Sample Procedure Flow

3
SYSTEM PROCEDURE DOC NO: QA-BPF-01 RECEIPT INSPECTION PAGE: 1 OF 3 Prep. By: Reviewed & Appd. by: Issued by: HOD-QA CEO / MR Exec-MIS REV. NO: 04 DATE : 15.05.04 REVISION RECORD SHEET REV. NO. DESCRIPTION OF AMMENDMENT DATE OF AMMENDMENT REASON FOR AMMENDMENT 00 Stated as per QS 9000: 1998 requirement 16.08.1999 QS9000:1998 updation 01 Responsibilities in column 3 re-defined & changed to AM-QA. Preparation, Review & approval, Issuance & functional deleted. Control plan for receipt/final inspection added. Frequency of dock audit changed. Separate register(QA-R- 11) used for dock audit 25.10.1999 Observations during Pre Assessment audit 02 Responsibility of Layout Inspection changed to Exec. Tool Room from Exec QA. And register TLR-R-07 replaces QA- R-08 for the same. 25.07.01 Observation during Audit 03 Clause 4.1, resp. changed to Exec. QS ipo AM-QA Clause 4.2& 4.3 merged. Clause 4.5, responsibility changed to Executive store in place of Sr. manager QA. Clause 4.8, provision added for temporary process parameter deviation to fulfill the requirement of product. Clause 4.11, generation of inspection standard added with responsibility Performance testing / initial testing added Layout inspection re-defined 18.11.03 QS 9000 System Review & Updation 04 Procedure changed from Simple Text to Flow Chart Title changed from Inspection & Testing to Receipt Inspection, only No. changed from QA-P-01 to QA- BPF-01 New Header & Footer added 15.05.2004 System review due to switching to ISO/TS 16949 DISTRIBUTED TO : S.NO. DESIGNATION SIGNATURE OF THE RECEIVER 1. ASST. MANAGER (QA) 2. MANAGER (PRODUCTION) 3. MANAGER (PURCHASE) 4. MANAGER (ENGG.)

description

iso flow chart

Transcript of Sample Procedure Flow

Page 1: Sample Procedure Flow

SYSTEM PROCEDURE DOC NO: QA-BPF-01

RECEIPT INSPECTION

PAGE: 1 OF 3

Prep. By: Reviewed & Appd. by: Issued by: HOD-QA

CEO / MR

Exec-MIS

REV. NO: 04 DATE : 15.05.04

REVISION RECORD SHEET REV. NO.

DESCRIPTION OF AMMENDMENT DATE OF AMMENDMENT

REASON FOR AMMENDMENT

00 Stated as per QS 9000: 1998 requirement 16.08.1999 QS9000:1998 updation

01 Responsibilities in column 3 re-defined & changed to AM-QA. Preparation, Review & approval, Issuance & functional deleted. Control plan for receipt/final inspection added. Frequency of dock audit changed. Separate register(QA-R-11) used for dock audit

25.10.1999 Observations during Pre Assessment audit

02 Responsibility of Layout Inspection changed to Exec. Tool Room from Exec QA. And register TLR-R-07 replaces QA-R-08 for the same.

25.07.01 Observation during Audit

03 • Clause 4.1, resp. changed to Exec. QS ipo AM-QA

• Clause 4.2& 4.3 merged. • Clause 4.5, responsibility changed to

Executive store in place of Sr. manager QA.

• Clause 4.8, provision added for temporary process parameter deviation to fulfill the requirement of product.

• Clause 4.11, generation of inspection standard added with responsibility

• Performance testing / initial testing added

• Layout inspection re-defined

18.11.03 QS 9000 System Review & Updation

04 • Procedure changed from Simple Text to Flow Chart

• Title changed from Inspection & Testing to Receipt Inspection, only

• No. changed from QA-P-01 to QA-BPF-01

• New Header & Footer added

15.05.2004 System review due to switching to ISO/TS 16949

DISTRIBUTED TO : S.NO. DESIGNATION SIGNATURE OF THE RECEIVER 1. ASST. MANAGER (QA) 2. MANAGER (PRODUCTION) 3. MANAGER (PURCHASE) 4. MANAGER (ENGG.)

Page 2: Sample Procedure Flow

SYSTEM PROCEDURE DOC NO: QA-BPF-01

RECEIPT INSPECTION

PAGE: 2 OF 3

Prep. By: Reviewed HOD-QA CEO

1.0 Purpose: To establish and maintain a system for inspection and testing in order to verify that the specified requirements for the product are met

2.0 Scope : All incoming goods including goods for job work.

3.0 Responsibility : Asstt. Manager (QA) 4.0 Definition :

--- 5.0 Description: S. No

Input Process / Activity Resp. & Interaction

Control Doc. / Check Point

Output

5.1 MRR (STR-F-

03) RGP (STR-F-10)

Store I/C QA-Exec

Material Identification tag (QA-F-01) Supplier Test certificate / Insp. Report

---

5.2

Pur-Exec QA-Exec

Approved supplier List (PUR-D-01)

Verification of approved supplier

5.3 Tagged material

5.4 Inspected Material

5.5 --

K

Reject & return MRR to store

Check A.S.L. & All related doc.

Randomsample selectioInspecti

Tear off acceportion as app

Update suppcard

MRR receipt from store

O

Not OK

&

QA-Exec Store I/C

Quality Plan (QA-Q-XXX) Sampling Plan (QA-D-04) Calibrated instrument

Incoming Inspection Report (QA-F-02)

K

n & on

p

O

Not OK

Appd. by: Issued by:

/ MR

Exec-MIS

REV. NO: 04 DATE : 15.05.04

QA-Exec QA-HOD Store I/C

Identification / Inspection Tag (QA-F-01)

Inspected material Approved MRR by QA

QA-Exec

Vendor history card (QA-F-05)

Entry in vendor history card

ted / rejected licable

lier history

Page 3: Sample Procedure Flow

SYSTEM PROCEDURE DOC NO: QA-BPF-01

RECEIPT INSPECTION

PAGE: 3 OF 3

Prep. By: Reviewed & Appd. by: Issued by: HOD-QA

CEO / MR

Exec-MIS

REV. NO: 04 DATE : 15.05.04

PERFORMANCE INDICATORS: Efficiency: Line rejections trend Effectiveness: Incoming %age Acceptance 6.0 Records:

6.1 QA-F-01 Identification Tag 6.2 QA-F-02 Incoming Inspection Report 6.3 QA-F-05 Vendor History Card 6.4 STR-F-03 Material Receipt cum Inspection Report 6.5 STR-F-10 Returnable Gate Pass / Receipt Report / Insp. Report – Job Work only

7.0 References:

7.1 QA-Q-XXX Relevant Quality Plans 7.2 QA-W-01 Work Instruction for Incoming Inspection 7.3 QA-D-04 Single Sampling Plan 7.4 PUR-D-01 Approved Supplier List 7.4 QA-D-05 List of Major / Minor Defects