Roy J. Schepens, Vice President
SWPF Director of Operations
Salt Waste Processing Facility Project Update
![Page 2: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/2.jpg)
Salt Waste Processing Facility Project
• Safety of our workforce is Parsons 1st priority
• Contractor for Salt Waste Processing Facility (SWPF) project [design, construct, and operate for one year]
• Process over 33 million gallons of stored high-activity radioactive salt waste, reducing a significant hazard to the public and environment at SRS
• Support DOE’s highest SRS priority to close tank farms; reduce risk and complete the DOE EM cleanup mission
• December 2008: Final design completed and full construction of first-of-kind facility authorized by DOE
• December 2010: Set Cesium Removal Contactors
2
![Page 3: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/3.jpg)
3
SWPF 3D Model
![Page 4: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/4.jpg)
Salt Waste Processing Facility Project
4
Construction Quantities
114 vessels, tanks, HXs, filters,
engineered items
Concrete: 45,600 yd3
Structural Rebar and Steel: 5,500
tons
Conduit: 115,000 linear feet
Wire and Cable: 690,000 linear
feet
Piping: 120,000 feet
4600 Valves
Physical Design Summary
34 acre J-Area Site adjacent to
SRS S-Area
Facility size: 83,300 ft2
Reinforced Concrete - 8 ft thick
base mat for Central Processing
Area (NPH Category PC-3)
Programmatic Requirements Summary
Hazard Category-2 Non-Reactor Nuclear Facility to process ~37 Mgal of SRS
Liquid and Salt Cake Waste
Design Life of 40 Years
Design Processing Throughput ≈ 9.4 Mgal/yr
Operational in October 2015 (80% Confidence)
Hot Commissioning and 1 Year of Operations
![Page 5: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/5.jpg)
SWPF Project Progression - SRS J-Area
5
June 2008
August 2009
March 2010 February 18, 2011, Facing East
![Page 6: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/6.jpg)
SWPF Project Progression – Cont’d
6
August 2011
![Page 7: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/7.jpg)
Walls to EL.154’
7
Operating Deck Over ASTA, Facing West
![Page 8: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/8.jpg)
SWPF – Walls to 116’ Elevation
8
![Page 9: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/9.jpg)
Cesium Removal Contactors Arrival & Installation
9
![Page 10: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/10.jpg)
Mechanical Installation
10
Room 131, North ASP Corridor, Facing South
![Page 11: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/11.jpg)
SWPF – Walls to 139’ Exhaust HEPA Filter Room
11
![Page 12: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/12.jpg)
SWPF – Onsite Piping Fabrication Shop
12
![Page 13: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/13.jpg)
SWPF – Onsite Fabricated Piping
13
![Page 14: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/14.jpg)
SWPF – Construction Safety
14
![Page 15: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/15.jpg)
SWPF Proven Technology and Performance
15
Proven Technology: Removal of radioactivity from bulk of stored waste at
SRS
Schedule: Start radioactive operations July 2014 (early finish) –
October 2015 (80% confidence)
Cost: Total Project Cost projected below
the DOE Performance Baseline of
$1.339 billion
Capacity Increases: Likely with Additional Likely Additional
Testing of Process Chemistry
Improvements
Setting the Right Standards in Welding
Performance Onsite and at Supplier Facilities
![Page 16: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/16.jpg)
CSSX/CFF Full Scale Integrated Test Operation
16
• Contract Testing Complete – Demonstrated 100% Capacity and Exceeded Cesium Removal Decontamination Factor
• Robust Operating Envelope Developed to Provide Flexibility of Operations
• Developing Enhanced Chemistry Testing to Improve Throughput
![Page 17: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/17.jpg)
1/5th-Scale APA Test Tank and Support Systems
17
![Page 18: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/18.jpg)
APA PLC Control Station
18
![Page 19: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/19.jpg)
SWPF Project/Construction Management
19
Supplier Oversight Plans In Place: Full-time Parsons oversight in supplier facilities for SWPF critical components ensures safety and quality standards are met
Active Construction And Engineering Team: Engineering proactively working real- time in support of constructability reviews; engineered equipment fabrication to meet construction’s needs
Early Operations Involvement: Full-time involvement from start of design and participation in constructability, maintenance, operations, and commissioning reviews
Pipe Welding: Onsite pipe fabrication facility in full operation.
HVAC Installation: Set HEPA Filters and Large Exhaust Fans
![Page 20: Salt Waste Processing Facility Project Update Roy J ... · PDF fileRoy J. Schepens, Vice President SWPF Director of Operations Salt Waste Processing Facility Project Update](https://reader034.fdocuments.in/reader034/viewer/2022051523/5a79fb877f8b9adf778bad03/html5/thumbnails/20.jpg)
Parsons Delivering Results at SRS
2011 – 2012 SWPF Goals
20
Continue construction facility walls, decking and support areas
Fabricate and install construction engineered equipment
Continue with piping fabrication and installation
Continue HVAC installation
Prepare for startup, which advances SRS EM cleanup and risk reduction goals