Sample Procedure Flow
description
Transcript of Sample Procedure Flow
SYSTEM PROCEDURE DOC NO: QA-BPF-01
RECEIPT INSPECTION
PAGE: 1 OF 3
Prep. By: Reviewed & Appd. by: Issued by: HOD-QA
CEO / MR
Exec-MIS
REV. NO: 04 DATE : 15.05.04
REVISION RECORD SHEET REV. NO.
DESCRIPTION OF AMMENDMENT DATE OF AMMENDMENT
REASON FOR AMMENDMENT
00 Stated as per QS 9000: 1998 requirement 16.08.1999 QS9000:1998 updation
01 Responsibilities in column 3 re-defined & changed to AM-QA. Preparation, Review & approval, Issuance & functional deleted. Control plan for receipt/final inspection added. Frequency of dock audit changed. Separate register(QA-R-11) used for dock audit
25.10.1999 Observations during Pre Assessment audit
02 Responsibility of Layout Inspection changed to Exec. Tool Room from Exec QA. And register TLR-R-07 replaces QA-R-08 for the same.
25.07.01 Observation during Audit
03 • Clause 4.1, resp. changed to Exec. QS ipo AM-QA
• Clause 4.2& 4.3 merged. • Clause 4.5, responsibility changed to
Executive store in place of Sr. manager QA.
• Clause 4.8, provision added for temporary process parameter deviation to fulfill the requirement of product.
• Clause 4.11, generation of inspection standard added with responsibility
• Performance testing / initial testing added
• Layout inspection re-defined
18.11.03 QS 9000 System Review & Updation
04 • Procedure changed from Simple Text to Flow Chart
• Title changed from Inspection & Testing to Receipt Inspection, only
• No. changed from QA-P-01 to QA-BPF-01
• New Header & Footer added
15.05.2004 System review due to switching to ISO/TS 16949
DISTRIBUTED TO : S.NO. DESIGNATION SIGNATURE OF THE RECEIVER 1. ASST. MANAGER (QA) 2. MANAGER (PRODUCTION) 3. MANAGER (PURCHASE) 4. MANAGER (ENGG.)
SYSTEM PROCEDURE DOC NO: QA-BPF-01
RECEIPT INSPECTION
PAGE: 2 OF 3
Prep. By: Reviewed HOD-QA CEO
1.0 Purpose: To establish and maintain a system for inspection and testing in order to verify that the specified requirements for the product are met
2.0 Scope : All incoming goods including goods for job work.
3.0 Responsibility : Asstt. Manager (QA) 4.0 Definition :
--- 5.0 Description: S. No
Input Process / Activity Resp. & Interaction
Control Doc. / Check Point
Output
5.1 MRR (STR-F-
03) RGP (STR-F-10)
Store I/C QA-Exec
Material Identification tag (QA-F-01) Supplier Test certificate / Insp. Report
---
5.2
Pur-Exec QA-Exec
Approved supplier List (PUR-D-01)
Verification of approved supplier
5.3 Tagged material
5.4 Inspected Material
5.5 --
K
Reject & return MRR to store
Check A.S.L. & All related doc.
Randomsample selectioInspecti
Tear off acceportion as app
Update suppcard
MRR receipt from store
O
Not OK
&
QA-Exec Store I/C
Quality Plan (QA-Q-XXX) Sampling Plan (QA-D-04) Calibrated instrument
Incoming Inspection Report (QA-F-02)
K
n & on
p
O
Not OK
Appd. by: Issued by:
/ MR
Exec-MIS
REV. NO: 04 DATE : 15.05.04
QA-Exec QA-HOD Store I/C
Identification / Inspection Tag (QA-F-01)
Inspected material Approved MRR by QA
QA-Exec
Vendor history card (QA-F-05)
Entry in vendor history card
ted / rejected licable
lier history
SYSTEM PROCEDURE DOC NO: QA-BPF-01
RECEIPT INSPECTION
PAGE: 3 OF 3
Prep. By: Reviewed & Appd. by: Issued by: HOD-QA
CEO / MR
Exec-MIS
REV. NO: 04 DATE : 15.05.04
PERFORMANCE INDICATORS: Efficiency: Line rejections trend Effectiveness: Incoming %age Acceptance 6.0 Records:
6.1 QA-F-01 Identification Tag 6.2 QA-F-02 Incoming Inspection Report 6.3 QA-F-05 Vendor History Card 6.4 STR-F-03 Material Receipt cum Inspection Report 6.5 STR-F-10 Returnable Gate Pass / Receipt Report / Insp. Report – Job Work only
7.0 References:
7.1 QA-Q-XXX Relevant Quality Plans 7.2 QA-W-01 Work Instruction for Incoming Inspection 7.3 QA-D-04 Single Sampling Plan 7.4 PUR-D-01 Approved Supplier List 7.4 QA-D-05 List of Major / Minor Defects