Sam Ellis Arielle Strong

Click here to load reader

download Sam Ellis Arielle Strong

of 18

description

Sam Ellis Arielle Strong. Mission and Vision of the Company. Trust Alstom is a complex company Mutual trust between colleagues and management is necessary for proper business conduct and effective project management Team Spirit - PowerPoint PPT Presentation

Transcript of Sam Ellis Arielle Strong

Slide 1

Sam EllisArielle Strong

1Mission and Vision of the CompanyTrustAlstom is a complex companyMutual trust between colleagues and management is necessary for proper business conduct and effective project managementTeam SpiritStrives for collective discipline and efforts to deliver successful projectsSense of ActionCommits to deliver products and services to customers which meet all expectations2History1928 Birth of Alsthom from merger of Thomson-Houston and SACM. First factory in Belfort, France1932 Alsthom acquired Constructions Electriques de France (a manufacturer of electric locomotives and electrical and hydraulic equipment)1955 Alsthom CC Locomotive beats world speed record at 331 km/h1956 First nuclear steam turbine3History1978 First TGV breaks world rail speed records and world endurance record for high speed train lines1998 Enters Paris Stock Exchange and changes name to Alstom2000 Delivers worlds largest cruise liner the Queen Mary 2 to Cunard2007 V150 sets new world rail speed record at 574.8 km/h2008 Unveils AGV, reaches commercial speed of 360 km/h4FactsNumber 1 in very high-speed, high speed, and tilting trainsNumber 2 in urban light rail and tram systems, commuter and regional trains, services, signaling, and systemsHeadquarters are in Levallois-Perret, France

5Recent NewsAlstom is developing close contacts with universities and colleges around the world in order to promote awareness of rail professions and make an active contribution to trainingAlstoms Smartlock solution will equip three new relay interlockings in the Southampton areaAlstom met with its main suppliers in Paris with the aim of strengthening its sustainable business partnerships with them and improving joint performance6Size and Market SectorsPresent in over 60 countriesEmploys over 27,000 peopleRecorded sales of 5.7 billion euros in fiscal year 2008-2009

7ProductsRail VehiclesTramsMetrosCommuter TrainsIntercity TrainsVery High Speed TrainsTilting TrainsLocomotivesSubsystems

8ProductsRail InfrastructureInformation SolutionsElectrificationCommunication SystemsTrack LayingStation UtilitiesWorkshops and Depots

9ProductsTurnkey SystemsUrban turnkey solutionsLight Rail Transit, Tramways, Metros, and Automatic Driverless Systems MetrosMain Line TurnkeyVery High Speed Railways, Intercity Rail Systems, and Freight Railways

10ServicesInfrastructure MaintenanceTechnology upgrades, maintenance for rail networks including signaling, tracks, stations, tunnels, bridges, workshops, and depotsRolling Stock servicesOptions in maintenance, renovation and parts services for rolling stock

11LocationsMain headquarters in Levallois-Perret, France near ParisAlstom has locations in 70 other countriesAlstom Transport in 60 other countriesIncluding Brazil, France, Germany, Switzerland, India, Italy, Ireland, US, UK, and Spain

12Key EmployeesPatrick Kron Chairman of the Board and CEOPhilippe Mellier Executive Vice President, President Transport SectorPhilippe Joubert Executive Vice President, President Power SectorPatrick Dubert -Senior Vice President, Human ResourcesHenri Poupart-Lafarge - Chief Financial OfficerPierre Gauthier United States President of Alstom

13Information about the business/working environmentThree core values: Trust, Team, & ActionAllows employees from different cultures to feel apart of single, unified organization Trusting and safe environmentOpen to new ideas and always thinking about the futureResponsibility is granted to all employeesIntern Massimo Rocca was in the Quality Construction Department. Given empowerment and responsibility which allowed him to integrate into the department and become operational very quickly.

14Career and Internship OpportunitiesALSTOM can make your dreams come true and you can make a career out of it.You need to be a person of passion results, innovation, change, excellence, & work with people from all over the world in all disciplines.Opportunities for internships, graduates, and experienced candidates in Brazil, Canada, China, France, Germany, India, Ireland, Spain, Switzerland, United Kingdom, United States40 internships available including a Design Engineer in Staffordshire, Assistant Project Manager in Chattanooga, or Intern in Switzerland42 graduate opportunities like a Controls Commissioning Engineer in Richmond or Senior Project Controller in Germany307 experienced jobs like Civil Engineer in Beijing or Software Engineer in Rochester

15

Technology, Products & Projects

2 Newest Technologies from Alstom

Pendolino Tilting Technology Allows faster trains to shorten journey times and cut CO2 emissions. Can cut times up to 2 or 3 and a half hours.

AGV (Automotrice Grande Vitesse) New generation of high speed trains. Combination of articulated architecture, composite materials, and improved traction systems. Eliminates vibration and rolling noise on board, cushions movement, optimizes aerodynamic performance, guarantees maximum security and reduces maintenance costs by 30%.

16

Technology, Products & Projects

Metropolis - 2nd generation of communication based train controlCitadis - a low floor tramCitadis Dualis links suburban and urban areas without changing trackCoradia - Diverse types of trams (diesel or electric, one or two decks)Pendolino Tilting track train 250 km/hDuplex Carries up to 1,050 passengers and goes up to 350 km/hAGV - World record holding V150 train that reaches 574.8 km/h.Prima Range of Locomotives - Flexible configuration from freight to passengers.

17Works Citedwww.alstom.com

18