TAKENAKA (MALAYSIA) SDN BHD GROUNDING RESISTANCE FOR POWER Project Name : Date of Measurement : Model no. of Measure : Building Height Building Structure (m) / Pole Grounding Electrode Rod Sort of Soil / Water level Lightning Rod Top Lebel from ground/material Plate Lightning Grounding Electrod Depth

Transcript of Sample

Page 1: Sample

Page 1 of 1TAKENAKA (MALAYSIA) SDN BHD

GROUNDING RESISTANCE FOR POWER

Project Name :Date of Measurement :Model no. of Measure :Building HeightBuilding Structure

(m) / PoleGrounding Electrode Rod

Grounding Electrode PlateSort of Soil / Water level

Lightning Rod Top Lebel from ground/material

Lightning Grounding Electrod Depth

Page 2: Sample

Page 1 of 1TAKENAKA (MALAYSIA) SDN BHD

GROUNDING RESISTANCE FOR POWER Grounding Resistance for Power / Telephone / Lan (mark circle your choice)

Page 3: Sample

Grounding Resistance for Power / Telephone / Lan (mark circle your cho

Project Name : TESCO-EXTRA,PLENTONG Measured by : WH Choong (TM)/ LC Siong (CBH)

: 9/5/2008

: KYORITSU Earth Tester Model 4106 alibration due date : 5/1/2009

Building Height 17,370 Meter

Record

No. location

Building Structure Metal Roofing on RC Column. 1 GL/AA-3 4

(m) / Pole 2 GL/AA-4 4

mmφ mmL nos19 × 1500 × 3

mm mm nos

× × ×

Clay Earth / 6.275m 2.8

2 x 4.5 m Grounding Constractor CBH Engineering Sdn bhd

Remarks

layout drawing

direction N

Remarks

electrical works

Date of Measurement

Model No. of Measure

Grounding Resistance(Ω)

Total Resistance(Ω)

Lightning Rod Top Lebel from ground/material Grounding Electrode Rod

Grounding Electrode Plate

(thickness)mm

Sort of Soil / Water level

Lightning Grounding Electorode Depth

(top of electrode)

Page 4: Sample

Grounding Resistance for Power / Telephone / Lan (mark circle your cho

Project Name : TESCO-EXTRA,PLENTONG Measured by : WH Choong (TM)/ LC Siong (CBH)

: 9/5/2008

: KYORITSU Earth Tester Model 4106 alibration due date : 5/1/2009

Building Height 17,370 Meter

Record

No. location

Building Structure Metal Roofing on RC Column. 1 3.5 & 4.0

(m) / Pole 2 4.0 & 4.0

mmφ mmL nos3 3.0 & 3.5

19 × 1500 × 3mm mm nos

4 3.0 & 3.0× × ×

Clay Earth / 6.275m 0.9

8 x 4.5 m Grounding Constractor CBH Engineering Sdn bhd

Remarks

layout drawing

direction N

Remarks

electrical works

Date of Measurement

Model No. of Measure

Grounding Resistance(Ω)

Total Resistance(Ω)

GL/L-18 (2sets)

Lightning Rod Top Lebel from ground/material

GL/M-18 (2sets)

Grounding Electrode Rod

GL/N-18 (2sets)

Grounding Electrode Plate

(thickness)mmGL/O-18 (2sets)

Sort of Soil / Water level

Lightning Grounding Electorode Depth

(top of electrode)

Page 5: Sample

Lightning Grounding Resistance Measurement

Project Name : TESCO-EXTRA,PLENTONG Measured by : WH Choong (TM)/ LC Siong (CBH)

: 9/5/2008

: KYORITSU Earth Tester Model 4106 alibration due date : 5/1/2009

Building Height 17,370 Meter

Record

No. location

Building Structure Metal Roofing on RC Column. 1 GL/AA-6 5

3 (m) / Pole 2 GL/AA-12 4

mmφ mmL nos3 GL/Q-6 5

19 × 1500 × 3mm mm nos

4 GL/Q-12 5× × ×

Clay Earth / 6.275m 5 GL/Q-15 5

5 x 4.5 m Grounding Constractor CBH Engineering Sdn bhd

layout drawing

layout drawing

direction N

electrical works

Date of Measurement

Model No. of Measure

Grounding Resistance(Ω)

Total Resistance(Ω)

Lightning Rod Top Lebel from ground/material Grounding Electrode Rod

Grounding Electrode Plate

(thickness)mm

Sort of Soil / Water level

Lightning Grounding Electorode Depth

(top of electrode)

Page 6: Sample

Illumination Photometry (emergency lighting) measure unit: lux

Project Name : Measured by :

: 00/00/2007

: Calibration due date : 00/00/2007

Floor Room name or Locationlighting fitting

measurementfluorescent incandescent(W)×nos (W)×nos Max Min

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

× ×

Remarks

Date of Measurement

Model No. of Measure

Page 7: Sample

electrical works

Page 8: Sample

measure unit: lux

00/00/2007

Remarks

Remarks

Page 9: Sample

electrical works

Page 10: Sample

Illumination Photometry (general lighting) Measure unit: Lux

Project Name : TESCO-EXTRA,PLENTONG Measured by: WH Choong (TM)/ Ben Chua (CBH)

: 12/6/2008

Measure : KYORITSU ILLUMINOMETER (Model 5200) Calibration due date : 19/4/2008

Floor Design Lux Remarks

Grd Façade 15 80 100 150

Grd External Carpark 75 30 36 50

Grd Internal Carpark 200 100 120 175

Grd M & E Room 15 300 360 350

Grd Staircase 8 150 180 160

Grd Lift Lobby 10 300 360 335

Grd Mall Area 40 500 600 550

Grd Toilets 9 500 600 510

Grd Food Court 24 500 600 650

1st M & E Room 20 300 360 325

1st Staircase 15 150 180 200

1st Lift Lobby 8 300 360 500

1st Mall Area 75 500 600 550

1st Toilets 15 500 500 510

1st Bazaar 20 500 600 570

1st Sales Area 120 900 1080 1100

1st Prep.Area 40 900 1080 920

1st BOH 70 150 180 185

1st Warehouse 50 150 180 185

1st Office 150 500 600 600

1st Canteen 20 300 360 550

1st Loading Bay 25 100 120 200

Remarks

electrical works

Date of Measurement

Room nameor location

Value ofmeasurement point

Design Primary Lux

Measurement(average) *

* measurement height must follow design condition(desigh calculation height).

Page 11: Sample

Insulation Resistance Measuerment Record (lighting DB :

Project Name : Measured by:

: 00/00/2007

Measure : Calibration due date : 00/00/2007

DB name :

circuit name No. Diagram No. circuit name

DB name :

circuit name No. Diagram No. circuit name

measure unit: MΩ

Date of Measurement

Measurement(MΩ)

Measurement(MΩ)

Page 12: Sample

Remarks

electrical works

Page 13: Sample

00/00/2007

circuit name

circuit name

measure unit: MΩ

Measurement(MΩ)

Measurement(MΩ)

Page 14: Sample

Remarks

electrical works

Page 15: Sample

Insulation Resistance Measuerment Record (power panel

Project Name : TESCO-EXTRA,PLENTONG Measured by: FC Wong (TM) / LC Siong (CBH)

: 3/6/2008 ~ 13/6/2008

Measure : KYORITSU ( Isulation Tester )Model 3165 alibration due date : 5/1/2008

DB name Load name interlocking Remarks

OK/NG OK/NG OK/NG OK/NG OK/NG

SSB/G/LP DB-G/L 1000 OK OK OK - - Good

to DB-G/P 1000 OK OK OK - - Good

SSB-FC 500 OK OK OK - - Good

SSB-UPS DB-INV 500 OK OK OK - - Good

to DB-SALE 600 OK OK OK - - Good

DB-UDB/F1 500 OK OK OK - - Good

DB-UDB/F2 500 OK OK OK - - Good

SSB/EG/LP DB-EG/L 1000 OK OK OK - - Good

to DB-EG/P 1000 OK OK OK - - Good

SSB-EFC 400 OK OK OK - - Good

400 OK OK OK - - Good

400 OK OK OK - - Good

Remarks

*1 : measure secondary side of electromagnetic switch

electrical works

Measure unit: MΩ

Date of Measurement

Insulation resistance

load/unload

indication

trouble indication

manual operation

automatic operation

(MΩ) *1

60A Travellator Isolator

60A Travellator Isolator

Page 16: Sample

Page 1 of 1TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

PROJECT NAME : AEON STATION 18 IPOHMeasured by :

LOR KUAN CHUANDate of measurement : 12 APRIL 2012Measure : KYORITSU 3001B Calibration due date :

FEEDER NAME WIRING METHOD

MSB-C1 (Located at Electrical Room No.1) R-Y Y-B B-R R-N Y-N B-N R Y B N

SSB-TGV 12X300mm2/1C XLPE/PVC (Al) 200 200 200 200 200 200 200 200 200 200

CP-TGV CHILLER 12X300mm2/1C XLPE/PVC (Al) 200 200 200 200 200 200 200 200 200 200

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

measurement unit: MΩ

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 17: Sample

Page 1 of 2TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

PROJECT NAME : AEON STATION 18 IPOHMeasured by :

Date of measurement :Measure : KYORITSU 300TB Calibration due date : 17 JAN 2012

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

measurement unit: MΩ

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 18: Sample

Page 2 of 2TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

measurement unit: MΩ

PROJECT NAME : AEON STATION 18 IPOHMeasured by:

Date of Measurement :Measure : KYORITSU 300TB Calibration due date :

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 19: Sample

Page 1 of 3TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

PROJECT NAME : AEON STATION 18 IPOHMeasured by :

Date of measurement :Measure : KYORITSU 300TB Calibration due date : 17 JAN 2012

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

WItnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

measurement unit: MΩ

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 20: Sample

Page 2 of 3TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

measurement unit: MΩ

PROJECT NAME : AEON STATION 18 IPOHMeasured by:

Date of Measurement :Measure : KYORITSU 300TB Calibration due date :

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 21: Sample

Page 3 of 3TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

PROJECT NAME : AEON STATION 18 IPOHMeasured by :

Date of measurement :Measure : KYORITSU 300TB Calibration due date : 17 JAN 2012

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

measurement unit: MΩ

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 22: Sample

Page 1 of 4TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

PROJECT NAME : AEON STATION 18 IPOHMeasured by :

Date of measurement :Measure : KYORITSU 300TB Calibration due date : 17 JAN 2012

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

WItnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

measurement unit: MΩ

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 23: Sample

Page 2 of 4TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

measurement unit: MΩ

PROJECT NAME : AEON STATION 18 IPOHMeasured by:

Date of Measurement :Measure : KYORITSU 300TB Calibration due date :

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 24: Sample

Page 3 of 4TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

PROJECT NAME : AEON STATION 18 IPOHMeasured by :

Date of measurement :Measure : KYORITSU 300TB Calibration due date : 17 JAN 2012

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

measurement unit: MΩ

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1

Page 25: Sample

Page 4 of 4TAKENAKA (MALAYSIA) SDN BHD

INSULATION RESISTANCE MEASUREMENT RECORD (FEEDER)

PROJECT NAME : AEON STATION 18 IPOHMeasured by :

Date of measurement :Measure : KYORITSU 300TB Calibration due date : 17 JAN 2012

FEEDER NAME WIRING METHOD

R-Y Y-B B-R R-N Y-N B-N R Y B N

REMARKS

Witnessed by:

*1: Fill in measurement of high voltage feeder onlyElectrical Works

measurement unit: MΩ

Insulation resistance between each phase

Insulation resistance each phase to grounding

After voltage proof

testing *1