.00
TILE SETTER......................$ 14.94 0.00
TRUCK DRIVER: Dump Truck........$ 12.39 1.18
TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57
TRUCK DRIVER: Semi-Trailer
Truck............................$ 12.50 0.00
TRUCK DRIVER: Water Truck.......$ 12.00 4.11
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of "identifiers" that indicate whether the particular
rate is a union rate (current union negotiated rate for local),
a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e., Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISION
Central Water Integration Pipeline Segment 5-2 Project SAWS Job No. 18-8615
SAWS Solicitation No. CO-00180
BP-1
BID PROPOSAL
PROPOSAL OF , a corporation a partnership consisting of an individual doing business as
TO THE SAN ANTONIO WATER SYSTEM:
Pursuant to Instructions and Invitations to Bidders, the undersigned proposes to furnish all labor and materials as specified and perform the work required for the project as specified, in accordance with the Plans and Specifications for the following prices to wit: PRICES FOR:
ITEM
NO. SPEC
NO. ITEM DESCRIPTION
(PRICE TO BE WRITTEN IN WORDS)
UNIT QTY UNIT PRICE
(IN FIGURES) TOTAL
(IN FIGURES)
1. 1025,
Item No.
1
Furnish and Install 36” welded steel
pipe by open trench in paved areas
(Sta 700+00 to Sta 718+00), in
accordance with the Contract
Documents, complete in place
LF 1,800 $_________ $_________
2.
COSA
202.1 Furnish and Install Prime Coat GAL 861 $_________ $_________
3. COSA
203.1 Furnish and Install Tack Coat GAL 1,819 $_________ $_________
4. COSA
205.2
Furnish and Install Hot Mix Asphaltic
Pavement Type B 10” thick SY 2,349 $_________ $_________
5. COSA
205.4
Furnish and Install Hot Mix Asphaltic
Pavement Type D – 2” thick SY 5,885 $_________ $_________
6. COSA
206.1
Furnish and Install Asphaltic Treated
Base – 6” thick SY 2,349 $_________ $_________
7.
1025,
Item No.
7
Furnish and Install 36” welded steel
pipe by open trench in unpaved areas
(Sta 718+00 to Sta 734+50), in
accordance with the Contract
Documents, complete in place
LF 1,650 $_________ $_________
8. COSA
208.1
Furnish and Install salvaging, hauling,
& stockpiling reclaimed asphaltic
pavement (Milling) – 2” thick
SY 3,536 $_________ $_________
9.
COSA
103.1
500.1
Remove and Reconstruct Concrete
Curb per COSA requirements LF 30 $_________ $_________
10.
COSA
103.3
502.4
Remove and Reconstruct Concrete
Sidewalk (pebble top) per COSA
requirements
SY 5 $_________ $_________
Central Water Integration Pipeline Segment 5-2 Project SAWS Job No. 18-8615
SAWS Solicitation No. CO-00180
BP-2
ITEM
NO. SPEC
NO. ITEM DESCRIPTION
(PRICE TO BE WRITTEN IN WORDS)
UNIT QTY UNIT PRICE
(IN FIGURES) TOTAL
(IN FIGURES)
11.
COSA
103.3
503.1
Remove and Reconstruct Portland
Concrete Driveway (pebble top) –
residential type per COSA
requirements
SY 188 $_________ $_________
12.
COSA
103.3
502.4
Remove and Reconstruct Portland
Concrete Sidewalk with Wheel Chair
Type I ramp (pebble top) type per
COSA requirements
SY 5 $_________ $_________
13.
COSA
800
Remove and Reconstruct Speed
Hump per COSA requirements SY 49 $_________ $_________
14. COSA
515.1
Furnish and Apply Topsoil (6-inch
depth) CY 367 $_________ $_________
15. 02931 Furnish and Apply Hydroseed SY 2,200 $_________ $_________
16. 1025
Item 16
Furnish and Install 4” combination air
valve, vault and assembly (Sta
713+75), in accordance with the
Contract Documents, complete in
place.
LS 1 $_________ $_________
17. 1025
Item 17
Furnish and install Drain valve
assembly (Sta 703+92 and Sta
733+85), in accordance with the
Contract Documents, complete in
place.
EA 2 $_________ $_________
18. 1025
Item 18
Furnish and Install Access Manway
assembly and vault (Sta 700+17), in
accordance with the Contract
Documents, complete in place.
LS 1 $_________ $_________
19. 1025
Item 19
Furnish and Install connection to 30”
pipeline at Knights Cross Drive (Sta
700+00), in accordance with the
Contract Documents, complete in
place.
LS 1 $_________ $_________
20. 1025
Item 20
Furnish and Install 30” Butterfly
Valves (FLG X FLG) for connection
at Knights Cross Drive (Sta 700+00)
in accordance with the Contract
Documents, complete in place.
EA 3 $_________ $_________
21. 1025
Item 21
Furnish and Install 30” DIP Coupling
Sleeve for connection at Knights
Cross Drive (Sta 700+00) in
accordance with the Contract
Documents, complete in place.
EA 2 $_________ $_________
Central Water Integration Pipeline Segment 5-2 Project SAWS Job No. 18-8615
SAWS Solicitation No. CO-00180
BP-3
ITEM
NO. SPEC
NO. ITEM DESCRIPTION
(PRICE TO BE WRITTEN IN WORDS)
UNIT QTY UNIT PRICE
(IN FIGURES) TOTAL
(IN FIGURES)
22. 1025
Item 22
Furnish and Install 30” DI Tee (FLG
X FLG) at Knights Cross Drive (Sta
700+00) in accordance with the
Contract Documents, complete in
place.
EA 1 $_________ $_________
23. 1025
Item 23
Furnish and Install 30” X 36” STL
Eccentric reducer (FLG X WLD) at
Knights Cross Drive (Sta 700+00) in
accordance with the Contract
Documents, complete in place.
EA 1 $_________ $_________
24. 1025
Item 24
Furnish and Install 30” DIP Spool
(FLG X PE) at Knights Cross Drive
in accordance with the Contract
Documents, complete in place.
LF 10 $_________ $_________
25. 15085 Perform Hydrostatic Pressure Test LS 1 $_________ $_________
26. 1025
Item 26
Furnish and Install temporary blow-
off at Terminus site (Sta 734+40), in
accordance with the Contract
Documents, complete in place.
LS 1 $_________ $_________
27. 16640
Furnish and Install cathodic
protection system in accordance with
the Contract Documents, complete in
place.
LS 1 $_________ $_________
28. COSA
535.1
Furnish and Install all Pavement
Markings, in accordance with the
Contract Documents, complete in
place.
LS 1 $_________ $_________
29. COSA
537.1
Furnish and Install all Pavement
Markers, in accordance with the
Contract Documents, complete in
place.
LS 1 $_________ $_________
30. 1025
Item 30
Remove and reconstruct sewer
laterals, in accordance with the
Contract Documents, complete in
place.
EA 7 $_________ $_________
31. 1025
Item 31
Remove and reconstruct 4’ tall cattle
fence with metal posts in-kind in
accordance with the Contract
Documents, complete in place
LF 835 $_________ $_________
32. COSA
540
Furnish and Install Storm Water
Pollution Prevention Plan - Erosion &
Sedimentation Controls in accordance
with the Contract Documents,
complete in place.
LS 1 $_________ $_________
Central Water Integration Pipeline Segment 5-2 Project SAWS Job No. 18-8615
SAWS Solicitation No. CO-00180
BP-4
ITEM
NO. SPEC
NO. ITEM DESCRIPTION
(PRICE TO BE WRITTEN IN WORDS)
UNIT QTY UNIT PRICE
(IN FIGURES) TOTAL
(IN FIGURES)
33. COSA
530.1
Furnish and Install Barricades, Signs
and Traffic Handling - in accordance
with the Contract Documents,
complete in place.
LS 1 $_________ $_________
34. SAWS
550.1
Provide trench excavation safety
protection LF 3,631 $_________ $_________
35. SAWS
101
Prepare right-of-way, in accordance
with the Contract Documents,
complete in place.
LS 1 $_________ $_________
36. 1510-A
Furnish and Install Temporary Void
Protection (4-ft by 8-ft Plywood
Sheet)
EA 40 $_________ $_________
37. 1510-B Furnish and Install Controlled Low
Strength Material. CY 1000 $_________ $_________
38. 1510-C Furnish and Install Pea Gravel-Filled
Polypropylene Bags (1-cu.ft) EA 400 $_________ $_________
39. 1510-D Furnish and Install 3 To 5 Inch Rock CY 500 $_________ $_________
40. 1510-E Furnish and Install Filter Fabric for
Void Mitigation SY 500 $_________ $_________
41. 1510-F Furnish and Install Permanent Turf
Reinforcement Mat (PTRM) SY 500 $_________ $_________
42. 1510-G Furnish and Install Low Slump
Concrete CF 150 $_________ $_________
43. 1510-H
Furnish and Install Special Trench
Safety Associated with Observation
of Voids
LF 20 $_________ $_________
44. 1510-I(a) Downtime Associated with
Observation of Voids in Trenches Day 10 $_________ $_________
45. SP100A
Intermediate
Demobilization/Remobilization
(Open-cut Construction)
EA 1 $_________ $_________
46. 1025
Item 46
Furnish and Install Electrical Work in
accordance with the Contract
Documents, complete in place
LS 1 $_________ $_________
47. 15080
Disinfect Water System, in
accordance with the Contract
Documents, complete in place.
LS 1 $_________ $_________
48. 1025
Item 48
Connection to 36” pipeline at
Terminus Site (Sta 734+50), in
accordance with the Contract
Documents, complete in place.
LS 1 $_________ $_________
Central Water Integration Pipeline Segment 5-2 Project SAWS Job No. 18-8615
SAWS Solicitation No. CO-00180
BP-5
ITEM
NO. SPEC
NO. ITEM DESCRIPTION
(PRICE TO BE WRITTEN IN WORDS)
UNIT QTY UNIT PRICE
(IN FIGURES) TOTAL
(IN FIGURES)
SUBTOTAL BASE BID AMOUNT
(Items 1 - 48)
$_________
49. 100.1
SP100A
Mobilization and Demobilization –
This item shall include project move-
in and move-out of personnel and
equipment, for all work including
furnishing all labor, materials, tools,
equipment and incidentals required to
mobilize, demobilize, bond and
insure the Work for the project in
accordance with the Contract
Documents, complete in place.
Maximum of 5% of Line Item ‘A.
SUBTOTAL BASE BID AMOUNT
(Items 1 – 48)’
LS 1 $_________ $_________
TOTAL BID AMOUNT $_________
Mobilization and Demobilization lump sum bid shall be limited to a maximum 5% of the Line Item ‘A.
SUBTOTAL BASE BID AMOUNT (Items 1 - 48)’. Line Item ‘A. SUBTOTAL BASE BID AMOUNT
(Items 1 - 48)’ is defined as all bid items EXCLUDING Item 49 – Mobilization and Demobilization. If
the Lump Sum price for Item 49 exceeds the allowable maximum stated for Mobilization and
Demobilization, SAWS reserves the right to cap the amount at 5% and adjust the extension of the
bid item accordingly. ______________________________ BIDDER’S SIGNATURE & TITLE FIRM’S NAME (TYPE OR PRINT) FIRM’S ADDRESS FIRM’S PHONE NO./FAX NO. FIRM’S EMAIL ADDRESS
Central Water Integration Pipeline Segment 5-2 Project SAWS Job No. 18-8615
SAWS Solicitation No. CO-00180
BP-6
The Contractor herein acknowledges receipt of the following:
Addendum Nos._________________________________ OWNER RESERVES THE RIGHT TO ACCEPT THE OVERALL MOST RESPONSIBLE BID. The Bidder offers to construct the Project in accordance with the Contract Documents for the contract price, to complete all work on the Project within 260 calendar days after the start date, as set forth in the Authorization to Proceed. The Bidder understands and accepts the provisions of the Contract Documents relating to liquidated damages of the Project if not completed on time. Complete the additional requirements of the Bid Proposal which are included on the following pages.
END OF SECTION
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 1
SECTION 01025
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 DESCRIPTION
A. This section defines the method that will be used to determine the quantities of Work
performed or materials supplied and establish the basis upon which payment will be made.
1.02 ADMINISTRATIVE SUBMITTALS
A. Schedule of Values: Submit schedule on CONTRACTOR's standard form. Refer to
Paragraph 1.05 of this Section and Section 01300 – Submittals for additional requirements.
B. Schedule of Estimated Progress Payments (refer to Paragraph 1.06 of this Section for
additional requirements):
1. Submit with initially acceptable Schedule of Values.
2. Submit adjustments thereto with Application for Payment.
C. Application for Payment.
D. Final Application for Payment.
1.03 RELATED WORK
A. Section 01300 – Submittals.
1.04 PRICE
A. Required items of Work and incidentals necessary for the satisfactory completion of the
Project shall be considered incidental to the specified Work required under this contract
and shall be considered as included in the unit prices for the various proposal items.
CONTRACTOR shall prepare his Bid accordingly to allow for such items:
1. Not specifically listed in the Bid Proposal.
2. Not specified in this section to be measured or to be included in one of the items
listed in the Bid Proposal.
3. To include CONTRACTOR’s overhead and profit.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 2
B. Work includes the furnishing of all labor, materials, equipment, tools, and related items for
performing all operations required to complete the Project satisfactorily in place, as
specified by the Contract Documents.
1.05 SCHEDULE OF ESTIMATED PROGRESS PAYMENTS
A. Show estimated payment requests throughout Contract Times aggregating the initial
Contract Price.
B. Base estimated progress payments on initially acceptable progress schedule. Adjust to
reflect subsequent adjustments in progress schedule and Contract Price as reflected by
modifications to the Contract Documents.
1.06 APPLICATION FOR PAYMENT
A. Reference Article VII Contract Payments of the Contract General Conditions.
B. Preparation:
1. Round values to nearest dollar.
2. List each Change Order and Written Amendment executed prior to date of
submission as separate line item. Totals to equal those shown on the Transmittal
Summary Form for each schedule as applicable.
3. Submit Application for Payment, including a Transmittal Summary Form and
detailed Application for Payment Form(s) for each schedule as applicable, a listing
of materials on hand for each schedule as applicable and such supporting data as
may be requested by OWNER.
C. Include accepted Schedule of Values for each schedule or portion of Work, the unit price
breakdown for Work to be paid on unit price basis, a listing of OWNER-selected equipment
if applicable, and allowances, as appropriate
1.07 MEASUREMENT – GENERAL
A. Weighing, measuring, and metering devices used to measure quantity of materials for
Work shall be suitable for purpose intended and conform to tolerances and specifications
as specified in National Institute of Standards and Technology, Handbook 44.
B. Whenever pay quantities of material are determined by weight, the material shall be
weighed on scales furnished by CONTRACTOR and certified accurate by the state agency
responsible. A weight or load slip shall be obtained from the weigh facility and delivered
to the OWNER's representative at the point of delivery of the material.
C. Vehicles used to haul material being paid for by weight shall be weighed empty daily and
at such additional times as required by OWNER. Each vehicle shall bear a plainly legible
identification mark.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 3
D. All materials that are specified for measurement by the cubic yard measured in the vehicle
shall be hauled in vehicles of such type and size that the actual contents may be readily and
accurately determined. Unless all vehicles are of uniform capacity, each vehicle must bear
a plainly legible identification mark indicating its water level capacity. All vehicles shall
be loaded to at least their water level capacity. Loads hauled in vehicles not meeting the
above requirements or loads of a quantity less than the capacity of the vehicle, measured
after being leveled off as above provided, will be subject to rejection, and no compensation
will be allowed for such material.
E. Where measurement of quantities depends on elevation of existing ground, elevations
obtained during construction will be compared with those shown on Drawings. Variations
of l foot or less will be ignored, and profiles shown on Drawings will be used for
determining quantities. Quantities will be based on ground profiles shown.
F. Units of measure shown on the Schedule of Values shall be as follows unless specified
otherwise.
Item Method of Measurement
AC Acre-Field Measure by OWNER
CY Cubic Yard-Field Measure by OWNER within the limits specified or shown
CY-VM Cubic Yard-Measured in the Vehicle by Volume
EA Each-Field Count by OWNER
GAL Gallon-Field Measure by OWNER
HR Hour
LB Pound(s)-Weight Measure by Scale
LF Linear Foot-Field Measure by OWNER
LS Lump Sum-Unit is one; no measurement will be made
MFBM Thousand Foot Board Measure-Delivery Invoice
SF Square Foot
SY Square Yard
TON Ton-Weight Measure by Scale (2,000 pounds)
1.08 PAYMENT
A. Reference Article VII Contract Payments of the General Conditions.
B. General:
1. The date for CONTRACTOR's submission of monthly Application for Payment
shall be established at the Pre-construction Conference.
C. Payment for all Work shown or specified in the Contract Documents is included in the
Contract Price. No measurement or payment will be made for individual items.
1.09 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS
A. Payment will not be made for the following:
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 4
1. Loading, hauling, and disposing of rejected material.
2. Quantities of material wasted or disposed of in manner not called for under the
Contract Documents.
3. Rejected loads of material, including material rejected after it has been placed by
reason of failure of CONTRACTOR to conform to provisions of the Contract
Documents.
4. Material not unloaded from transporting vehicle.
5. Defective Work not accepted by OWNER.
6. Material remaining on hand after completion of Work.
1.10 PARTIAL PAYMENT FOR STORED MATERIALS AND EQUIPMENT
A. Partial payment for stored materials and equipment shall be in accordance with Article VII,
Section 7.2 of the General Conditions of these Contract Documents and any revisions to
said General Conditions as documented in the Supplementary Conditions.
1.11 BID PROPOSAL ITEMS
A. Bidder will complete the Work for the following listed Work items for the prices listed on
the Bid Proposal:
Item No. 1: Furnish and Install 36” welded steel pipe by open trench in paved areas (Sta
700+00 to Sta 718+00), in accordance with the Contract Documents, complete in
place
1. Measurement – Measurement of Item No. 1 will be by lineal foot of pipe installed.
2. Payment for steel pipe installed will be made at the unit price cost per lineal foot
of pipe furnished and installed by the open cut method. Payment shall constitute
full compensation to the CONTRACTOR for furnishing all labor, equipment,
tools, and materials. Such payment shall include, but not be limited to: factory
QA/QC, factory witness tests, fabrication and delivery of welded steel pipe,
fittings, removal of existing asphalt concrete pavement, excavation, select pipe
bedding material, backfill, compaction, welded joints, weld testing, pipe lining and
coating repair, hauling and disposition of surplus excavated material as specified
and as indicated on the Contract Drawings and Specifications.
Item No. 2: Furnish and Install Prime Coat
1. Description - Furnish and Install Prime Coat in paved areas, in accordance with
the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 2 will be by gallons.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 5
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 3: Furnsh and Install Tack Coat
1. Description - Furnish and Install tack coat in paved areas, in accordance with the
Contract Documents, complete in place.
1. Measurement – Measurement of Item No. 3 will be by gallons.
2. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 4: Furnish and Install Hot Mix Asphaltic Pavement Type B - 10” thick
1. Description - Hot Mix Asphaltic Pavement Type B -10” thick, in accordance
with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 4 will be by square yards.
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 5: Furnish and Install Hot Mix Asphaltic Pavement Type D – 2” thick
1. Description - Furnish and Install Hot Mix Asphaltic Pavement Type D – 2”
thick, in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 5 will be by square yards.
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 6
Item No. 6: Furnish and Install Asphaltic Treated Base – 6” thick
1. Description – Furnish and Install Asphaltic Treated Base – 6” thick, in
accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 6 will be by square yards.
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 7: Furnish and Install 36” welded steel pipe by open trench in unpaved areas (Sta
718+00 to Sta 734+50), in accordance with the Contract Documents, complete in
place
1. Measurement – Measurement of Item No. 7 will be by lineal foot.
2. Payment for steel pipe installed will be made at the unit cost per lineal foot of pipe
furnished and installed by the open cut method. Payment shall constitute full
compensation to the CONTRACTOR for furnishing all labor, equipment, tools,
and materials. Such payment shall include, but not be limited to: factory QA/QC,
factory witness tests, fabrication and delivery of welded steel pipe, fittings,
excavation, select pipe bedding material, backfill, controlled low strength material,
compaction, welded joints, weld testing, pipe lining and coating repair, hauling
and disposition of surplus excavated material as specified and as indicated on the
Contract Drawings and Specifications.
Item No. 8: Furnish and Install Salvaging, hauling, & stockpiling reclaimed asphaltic
pavement (Milling) at Knight Cross Dr – 2” thick
1. Description - Salvaging, hauling, & stockpiling reclaimed asphaltic pavement
(Milling) at Knight Cross Dr – 2” thick, in accordance with the Contract
Documents, complete in place.
2. Measurement – Measurement of Item No. 8 will be by square yards.
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 9: Remove and Reconstruct Concrete Curb per COSA requirements
1. Description – Remove and Reconstruct Concrete Curb per COSA requirements, in
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 7
accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 9 will be by lineal feet.
3. Payment shall be made for the work performed and in accordance with the unit
cost. Payment shall constitute full compensation to the CONTRACTOR for
furnishing all: labor, equipment, tools, and materials; and for performing all
operations required to furnish to the OWNER this item, as specified and as
indicated on the Contract Drawings and Specifications.
Item No. 10: Remove and Reconstruct Concrete Sidewalk per COSA requirements
1. Description – Remove and Reconstruct Concrete Sidewalk per COSA
requirements, in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 10 will be by lineal feet.
3. Payment shall be made for the work performed and in accordance with the unit
cost. Payment shall constitute full compensation to the CONTRACTOR for
furnishing all: labor, equipment, tools, and materials; and for performing all
operations required to furnish to the OWNER this item, as specified and as
indicated on the Contract Drawings and Specifications.
Item No. 11: Remove and Reconstruct Portland Cement Concrete Driveway – Residential Type
per COSA requirements
1. Description – Remove and Reconstruct Portland Cement Concrete Driveway –
Commercial Type per COSA requirements, in accordance with the Contract
Documents, complete in place.
2. Measurement – Measurement of Item No. 11 will be by square yards.
3. Payment shall be made for the work performed and in accordance with the unit cost.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all: labor, equipment, tools, and materials; and for performing all operations
required to furnish to the OWNER this item, as specified and as indicated on the
Contract Drawings and Specifications.
Item No. 12: Remove and Reconstruct Portland Concrete Sidewalk with Wheel Chair Type I ramp
(pebble top) type per COSA requirements
1. Description – Remove and Reconstruct Portland Concrete Sidewalk with Wheel
Chair Type I ramp (pebble top) type per COSA requirements, in accordance with
the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 12 will be by square yards.
3. Payment shall be made for the work performed and in accordance with the unit cost.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 8
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all: labor, equipment, tools, and materials; and for performing all operations
required to furnish to the OWNER this item, as specified and as indicated on the
Contract Drawings and Specifications.
Item No. 13: Remove and Reconstruct Speed Hump per COSA requirements
1. Description - Remove and Reconstruct Speed Hump per COSA requirements, in
accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 13 will be by square yards.
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 14: Furnish and Apply Topsoil (6-inch depth)
1. Description - Furnish and Apply Topsoil (6-inch depth), in accordance with the
Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 14 will be by cubic yards.
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 15: Furnish and Apply Hydroseed
1. Description - Furnish and Apply Hydroseed, in accordance with the Contract
Documents, complete in place.
2. Measurement – Measurement of Item No. 15 will be by square yards.
3. Payment of the full price shall be paid for the work performed and in accordance
with the Schedule of Values. Payment shall constitute full compensation to the
CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and
for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 9
Item No. 16: Furnish and Install 4” combination air valve, vault and assembly (Sta 713+75), in
accordance with the Contract Documents, complete in place.
1. Description - Furnish and Install 4” combination air valve, vault and assembly
(Sta 713+75), in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 16 will be by lump sum price.
3. Payment for the combination air valve vault will be made at the lump sum price.
The CONTRACTOR shall prepare a Schedule of Values per Section 1.05.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all labor, equipment, tools, and materials. Such payment shall include, but not be
limited to: precast concrete vault, access hatch, ladder, air vents, PVC piping,
handling eyes, vault drain sump, reinforced concrete encasement, steel pipe,
fittings, weld testing, insulating flange kits, air and vacuum valve, air/vac goose
neck piping, gate valve, painting, excavation, backfilling, shoring, hauling and
disposition of surplus excavated material as specified and as indicated on the
Contract Drawings and Specifications.
Item No. 17: Furnish and install Drain valve assembly (Sta 703+92 and Sta 733+85), in
accordance with the Contract Documents, complete in place.
1. Description - Furnish and install Drain valve assembly (Sta 703+92 and Sta
733+85) in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 17 will be by each item.
3. Payment for the drain valve assembly will be made at per each. Payment shall
constitute full compensation to the CONTRACTOR for furnishing all labor,
equipment, tools, and materials. Such payment shall include, but not be limited
to: precast concrete shaft and rings, manhole cover, piping, reinforced concrete
valves, excavation, backfilling, shoring, hauling and disposition of surplus
excavated material as specified and as indicated on the Contract Drawings and
Specifications.
Item No. 18: Furnish and Install Access Manway assembly and vault (Sta 700+17), in
accordance with the Contract Documents, complete in place.
1. Description - Furnish and Install Access Manway assembly and vault (Sta
700+17), in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 18 will be by lump sum.
3. Payment for the access manway vault will be made at the lump sum price. The
CONTRACTOR shall prepare a Schedule of Values per Section 1.05. Payment
shall constitute full compensation to the CONTRACTOR for furnishing all labor,
equipment, tools, and materials. Such payment shall include, but not be limited
to: precast concrete vault, access hatch, ladder, air vents, PVC piping, handling
eyes, vault drain sump, reinforced concrete encasement, steel pipe, fittings, weld
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 10
testing, insulating flange kits, air valve, gate valve, painting, excavation,
backfilling, shoring, hauling and disposition of surplus excavated material as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 19: Furnish and Install connection to 30” pipeline at Knights Cross Drive (Sta
700+00), in accordance with the Contract Documents, complete in place.
1. Description - Furnish and Install connection to 30” pipeline at Knights Cross
Drive (Sta 700+00), in accordance with the Contract Documents, complete in
place.
2. Measurement – Measurement of Item No. 19 will be by lump sum.
3. Payment for the connection will be made at the lump sum price. The
CONTRACTOR shall prepare a Schedule of Values per Section 1.05. Payment
shall constitute full compensation to the CONTRACTOR for furnishing all labor,
equipment, tools, and materials. Such payment shall include, but not be limited
to: excavation, backfilling, shoring, removal and disposal of existing piping,
hauling and disposition of surplus excavated material as specified and as
indicated on the Contract Drawings and Specifications.
Item No. 20: Furnish and Install 30” Butterfly Valves (FLG X FLG) for connection at Knights
Cross Drive (Sta 700+00) in accordance with the Contract Documents, complete
in place.
1. Description – Furnish and Install 30” Butterfly Valves (FLG X FLG) for
connection at Knights Cross Drive (Sta 700+00) in accordance with the Contract
Documents, complete in place
2. Measurement – Measurement of Item No. 20 will be by each item.
3. Payment for butterfly valves will be made at the unit cost per each item installed.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all labor, equipment, tools, and materials. Such payment shall include, but not be
limited to: fabrication, delivery, testing and installation of valve, gear box, valve
can, valve stem extension, masonry support, reinforce concrete slab, excavation,
backfill, compaction, hauling and disposition of surplus excavated material as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 21: Furnish and Install 30” DIP Coupling Sleeve for connection at Knights Cross Drive
(Sta 700+00) in accordance with the Contract Documents, complete in place
1. Description – 30” DIP Coupling Sleeve for connection at Knights Cross Drive in
accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 21 will be by each item.
3. Payment for couplings will be made at the unit cost per each item installed.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 11
all labor, equipment, tools, and materials. Such payment shall include, but not be
limited to: fabrication, delivery, install of coupling, excavation, backfill,
compaction, hauling and disposition of surplus excavated material as specified
and as indicated on the Contract Drawings and Specifications.
Item No. 22: Furnish and Install 30” DI Tee (FLG X FLG) at Knights Cross Drive (Sta 700+00)
in accordance with the Contract Documents, complete in place.
1. Description – Furnish and Install 30” DI Tee (FLG X FLG) at Knights Cross
Drive (Sta 700+00) in accordance with the Contract Documents, complete in
place.
2. Measurement – Measurement of Item No. 22 will be by each item.
3. Payment for the tees will be made at the unit cost per each item installed.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all labor, equipment, tools, and materials. Such payment shall include, but not be
limited to: fabrication, delivery, install of tee, excavation, backfill, compaction,
hauling and disposition of surplus excavated material as specified and as
indicated on the Contract Drawings and Specifications.
Item No. 23: Furnish and Install 30” X 36” STL Eccentric reducer (FLG X WLD) at Knights
Cross Drive (Sta 700+00) in accordance with the Contract Documents, complete
in place.
1. Description – Furnish and Install 30” X 36” STL Eccentric reducer (FLG X
WLD) at Knights Cross Drive (Sta 700+00) in accordance with the Contract
Documents, complete in place.
2. Measurement – Measurement of Item No. 23 will be by each item.
3. Payment for the reducers will be made at the unit cost per each item installed.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all labor, equipment, tools, and materials. Such payment shall include, but not be
limited to: fabrication, delivery, installation of reducer, excavation, backfill,
compaction, hauling and disposition of surplus excavated material as specified
and as indicated on the Contract Drawings and Specifications.
Item No. 24: Furnish and Install 30” DIP Spool (FLG X PE) at Knights Cross Drive in
accordance with the Contract Documents, complete in place.
1. Description – Furnish and Install 30” DIP Spool (FLG X PE) at Knights Cross
Drive in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 24 will be by lineal foot.
3. Payment for the DIP spools will be made at the unit cost per lineal foot installed.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 12
all labor, equipment, tools, and materials. Such payment shall include, but not be
limited to: fabrication, delivery, install of the spools, excavation, backfill,
compaction, hauling and disposition of surplus excavated material as specified
and as indicated on the Contract Drawings and Specifications.
Item No. 25: Perform Hydrostatic Pressure Test
1. Description – Perform Hydrostatic Pressure Test, in accordance with the Contract
Documents, complete in place.
2. Measurement – Measurement of Item No. 25 will be by lump sum.
3. Payment for the connection will be made at the lump sum price. The
CONTRACTOR shall prepare a Schedule of Values per Section 1.05. Payment
shall constitute full compensation to the CONTRACTOR for furnishing all labor,
equipment, tools, and materials as specified and as indicated on the Contract
Drawings and Specifications.
Item No. 26: Furnish and Install temporary blow-off at Terminus site (Sta 734+40), in
accordance with the Contract Documents, complete in place.
1. Description – Furnish and Install temporary blow-off at Terminus site (Sta
734+40), in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 26 will be by lump sum.
3. Payment for the connection will be made at the lump sum price. The
CONTRACTOR shall prepare a Schedule of Values per Section 1.05. Payment
shall constitute full compensation to the CONTRACTOR for furnishing all labor,
equipment, tools, and materials. Such payment shall include, but not be limited
to: excavation, backfilling, shoring, piping, valves, hauling and disposition of
surplus excavated material as specified and as indicated on the Contract
Drawings and Specifications.
Item No. 27: Furnish and Install cathodic protection system in accordance with the Contract
Documents, complete in place.
1. Description – Furnish and Install cathodic protection system in accordance with
the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 27 will be by lump sum.
3. Payment of the full price shall be paid for the work performed for the lump sum
amount as specified in Section 16640. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 28: Furnish and Install all Pavement Markings, in accordance with the Contract
Documents, complete in place.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 13
1. Measurement – Measurement of Item No. 46 will be by lump sum.
2. Payment of the full price shall be paid for the work performed for the lump sum
amount as specified in Section COSA 535.1. The CONTRACTOR shall prepare
a Schedule of Values per Section 1.05. Payment shall constitute full
compensation to the CONTRACTOR for furnishing all: labor, equipment, tools,
and materials; and for performing all operations required to furnish to the
OWNER this item, as specified and as indicated on the Contract Drawings and
Specifications.
Item No. 29: Furnish and Install all Pavement Markers, in accordance with the Contract
Documents, complete in place.
1. Measurement – Measurement of Item No. 47 will be by lump sum.
2. Payment of the full price shall be paid for the work performed for the lump sum
amount as specified in Section COSA 537.1. The CONTRACTOR shall prepare
a Schedule of Values per Section 1.05. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 30: Remove and reconstruct sewer laterals, in accordance with the Contract
Documents, complete in place.
1. Measurement – Measurement of Item No. 30 will be by each lateral.
2. Payment for the sewer laterals will be made at the unit cost per each lateral
installed. Payment shall constitute full compensation to the CONTRACTOR for
furnishing all labor, equipment, tools, and materials. Such payment shall include,
but not be limited to: piping, couplings, excavation, backfill, shoring,
compaction, hauling and disposition of surplus excavated material as specified
and as indicated on the Contract Drawings and Specifications.
Item No. 31: Remove and reconstruct 4’ tall cattle fence with metal posts in-kind in accordance
with the Contract Documents, complete in place
1. Description – Remove and reconstruct 4’ tall cattle fence with metal posts in-
kind in accordance with the Contract Documents, complete in place
2. Measurement – Measurement of Item No. 31 will be by lineal foot.
3. Payment for the cattle fence will be made at the unit cost foot of fence installed.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all labor, equipment, tools, and materials. Such payment shall include, but not be
limited to: removal and disposal of existing fence, temporary fencing during
construction, new fencing, excavation, backfill, compaction, hauling and
disposition of surplus excavated material as specified and as indicated on the
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 14
Contract Drawings and Specifications.
Item No. 32: Furnish and Install Storm Water Pollution Prevention Plan - Erosion &
Sedimentation Controls in accordance with the Contract Documents, complete in
place.
1. Measurement – Measurement of Item No. 32 will be by lump sum.
2. Payment for the Pavement Markers will be made at the lump sum price. The
CONTRACTOR shall prepare a Schedule of Values per Section 1.05. Payment
shall constitute full compensation to the CONTRACTOR for furnishing all: labor,
equipment, tools, and materials; and for performing all operations required to
furnish to the OWNER this item, as specified and as indicated on the Contract
Drawings and Specifications.
Item No. 33: Furnish and Install Barricades, Signs and Traffic Handling - in accordance with
the Contract Documents, complete in place
.
1. Description – Barricades, Signs and Traffic Handling, in accordance with the
Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 33 will be by lump sum.
3. Payment of the full price shall be paid for the work performed for the lump sum
amount as specified in Section COSA 530.1. The CONTRACTOR shall prepare
a Schedule of Values per Section 1.05. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 34: Provide trench excavation safety protection
1. Description – Trench excavation safety protection in accordance with the Contract
Documents, complete in place.
2. Measurement – Measurement of Item No. 34 will be by lineal feet.
3. Payment shall be made for the work performed and in accordance with the unit
cost as specified in SAWS 550.1. Payment shall constitute full compensation to
the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 35: Prepare Right-of-Way
1. Description – Preparing right-of-way in accordance with the Contract
Documents, complete in place.
2. Measurement – Measurement of Item No. 35 will be by lump sum.
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 15
3. Payment for the preparation right of way will be made at the lump sum price and
as described in Specifications Section 101. The CONTRACTOR shall prepare a
Schedule of Values per Section 1.05. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 36: Furnish and Install Temporary Void Protection (4-ft by 8-ft Plywood Sheet)
1. Measurement – Measurement of Item No. 36 will be by each unit.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full compensation to
the CONTRACTOR for furnishing all: labor, equipment, tools, and materials; and for
performing all operations required to furnish to the OWNER this item, as specified
and as indicated on the Contract Drawings and Specifications.
Item No. 37: Furnish and Install Controlled Low Strength Material.
1. Measurement – Measurement of Item No. 37 will be by the cubic yard.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 38: Furnish and Install Pea Gravel-Filled Polypropylene Bags (1-cu.ft)
1. Measurement – Measurement of Item No. 38 will be by the cubic foot.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 39: Furnish and Install 3 To 5 Inch Rock
1. Measurement – Measurement of Item No. 39 will be by the cubic yard.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 40: Furnish and Install Filter Fabric for Void Mitigation
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 16
1. Measurement – Measurement of Item No. 40 will be by the square yard.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full compensation
to the CONTRACTOR for furnishing all: labor, equipment, tools, and materials;
and for performing all operations required to furnish to the OWNER this item, as
specified and as indicated on the Contract Drawings and Specifications.
Item No. 41: Furnish and Install Permanent Turf Reinforcement Mat (PTRM)
1. Measurement – Measurement of Item No. 41 will be by the square yard.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full
compensation to the CONTRACTOR for furnishing all: labor, equipment, tools,
and materials; and for performing all operations required to furnish to the
OWNER this item, as specified and as indicated on the Contract Drawings and
Specifications.
Item No. 42: Furnish and Install Low Slump Concrete
1. Measurement – Measurement of Item No. 42 will be by the cubic foot.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full
compensation to the CONTRACTOR for furnishing all: labor, equipment,
tools, and materials; and for performing all operations required to furnish to the
OWNER this item, as specified and as indicated on the Contract Drawings and
Specifications.
Item No. 43: Furnish and Install Special Trench Safety Associated with Observation of Voids
1. Measurement – Measurement of Item No. 43 will be by the linear foot.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full
compensation to the CONTRACTOR for furnishing all: labor, equipment,
tools, and materials; and for performing all operations required to furnish to the
OWNER this item, as specified and as indicated on the Contract Drawings and
Specifications.
Item No. 44: Downtime Associated with Observation of Voids in Trenches
1. Measurement – Measurement of Item No. 44 will be by the calendar day.
2. Payment of the full price shall be paid for the work performed for the unit price
amount as specified in Section 01510. Payment shall constitute full
compensation to the CONTRACTOR for furnishing all: labor, equipment,
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 17
tools, and materials; and for performing all operations required to furnish to the
OWNER this item, as specified and as indicated on the Contract Drawings and
Specifications.
Item No. 45: Intermediate Demobilization/Remobilization (Open-cut Construction)
1. Description – Intermediate Demobilization/Remobilization (Open-cut
Construction) in accordance with the Contract Documents, complete in place.
2. Measurement – Measurement of Item No. 45 will be by each item.
3. Payment of the full price shall be paid for the work performed for the unit price.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all: labor, equipment, tools, and materials; and for performing all operations
required to furnish to the OWNER this item, as specified and as indicated on the
Contract Drawings and Specifications.
Item No. 46: Furnish and Install Electrical Work in accordance with the Contract Documents,
complete in place
1. Measurement – Measurement of Item No. 46 will be by lump sum.
2. Payment for the electrical will be made at the lump sum price. The
CONTRACTOR shall prepare a Schedule of Values per Section 1.05. Payment
shall constitute full compensation to the CONTRACTOR for furnishing all: labor,
equipment, tools, and materials; and for performing all operations required to
furnish to the OWNER this item, as specified and as indicated on the Contract
Drawings and Specifications.
Item No. 47: Disinfect Water System, in accordance with the Contract Documents, complete in
place.
1. Measurement – Measurement of Item No. 47 will be by lump sum.
2. Payment for the disinfection of the water system will be made at the lump sum
price. The CONTRACTOR shall prepare a Schedule of Values per Section 1.05.
Payment shall constitute full compensation to the CONTRACTOR for furnishing
all: labor, equipment, tools, and materials; and for performing all operations
required to furnish to the OWNER this item, as specified and as indicated on the
Contract Drawings and Specifications.
Item No. 48: Connection to 36” pipeline at Terminus Site (Sta 734+50), in accordance with the
Contract Documents, complete in place.
1. Measurement – Measurement of Item No. 48 will be by lump sum.
2. Payment for the connection to the existing 36” pipeline will be made at the lump
sum price. The CONTRACTOR shall prepare a Schedule of Values per Section
1.05. Payment shall constitute full compensation to the CONTRACTOR for
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 18
furnishing all labor, equipment, tools, and materials. Such payment shall include,
but not be limited to: excavation, removal of dish head and temporary blow-off,
steel pipe, steel fittings, weld testing, butt straps, backfilling, hauling and
disposition of surplus excavated material as specified and as indicated on the
Contract Drawings and Specifications.
Item No. 49: Mobilization and Demobilization
1. Description – Work item shall include mobilization and demobilization costs
associated with the Central Water Integration Pipeline Project scope. This item
shall include project move-in and move-out of personnel and equipment, for all
work including furnishing all labor, materials, tools, equipment and incidentals
required to mobilize, demobilize, bond and insure the Work for the project in
accordance with the Contract Documents, complete in place
2. Measurement – Measurement of Item No. 49 will be by lump sum as the work
progresses. If the Lump Sum price for Item 49 exceeds the allowable maximum
stated for Mobilization and Demobilization, SAWS reserves the right to cap the
amount at 5% and adjust the extension of the bid item accordingly.
3. Payment – Partial payments of the lump sum bid for mobilization will be as
follows:
a. When 1% of the adjusted contract amount for construction items (which
is defined as the total contract amount less the lump sum proposal for
mobilization) is earned, 50% of the mobilization lump sum proposal
will be paid. Insurance and Bonds will be paid on the initial request for
payment under a sub-heading to mobilization entitled "Insurance and
Bonds". The amount paid for Insurance and Bonds will not exceed 3%
of the total contract amount for construction items. Receipts or other
proof of payment for the full amount of compensation requested under
the sub-heading of “Insurance and Bonds” shall be provided to the
OWNER with the request for payment.
b. When 5% of the adjusted contract amount for construction items is
earned, 75% of the mobilization lump sum proposal will be paid.
c. Upon completion of all Work under this contract, payment for the
remainder of the lump sum proposal for mobilization will be made.
PART 2 PRODUCTS – NOT USED
PART 3 EXECUTION – NOT USED
END OF SECTION
CENTRAL WATER INTEGRATION PIPELINE MEASUREMENT AND PAYMENT
PIPELINE SEGMENT 5-2 PROJECT JULY 2018
001025 - 19
This page left intentionally blank
CH
KD
:
DR
WN
:
PR
OJ:
DE
SN
:
www.tetratech.com
MARK DATE DESCRIPTION BY
8/10/2018 4:04:22 PM - W:\WORK\C-1471 SAWS VISTA RIDGE INTEGRATION PROJECT (TETRA TECH)\DESIGN\CIVIL\CWIP TRANSMISSION PIPELINES\SEGMENT 5-2\CONSTRUCTION DOCUMENTS\CONTRACTOR LAYDOWN AREAS.DWG - VICTORIA SANCHEZ
1
A B
C D
E F
23
45
67
Ba
r m
ea
su
re
s 1
in
ch
, o
th
erw
ise
d
ra
win
g is n
ot to
sca
le
Copyright: Tetra Tech
20
0-0
93
08
-1
80
01
CENTRAL WATER INTEGRATION PIPELINE
SEGMENT 5-2
SAN ANTONIO WATER SYSTEM
700 N. St Mary's, Suite 300
San Antonio, TX 78205
Ph (210) 299-7900 Fax (210) 226-8497
Texas Registration No. F-3924
AD
DE
ND
UM
N
0
SC
AL
E:
60
12
02
40
1"=
1
20
'
G-3
00
8
PR
OP
ER
TY
L
IN
ES
LE
GE
ND
EX
IS
TIN
G C
ON
TO
UR
S
TERMINUS SITE ACCESS
PLAN
LA
S LO
MA
S
ELE
ME
NT
AR
Y S
CH
OO
L
(V
OL. 9624, P
G. 94, D
PR
)
10
0-Y
R W
AT
ER
SU
RF
AC
E L
IM
IT
S
PR
OP
OS
ED
C
ON
TO
UR
S
DA
GU
E R
AN
CH
L
TD
P
RT
NR
SH
P
HU
EB
NE
R R
D
NC
B 1
92
21
B
LK
L
OT
P
-8
, P
-1
9B
&
P
-2
6
DA
GU
E R
AN
CH
L
TD
P
RT
NR
SH
P
HU
EB
NE
R R
D
NC
B 1
92
21
B
LK
L
OT
P
-8
, P
-1
9B
&
P
-2
6
H
A
R
D
Y
O
A
K
B
O
U
L
E
V
A
R
D
(
U
N
D
E
R
C
O
N
S
T
R
U
C
T
I
O
N
)
H
U
E
B
N
E
R
R
O
A
D
AL
L W
EA
TH
ER
A
CC
ES
S R
OA
D
(C
ON
ST
RU
CT
ED
A
ND
MA
IN
TA
IN
ED
B
Y O
TH
ER
S)
LO
T 2
BL
OC
K 5
8
LO
T 1
BLO
CK
58
PIP
EL
IN
E
SE
GM
EN
T 5
-1
UN
PL
AT
TE
D
PO
RT
IO
N O
F
15
0.2
56
A
CR
ES
DA
GU
E R
AN
CH
L
IM
IT
ED
PA
RT
NE
RS
HIP
(V
OL
. 1
47
66
, P
G. 1
41
0-1
41
7, O
PR
)
DA
GU
E R
AN
CH
L
TD
PA
RT
NE
RS
HIP
GE
NE
RA
L N
OT
ES
1.
CO
NT
RA
CT
OR
S
HA
LL
B
E A
WA
RE
T
HA
T T
HE
RE
A
RE
M
UL
TIP
LE
CO
NT
RA
CT
OR
S O
N-S
IT
E A
ND
C
OO
RD
IN
AT
IO
N IS
R
EQ
UIR
ED
W
IT
H A
LL
ON
-G
OIN
G W
OR
K.
2.
CO
NT
RA
CT
OR
S
HA
LL
C
ON
FIN
E A
LL
V
EH
IC
LE
S T
O T
HE
A
CC
ES
S R
OA
DS
DE
SIG
NA
TE
D O
N T
HIS
P
LA
N A
ND
N
OT
IM
PA
CT
A
NY
O
TH
ER
A
RE
AS
.
3.
CO
NT
RA
CT
OR
S
HA
LL
B
E R
ES
PO
NS
IB
LE
F
OR
F
LA
GG
ER
C
ON
TR
OL
T
O
FA
CIL
IT
AT
E T
RA
FF
IC
O
F V
EH
IC
LE
S E
NT
ER
IN
G A
ND
L
EA
VIN
G T
HE
S
IT
E.
4.
CO
NT
RA
CT
OR
T
O C
OO
RD
IN
AT
E W
IT
H C
OS
A T
O A
PP
RO
VE
H
AU
L R
OU
TE
S.
NO
H
AU
LIN
G W
IL
L B
E A
LL
OW
ED
F
RO
M 8
P
M T
O 9
A
M.
5.
5-2
C
ON
TR
AC
TO
R W
IL
L O
NL
Y H
AV
E A
CC
ES
S F
RO
M H
AR
DY
O
AK
B
LV
D
UN
TIL
H
UE
BN
ER
R
OA
D C
ON
ST
RU
CT
IO
N IS
C
OM
PL
ET
E. A
FT
ER
H
UE
BN
ER
RO
AD
IS
C
OM
PL
ET
E A
ND
5
-1
C
ON
TR
AC
TO
R C
OM
PL
ET
ES
C
ON
ST
RU
CT
IO
N
OF
T
HE
A
LL
W
EA
TH
ER
A
CC
ES
S R
OA
D, T
HE
C
ON
TR
AC
TO
R W
IL
L A
CC
ES
S
TH
E S
IT
E F
RO
M H
EU
BN
ER
R
OA
D A
CC
ES
S P
OIN
T. T
HIS
W
IL
L B
E T
HE
ON
LY
A
CC
ES
S P
OIN
T.
6.
TR
EE
S S
HO
WN
A
RE
F
OR
R
EF
ER
EN
CE
O
NL
Y. C
ON
TR
AC
TO
R T
O
RE
FE
RE
NC
E T
HE
A
PP
RO
VE
D T
RE
E P
RO
TE
CT
IO
N P
LA
N F
OR
T
HE
S
IT
E
AN
D C
OM
PL
Y W
IT
H A
LL
P
RO
TE
CT
IO
N R
EQ
UIR
EM
EN
TS
S
HO
WN
TH
ER
EO
N.
7.
CO
NT
RA
CT
OR
S
HA
LL
N
OT
U
SE
A
RE
AS
W
IT
HIN
T
HE
1
00
-Y
R W
AT
ER
SU
RF
AC
E L
IM
IT
S S
HO
WN
H
ER
EO
N A
S S
TA
GIN
G/L
AY
DO
WN
O
R M
AT
ER
IA
L
ST
OR
AG
E A
RE
AS
.
8.
CO
NT
RA
CT
OR
T
O R
EF
ER
EN
CE
T
HE
A
PP
RO
VE
D S
WP
PP
P
LA
N A
ND
CO
MP
LY
W
IT
H A
LL
P
RO
TE
CT
IO
N R
EQ
UIR
EM
EN
TS
S
HO
WN
T
HE
RE
ON
.
PIP
EL
IN
E
SE
GM
EN
T 5
-2
50
' N
AT
UR
AL
V
EG
ET
AT
IV
E B
UF
FE
R
5
0
'
N
A
T
U
R
A
L
V
E
G
E
T
A
T
I
V
E
B
U
F
F
E
R
NA
TU
RA
L V
EG
ET
AT
IV
E B
UF
FE
R
HU
EB
NE
R R
OA
D
AC
CE
SS
P
OIN
T
(S
EE
N
OT
E 5
)
EX
IS
TIN
G T
RE
E
TO
R
EM
AIN
EX
IS
TIN
G T
RE
E T
O B
E
RE
MO
VE
D
L
O
T
L
I
N
E
L
O
T
L
I
N
E
LOT LINE
VA
RIA
BL
E W
ID
TH
PU
BL
IC
D
RA
IN
AG
E
EA
SE
ME
NT
PR
OT
EC
T E
XIS
TIN
G
TR
EE
S (R
EF
. T
RE
E
PR
ES
ER
VA
TIO
N P
LA
N)
LO
T 3
BL
OC
K 5
8
NR
CB
VS
EX
IS
TIN
G G
RO
UN
D
ST
OR
AG
E T
AN
K N
O. 1
(U
ND
ER
C
ON
ST
RU
CT
IO
N)
EX
IS
TIN
G G
RO
UN
D
ST
OR
AG
E T
AN
K N
O. 2
(U
ND
ER
C
ON
ST
RU
CT
IO
N)
SA
WS
2
0' P
ER
MA
NE
NT
WA
TE
R E
AS
EM
EN
T
TE
RM
IN
US
S
IT
E
10
06
10
06
PO
SS
IB
LE
OF
FS
IT
E S
HA
RE
D
TE
RM
IN
US
A
ND
5
-1
CO
NT
RA
CT
OR
ST
AG
IN
G/ L
AY
DO
WN
AR
EA
.
PO
SS
IB
LE
OF
FS
IT
E S
HA
RE
D
TE
RM
IN
US
A
ND
5
-1
CO
NT
RA
CT
OR
ST
AG
IN
G/ L
AY
DO
WN
AR
EA
.
10
0-Y
R W
AT
ER
SU
RF
AC
E L
IM
IT
S
10
0-Y
R W
AT
ER
SU
RF
AC
E L
IM
IT
S
OW
NE
R:
CIT
Y O
F S
AN
A
NT
ON
IO
TU
NN
EL
SH
AF
T
16
' S
EW
ER
E
AS
EM
EN
T
(V
OL
. 1
81
24
, P
G 1
31
4)
10
0-Y
R W
AT
ER
SU
RF
AC
E L
IM
IT
S
SIL
VE
R K
NO
LL
PER ADDENDUM #18/10/181
AL
L W
EA
TH
ER
A
CC
ES
S R
OA
D
AC
CE
SS
IB
LE
T
O C
ON
TR
AC
TO
R
1
EX
IS
TIN
G A
LL
W
EA
TH
ER
A
CC
ES
S
RO
AD
N
OT
A
CC
ES
SIB
LE
T
O
CO
NT
RA
CT
OR
NR
SE
GM
EN
T 5
-1
ST
AG
IN
G/L
AY
DO
WN
AR
EA
TE
RM
IN
US
ST
AG
IN
G/L
AY
DO
WN
AR
EA
1
1
TE
MP
OR
AR
Y C
ON
ST
RU
CT
IO
N
EA
SE
ME
NT
(W
ID
TH
V
AR
IE
S)
SA
WS
50' P
ER
MA
NE
NT
EA
SE
ME
NT
HA
RD
Y O
AK
B
LV
D.
AC
CE
SS
P
OIN
T
(S
EE
N
OT
E 5
)