Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on...

9
Sample Project Sample Summary Report Created: 04-10-2018 Author: Marielle Price (@MPR) Status: P1, P2, P3, Completed, Verified Dates: 04-04-2018 - 04-09-2018 Recipients [email protected] Description This report contains all tasks for this Sample Project. Sample Summary Report pg. 1 Created with Fieldwire

Transcript of Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on...

Page 1: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

Sample Project

Sample Summary ReportCreated: 04-10-2018Author: Marielle Price (@MPR)Status: P1, P2, P3, Completed, VerifiedDates: 04-04-2018 - 04-09-2018

Recipients

[email protected]

Description

This report contains all tasks for this Sample Project.

Sample Summary Report pg. 1 Created with Fieldwire

Page 2: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

04-10-2018Sample Project

# Description Category Plan Assignee Status

1 Review emergency egress plan with safetymanager

Safety A2.01-1 @BSU Overdue - 04-04-2018

2 Client approval on color palette Design - @KCL Start - 04-14-2018

3 Found unmarked utility line in road Demo C5.1 @BSU Verified - 03-30-2018

4 Sawcut along break in asphalt Paving C5.1 @JFO Priority 1 - 04-04-2018

5 Plumbing for faucet does not align with sink Plumbing A2.01-1 @BSU Priority 1 - 04-04-2018

6 Replace damaged carpet tile Flooring A2.01-1 @JFO Start - 04-11-2018

7 Room 106 wall completion Drywall A2.01-1 @BEN Priority 3 - 04-04-2018

8 Repair wall board once t-stat is moved Drywall - @JFO Priority 2 - 04-04-2018

9 Tape & finish gyp board Drywall - @JSM Priority 2 - 04-04-2018

10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018

11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018

12 T-bar installation Ceilings A2.03-1 @JFO Overdue - 04-08-2018

13 A-type fixture installation Electrical E.3 @JSM Priority 2 - 04-04-2018

14 Sawcutting sidewalk in progress Demo C4.1 @BSU Priority 3 - 04-04-2018

15 Install conduit for EF-4 fan Electrical E.4 @JSM Priority 1 - 04-04-2018

16 EF-4 fan installation HVAC - @JFO Priority 2 - 04-04-2018

17 Slab-on-grade pour Concrete S2.01a @BSU Priority 2 - 04-04-2018

18 Safety Walk Safety - @JFO Completed - 04-03-2018

19 Clean up needed Clean Up A2.01-1 @JFO Priority 2 - 04-04-2018

20 T-stat conflicts with shelving HVAC A2.01-1 @JSM Priority 2 - 04-04-2018

Sample Summary Report pg. 2 Created with Fieldwire

Page 3: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

5

6

7

1920

Foundation Plan

Page 4: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

12

ASK-011

Page 5: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

14

Page 6: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

3

4

11

RFI 21

Page 7: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

13

Link to RCP

Page 8: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

15

Page 9: Sample Summary Report... · 10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018 11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018 12 T-bar installation Ceilings

17

B1 Rebar

B2 Rebar

CIP Specs