Samjin Industrial Co., LTD. · Project Owner AK Plaza Year of Construction 1993. ARCHITECTURE...
Transcript of Samjin Industrial Co., LTD. · Project Owner AK Plaza Year of Construction 1993. ARCHITECTURE...
Samjin Industrial Co., LTD.
SAMJIN INDUSTRIAL Co., LTD.SAMJIN STEEL STRUCTURE Co., LTD.
http://www.samjinst.com Contact : [email protected] Office : RM., A-507, Ansung Building, 410-13, Shindolim-Dong, Guro-Gu, Seoul, Korea
Doha Office : IBA Building No.230,1st floor, C-Ring Rd., Doha, Qatar. P.O.Box: 3973
C O N T E N T S
ABOUT THE COMPANY∙ CEO's message ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙3∙ Brief history ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙4∙ Certificates & Awards ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙6∙ Business fields ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙9∙ Fabrication plant in Hwasung, Korea ∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 11
CIVIL WORK∙ Road ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 18∙ Railway ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 20∙ Bridge ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 22∙ Floodgate construction∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 36
ARCHITECTURAL WORK∙ Residential ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 42∙ Commercial ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 47∙ Office building ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 54∙ Public building ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 57∙ Station ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 58∙ Sports facility ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 62
PLANT∙ Thermal power plant ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 76∙ Petroleum storage tank∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 91∙ LNG storage tank ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 92∙ Iron mill ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 94∙ Nuclear power plant ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 102
C E O ' s M e s s a g e
Since the foundation of the company in 1967, Samjin has been delivering
better reliable standards to fulfill our philosophy “Quality is everything”.
S a m j i n h a s s t r e n g t h e n e d i t s r e l i a b i l i t y & c r e d i b i l i t y a s t h e p r e -
eminent expert company with optimized technology and accumulated
management know-how based on the experience performed over 300
clients around the world.
Now we are stretching our muscles to Gulf area to deliver better products
and ser vices with updated technologies and efficient management
system.
Hwang, Sunbok / CEO Samjin Industrial Co., LTD.
" Q u a l i t y i s e v e r y t h i n g "
2 3
J a n 2 0 0 1 Mokdong Hyundai Hyperion apartmentO c t 2 0 0 1 Daejon world cup stadiumJ u l 2 0 0 2 Achived Level 1 factory certificateD e c 2 0 0 2 Get Gol Reservoir floodgate constructionJ a n 2 0 0 4 Chung Gye Chun City park restorationA p r 2 0 0 4 Hwang Hakdong business center redevelopmentO c t 2 0 0 5 Busan Lotteworld department store & plaza steel structure workJ a n 2 0 0 8 Marafiq IWPP power plant project (steel structure) in Saudi ArabiaJ u n 2 0 0 8 Cirebon 695MW 1uint / Buckstay fabrication work in IndonesiaS e p 2 0 0 8 Al Khalij PJT Buckstay fabrication work in LibyaS e p 2 0 0 8 Gheco-one PJT Buckstay fabrication work in ThailandM a y 2 0 0 9 Al Dur IWPP power plant project building work (steel structure &
cladding work) in BahrainJ u n 2 0 0 9 Haeundae I’ Park apartment steel structure workJ u l 2 0 0 9 Yeosu thermal power plant
Nuclear Energy ProjectsJ u n 1 9 9 6 Installed Uljin nuclear energy #5, 6 main water supply and circulation pump J u n 1 9 9 7 Installed Young Kwang nuclear energy #5, 6 liner plate and nuclear steam
supply facilitiesN o v 1 9 9 9 Installed Uljin nuclear energy #5, 6 CLP&SLPJ u n 2 0 0 2 KEDO nuclear energy CLP&SLP installationF e b 2 0 0 7 Sin Gori nuclear energy #1, 2 nuclear reactor equipment installationN o v 2 0 0 9 Uljin-Nuclear power plant #1, 2 M/C installation
Overseas branchesD e c 2 0 0 7 Established branch in Kingdom of Saudi ArabiaN o v 2 0 0 8 Established branch of Samjin Industrial Co., LTD. in ThailandS e p 2 0 0 9 Established branch of Samjin Steel Structure in Kingdom of BahrainD e c 2 0 1 1 Established Samjin Qatar Trading & Contracting in State of QatarF e b 2 0 1 2 We are establishing Company in Abu Dhabi, UAE
Major awardsA u g 1 9 9 6 Awarded citation from Ministry of Finance and EconomyD e c 2 0 1 1 Awarded from the Prime Minister of Korea for contribution to the
development of nuclear power plant industry
New
mill
enni
um 2
000
~ Bu
sine
ss e
xpas
ion
stag
e
B r i e f h i s t o r y
Samjin Industries Co., LTD.(together with Samjin Steel Structure Co. LTD.) was founded as a steel structure specialized construction company in Korea 1967. It has embarked on construction field with the sprits of veracity and trust. Since then, Samjin has thrived with local and overseas costomers providing best quality performance.
A u g 1 9 6 7 Samjin Workshop was founded in Korea A p r 1 9 7 3 Renamed as Samjin Industrial Co., LTD.M a y 1 9 8 4 Samjin Steel Structure Co., LTD.was founded
J u l 1 9 9 4 Established fabrication line in Sihwa cityJ u l 1 9 9 6 Hyundai I-Tower buildingN o v 1 9 9 6 Busan World Cup stadiumM a y 1 9 9 7 Kyun Buk KTX 4-1 block (Chunan Station)J u n 1 9 9 7 Achieved ISO 9001:2000 CHSB-RS A p r 1 9 9 9 Ulsan world cup stadium
1967
- 19
80's
Dev
elop
men
t sta
ge
1990
's - 2
000
Gro
wth
sta
ge
4 5
C e r t i f i c a t e s
ISO 9001 Cerificate of Samjin Industrial Co., LTD.• Certified by : HSB-RS
ISO 14001 Cerificate of Samjin Industrial Co., LTD.• Certified by : HSB-RS
ISO 9001 Cerificate of Samjin Steel Structure Co., LTD.• Certified by : HSB-RS
OHSAS 18001 Cerificate of Samjin Industrial Co., LTD.• Certified by : HSB-RS
Factory Certificate• Certified by :Ministry of Construction and Transportation
Aw a r d s
Award from the Prime Minister contribution to the development of nuclear power plant industry
Award from Korea Electric Power Corporation for assistance of thermal power plant construction in 1997
Award from Korea Electric Power Corporation for assistance of nuclear power plant construction in 1999
C e r t i f i c a t e s & A w a r d s
Business registrat ion cer t i f icates of overseas branches & corporat ion Business registrat ion cer t i f icates of overseas branches & corporat ion
Thailand : Samjin Industrial(Thailand) Co., LTD. (overseas corporation)
Kingdom of Bahrain : Samjin Steel Structure Co., LTD. (overseas branch)
State of Qatar : Samjin Industrial Co., LTD. (overseas corporation)
United Arab Emirates : Samjin Industrial Co., LTD. (overseas branch)
Kingdom of Saudi Arabia : Samjin Steel Structure Co., LTD. (overseas corporation)
6 7
B u s i n e s s f i e l d s
Investment in business development and proposal
F r o m t h e p l a n n i n g s t a g e , S a m j i n p r o v i d e s
p r o f e s s i o n a l d e v e l o p m e n t i n v e s t m e n t a n d
c o n s u l t i n g s e r v i c e s f o r c l i e n t r e g a r d i n g
e n v i r o n m e n t a l i m p a c t a s s e s s m e n t , p r o j e c t
feasibi l ity, basic sur vey and project f inancing
review.
Designing and engineering
Samjin's exper iences based on sophist icated
d e s i g n i n g & c u t t i n g - e d g e e n g i n e e r i n g
technologies are the major k now-how of the
successes of variety of large scale projects.
Construction
Samjin implements projects based on a customized
project management system to deliver the best
quality products
Steel structure project
Samjin's own steel fabrication plant in Hwasung
w i t h a n n u a l p r o d u c t i o n c a p a c i t y o f 5 7 , 0 0 0
metric-tons is supplying high quality standardized
produc ts through the automated produc t ion
system. This fac tor y achieved ISO 9001:2000
certificate in 1997.
CM (Construction management)
S a m j i n p r o v i d e s t h e o p t i m i z e d b u s i n e s s
management solutions, offering technological and
management related alternatives for the entire
process of construction contractual work from
planing to operation and management to the
clients.
Samjin implements projects based on optimized project management system to deliver the best quality products and services.
8 9
10 11
"Quality is everything" Samjin
Hwasung plant complex is sitting on the area of
52,463m2 in the city of Hwasung, Korea. Our high-end
fabrication lines produce products precisely for any
steel frame constructions, plant equipment, scaffolds
and nuclear energy facility.
Fabrication lines
Hwasung plant
12 13
"Quality is everything" Samjin
Plant organization chart
Place Worker Person(s)
Hwasung plant
Officials 3
General manager 1
Administrative 19
Office worker 7
Technical worker (Welder) 85(45)
Total 115
Field worker(across country) approximate 400
Total approximate 515
Department of production
Plant
Department of public affairs
Department of general affairs
Team 1 Product / Quality tests
Team 2 Product / Quality tests
Productioncontrol
Shipping control,Process control,Materials control
Publicaffairs
Public affairs,Budget and purchase
Facilitymanagement
Gauging and maintaining facilities
General affairsHuman resources and labor
Department of quality control
Qualitycontrol
Guarantee test and examination
Fair process Mutual trust
Safety first Quality
Plant introduction
Plant policy
Location 221-5 Gwang Pyungri, Susin Myun, Hwa Sung City, Kyung GidoTEL: 031) 357-6271(3) / FAX: 031) 357-6274
E-Mail [email protected]
History 1994. 7. 21. Establishment of Sihwa Factory (area 9,099.7m2)1999. 11. Transfer to Sushin Myun, Hwa Sung Goon (area 52,463m2)2000. 2. 15. Factory Registration
Products Production of Floodgate, Infrastructure, Pipes, Construction Attachments, Metal Factory Items and More.
Average Maximum Production Per Month
2,000ton, Iron Frame : 3,500ton
Policy
Hwasung plant
14 15
"Quality is everything" Samjin
NC Drilling M/C
Manufacturer Daito (Japan)
Feature H=1,000mm, 3 Axis 33.5φ
Usage H-beamtube drilling, Marking
Bans saw (2 Qty)
Manufacturer Daito (Japan)
Feature Flange width 700mm (max)
Usage H-beam pipe and cutting other section steel
Scallop M/C (2 Qty)
Manufacturer Hataly (Japan)
Feature Flange width 700 mm (max)
Usage H-beam improvement and Scallop process
Splice drilling M/C
Manufacturer Showa Seiko (Japan)
Feature 50 φ (Max)
Usage Splice drilling
Plame planer
Manufacturer Tanaka (japan)
Feature 15 Torch 4m x 24m
Usage Gas cutting
BK assembling and Strengthening M/C
Manufacturer Tanaka (Japan)
Feature H=2,500mm, B=600
Usage BH assembling and Strengthening
Submerged Welding M/C
Manufacturer Hyundai Welding (Korea)
Feature Tandem
Usage BH automated welding
Machines and facilitiesGroup Daily Monthly Annual
B/H 48 ton 1,250 ton 15,000 ton
Process/Assembling 135 ton 3,500 ton 42,000 ton
Total 183 ton 4,750 ton 57,000 ton
Production Capacity
Plant area and lay-outField area : 52,463m2
Building : 29,645m2
80t Gantry
CNC drillingmachine
Plame planer,BH assembling,
Straitening machine
Scallop M/CBand saw
Welding zone
5 tonRoof crane
Automatedwelding line
Fit-up zone
5 ton
Manufacture work
5 ton
Splice drillingmachine
Cutting work
20 ton
10 ton
20 ton
50t Gantry
25t Gantry
20t Gantry
Process/Assembling
73.7%
B/H26.3%
20 ton
20 ton
10 ton
50 ton
16 17
"Quality is everything" Samjin
Civil WorkSamjin is exploring its business
opportunities in civil work. We are actively participating in the
large scale projects.
• Road • Railway
• Bridge • Tunnel
• Port • Airport
• Subway
• Floodgate Construction
C i v i l R o a d
18 19
"Quality is everything" Samjin
Project Owner Korea Expressway Corporation
Year of Construction 1997.07-1999.09
Remarks 26km
Youngdong HighwayYoungdong Highway 10 Block (Jin Boo Bridge)
C i v i l R a i l w a y
20 21
"Quality is everything" Samjin
Project Owner Seoul Regional Construction Management Office
Year of Construction 2005.01-2005.12
Remarks 83m
Kyungeui Line Rail BridgeKyungeui Line Rail Bridge Repair / Installation
C i v i l R a i l w a y
22 23
"Quality is everything" Samjin
Project Owner Seoul Metro
Year of Construction 1997.11-1999.10
Remarks 1,360m
Dangsan Railway Bridge
24 25
"Quality is everything" Samjin
Project Owner Busan City Construction Department
Year of Construction 2008
Remarks 7,420m, Container Transport Road
Busan Kwangan Bridge
C i v i l B r i d g e
26 27
"Quality is everything" Samjin
Project Owner Seoul City Construction Safety Management Department
Year of Construction 1995.06-2005.10
Remarks 1,161m
C i v i l B r i d g e
Sungsoo BridgeSungsoo Bridge Restoration / Expansion
28 29
"Quality is everything" Samjin
Project Owner Seoul City Construction Safety Management Department
Year of Construction 1997.12-2005.06
Remarks 1,600m
Mapo Bridge
C i v i l B r i d g e
30 31
"Quality is everything" Samjin
Project Owner Seoul City Construction Safety Management Department
Year of Construction 1998.08-2005.06
Remarks 915m
Hannam Bridge
C i v i l B r i d g e
32 33
"Quality is everything" Samjin
Project Owner Iksan Regional Construction and Management Administration
Year of Construction 2008.12-2010.12
Remarks 2,028m
Geogeum-Large BridgeGeogeum-Large Bridge Installation Work
C i v i l B r i d g e
34 35
"Quality is everything" Samjin
Youngsan BridgeGeoje-Large BridgeProject Owner Geoje Regional Construction and Management Administration
Year of Construction 2004.12-2010.12
Remarks 740m
Project Owner Youngsan Regional Construction and Management Administration
Year of Construction 2004.12-2010.12
Remarks 384.4m
C i v i l B r i d g e
C i v i l F l o o d g a t e c o n s t r u c t i o n
36 37
"Quality is everything" Samjin
Project Owner Korea Rural Community & Agricultural Corporation
Year of Construction 2001.03-2003.09
Remarks ROLLER GATE-10 Repaired Winch and Hoist Exchanged
Sukmoon District FloodgateSukmoon District Floodgate Repair
C i v i l F l o o d g a t e c o n s t r u c t i o n
38 39
"Quality is everything" Samjin
Project Owner Korea Rural Corporation
Year of Construction 2009.03-2010.02
Remarks Cylinder 3EA Change Work
Semangeum Drainage Lock GateSaemangeum Drainage Lock Gate Oil Pressure Cylinder Change Work
40 41
"Quality is everything" Samjin
Samjin is exploring its business opportunities in architectural work. We are actively participating in the
large scale projects.
• Residential • Commercial
• Education • Hospital
• Public Building • Station
• Sports Facility
Architectural Work
A R C H I T E C T U R E R e s i d e n t i a l b u i l d i n g
42 43
"Quality is everything" Samjin
Project Owner Hyundai Development Co., LTD.
Year of Construction 2009.06-2010.12
Remarks 72 Floors
Haeundae I'ParkHaeundae I'Park Steel Structure Work
A R C H I T E C T U R E Co m m e rc i a l re s i d e nt i a l co m p l e x b u i l d i n g
44 45
"Quality is everything" Samjin
Project Owner Hyundai Department Store
Year of Construction 2001.01-2003.02
Remarks 69 Floors
HyperionMokdong Hyundai Hyperion
A R C H I T E C T U R E R e s i d e n t i a l b u i l d i n g A R C H I T E C T U R E C o m m e r c i a l b u i l d i n g
46 47
"Quality is everything" Samjin
Hyundai Supervill
Project Owner Hyundai Development Co., LTD.
Year of Construction 2003
AK Department Store
Project Owner AK Plaza
Year of Construction 1993
A R C H I T E C T U R E C o m m e r c i a l b u i l d i n g
48 49
"Quality is everything" Samjin
Project Owner Lotte World Company
Year of Construction 2005.10-2008.09
Remarks 107 Floors
Lotte WorldBusan 2nd Lotte World
A R C H I T E C T U R E C o m m e r c i a l b u i l d i n g
50 51
"Quality is everything" Samjin
Project Owner Techno Mart
Year of Construction 1996.01-1997.04
Remarks 39 Floors
Techno MartGu-uidong Techno Mart
A R C H I T E C T U R E C o m m e r c i a l b u i l d i n g
52 53
"Quality is everything" Samjin
Project Owner Hyundai Department Store
Year of Construction 2002.07-2003.08
Boochun Hyundai Department Store
A R C H I T E C T U R E O f f i c e b u i l d i n g
54 55
"Quality is everything" Samjin
Project Owner POSCO Center
Year of Construction 1995
Remarks 31 Floors
POSCO CenterPOSCO Center
A R C H I T E C T U R E O f f i c e b u i l d i n g A R C H I T E C T U R E P u b l i c b u i l d i n g
56 57
"Quality is everything" Samjin
Halla Sigma Tower
Project Owner Halla E&C Corp.
Year of Construction 2004
Yongin Culture Welfare Administration TownProject Owner Yongin City Construction Department
Year of Construction 2008
A R C H I T E C T U R E S t a t i o n
58 59
"Quality is everything" Samjin
Project Owner Station Department Store
Year of Construction 2001.04-2005.04
Yongsan Station & Department Store
A R C H I T E C T U R E S t a t i o n
60 61
"Quality is everything" Samjin
Project Owner Station Department Store
Year of Construction 2002.02-2001.10
Anyang Station & Department Store
A R C H I T E C T U R E S p o r t s f a c i l i t y
62 63
"Quality is everything" Samjin
Project Owner Busan City General Construction Department
Year of Construction 1996.11-1999.11
Busan World Cup Stadium
A R C H I T E C T U R E S p o r t s f a c i l i t y
64 65
"Quality is everything" Samjin
Project Owner Korea Racing Authority
Year of Construction 2002.01-2004.06
Busan Kyungnam Race Track
A R C H I T E C T U R E S p o r t s f a c i l i t y
66 67
"Quality is everything" Samjin
Project Owner Daejon City Construction Management Department
Year of Construction 2001.10-2006.10
Daejeon World Cup Stadium
A R C H I T E C T U R E S p o r t s f a c i l i t y
68 69
"Quality is everything" Samjin
Project Owner Ulsan City General Construction Department
Year of Construction 1999.04-2001.11
Ulsan World Cup Stadium
A R C H I T E C T U R E S p o r t s f a c i l i t y
70 71
"Quality is everything" Samjin
Project Owner Jinju Facilities Management Office
Year of Construction 2009.04-2009.12
Jinju Sports ComplexJinju Sports Complex Steel and Pipe Truss Installation
A R C H I T E C T U R E S p o r t s f a c i l i t y
72 73
"Quality is everything" Samjin
Project Owner Seoul City Construction Management Department
Year of Construction 1998.05-1999.12
Euijongbu General Sports Stadium
74 75
"Quality is everything" Samjin
Samjin is exploring its business opportunities in plant industrial. We are actively participating in the
large scale projects.
Plant
• Thermal Power Plant
• Cemical Power Plant
• Petroleum Storage Tank
• LNG Storage Tank
• Iron Mill
• Nuclear Power Plant
P l a n t T h e r m a l p o w e r p l a n t ( K i n g d o m o f S a u d i A r a b i a )
76 77
"Quality is everything" Samjin
Marafiq IWPP Project Project Owner Jubail Water and Power Co., LTD.
Year of Construction 2008.01-2009.06
Steel Structure
P l a n t T h e r m a l p o w e r p l a n t ( K i n g d o m o f B a h r a i n )
78 79
"Quality is everything" Samjin
Al Dur IWPP ProjectProject Owner Al Dur Power and Water Company BSC(C)
Year of Construction 2009.05-2011.02
Building Work (Steel Structure & Cladding Works)
P l a n t T h e r m a l p o w e r p l a n t ( S t a t e o f K u w a i t )
80 81
"Quality is everything" Samjin
Sabiya CCGT ProjectProject Owner Sabuya CCGT
Year of Construction 2009.11-2011.03
Building Work (Steel Structure Works)
P l a n t T h e r m a l p o w e r p l a n t
82 83
"Quality is everything" Samjin
Project Owner Korea South-East Power Co., LTD.
Work Section #3,4 Boiler/Turbine Iron Frame (2004.11-2006.03)#1,2 Chimney Iron Frame (2002.06-2003.09)#3,4 Duct@Ggh Installation (2006.08.-2007.12)#3,4 Boiler Body/Exterior Installation (2005.04-2009.03)#3,4 Boiler Fsh, Frh Tube Change Work (2008.08-2009.09)#1,2 Boiler Final Superheater Tube Change Work (2010.02-2010.05)
Youngheung Thermal Power Plant
P l a n t T h e r m a l p o w e r p l a n t
84 85
"Quality is everything" Samjin
Project Owner Korea East West Power Co., LTD.
Work Section #1,2 Boiler Iron Frame Installation (1996.02-1999.08)#3,4 Turbine and Main Controller Iron Frame Installation (1997.05-1999.12)#5,6 Boiler Iron Frame Installation (2003.01-2004.12)#7,8 Boiler Iron Frame Installation (2007.08-2008.08)
Dangjin Thermal Power Plant
P l a n t T h e r m a l p o w e r p l a n t
86 87
"Quality is everything" Samjin
Project Owner E-TEC E&C
Year of Construction 2008.12-2010.05
Gunjang EnergyGunjang Energy Boiler Installation Work
P l a n t T h e r m a l p o w e r p l a n t
88 89
"Quality is everything" Samjin
Project Owner Korea South-East Power Co., LTD.
Year of Construction 2009.07-2009.12
Yeosu thermal power plant
P l a n t P e t r o l e u m s t o r a g e t a n kP l a n t T h e r m a l p o w e r p l a n t
90 91
"Quality is everything" Samjin
Hyundai OilbankProject Owner Hyundai Oilbank Co., LTD.
Year of Construction 2009.12-2011.02
Hyundai Oilbank #2 Process & Offsite Tank Manufacture and Installation
Taean thermal power plantProject Owner Korea South-East Power Co., LTD.
Year of Construction 2009.07-2009.12
P l a n t L N G s t o r a g e t a n k
92 93
"Quality is everything" Samjin
Project Owner Korea Gas Corporation
Year of Construction 2008.05-2011.08
Remarks 200,000KL-1
Pyeongtaek LNG tankPyeongtaek LNG Tank #21 M/C Piping Installation Work
P l a n t I r o n m i l l
94 95
"Quality is everything" Samjin
Project Owner POSCO
Work Section #4 Machine Installation (1979.06-1981.10)#4 1st Repair(1994.01-1994.07)#2 2nd Repair(1997.02-1997.08)#2 Rationalization(2004.02-2005.08)#3 2nd – 5th Machine Installation (2005.12-2006.08)#3 No4 M/C Construction(2006.02-2006.07)#Finex #1 Body Machine(2005.01-2006.12)#4 Sintering Rationalization M/C Installation Work
(2009.08-2010.10)
POSCO
P l a n t I r o n m i l l
96 97
"Quality is everything" Samjin
Project Owner POSCO
Work Section #3 Machine Installation (1989.05-1990.10)#5 Machine Equipments (1997.08-1999.03)#1 Repair (2002.03-2002.08)#2 Repair (2002.12-2005.07)#2 Repair (2004.12-2005.08)#3 Repair (2007.10-2007.12)#4 Blast Furnace Repair (2008.03-2009.09)# Thick Plate Strengthen Steel Frame Work
(2009.06-2010.10)
Kwangyang Steel
P l a n t I r o n m i l l
98 99
"Quality is everything" Samjin
Project Owner HYUNDAI STEEL COMPANY
Year of Construction 2008.02-2009.12
Dangjin Hyundai SteelDangjin Hyundai Steel Round Bar Factory Steel Manufacture and Installation Work
P l a n t I r o n m i l l
100 101
"Quality is everything" Samjin
Project Owner Hyundai Steel Pipe Co., LTD.
Year of Construction 1997.05-1998.08
Hyundai Steel PipeHyundai Steel Pipe Yoolchon Cold Rolled Mill Factory
P l a n t N u c l e a r p o w e r p l a n t
102 103
"Quality is everything" Samjin
Project Owner Korea East West Power Co., LTD.
Work Section Gori Nuclear Energy #1 Steam Generator Exchange (1998.11-2000.10)Uljin Nuclear Energy #5,6 Clp&Slp Installation (1999.06-2004.05)Uljin Nuclear Energy #5,6 Main Water Supply and Circulation Pump Installation (1996.06-2004.05)Uljin Nuclear Power Plant #1,2 M/C Installation Work (2009.11-2012.04)Young Kwang Nuclear Energy #5,6 Liner Plate Installation (1997.06-2001.08)Young Kwang Nuclear Energy #5,6 Nuclear Steam Supply Facilities Installation (1997.06-2001.08)Sin Gori Nuclear Energy # 1,2 Liner Plate Installation (2006.03-2011.02)Sin Gori Nuclear Energy #1,2 Nuclear Reactor Equipments Installation (2007.02-2011.07)Sin Gori Nuclear Energy #1,2 Emergency Generator and Alternating Current Diesel Generator Installation (2008.02-2011.05)Kedo Nuclear Energy Clp&Slp Installation (2002.06-2008.12) about 2,593tonSin Gori Nuclear Energy #3,4 Clp&Slp Installation (2008.09-2013.09)Sin Gori Nuclear Power Plant #3,4 Nuclear Reactor Equipment Main M/C And Assistance M/C Installation (2009.05-2013.07)
Nuclear power plantUljin nuclear energy
P l a n t N u c l e a r p o w e r p l a n t
104 105
"Quality is everything" Samjin
A p p e n d i x
106 107
"Quality is everything" Samjin
Other Construction Overseas Works
Ship
men
t equ
ipm
ent OVERHEAD/GANTRY CRANE Engineering, Supply & Erection
Project owner Korea Highway Corporation
Client Samsung C&T Corporation
Construction Period 2005.05-2006.01
Quantity OVERHEAD CRANEG A N T R Y C R A N E G A N T R Y C R A N E G A N T R Y C R A N E G A N T R Y C R A N E G A N T R Y C R A N E
1,400 TON X 54M - 1SET150 TON X 32M - 1SET 130 TON X 23M - 2SET
50 TON X 32M - 2SET10 TON X 32M - 1SET10 TON X 23M - 1SET
Hea
ting
Equi
pmen
t
Construction of Heat Contractile Machine in Ilsan and Suseo Area
(1991.7-1992.6), 26,000H3-4
Construction of Heat Contractile Machine in Chungju District Heating.
(1998.8-1999.6), 26,000H3-2
Construction of Heat Contractile Machine in Songdo Steam Supply Power Plant.
(2007.12-20008.11), 30,000H3-1
LNG
TAN
K Eq
uipm
ent
Tong Young LNG
Tong Young Lng Expansion (#13Tank Production/Installation) Tong Young Lng Expansion (#17Tank Production/Installation)
Project owner Korea Gas Corporation
Client Hyundai Engineering and Construction Co., LTD.
Quantity 200,000KL-1/140,000KL-1
Construction Period 2007.02-2010.08/ 2009.10-2012.07
Power SourceGheco-one PJT Buckstay Fabrication
Client Doosan Heavy Industries Co., LTD.
Quantity 548.859ton
Construction Period 2008.09-2009.12
Power SourceAl Dur IWPP-Project Building Work(Steel Structure & Cladding Works)
Project owner Al Dur Power and Water Company Bsc(C)
Client Hyundai Heavy Industries Co., LTD.
Quantity 8,131.43ton
Construction Period 2009.05-2011.02
Power SourceMarafiq-Iwpp-Project (Steel Structure)
Project owner Jubail Water and Power Co. (Kingdom of Saudi Arabia)
Client Hyundai Heavy Industries Co., LTD.
Quantity 8,498ton
Construction Period 2008.01-2009.06
Power SourceAl Khalij PJT Buckstay Fabrication
Client Doosan Heavy Industries Co., LTD.
Quantity 656.896ton
Construction Period 2008.09-2010.09
Power SourceCirebon 695MW 1uint/Buckstay Fabrication
Client Doosan Heavy Industries Co., LTD.
Quantity 669.7ton
Construction Period 2008.06-2009.02
Floodgate ConstructionSpillway & RWO Radial Gate
Project owner Malaysia
Client Posmec
Shape Radial Gate
Dimensions 14,900×21,240mm
Weight 470 ton/1set
Quantity 4SET
LNG TANK EquipmentLNG Tank Mechanical Work for Jetty Development and LNG Receiving – Terminal Project
Project owner PTT LNG Company Limited
Client GS Engineering & Construction Corp.
Adress 68/32 Sintavee Garden Sukhumvit Rd., Banchang, Rayong 21130 Thailand
Quantity 160,000 KL – 2
Construction Period 2008.09-2011.05
Other construction works in KoreaSouthern & Northern Jeju thermal power plantProject owner Korea Midland Power Co., LTD. / Korea Southern
Client Daelim Industrial Co., LTD. /Hyundai Heavy Industries Co., LTD.
Work Section #North Jeju Turbine Powerhouse Iron Frame (2004.07-2005.06)#Northern Jeju Desulfurization and Dust Collector Installation (2004.11-2005.06)#Southern Jeju #3, 4 Heavy Oil Pipe Laying Construction(2004.07-2007.05) #Southern Jeju Various Tanks and Boiler Body Installation (2004.07-2007.05)
Samchunpo thermal power plantProject owner Korea Electronic Power Corporation
Client Hyundai Heavy Industries Co., LTD.
Work Section #3,4 Chimney Iron Frame Construction (1991.04-1993.05)
Paju Co-generation plant M/C piping installation workProject owner Korea District Heating Corp.
Client Daewoo E&C Co., LTD.
Work Scope #HRSGs & Auxiliaries/Feedwater System/Turbine Bypass System
Construction Period 2009.04-2010.11
Pow
er s
ourc
e Hyundai I-TOWER buildingProject owner Hyundai Department Store
Client Hyundai Development Company
Quantity 7,100ton
Construction Period 1996.07-2001.04
Hwang Hakdong Redevelopment businessProject owner General Redevelopment
Client Hyundai Engineering and Construction Co., LTD.
Quantity 7,300ton
Construction Period 2004.04-2006.05
Busan NeospoProject owner Busan City Construction Management Department
Client Hyundai Heavy Industries Co., LTD.
Quantity 9,800ton
Construction Term 1996.10-1999.03
Boochun Hyundai department storeProject owner Hyundai Department Store
Client Hyundai Development Company
Quantity 11,000ton
Construction Period 2002.07-2003.08
Busan Lotteworld department store & plaza steel structure workProject owner Lotte Shopping Co., LTD.
Client Lotte E&C Co., LTD.
Quantity 14,000ton
Construction Period 2005.10-2010.07
Sale
s an
d Bu
sine
ss fa
cilit
yIncheon steel medium size factoryProject owner Incheon Steel Co., LTD.
Client Hyundai Development Company
Quantity 18,000ton
Construction Period 1986.10-1989.11
Hyundai Heavy Industries Yonghyun factoryProject owner Hyundai Heavy Industries Co., LTD.
Client Hyundai Engineering and Construction Co., LTD.
Quantity 7,900ton
Construction Period 2005.11-2006.03
Iron
mill
Ulsan general sports stadiumProject owner Ulsan City General Construction Department
Client Hyundai Engineering and Construction Co., LTD.
Quantity 2,493ton
Construction Period 2003.12-2005.08
Daejon world cup stadiumProject owner Daejon City Construction Management Department
Client Hyundai Development Company
Quantity 3,882ton
Construction Period 2001.10-2006.10
Euijongbu general sports stadiumProject owner Seoul City Construction Management Department
Client Hyundai Development Company
Quantity 3,295ton
Construction Period 1998.05-1999.12
Spor
ts fa
cilit
yBr
idge
Con
stru
ctio
n Singuje bridgeProject owner Korea Expressway Corporation
Client Hyundai Engineering and Construction Co., LTD.
Quantity 7,153ton
Construction Period 1998.02-1998.11
Chunggyechun restorationProject owner Seoul City Construction Safety Management Department
Client Hyundai Engineering and Construction Co., LTD.
Quantity 1,850ton
Construction Period 2004.01-2004.07
Doo Mool Bridge / Bi Woo Bridge / Moo Hak Bridge
Seocho-dong aqua bridgeModel Structure (Pedestrian Bridge)
Railr
oad
Faci
lity Kyun Buk KTX 4-1 Block (Chunan Station)
Project owner Korea KTX Construction Corporation
Client Halla Engineering and Construction Corp.
Quantity 8,450ton
Construction Period 1997.05-2000.12
Incheon International Airport Railroad (Gyulhyun public works)Project owner Incheon International Airport Railroad
Client KCC Engineering and Construction Co., LTD.
Quantity 1,350ton (Pipe Infrastructure)
Construction Period 2004.11-2005.06
Kyuneui line Dora mountain public worksProject owner Seoul Regional Construction Management Department
Client Hyundai Engineering and Construction Co., LTD.
Quantity 1,895ton
Construction Period 2005.01-2005.12
Floo
dgat
e Co
nstr
uctio
n Daeheung district repair facility (Yedang resorvoir)Project owner Korea Rural Community & Agricultural Corporation
Client KT Construction Company
Quantity RADIAL GATE : 26 Exchanged Girder and Canopy Exchanged
Construction Period 2004.03-2005.12
Getgol reservoir floodgate constructionProject owner Incheon City General Construction Department
Client Youngdong Constructions Company
Quantity RADIAL GATE - 10 Established Winch and Hoist Built
Construction Period 2002.12-2004.10
Yeongwol gas and steam power plant tank manufacture and installation /Hrsg stack manufactureProject owner Korea South Power Co., LTD.
Client Keang Nam Enterprises Co., LTD./ Seentec Co., LTD.
Quantity Water Tank(15,000m³- 2unit)/ Pure Water Tank(2,000m³- 2unit)
Construction Period 2009.04-2009.10/ 2009.08-2009.11