Samsung sac global reference catalogue
-
Upload
haluk-tosun -
Category
Engineering
-
view
37 -
download
0
Transcript of Samsung sac global reference catalogue
1
Reference Site
2014. 02. 07
Air Conditioning Marketing Group
SE
2
Reference Site
Equipment Selection Image
Application Issue
Global Reference Site Map
3
1. Europe
2. South East Asia
3. the Middle East
4. Africa
5. South West Asia
6. Latin America
7. Korea
8. China
Content
4
Reference Site
Equipment Selection Image
Application Issue
1. Europe
5
Reference Site
Equipment Selection Image
Application Issue
ORCO Shopping Mall
Project ORCO Project
Location Budapest, Hungary
Date of Completion 2012
Size 12,000 m2
Value € 571K
Shopping Mall
7,000
mm
• Limited installation space for the outdoor units
- High walls surrounding the area
- Samsung provided full CFD simulation analysis
• The investor wanted the most energy efficient solution
with best control solution
Classification Type Q’ty / HP
ODU DVM PLUS 3 HR 52 EA
IDU 4way, Duct, Console
Air Handling Units
300 EA
6 EA
Control S-NET 3, DMS, Power distribution
6
Reference Site
Equipment Selection Image
Application Issue
IKEA Shopping Complex Mall
Complex Mall
Project IKEA Shopping Complex Mall
Location Valladolid, Spain
Date of Completion AUG, 2012
Size 20,700 m2
Value € 210K
Customer Atil Cobra (Big Installer)
Classification Type Q’ty / HP
ERV RHF***EE 166 EA
Control CO2 Sensor, MWR-WE10
• CO2 sensors to control the multiple ERVs
- HQ developed a special software for customer
• Free cooling with volume damper and energy saving
control
• Extended temperature ratio to ±10℃ with energy saving
control of MWR-WE10
7
Reference Site
Equipment Selection Image
Application Issue
Parkalgar Radisson Hotel
Project Parkalgar Hotel (5 Star Hotel)
Location Portimão, Portugal
Date of Completion 2011
Size 16,000 m2 (208 rooms & 166
apt.)
Value € 450K
Classification Type Q’ty / HP
ODU DVM PLUS 4
FJM
19 EA
166 EA
IDU Duct(Hotel), RAC(Appt.) 737 EA
Control DMS 2, LonWorks gateway
• Customer want to provide an overall total solution, such as
air-conditioner, TV, refrigerators, cookers and microwaves.
- Samsung can provide customers with a tailored total
solution.
• LonWorks BMS connection
Hotel & Resort
8
Reference Site
Equipment Selection Image
Application Issue
Southend Airport
Airport
Project Southend Airport
Location London, UK
Date of Completion JUN, 2011
Size 4,500 m2
Value € 320K
Classification Type Q’ty / HP
ODU DVM PLUS 3 18 EA
IDU Duct, Wall Mounted 47 EA
Control MWR-WH00
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
9
Reference Site
Equipment Selection Image
Application Issue
Murawa Office Park
Office Park
Project Murawa Office Park
Location Poznan, Poland
Date of Completion December, 2010
Size 7,500 m2
Value € 205k
Classification Type Q’ty / HP
ODU DVM PLUS III HR 10 EA
IDU Duct, 4Way Cassette, RAC 151 EA
Control Lonworks Interface
• Monitor power distribution
• Set room temperature
• Control fan speed
• Zone management
• Lonworks Gateway the best solution to integrate DVM
PLUS system into BMS and control the system
simultaneously
10
Reference Site
Equipment Selection Image
Application Issue
Sheraton Edinburgh Hotel
Hotel & Resort
Project Sheraton Hotel (5-star hotel)
Location Edinburgh, UK
Date of Completion OCT, 2010
Size 11,500 m2 (269 rooms)
Value € 220K
Classification Type Q’ty / HP
ODU DVM PLUS 2 HR 25 EA
IDU Slim Duct 285 EA
Control DMS 2, MWR-WH00
• Fidelio system application with Samsung AC
- Samsung developed the Fidelio application for customer
• PC based centralized control system (DMS2)
11
Reference Site
Equipment Selection Image
Application Issue
PFRON
Office Building
Project PFRON
Location Warsaw, Poland
Date of Completion 2010
Size 4,525 m2
Value € 150K
Classification Type Q’ty / HP
ODU DVM PLUS 3 22 EA
IDU 4way, Slim 1way, RAC 215 EA
Control DMS 2, Window relay, Use restriction by
Control logic management
• PC based centralized control system (DMS2)
• Window contact control for energy saving
• Electric power use limit combined with DMS2 control
logic management
12
Reference Site
Equipment Selection Image
Application Issue
Pecsa Sanatorium
Sanatorium
Project Pecsa Sanatorium
Location Madrid, Spain
Date of Completion 2010
Size - m2
Value € 230K
• AHU Systems (Heating load 30%)
- AHU system was installed with Solar panels for
corresponding the energy regulation
• PC based centralized control system (DMS2)
Classification Type Q’ty / HP
ODU DVM PLUS 3 HP 16 EA
IDU AHU, 4Way, Duct, 2Way 96 EA
Control DMS2, MWE-WH00
13
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM PLUS II HR 11
IDU Wall mounted / Ceiling 171
Control DMS, Key tag, Fidelio
Holiday Inn Hotel
Project Holiday Inn Hotel
Location Slough, UK
Date of Completion Oct, 2008
Size 9 floors
Value -
• ODU Installation Space
- Group installation on the rooftop
Hotel
• Management of air conditioning system
- DMS
- Fidelio : 3rd Party control system
14
Reference Site
Equipment Selection Image
Application Issue
VAM Design Center
Art Gallery
Project VAM Design Center (Art Gallery)
Location Budapest, Hungary
Date of Completion 2007
Size 11,500 m2
Value € 286K
Classification Type Q’ty / HP
ODU DVM PLUS 2 24 EA
IDU Duct, Wall Mounted 86 EA
Control DMS, Power Distribution
• PC based centralized control system (DMS)
• Power distribution system (SiM, WHM)
15
2. South East Asia
16
Reference Site
Equipment Selection Image
Application Issue
RASUNA Tower
Project RASUNA Tower
Location Jakarta, Indonesia
Date of Completion 2014
Size 60 floors
Value 5.0M US$
• Optimize indoor humidity control
• Improved design with DVM +4
• Interlock control with BACnet
• Power distribution
- PIM (WHM interface module - MIM-B16)
- Local watt-hour meter (Pulse type)
Classification Type Q’ty / HP
ODU DVM PLUS IV 380
IDU 4 Way, Duct, ERV+ 1,223
Control BACnet
Office & Residential Building
17
Reference Site
Equipment Selection Image
Application Issue
Arya Residences
Project Arya Residences
Location Taguig City, philippines
Date of Completion 2013
Size 2 towers
Value 2.0M US$
• LEED-registered residential building
- SAC with high EER
- DVM Mini
- DVM+4 / CAC
• Optimized design for ODU
- Air flow analysis by CFD
- Proposal of optimized ODU space
Classification Type Q’ty / HP
ODU DVM Mini 1720HP
IDU 4 Way & Duct 895
Control Individual remote controller
Luxury Residential Building
18
Reference Site
Equipment Selection Image
Application Issue
Project Viet Han Tower (Space 21)
Location Hanoi, Vietnam
Date of Completion July, 2011
Size 17 floors
Value 460k US$
Viet Han Tower (Space 21)
• High-rise building
- Level different over 50m
- PDM(Pressure Drop Modulation) Kit
• Countermeasures of region with high humidity
- Reinforced insulator
Office Building
• Power distribution
- PIM (WHM interface module - MIM-B16)
- Local watt-hour meter (Pulse type)
Classification Type Q’ty / HP
ODU DVM PLUS III 65
IDU 4way 222
Control DMS2, Power distribution with PIM
19
Reference Site
Equipment Selection Image
Application Issue
Kumho Asiana Plaza
Project Kumho Asiana Plaza
Location Hochiminh, Vietnam
Date of Completion 2009
Size Service residential 32th floor
Value 3.2M US$
• PC based centralized control system
- S-Net 3 & DMS
- Function : Monitoring & operation
• Power distribution : SiM, WHM
Luxury Residential Apartment
• Countermeasures of region with high humidity
- Reinforced insulator
Classification Type Q’ty / HP
ODU DVM PLUS III 128
IDU Slim 1way 1,155
Control S-Net 3, DMS, Power distribution with SiM
20
Reference Site
Equipment Selection Image
Application Issue
Project Imperial Palace
Location Cebu, Philippines
Date of Completion 2009
Size 6 buildings
Value 3.2M US$
• Damage from sea wind (water)
- Install Wall against the wind
- Anticorrosive agent
• Interlock control with BMS system
Classification Type Q’ty / HP
ODU DVM/DVM PLUS 2,3 2850HP
IDU 1way / Slim duct 1355
Control BMS interlock control
Imperial Palace
Resort
21
Reference Site
Equipment Selection Image
Application Issue
West Sands Resort
Project West Sands Resort
Location Mai Khao Beach, Thailand
Date of Completion 2009
Size 426 villas & residences
Value 1.0M US$
• Prevention from Damage of sea wind (water)
- Install Wall against the wind
- Anticorrosive agent
Resort
• Countermeasures of region with high humidity
- Reinforced insulator
Classification Type Q’ty / HP
ODU DVM PLUS III 984HP
IDU 1 Way / Duct 755
Control DMS
22
Reference Site
Equipment Selection Image
Application Issue
St. Joseph School
Project St. Joseph School
Location Sydney, Australia
Date of Completion 2011
Size 10 Different Buildings
Value 250K AUD$
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
School
• Refurbishment of HVAC system
- SAC(DVM system) application
Classification Type Q’ty / HP
ODU DVM PLUS III (HP/HR) 500HP
IDU 1 Way / 4 Way 250
Control Central Controller, DMS2
23
Reference Site
Equipment Selection Image
Application Issue
Rockhampton Aged Care
Project Rockhampton Aged Care
Location Rockhampton, QLD Australia
Date of Completion 2011
Size 100 Beds Aged Care Residents
Value 120K AUD$
• Management of air-conditioning system
- Easy Control : S-NET Mini with touch screen
- Monitoring & Operation
Residence
• Retirement Village
- Emergency Shutdown A/C System in Fire Mode
Classification Type Q’ty / HP
ODU DVM PLUS III 72HP
IDU Wall mounted 100
Control S-NET Mini
24
Reference Site
Equipment Selection Image
Application Issue
Breakfast Point Apartment
Project Breakfast Point Apartment
Location Sydney, Australia
Date of Completion 2011
Size 3 Buildings each with 5 Levels
Value 450k AUD$
• High end value residential apartment
- System combination : DVM Mini & 2~4 IDUs
Luxury Residential Apartment
• Location of ODU
- Roof & Basement
- Securing air circulation of ODU located in basement
Classification Type Q’ty / HP
ODU DVM Mini 1670HP
IDU Wall mounted 450
Control Individual Wireless Controller
25
Reference Site
Equipment Selection Image
Application Issue
Thai Hoa Pediatrics Hospital
Project Thai Hoa Pediatrics Hospital
Location Dong Thap, Vietnam
Date of Completion June, 2011
Size 7 floors
Value 249K US$
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
Hospital
• N/A
Classification Type Q’ty / HP
ODU DVM PLUS III 25 / 382HP
IDU 4 Way 213
Control Central Controller, DMS
26
Reference Site
Equipment Selection Image
Application Issue
Golf Phu My Hotel
Project Golf Phu My Hotel
Location Ba Ria Vung Tau, Vietnam
Date of Completion December, 2011
Size 12 floors
Value 500K US$
• Management of air conditioning system
- Integrated and centralized control system
- DMS + S-Net 3
• Watt-hour Meter interface Module
• ERV
- Interlock with SAC
Classification Type Q’ty / HP
ODU DVM PLUS III 21 / 74HP
IDU 4 Way & Duct 313
Control S-Net 3
Hotel
27
Reference Site
Equipment Selection Image
Application Issue
Green Boutique Hotel
Project Green Boutique Hotel
Location Puchong, Selangor, Malaysia
Date of Completion Jan, 2011
Size 6 floors
Value 70K US$
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Monitoring & Operation
Hotel
• Interior design
- Compact ducted units
Classification Type Q’ty / HP
ODU DVM PLUS III 3 / 48HP
IDU Duct 57
Control S-Net Mini
28
Reference Site
Equipment Selection Image
Application Issue
Bangsar Hill Bungalow
Project Bangsar Hill Bungalow
Location Kuala Lumpur, Malaysia
Date of Completion Feb, 2012
Size 4 floors
Value 65K US$
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Simplified remote controller
Bungalow
• Interior design
- Compact ducted units
Classification Type Q’ty / HP
ODU DVM PLUS III 4 / 56HP
IDU Duct 23
Control S-Net Mini
29
Reference Site
Equipment Selection Image
Application Issue
Plaza Damas 3
Project Plaza Damas 3
Location Kuala Lumpur, Malaysia
Date of Completion May, 2011
Size 10 floors
Value 370K US$
• Management of air conditioning system
- Simplified remote controller
Service Apartment
• Compact 4-way cassette
• Ceiling Concealed Duct
• RAC with Virus doctor
Classification Type Q’ty / HP
ODU CAC 81 / 960HP
IDU 4 Way & Duct 81
Control Individual remote controller
30
Reference Site
Equipment Selection Image
Application Issue
The Beaufort
Project The Beaufort
Location Taguig City, philippines
Date of Completion December, 2012
Size 42 floors(2 towers)
Value 2.0M US$
• High-rise building
• Complex building
- Office & Residence
Office & Residential Building
• Management of air conditioning system
- Simplified remote controller
Classification Type Q’ty / HP
ODU DVM PLUS III 2000HP
IDU 4 Way & Duct 1,500
Control Individual remote controller
31
Reference Site
Equipment Selection Image
Application Issue
Trillium tower
Project Trillium tower
Location Surabaya, Indonesia
Date of Completion 2011
Size 110m’s height
Value -
• High-rise building
- Level different over 50m
- PDM(Pressure Drop Modulation) Kit
• Management of air conditioning system
- Simplified remote controller
Classification Type Q’ty / HP
ODU DVM PLUS III 3
IDU Ceiling 50
Control Individual remote controller
Office & Residential Building
32
Reference Site
Equipment Selection Image
Application Issue
Design Hub
Project Design Hub
Location Singapore
Date of Completion 2011
Size 1428HP
Value -
• Optimized piping design against long piping issue
for storage space.
• CFD analysis for limited outdoor space
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Simplified remote controller
Classification Type Q’ty / HP
ODU DVM PLUS III 119
IDU 4 Way & Duct 334
Control S-Net Mini
Office Building
33
Reference Site
Equipment Selection Image
Application Issue
The New iLoiLo City Hall
Project The New iLoiLo City Hall
Location iLoiLo City, Philippines
Date of Completion December, 2011
Size 7 floors
Value 0.5M US$
• Energy evaluation in comparison with Chiller.
• Previous building is using chiller.
Office Building
• Management of air conditioning system
- S-Net Mini controller
Classification Type Q’ty / HP
ODU DVM PLUS III 600HP
IDU 4 Way 550HP
Control S-Net Mini controller
34
3. the Middle East
Classification Type Q’ty / HP
ODU DVM PLUS IV HR 79
IDU AHU, Duct, Ceiling 650
Control S-Net 3, DMS, Key-Tag. Wired R/C
Reference Site
Equipment Selection Image
Application Issue
Project The Hilton Dead Sea Resort
Location Dead Sea, Jordan
Date of Completion 2014
Size 1320 HP
Value 1.0M US$
Hilton Dead Sea Resort
• Powerful Performance in High Ambient Temperature
• Heat Recovery & Technology
- Continuously Simultaneous Heating & Cooling
• Energy Saving & Eco-friendly
- Top Class Energy Efficiency
Hotel
36
Reference Site
Equipment Selection Image
Application Issue
Mall of Istanbul
Project Mall of Istanbul
Location Istanbul, Turkey
Date of Completion 2012
Size 762,000 m2
Value 1.8M US$
• PC based centralized control system
- S-Net 3 & DMS
- Function : Monitoring & operation
• Power distribution : SiM, WHM
Commercial Complex
• Countermeasures of region with high humidity
- Reinforced insulator
Classification Type Q’ty / HP
ODU DVM PLUS IV 108 EA / 2,080 HP
IDU Slim Duct 2,136 EA
Control S-Net 3, DMS, Power distribution with SiM
37
Reference Site
Equipment Selection Image
Application Issue
AJMAN One
Luxury Residential Apartment
Project AJMAN One
Location Ajman, UAE
Date of Completion 2012
Size Twelve towers, 26 floors
Value 3.7M US$
Classification Type Q’ty / HP
ODU CAC Camel 6,754 EA
IDU MSP Duct 6,754 EA
Control Wired remote controller
• Design machine room
- Louver for better air circulation
- Exhaust fan and SVC space for
• The Biggest CAC Ref. Site in the GCC Countries.
• Oil trap & additional accumulator
38
Reference Site
Equipment Selection Image
Application Issue
Titanic Hotel
Project Titanic Hotel
Location Istanbul, Turkey
Date of Completion 2012
Size 331 Rooms
Value 1.2M US$
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
• Interior design
Classification Type Q’ty / HP
ODU DVM PLUS IV
IDU
Control
Hotel
39
Reference Site
Equipment Selection Image
Application Issue
SBG Plaza
Office Building
Project SBG plaza
Location Muscat, Oman
Date of Completion 2012
Size 3700Ton
Value 1.6M US$
Classification Type Q’ty / HP
CAC MSP Duct (60K) 1500 EA
RAC RAC (18K) 500 EA
Control
• Power distribution
- Local pulse type watt hour meter
• Interior design
- Compact ducted units
40
Reference Site
Equipment Selection Image
Application Issue
Braka Nuclear Power Plant
Commercial Building
Project Braka Nuclear Power Plant
Location Braka, UAE
Date of Completion 2011
Size
Value 1.25M US$
Classification Type Q’ty / HP
ODU DVM+3 High 137 EA
IDU 4way, MSP Duct 214 EA
Control Centralized controller, DMS, S-Net Mini
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Simplified remote controller
• Power distribution
- Local pulse type watt hour meter
41
Reference Site
Equipment Selection Image
Application Issue
Dead Sea Lagoon Hotel
Hotel
Project Lagoon Hotel
Location Dead Sea, Jordan
Date of Completion 2011
Size
Value US$
Classification Type Q’ty / HP
ODU DVM+3 High 44
IDU Duct 760
Control S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Interior design
- Compact ducted units
42
Reference Site
Equipment Selection Image
Application Issue
Seasons Community
Luxury Residential Apartment
Project Seasons Community
Location UAE
Date of Completion 2009~2012
Size 365 Flats
Value US$
Classification Type Q’ty / HP
ODU CAC 694 EA
IDU MSP Duct 694 EA
Control Wired remote controller
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
43
Reference Site
Equipment Selection Image
Application Issue
Glozny
Hotel
Project Glozny
Location Glozny, Chechnya
Date of Completion 2011
Size 4.5-hectar (5 building)
Value 1.86M US$
Classification Type Q’ty / HP
ODU DVM +3, Mini DVM, FJM 5248HP
IDU 1 Way / Duct 3526EA
Control DMS, On/Off
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
• Hotel, Shopping center, swimming pool, restaurant
44
Reference Site
Equipment Selection Image
Application Issue
Princess Resort
Resort
Project Princess Resort
Location Izmir, Turkey
Date of Completion 2004
Size
Value $
Classification Type Q’ty / HP
ODU DVM PLUS
IDU Duct Type
Control
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
45
Reference Site
Equipment Selection Image
Application Issue
Project Brandium
Location Turkey,İstanbul
Date of Completion 2013
Size 7891 KW (INDOOR)
Value 1.4M$
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 154
IDU AHU, Duct, Ceiling, Wall 2607
Control S-NET3, DMS, Key-tag, Automation
Brandium
Residence and Hotel
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
46
Reference Site
Equipment Selection Image
Application Issue
Project Sinpaş Ottomare
Location Turkey,İstanbul
Date of Completion 2013
Size 3200 KW (INDOOR)
Value 0.5M$
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 76
IDU AHU, Duct, Ceiling, Wall 2985
Control S-NET3, DMS, Key-tag, Automation
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Limited installation period
Sinpaş Ottomare
Residence and Hotel
47
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 45
IDU AHU, Duct, Ceiling, Wall 849
Control S-NET3, DMS, Key-tag, Automation
Project Terrace Tema
Location Turkey,İstanbul
Date of Completion 2014
Size 3250 KW (INDOOR)
Value 662k$
Terrace Tema
Residence
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
48
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 333
IDU AHU, Duct, Ceiling, Wall 1736
Control S-NET3, DMS, Key-tag, Automation
Project Mandarin Oriental
Location Turkey,İstanbul
Date of Completion 2013
Size 9000 KW (INDOOR)
Value 1.6M$
Mandarin Oriental
• Variety design for the project
Residence
49
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU CAC 262
IDU MSP Duct 262
Control Wired
Project Narges Complex
Location Tehran, Iran
Date of Completion Jul 2013
Size ODU 805 HP
Value 420K USD
Narges Complex
Residence
• Powerful Performance in High Ambient Temperature
50
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU CAC 226
IDU MSP Duct 226
Control Wired
Project Zeytun Complex
Location Tehran, Iran
Date of Completion Jul 2013
Size ODU 813 HP
Value 410K USD
Zeytun Complex
Residence
• Powerful Performance in High Ambient Temperature
51
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM+4 HP 16
IDU 4Way Cassette, Ceiling, Wall 115
Control Wireless, S-Net
Project Commercial Center of Elahiye
Location Tehran, Iran
Date of Completion Aug 2013
Size ODU 222HP
Value 110K USD
Zeytun Complex
Commercial Building
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
52
4. Africa
53
Reference Site
Equipment Selection Image
Application Issue
Intercontinental Hotel
Luxury Hotel
Project Intercontinental Hotel (5 star)
Location Libreville, Gabon
Date of Completion 2013
Size 714 HP
Value $ 0.5 M
Classification Type Q’ty / HP
ODU DVM+4 714 HP
IDU Slim Duct 394 ea
Control S-NET Mini
• Change the design from chiller to DVM S.
• Winning Factor : Winning through SSA installer co-work in no installation infrastructure country
54
Reference Site
Equipment Selection Image
Application Issue
Icon Tower (Land Mark)
Luxury Office + Residence
Project ICON Tower
Location Kinshasa, DR Congo
Date of Completion 2013
Size 596 HP
Value 0.5 M$
Classification Type Q’ty / HP
ODU DVM S 596 HP
IDU High wall / Cassette 394 ea
Control S-NET Mini
• Winning Factor
- Customer confidence (Local Manager direct sale activity, SE design support)
- Energy Efficiency of product
55
Reference Site
Equipment Selection Image
Application Issue
Congo Trade Center (Land Mark)
Luxury Office + Residence
Project CTC (Congo Trade Center)
Location Kinshasa, DR Congo
Date of Completion 2014
Size 690 HP
Value 0.5 M$
Classification Type Q’ty / HP
ODU DVM S, DVM Eco 690 HP
IDU Wall mount 465 ea
Control Wireless RMC
• Change the design from chiller to DVM S.
• Winning Factor :
- Relationship with client
- HQ RPM & SE local support in DVM S launching conference on Sep.2013
- DVM S advertisement in local premium magazine
56
Reference Site
Equipment Selection Image
Application Issue
Du Grand Palais Des Nations
The National Assembly building
Project Du Grand Palais Des Nations
Location Conakry, Guinea
Date of Completion 2013
Size 340 HP
Value 0.2 M$
Classification Type Q’ty / HP
ODU DVM S 596 HP
IDU High wall / HSP & MSP Duct 113 ea
Control DMS 2, S Net 3
• Management of air conditioning system
- Integrated and centralized control system
- DMS 2 + S-Net 3
• Change the design from 2 among 4 blocks of Competitor air-cooled chiller to DVM S.
57
Reference Site
Equipment Selection Image
Application Issue
National Security Center
Government office building
Project National Security Center
Location Khartoum, Sudan
Date of Completion 2014
Size 780 HP
Value 0.5 M$
Classification Type Q’ty / HP
ODU DVM S, Desert 780 HP
IDU Slim / MSP Duct 227 ea
Control DMS 2
• Management of air conditioning system
- Integrated and centralized control system
- DMS 2 + S-Net 3
• Winning factor : Samsung brand image., Technical Support.
58
Reference Site
Equipment Selection Image
Application Issue
Accra Financial Center
Premium office building
Project Accra Financial Center
Location Accra, Ghana
Date of Completion 2014
Size 758 HP
Value 0.4 M$
Classification Type Q’ty / HP
ODU DVM S 758 HP
IDU MSP/HSP Duct, Mini 4W CST 127 ea
Control Wired RMC, Group Controller
• Land mark PJT in Accra
59
Reference Site
Equipment Selection Image
Application Issue
Hilltop Private Hospital
Hospital
Project Hilltop Private Hospital
Location Lusaka, Zambia
Date of Completion 2014
Size 384 HP, CAC 40 set
Value 0.4 M$
Classification Type Q’ty / HP
ODU DVM S, CAC 384 HP
IDU Mini 4W CST, Slim Duct,
High-Wall
164 ea
Control Wired RMC, Group Controller
• Winning Factor : Technical Support to new SAC Distributer.
60
Reference Site
Equipment Selection Image
Application Issue
Department of Military Veterans
Government office building
Project Department of Military Veterans
Location Pretoria, South Africa
Date of Completion 2013
Size 120 HP
Value 0.3 M$
Classification Type Q’ty / HP
ODU DVM S, HR 110 HP
IDU Mini 4W & 4W CST 43 ea
Control Wired RMC, Motion detect sensor
61
Reference Site
Equipment Selection Image
Application Issue
Venetia Housing Development
Residence
Project Venetia Housing Development
Location Venetia (North Limpopo Province)
Date of Completion 2014
Size 368 HP
Value 0.37 M$
Classification Type Q’ty / HP
ODU DVM S Eco 368 HP
IDU Wall mount 368 ea
Control
• Housing development for open cast diamond mine.
• Winning Factor :
- New Relationship with Consulting Engineer
- Competitiveness
- Design Assistance
X 92
62
Reference Site
Equipment Selection Image
Application Issue
Sun City Vacation Club
Residence
Project Sun City Vacation Club
Location North West Province (South Africa)
Date of Completion 2014
Size 500 HP
Value 0.4 M$
Classification Type Q’ty / HP
ODU FJM 7kw/10kw 110 HP
IDU Wall mount 43 ea
Control
X 142
• Vacation Time-Share Housing
• Winning Factor
- Relationship with Consulting Engineer
- Design Assistance
- Competitiveness (Budget Constraints)
63
Reference Site
Equipment Selection Image
Application Issue
English Point Marina
Luxury Town Villa
Project English Point Marina
Location Mombasa, Kenya
Date of Completion 2011. May (Start)
Size 1056HP
Value $ 0.9 M
Classification Type Q’ty / HP
ODU DVM+4 1056HP
IDU 4Way CST, Duct, RAC 734 ea
Control S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Cooling Efficiency
• Anti- Corrosion performance
64
Reference Site
Equipment Selection Image
Application Issue
The Houghton
Exclusive Residence
Project The Houghton
Location Johannesburg, South Africa
Date of Completion 2012. Mar (Start)
Size 440 HP
Value $ 469 K
Classification Type Q’ty / HP
ODU DVM+4 HR 440HP
IDU Duct 198 ea
Control S-Net 3, DMS2
• PC based centralized control system
- S-Net 3 & DMS 2
- Function : Monitoring & operation
• Energy Efficiency of product
• Relationship with client.
• Design support
65
Reference Site
Equipment Selection Image
Application Issue
Universal Plaza
Commercial Center
Project Universal Plaza
Location Gaborone, Botswana
Date of Completion 2012. Feb (Start)
Size 928 HP
Value $ 0.7 M
Classification Type Q’ty / HP
ODU DVM+4 928HP
IDU Big Duct, 4W CST 119 ea
Control
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
• Office Building + Shopping Mall
• Design support
66
Reference Site
Equipment Selection Image
Application Issue
• Brand Value
• High Efficiency
•Technical Support
Key Tag
Project Tribe Hotel
Location Nairobi, Kenya
Date of Completion 2010
Size 137rooms, 450HP
Value $ 150 K
Classification Type Q’ty / HP
ODU DVM+2,3, Mini 450HP
IDU 4Way CST, Duct 160 ea
Control Wired remote controller, Key Tag
• Brand Value
• High Efficiency
• Technical Support
Tribe Hotel
Hotel
67
5. South West Asia
68
Reference Site
Equipment Selection Image
Application Issue
Project Yoo Pune
Location Pune in India
Date of Completion 2015 (under construction)
Size 6 buildings( total 228 flats)
Value 2.2M$ (partially bid)
Classification Type Q’ty / HP
ODU DVM S 4500HP
IDU 1Way Cassette
Control Individual control
• Client(Panchshil, developer) prefers Samsung 1way CST.
- Daikin also have 1way CST, but our design is better.
• The Client has been satisfied with previous site. (One North PJT)
- When claiming noise of 1 way CST, HQ visited site and changed S/W to reduce noise.
• CRM with client is good. (HQ directors and executives visited, and visited in Laxmi TF.)
Reason for win
19 floors & 38 flats each building
EON HADAPSAR YOO
Residential Apartment
GSBN ID: IN201305140031
69
Reference Site
Equipment Selection Image
Application Issue
Project AAMBY VALLEY
Location Lonavala, Maharashtra
Date of Completion December 2014
Size 496 HP
Value 2 M$
Classification Type Q’ty / HP
ODU DVM S 26EA (16HP)
8EA (10HP)
IDU DUCTABLES 132
Control Individual control
• DVM S Technology - We presented DVM S PPT and had detailed discussion with M/s Aamby Valley team and we proved our technology
better than our competition.
• Site Inspections - We requested M/s Aamby Valley team to visit our installed and ongoing project sites in Pune and get the true feedback from
the End users. It has helped us a lot as all the Customer gave positive feedback specially Persistent Systems Ltd.
• Follow up - We have kept close watch on this BO continuously.
• Dealer Support - Dealer supported for Custom clearance and Import duty related concerns.
Aamby Valley City
Residential Apartment
GSBN ID: IN201401071127
Reason for win
70
Reference Site
Equipment Selection Image
Application Issue
International City
Residential
Project International City
Location Gurugaon in India
Date of Completion 2015 (under construction)
Size 188 Villas
Value 2.3M$
Classification Type Q’ty / HP
ODU DVM S 3500HP
IDU MSP/HSP 760ea
Mini 4way 294
Control Individual control
• Solution: High efficiency & Prove our superiority over competitors
• Access: Making Sobha developer confident on in-house design team.
Customized control system on controllers for chairman house(special requirement of 16℃)
• Value : DVM S efficiency against other VRFs save electric charges
• Education : Requirements from client on design, approvals, expectation were taken well promptly.
※ This PJT is phase 1 and Phase 2(4M$) will be start in 2014.
GSBN ID: IN201210120011
Reason for win
71
Reference Site
Equipment Selection Image
Application Issue
DLF Park Tower
Residential Apartment
Project DLF Park Tower, Park Height
Location Gurgaon, India
Date of Completion 2012
Size 1975 - 2704 Sq.Ft.
Value 4.3M$
Classification Type Q’ty / HP
ODU DVM PLUS III 1,611 EA
IDU 4 Way Cassette, RAC 10,018 EA
Control Wired Remote Controller
• Individual Control System
- Wired Remote Controller
• The Largest contract amount in India
72
6. Latin America
73
Reference Site
Equipment Selection Image
Application Issue
Novotel Manaus Hotel
Hotel
Project Novotel Manaus Hotel
Location Manaus, Brazil
Date of Completion 2013
Size
Value $ 400 K
Classification Type Q’ty / HP
ODU DVM+4 364HP
IDU EA
Control S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Interior design
- Compact ducted units
74
Reference Site
Equipment Selection Image
Application Issue
Mexico Secrets Hotel
Hotel
Project Mexico Secrets Hotel
Location Huatulco, Mexico
Date of Completion 2012
Size 25,000㎡ (1,100HP)
Value $750K
Classification Type Q’ty / HP
ODU DVM+2 38 EA / 1,100HP
IDU 4Way Cassette,
4Way Cassette (Interior) 658 EA
Control DMS2, S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Interior design - 4Way Cassette (Interior)
• Long piping length design (Over 90m)
• Anti- Corrosion performance
75
Reference Site
Equipment Selection Image
Application Issue
Project Marriot
Location Santiago, Chile
Date of Completion April 2014
Size 230 HP
Value Total 0.25 M$
Classification Type Q’ty / HP
ODU DVM S 20
IDU DUCTABLES 249
Control Central Control BMS.
• DVM S Technology – We presented DVM S PPT to Marriot representatives and they seemed to be pleased with the
reasonable price and top notch technology.
• Technical support – We have good reputation of high quality technical service and 10 years experience on AC business
and for that, other project leaders had recommend our brand to Marriot representatives.
Marriot Hotel
Hotel
Reason for win
GSBN ID: CL201401102979
76
Reference Site
Equipment Selection Image
Application Issue
Project DRAGAMEX Offices
Location México City
Date of Completion November 2010
Size 700 m2
Value $36K USD
Classification Type Q’ty / HP
ODU DVM PLUS III 4
IDU High Wall
4 Way Cassette
40
8
Control Wireless Remote Controller
DRAGAMEX Offices
Office Building
• VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image,
dimension, energy saving) to the closer competitors.
• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
Reason for win
77
Reference Site
Equipment Selection Image
Application Issue
Hotel West Colonia
Hotel
Project Hotel West Colonia
Location Colonia, Uruguay
Date of Completion 2011
Size 5,800 m2
Value $0.2M USD
Classification Type Q’ty / HP
ODU DVM plus IV 15
IDU Slim Duct
4 Way Cassette
114
25
Control Integrated Management System
• Samsung Products have a good design , image and elegance to the Hotel environment according to the architectural
design.
• Samsung products have a high technology focus in energy saving and environment cares.
78
Reference Site
Equipment Selection Image
Application Issue
Hotel Orpheo
Hotel
Project Hotel Orpheo
Location Montevideo, Uruguay
Date of Completion 2012
Size 3,300 m2
Value $0.1M USD
Classification Type Q’ty / HP
ODU DVM plus IV 15
IDU Wall-mounted 108
Control Wireless remote controller
• VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image,
dimension, energy saving) to the closer competitors.
• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
79
Reference Site
Equipment Selection Image
Application Issue
Building Puerto Punta
Residential Building
Project Building Puerto Punta
Location Maldonado, Uruguay
Date of Completion 2012
Size 7,500 m2
Value $0.2M USD
Classification Type Q’ty / HP
ODU DVM plus IV 15
IDU Slim Duct
Wall-mounted / 4Way
140
4 / 6
Control Wireless, Wired remote controller
• Samsung has better disign for this kind of building (elengant desing)
• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
80
7. Korea
81
Reference Site
Equipment Selection Image
Application Issue
SAMSUNG Electronics Semiconductor Research Center - DSR
Project SAMSUNG Electronics
DSR Project
Location Hwasung, Korea
Date of Completion 2014.1
Size 335,125㎡ (28F ~ B5F)
Value 20M$
• Solar, Geothermal, LED lighting, Eco-friendly, and
Renewable Energy Utilization • Energy-Saving Design : Partial Load by Use Zoning
• BEMS, FMS system applies
Office Building
• Application of Mixed HVAC in Office Building
- DVM : 52% (7,610RT included Geothermal 713RT)
- Absorption Chiller : 25% (4,000RT)
- Turbo Chiller : 23% (3,600RT)
Classification Type Q’ty / HP
ODU DVM Water II 328 EA
IDU 1Way CST, 4Way CST,
Slim Duct, MSP Duct, AHU 3,983 EA
Control BEMS, FMS
82
Reference Site
Equipment Selection Image
Application Issue
SAMSUNG Electronics Research Center - R5
Project SAMSUNG Electronics
R5 Project
Location Suwon, Korea
Date of Completion 2013
Size 275,042㎡ (27F ~ B5F)
Value 16.5M$
• Solar, Geothermal, LED lighting, Eco-friendly, and
Renewable Energy Utilization • Energy-Saving Design : Partial Load by Use Zoning
• BEMS, FMS system applies
Office Building
• Application of Mixed HVAC in Office Building
- DVM : 58.1% (7,196RT)
- Absorption Chiller : 32.3% (4,000RT)
- Turbo Chiller : 9.7% (1,200RT)
Classification Type Q’ty / HP
ODU DVM Water II 273 EA
IDU 1Way CST, 4Way CST,
Slim Duct, MSP Duct, AHU 3,142 EA
Control BEMS, FMS
83
Reference Site
Equipment Selection Image
Application Issue
SAMSUNG Electronics Seocho Office
Project SAMSUNG Electronics
Seocho Office
Location Seoul, Korea
Date of Completion 2008
Size 195,438㎡ (42F ~ B8F)
Value
• Management of air conditioning system
- Centralized controller
• Special room temperature control : 0.1℃ deviation
Office Building
• Application of Mixed HVAC in Office Building
- AHU : 60% (Central)
- DVM : 40% (Individual)
Classification Type Q’ty / HP
ODU DVM PLUS II / DVM Water 75 / 71EA
IDU LSP DUCT (11 ~14kW) 788 EA
Control BMS
84
Reference Site
Equipment Selection Image
Application Issue
Yoksam K-Office
Project Yoksam K-Office
Location Seoul, Korea
Date of Completion 2013
Size 12,316㎡ (15F ~ B4F)
Value
• All SAC are controlled with DMS
• Apply the PDM kit, RL/RG stand 70m vertically. ODUs were installed on the roof.
Office Building
Classification Type Q’ty / HP
ODU DVM PLUS IV 79EA
IDU 1,4WAY / Duct 180 EA
Control DMS 2
85
Reference Site
Equipment Selection Image
Application Issue
Tower Palace
Residential Complex
Project Tower Palace
Location Seoul, Korea
Date of Completion 2004
Size A group of Seven Towers
42-72 Floors
Value 39.4M$
Classification Type Q’ty / HP
ODU DVM 3,614 EA
IDU 1 Way, 4 Way CST, Duct 17,731 EA
Control Centralized Controller, DMS, S-Net 3
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
• Specific air discharge structure for skyscrapers
• Minimize installation space
• Low-noise design
86
Reference Site
Equipment Selection Image
Application Issue
Hannam The Hill Town
Project Hannam The Hill Town
Location Seoul, Korea
Date of Completion 2011
Size A group of 32 towers, 12 floors
Value -
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
Luxury Residential Apartment
• CFD analysis for indoor selection & location
Classification Type Q’ty / HP
ODU DVM PLUS IV / SLIM 442
IDU Cassette 2,950
Control Centralized controller, Home Network
87
Reference Site
Equipment Selection Image
Application Issue
Songdo WorldMark
Residential Apartment
Project Songdo World Mark
Location In-cheon, Korea
Date of Completion 2010
Size A group of 10 towers,
45 floors
Value
Classification Type Q’ty / HP
ODU DVM Water, DVM+4 382
IDU 1 Way / 2 Way / 4 Way 2,388
Control Centralized controller, Home Network
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
•
88
Reference Site
Equipment Selection Image
Application Issue
Soowan Noble Land 13 Block
Residential Apartment
Project Soowan Noble Land 13 Block
Location Gwang-ju, Korea
Date of Completion 2011
Size A group of 10 towers,
24 floors
Value
Classification Type Q’ty / HP
ODU DVM+4, DVM Home 659
IDU 1 Way / 2 Way / 4 Way 1,977
Control Centralized controller, Home Network
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
89
Reference Site
Equipment Selection Image
Application Issue
Jong-am SK View
Residential Apartment
Project Jong-am SK View
Location Seoul, Korea
Date of Completion 2011
Size A group of 6 towers,
20 floors
Value
Classification Type Q’ty / HP
ODU DVM+4 272
IDU 1 Way / 2 Way / 4 Way 942
Control Centralized controller, Home Network
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
90
Reference Site
Equipment Selection Image
Application Issue
High-1 Resort
Resort
Project High-1 Resort
Location Gangwon-do, Korea
Date of Completion 2010
Size A group of 10 towers,
45 floors
Value -
Classification Type Q’ty / HP
ODU DVM+3 , DVM SLIM 596
IDU 1Way / 2W / 4W / Duct 1,952
Control Room Controller
• Management of air conditioning system
- Wired remote controller
• Interior design
- Compact ducted units, Slim 1 Way Cassette
91
Reference Site
Equipment Selection Image
Application Issue
Reesom Resort
Resort
Project Reesom Resort
Location Chung-cheong, Korea
Date of Completion 2011
Size 50 Private Villa & 1 Hotel Bidg.
Value -
Classification Type Q’ty / HP
ODU DVM+4 114
IDU 1Way / 2W / 4W / Duct 1,224
Control Room Controller
• Whole houses are equipped with SAC
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units, Slim 1 Way Cassette
92
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM PLUS IV 36
IDU Cassette 329
Control DMS 2 , S-NET3
Jongro Pagoda Eng Institute
Project Jongro Pagoda Eng Institute
Location Seoul, Korea
Date of Completion 2011
Size 14 floors
Value -
• PC based centralized control system
- S-Net 3 & DMS 2
- Function : Monitoring & operation
- Fully working during open hour (8AM ~ 10PM)
Commercial Building
93
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM PLUS III 45
IDU Cassette 352
Control DMS
Jamsil Parkrio
Project Jamsil Parkrio
Location Seoul, Korea
Date of Completion July, 2008
Size 5 floors
Value 0.5M US$
• ODU Installation Space
- Group installation on the rooftop
Commercial Building
• Noise from ODU
- Installation of soundproofing walls
94
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM S 437
IDU Cassette & Duct 1308
Control DMS
Lotte Premium Outlet(Shopping mall)
Project Lotte Premium Outlet
Location Gyeong-gi, Korea
Date of Completion 2013
Size 3 floors / 77,000m2
Value 437 EA( 6500HP )
• ODU Installation Space
- Group installation on the rooftop
Commercial Building
• Vapor injection technology for high heating
performance under low temperature
• Energy efficiency with high IPLV 6.6
95
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM S 304
IDU Cassette & Duct 1198
Control DMS
Paju Premium Outlets(Shopping mall)
Project Paju Premium Outlet
Location Gyeng-gi, Korea
Date of Completion 2011
Size 4 floors / 4 blocks
Value 304 EA( 4256HP )
• ODU Installation Space
- Group installation on the rooftop
•Small outdoor unit installation space to save space cost
Commercial Building
• Individual control of 4way cassette louvers
• Long refrigerant piping for flexible design (piping
length 220m, level difference 110m)
96
Reference Site
Equipment Selection Image
Application Issue
• Rain / Temperature / Humidity sensor for snow detecting
• DVM GEO + Hydro Unit(LT)
• Snow detecting on car entering gate and snow melting system
Raemian Gallery
Gallery
Classification Type Q’ty / HP
ODU DVM +4 23
IDU Cassette & Duct, AHU 97
Hydro Unit LT(Low Temperature) 10 HP
Control DMS BacNet, Wired remote, Central
Project Raemian Gallery
Location Moonjungdong Seoul in Korea
Date of Completion 2012. 7
Size 5 floors
Value
97
8. China
98
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM S 114
IDU Cassette & Duct 1710
Control DMS, S-Net 3
Changsha Greenland Plaza(No.5/6 Building)
Project Changsha Greenland Plaza
Location Changsha, Hunan Province
Date of Completion 2013
Size 33F,36F
Value 4320HP
• Installation of DVM S at middle floors
• Electricity billing system
Commercial Building
• Wide operation temperature range
(Cooling -15-54℃,Heating -23-29℃)
• Air-conditioning electricity billing system for tenants
99
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM S 153
IDU Cassette & Duct 862
Control Wired remote control
Huasheng Advanced Business Park
Project Complex building
Location Chengdu, Sichuan Province
Date of Completion 2013
Size 20F
Value 2946HP
• Installation of DVM S and fresh air intake
unit every floor(4~20F)
Commercial Building
• Small installation area fit into machine room
• Sufficient external static pressure of 80Pa
suitable for small-sized machine room
100
Reference Site
Equipment Selection Image
Application Issue
Image
Tianqi International Building
Classification Type Q’ty / HP
ODU DVM S 94EA / 4000HP
IDU 4Way CST, Duct 1524EA
Control S-Net 3
Project Tianjin, China
Location
Date of Completion
Size 53,000㎡ (25Floor)
Value 2M$
Commercial Building
• Long refrigerant piping for flexible design (piping length 220m, level difference 110m)
• Designed with Slim Duct indoor unit to install in the narrow ceiling space (199mm)
• Low indoor unit noise level(25dBA)
101
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM S 63
IDU Cassette & Duct 351
Control DMS, S-Net 3
Hangzhou Wantong Center
Project Hangzhou Wantong Center
Location Gongshu District, Hangzhou City
Date of Completion 2013
Size 12020㎡ (17F,12F)
Value 1010HP
Commercial Building
• Installation of all DVM S units on middle floor for machine room
• Sufficient external static pressure of 80Pa to prevent short-circuit air flow in machine room
• Individual indoor unit control to prevent excessive cooling/heating in open space
102
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM S 210
IDU Cassette & Duct 844
Control DMS, S-Net 3
Hangzhou Network Industry & Technology Park
Project Network Industry & Technology
Park
Location Bingjiang District, Hangzhou City
Date of Completion 2013
Size 47628㎡ (19F)
Value 3402HP
Commercial Building
• Installation of DVM S units on podium and rooftop
• Air ventilation using Fresh Air Intake units
• Vapor injection technology for high heating
• performance under low temperature
• Energy efficiency with high IPLV 6.6
103
Reference Site
Equipment Selection Image
Application Issue
Qingdao Berlin New City Tower
Commercial Building
Classification Type Q’ty / HP
ODU DVM S 100
IDU Cassette & Duct 1006
Control DMS, S-Net 3
Project Qingdao Berlin New City Tower
Location Changjiang dong Street,
Qingdao City
Date of Completion 2013
Size
Value 3022HP
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
104
Reference Site
Equipment Selection Image
Application Issue
Classification Type Q’ty / HP
ODU DVM S 312
IDU Cassette & Duct 2056
Control DMS, S-Net 3
Project Tianrun Fuxi Dadao
Location Chaoyang District,
Beijing City
Date of Completion 2013
Size
Value 2216HP
Tianrun Fuxi Dadao, Beijing City
Commercial Building
• Installation of all DVM S units on middle floor
• Backup operation of outdoor unit under emergency status to continue operation
• Small outdoor unit installation space to save space cost
105
Reference Site
Equipment Selection Image
Application Issue
Dayawan Technological Innovation Building
Office Building
Classification Type Q’ty / HP
ODU DVM S 40
IDU 660
Control Wired remote control
Project Dayawan Technological
Innovation Building
Location Huizhou, Guangdong Province
Date of Completion
Size 27,200㎡ (23F)
Value M$
• Installation of DVM S units on podium and rooftop
• Combination ratio of 120%
106
Reference Site
Equipment Selection Image
Application Issue
Binhai International School
Education Building
Classification Type Q’ty / HP
ODU DVM S 25
IDU 4Way CST 120
Control Wired remote control
Project Binhai International School
Location Ningbo, Zhejiang Province
Date of Completion
Size 1,400㎡
Value M$
• Installation of DVM S units on rooftop of
• restaurant and office building
• Air ventilation using Fresh Air Intake units
• Air purification with anti-virus module
107
Reference Site
Equipment Selection Image
Application Issue
Image
Lasa Hotel
Hotel
Classification Type Q’ty / HP
ODU DVM +3 994HP
IDU
Control
Project Tianjin, China
Location
Date of Completion
Size 30,933㎡
Value 0.6M$
• Management of air conditioning system
- Simplified remote controller
108
Reference Site
Equipment Selection Image
Application Issue
Samsung Electronics Factory Building
Factory Building
Classification Type Q’ty / HP
ODU DVM S 47
IDU 4Way CST 273
Control Interlock control
Project Samsung Electronics Factory
Building
Location Tianjin
Date of Completion
Size 10,518㎡ (1072HP)
Value M$
• Installed in machine room on the ground floor
• Adaptive sine wave control technology to reduce harmonic noise
• Snow removal function
109
Reference Site
Equipment Selection Image
Application Issue
Bo’ao Sports Center
Sports Center
• Installed in machine room on the ground floor
• Combination ratio of no greater than 110%
• Small installation area for good exterior view
Classification Type Q’ty / HP
ODU DVM 34
IDU AHU 247
Control Wired remote control
Project Samsung Electronics Factory
Building
Location Shaoxing, Zhejiang Province
Date of Completion
Size 12,712㎡ (908HP)
Value M$
110
Reference Site
Equipment Selection Image
Application Issue
• Individual control of 4way cassette louvers
• RoHs certification for environment protection
Bridge Bray Industrial Park
Office Building
• Installation of DVM S units on rooftop
• Designed with ceiling concealed indoor units
• Combination ratio of no greater than 118%
Classification Type Q’ty / HP
ODU DVM S 87
IDU 4Way CST 910
Control Wired remote control
Project Bridge Bray Industrial Park
Location Ningbo, Zhejiang Province
Date of Completion
Size 18,200㎡ (1300HP)
Value M$
111
Reference Site
Equipment Selection Image
Application Issue
Thank you