Sample Project
Sample Summary ReportCreated: 04-10-2018Author: Marielle Price (@MPR)Status: P1, P2, P3, Completed, VerifiedDates: 04-04-2018 - 04-09-2018
Recipients
Description
This report contains all tasks for this Sample Project.
Sample Summary Report pg. 1 Created with Fieldwire
04-10-2018Sample Project
# Description Category Plan Assignee Status
1 Review emergency egress plan with safetymanager
Safety A2.01-1 @BSU Overdue - 04-04-2018
2 Client approval on color palette Design - @KCL Start - 04-14-2018
3 Found unmarked utility line in road Demo C5.1 @BSU Verified - 03-30-2018
4 Sawcut along break in asphalt Paving C5.1 @JFO Priority 1 - 04-04-2018
5 Plumbing for faucet does not align with sink Plumbing A2.01-1 @BSU Priority 1 - 04-04-2018
6 Replace damaged carpet tile Flooring A2.01-1 @JFO Start - 04-11-2018
7 Room 106 wall completion Drywall A2.01-1 @BEN Priority 3 - 04-04-2018
8 Repair wall board once t-stat is moved Drywall - @JFO Priority 2 - 04-04-2018
9 Tape & finish gyp board Drywall - @JSM Priority 2 - 04-04-2018
10 Repaint wall Paint - @JSM Priority 2 - 04-04-2018
11 Patching on Chestnut Street Paving C5.1 @BSU Start - 04-10-2018
12 T-bar installation Ceilings A2.03-1 @JFO Overdue - 04-08-2018
13 A-type fixture installation Electrical E.3 @JSM Priority 2 - 04-04-2018
14 Sawcutting sidewalk in progress Demo C4.1 @BSU Priority 3 - 04-04-2018
15 Install conduit for EF-4 fan Electrical E.4 @JSM Priority 1 - 04-04-2018
16 EF-4 fan installation HVAC - @JFO Priority 2 - 04-04-2018
17 Slab-on-grade pour Concrete S2.01a @BSU Priority 2 - 04-04-2018
18 Safety Walk Safety - @JFO Completed - 04-03-2018
19 Clean up needed Clean Up A2.01-1 @JFO Priority 2 - 04-04-2018
20 T-stat conflicts with shelving HVAC A2.01-1 @JSM Priority 2 - 04-04-2018
Sample Summary Report pg. 2 Created with Fieldwire
5
6
7
1920
Foundation Plan
12
ASK-011
14
3
4
11
RFI 21
13
Link to RCP
15
17
B1 Rebar
B2 Rebar
CIP Specs