SAMARA REGION TOGLIATTI SPECIAL ECONOMIC ZONE OF ...
Transcript of SAMARA REGION TOGLIATTI SPECIAL ECONOMIC ZONE OF ...
SAMARAREGION
TOGLIATTI SPECIAL ECONOMIC ZONEOF INDUSTRIAL PRODUCTION TYPE
Updated: April 2014
1SAMARA REGION IS ONE OF THE MOST ECONOMICALLY DEVELOPED REGIONS OF THE RUSSIAN FEDERATION
SAMARA
MOSCOW
SAINT PETERSBURG
53 600 sq. km
3.2 mln.
€ 21.3 3 bln.
Area
Population
Gross Regional Product(2013 forecast)
Distance – 1 064 km
Updated: 2014
ru AA+Credit rating
Long-term Aa1.ruCredit rating
ВВ+Credit rating
Вa1Credit rating
9th place in RussiaInvestment potential
NationalInternational
6th place Human potentialdevelopment index
2SAMARA REGION RATINGS
Updated: April 2014
3TOGLIATTI IS THE LEADER OF ECONOMIC DEVELOPMENT OF SAMARA REGION
Updated: 2014
TION
314,7 sq. km AREA
719 600POPULA
TOGLIATTI
71.2 mln. POPULATION
1000 kmRADIUS
20.4 mln. POPULATION
500 kmRADIUS
4POPULATION
Updated: October 2012
TOGLIATTI
71.2 mln. POPULATION
1000 kmRADIUS
20.4 mln. POPULATION
500 kmRADIUS
4POPULATION
Updated: October 2012
TOGLIATTI
71.2 mln. POPULATION
1000 kmRADIUS
20.4 mln. POPULATION
500 kmRADIUS
4POPULATION
Updated: October 2012
660 ha
(6 600 000 m2)AREA OF SEZON THE TERRITORY OFSTAVROPOLSKY DISTRICT
SEZ TOGLIATTI
AVTOVAZ
Technical Park «Zhigulevskaya Valley»
Stavropolskydistrict
Tol’yatti
5TOGLIATTI SPECIAL ECONOMIC ZONE OF INDUSTRIAL PRODUCTION TYPE
Updated: October 2012
660 ha
(6 600 000 m2)AREA OF SEZON THE TERRITORY OFSTAVROPOLSKY DISTRICT
I T T A I L G O T Z E S
AVTOVAZ
Technical Park «Zhigulevskaya Valley»
Stavropolskydistrict
Tol’yatti
5TOGLIATTI SPECIAL ECONOMIC ZONE OF INDUSTRIAL PRODUCTION TYPE
Updated: October 2012Updated: April 2014
6SEZ LAY OUT
436 ha
143 ha
46 ha
30 ha
2 ha
1.5 ha
1.5 ha
4 360 000 m2
1 430 000 m2
460 000 m2
300 000 m2
20 000 m2
15 000 m2
15 000 m2
Residents’ industrial zone
Engineering and transportation infrastructure zone
Sanitary zone
Customs zone
Public-service zone
Administrative zone
Fire station
3 stage 2 stage 1 stage
Updated: 2014
(2015-2016) (2014-2015) (2012-2 014)
7VOLUME AND STRUCTURE OF INVESTMENTS FOR SEZ INFRASTRUCTURE DEVELOPMENT
41.2 % 53.1 % 5.7 %
€ 0.14bln.
€ 0.18bln.
€ 0.02bln.
NON BUDGETARYINVESTMENTS
FEDERALBUDGET
SAMARA REGIONBUDGET
€ 0.34bln.
Updated: April 2014
9
GAS DISTRIBUTION SUBSTATION
TOGLIATTI YAGODNOE ROAD
INDUSTRIAL INFRASTRUCTURE
ELECTRICAL SUBSTATION №1
ELECTRICAL SUBSTATION №2
AVTOVAZ WAREHOUSE TERMINAL
SEZ TOGLIATTITechnical Park «Zhigulevskaya Valley»
Updated: 0ctober 2012
8INDUSTRIAL INFRASTRUCTURE
Gas supply
Motor roadRailwayHigh-speedInternet
IP-telephony
Sewage systemWater supply Electrical powersupply
Capitalconstructioncosts economyof up to 30%for investors
Updated: April 2014
9
GAS DISTRIBUTION SUBSTATION
TOGLIATTI YAGODNOE ROAD
INDUSTRIAL INFRASTRUCTURE
ELECTRICAL SUBSTATION №1
ELECTRICAL SUBSTATION №2
AVTOVAZ WAREHOUSE TERMINAL
SEZ TOGLIATTITechnical Park «Zhigulevskaya Valley»
Updated: Aprilr 2014
11LOGISTICS
Logistical costs1.32 EUR per 1 km of Euro-sized truck mileage in Europe 0.75 EUR per 1 km of Euro-sized truck mileage in Russia
RAILWAYAn electrified double-track railway main line «Syzran-Zhiguli Sea-Samara» routes through the territory of Togliatti having access to the Transsib International transport corridor
M5 – «Moscow-Samara-Ufa-Chelyabinsk» federal highway
RIVER HARBOUR – the port is capable of receiving and handling river-sea class vessels and provides access to the «North-South» International transport corridor.
INTERNATIONAL AIRPORT«Kurumoch» – 60 km away from Togliatti
Distance from SEZ «Togliatti» to the nearest cities with car production:
Naberezhnye ChelnyIzhevsk Nizhny NovgorodKalugaMoscow Saint-Petersburg
431 km629 km667 km
1 019 km1 016 km1 763 km
8-9 h. driving time12-13 h. driving time14-15 h. driving time20-21 h. driving time20-21 h. driving time34-35 h. driving time
Distance from SEZ «Togliatti» to the nearest Russian seaports:
Saint-Petersburg (Baltic Sea) Novorossiysk (Black Sea) Rostov-on-Don (Sea of Azov) Astrakhan (Caspian Sea)
1 763 km1 690 km1 295 km1 243 km
34-35 h. driving time31 h. driving time24 h. driving time24 h. driving time
Updated: October 2012
10BUSINESS INFRASTRUCTURE
Administration and business center with all necessary facilities
«One stopshop» concept
Banks Conference hall
Exhibition center
Dining facilities
Offices
Communicationscenter
Meeting rooms
Medical service
Gym
Updated: April 2014
11LOGISTICS
Logistical costs1.32 EUR per 1 km of Euro-sized truck mileage in Europe 0.75 EUR per 1 km of Euro-sized truck mileage in Russia
RAILWAYAn electrified double-track railway main line «Syzran-Zhiguli Sea-Samara» routes through the territory of Togliatti having access to the Transsib International transport corridor
M5 – «Moscow-Samara-Ufa-Chelyabinsk» federal highway
RIVER HARBOUR – the port is capable of receiving and handling river-sea class vessels and provides access to the «North-South» International transport corridor.
INTERNATIONAL AIRPORT«Kurumoch» – 60 km away from Togliatti
Distance from SEZ «Togliatti» to the nearest cities with car production:
Naberezhnye ChelnyIzhevsk Nizhny NovgorodKalugaMoscow Saint-Petersburg
431 km629 km667 km
1 019 km1 016 km1 763 km
8-9 h. driving time12-13 h. driving time14-15 h. driving time20-21 h. driving time20-21 h. driving time34-35 h. driving time
Distance from SEZ «Togliatti» to the nearest Russian seaports:
Saint-Petersburg (Baltic Sea) Novorossiysk (Black Sea) Rostov-on-Don (Sea of Azov) Astrakhan (Caspian Sea)
1 763 km1 690 km1 295 km1 243 km
34-35 h. driving time31 h. driving time24 h. driving time24 h. driving time
Updated: April 2014
13
SEZ TOGLIATTIFOREIGN COUNTRIES RUSSIA, BELARUS, KAZAKHSTAN
CUSTOMS DUTIES LEVIEDVAT LEVIED
GOODS OF THE CUSTOMS UNION
FOREIGN GOODS
CUSTOMS DUTIES LEVIEDVAT LEVIED
THE PROCESSED PRODUCTS MADE WITH THE USE OF
FOREIGN GOODS
0% CUSTOMS DUTIESVAT
FREE CUSTOMS ZONE REGIME
Updated: October 2012
12FREE CUSTOMS ZONE REGIME
FOREIGN COUNTRIES RUSSIA, BELARUS, KAZAKHSTAN
0%0%0%
IMPORTDUTIES
IMPORTDUTIES
VAT VAT REFUND
EQUIPMENTCOMPONENTS
RAW MATERIALS
Updated: April 2014
SEZ TOGLIATTI
13
SEZ TOGLIATTIFOREIGN COUNTRIES RUSSIA, BELARUS, KAZAKHSTAN
CUSTOMS DUTIES LEVIEDVAT LEVIED
GOODS OF THE CUSTOMS UNION
FOREIGN GOODS
CUSTOMS DUTIES LEVIEDVAT LEVIED
THE PROCESSED PRODUCTS MADE WITH THE USE OF
FOREIGN GOODS
0% CUSTOMS DUTIESVAT
FREE CUSTOMS ZONE REGIME
Updated: April 2014
15
GOVERNMENT GUARANTIES
ADMINISTRATIVE REGIME
THE RIGHT TO BUY LAND
FREE CONNECTION TO UTILITIES
Updated: October 2012
14TAX REGIME
PROFIT TAX
20%2%5%9%12%15,5%
2012 – 2018 years2019 – 2020 years2021 – 2022 years2023 – 2024 years2025 and further
PROPERTY TAX
2,2%0% 10 years
LAND TAX
1,5%0% 5 years
TRANSPORT TAX
€ 0.15 € 3.75 € 0 5 years
Rate on the territory of the RFRate on the territory of SEZ
Profit tax for SEZ residents:— Accelerated procedure on admission of R&D expenses— Accelerated depreciation
Updated: April 2014
15
GOVERNMENT GUARANTIES
ADMINISTRATIVE REGIME
THE RIGHT TO BUY LAND
FREE CONNECTION TO UTILITIES
Updated: April 2014
17SEZ RESIDENT
Register within the territoryof Stavropolsky District
Get the investment project approved by the Russian Economic Development Ministry
Conclude agreementon conducting industrial activities
Invest not less than €3 mln. in production
To obtain the SEZ resident status an investor shall:
Updated: October 2012
16ONE STOP SHOP CONCEPT
Public authorities included in «one stop shop» system in SEZ «Togliatti»:
— Federal Tax Service
— Ministry for Ecology and Natural Resources
— Ministry for Public Health and Social Development
— Federal Service of State Registration, Land Register and Mapping
— Russian Technical Supervisory Board
— State Construction Supervisory Board Inspection
— Pension Fund
— Social Insurance Fund
— Federal Compulsory Medical Insurance Fund
— Migration Service
— Chamber of Commerce and Industry
— Federal Custom ServiceEnsures short resident registration time and provides investors with a single point of contact for all issues concerning business relations with the government
Updated: April 2014
17SEZ RESIDENT
Register within the territoryof Stavropolsky District
Get the investment project approved by the Russian Economic Development Ministry
Conclude agreementon conducting industrial activities
Invest not less than €3 mln. in production
To obtain the SEZ resident status an investor shall:
Updated: April 2014
17SEZ RESIDENT
Register within the territoryof Stavropolsky District
Get the investment project approved by the Russian Economic Development Ministry
Conclude agreementon conducting industrial activities
Invest not less than €3 mln. in production
To obtain the SEZ resident status an investor shall:
tob012
17SEZ RESIDENT
Register within the territoryof Stavropolsky District
Get the investment project approved by the Russian Economic Development Ministry
Conclude agreementon conducting industrial activities
Invest not less than €3 mln. in production
To obtain the SEZ resident status an investor shall:
tob012
17SEZ RESIDENT
Register within the territoryof Stavropolsky District
Get the investment project approved by the Russian Economic Development Ministry
Conclude agreementon conducting industrial activities
Invest not less than €3 mln. in production
To obtain the SEZ resident status an investor shall:
tob012
17SEZ RESIDENT
Register within the territoryof Stavropolsky District
Get the investment project approved by the Russian Economic Development Ministry
Conclude agreementon conducting industrial activities
Invest not less than €3 mln. in production
To obtain the SEZ resident status an investor shall:
tob012
18
17 residents
In negotiationswith morethan 100 companies
18INVESTOR RELATIONS
Обновлено: январь 2013
Updated: April 2014
19KEY COST PARAMETERS
Parameter SEZ area for residents' construction Rate/tariff
Land rent in SEZ**
436 ha4 360 000 m2
1 118.5 EUR/ha 0.11 EUR/m2
Land value in SEZ ** 2 796.3 EUR/ha 0.28 EUR/m 2
Construction of a standard industrial building from 424.2 EUR/m2
Parameter Total capacity in SEZ * Rate/tariff
Gas supply 250 090.9 m3/hour 81.9 - 82.2 EUR/1000 m3
Electrical power supply 170 MW 0.076 EUR/kW-h
Drinking water
Technical water
7 300
m3/day
m3/day
m3/day35 620 0.4 EUR/m3
0.2 EUR/m3
Sewage 7 300 0.5 EUR/m3
Storm water 40 260 m3/day 0.3 EUR/m3
The values are indicated without VAT applicable within the territory of Stavropolsky District, Samara region, and are effective for April 2014
1 ha = 10 000 m2
1 ha = 2.5 acres
Updated: April 2014
Presented tariffs are indicative and unofficial.Exchange rate 1 EUR = 49.5 RUB
* According to project design
21SCHEDULE OF DOCUMENTATION DEVELOPMENT AND SEZ CONSTRUCTION
2012 2013
SEZ to be constructed in 3 stages for a gradual infrastructure development by 2015
Activity
I Q II Q III Q IV QI Q II Q III Q IV Q
Fence of SEZ area
Internal facilities and transport infrastructure
Facilities of a communal zone
Customs infrastructure
External facilities
Construction workPreparation work
Updated: October 2012
20HUMAN RESOURCES IN TOGLIATTI
Located in the city are:— 6 higher education institutions— 14 branches of other Russian higher education institutions— 21 colleges and technical schools
13 715 specialists graduate each year including:— 8 348 with higher education— 3 730 with specialized secondary education— 1 637 with elementary vocational education
Average monthly salaries:€ 322 — worker€ 366 — specialist€ 618 — manager
Updated: April 2014
21SCHEDULE OF CONSTRUCTION OF SEZ INFRASTRUCTURE
Updated: April 2014
I stage
Constructionto be finished
Engineering network
Transportinfrastructure
Communal zone
Customs zone **
* Residents must have:- agreed technical requirements- engineering network constructed- signed agreement on utilities supply
** Until the construction is finished it is possible to use:
Availabilityfor connection/usage
Start of construction –II Q 2014
I Q 2014
II Q 2014
2015
III Q 2014
II Q 2014*
II Q 2014
2016
III Q 2014
1st SOP – July 2014
II stage
- FCZ procedure on a temporary basis- AVTOVAZ warehouse terminal, which is in appr. 8 km from SEZ
Alexey PakhomenkoHead of Branch office in Samara [email protected]
Alena MezinaHead of Investor Relations [email protected]
JSC «SEZ» branch officeRussia, Samara region,Togliatti, Str. Frunze, 8, office 508Tel. +7 (8482) 555-179Fax +7 (8482) 555-178
www.seztogliatti.ru
Welcometo Samara region!