Samoa Pulp Mill Case

5
Samoa Pulp Mill Case PST Support to EPA Region IX Samoa, CA & Longview, WA Northwest Area Committee Meeting – November 2013

description

Samoa Pulp Mill Case. PST Support to EPA Region IX Samoa, CA & Longview, WA. Northwest Area Committee Meeting – November 2013. Constructed in 1963 as a pulp manufacturing facility Abandoned in 2008 - PowerPoint PPT Presentation

Transcript of Samoa Pulp Mill Case

Page 1: Samoa Pulp Mill Case

Samoa Pulp Mill Case

PST Support to EPA Region IX

Samoa, CA & Longview, WA

Northwest Area Committee Meeting – November 2013

Page 2: Samoa Pulp Mill Case

• Constructed in 1963 as a pulp manufacturing facility• Abandoned in 2008• 4 million gallons of caustic liquids (pH>13) & 10k

gallons of various acids (pH<1) remain onsite

Page 3: Samoa Pulp Mill Case
Page 4: Samoa Pulp Mill Case

Region IX Requested PST Support

• PST mobilized the chemical pump load and HMRT to Samoa, CA

• 165,000 gallons pumped from 2 pulp liquor tanks to 10 frac tanks

• Reduced risk of tanks overflowing due to rainwater accumulation

Page 5: Samoa Pulp Mill Case

Projected Operations• Fabrication/construction of pipeline at Samoa facility to allow for

pumping of product from tanks to tank barge• Start 18NOV – anticipated duration 2-3 weeks

• Fabrication/construction of pipeline at KapStone Container Corporation (formerly Longview Fiber Company) for offload

• Start 02DEC – anticipated duration 2-3 weeks

• First barge loading of product in Samoa, CA• Start 06JAN – anticipated duration 7-10 days

• First barge unloading in Longview, WA• Start 19JAN – anticipated duration 7-10 days