SALIENT FEATURES (120 MW LOWER KOPILI HYDROELECTRIC PROJECT) features, Detailed... · 6.1.10...
Transcript of SALIENT FEATURES (120 MW LOWER KOPILI HYDROELECTRIC PROJECT) features, Detailed... · 6.1.10...
SALIENT FEATURES
(120 MW LOWER KOPILI HYDROELECTRIC PROJECT)
1 Head Works
1.1 Dam Complex (General)
1.1.1 Location River Kopili near Longku
1.1.2 Type of Dam Concrete Gravity Dam
1.1.3 Top of Dam El 229.00 m
1.1.4 Full reservoir level El 226.00 m
1.1.5 Maximum Water level El 226.00 m
1.1.6 Minimum draw down level El 202.00 m
1.1.7 No. of Spillway blocks 6 No’s
1.1.8 Grade of Concrete As Shown in the Employers
Drawings.
1.2 Orifice Spillway
1.2.1 Design flood (PMF) 11030 Cumec
1.2.2 Invert Level EL. 190.00
1.2.3 No of Gates 6 No’s
1.2.4 Gate Type Radial
1.2.5 Size 10.0 m (W) x 12.50 m (H)
1.2.6 Hoisting arrangement Hydraulic cylinder
1.2.7 No of Stop log gates One
1.2.8 Hoisting arrangement for Stoplog gate Gantry Crane
1.2.9 Energy dissipation Trajectory Bucket (Ski jump)
1.2.10 Plunge Pool Pre-Excavated Hole for all over
flow blocks
1.2.11 Maximum Discharge for Riparian flow 33.97Cumec
1.2.12 Riparian flow Through Auxiliary Power
House
27.434 Cumec (Including 10%
Over load = 24.94x 1.1)
1.2.13 Balance Discharge for Riparian flow 6.536 Cumec
1.2.14 Diameter of Steel Pipe for Riparian
flow
1.50m
1.2.15 Center Line of Pipe for Balance
Riparian Pipe
EL 198.00m
1.2.16 Location of Pipe for Balance Riparian
Pipe
Left Pier of Block no.-13
1.2.17 Pipe Shall be completed with Inlet,
and Outlet with Slide Valve and
Hooded Cone Discharge Valve (HM
Scope)
Yes
1.3 Overflow Spillway
1.3.1 Spillway Crest level EL. 223.00 m
1.3.2 Gate Type Vertical Slide gate
1.3.3 No of gates One
1.3.4 Gate size 4.00 m (W) x 3.00 m (H)
1.3.5 Hoisting arrangement Twin Stem Screw Hoist
ASSAM POWER GENERATION CORPORATION LIMITED
1.4 River Diversion Scheme
1.4.1 Scheme Single Stage Diversion
1.4.2 River Diversion Flood 720 Cumec (25 Years Return
Period Non-Monsson Flood)
1.4.3 Diversion Tunnel 10.5 dia- 356m long, Left Bank
(shotcrete lined)
1.4.4 Construction Sluices 2 Nos, 5.0m (W) x 5.0m (H)
1.4.5 Inlet level for Construction Sluices EL 171.00m
1.4.6 Location of Construction Sluice Gates Block No 13, 14
1.4.7 Design Discharge through each Sluice 250 Cumec
1.4.8 Plug behind Construction Sluice Yes
1.4.9 No of Gates in Diversion Tunnel Gate 2.0 nos ( 4.5m x 10.5m)
1.5 Main Power Intake
1.5.1 Location Right bank
1.5.2 Design discharge at Trash Rack 123.98 Cumec (10% overload)
1.5.3 Design discharge for main Plant 123.98 Cumec (10% overload)
1.5.4 No of trash rack bays 6 No’s
1.5.5 Trash rack sill level El. 195.00 m
1.5.6 Trash rack size 7.38m (W) x 7.50m (H)
1.5.7 Type Fixed
1.5.8 Trash rack inclination 18o
1.5.9 TRCM No
1.5.10 No. of gates 2 no. ( 1- Service & 1- Maint.)
1.5.11 Gate size 6.0 m (W) x 6.0 m (H)
1.5.12 Crest Elevation EL 189.50 m
1.5.13 Type of Intake Gate Vertical slide
1.5.14 Grade of Concrete for Reinforced
Concrete
M30
1.6 Auxiliary Intake
1.6.1 Location Dam Body (Block No-15)
1.6.2 Design discharge at Trash Rack 27.43 Cumec (10% overload)
1.6.3 Design discharge for Auxiliary Plant 27.43 Cumec (10% overload)
1.6.4 No of trash rack bays 2 No’s
1.6.5 Trash rack sill level El. 195.00 m
1.6.6 Trash rack size 3.60m (W) x 7.50m (H)
1.6.7 Type Fixed
1.6.8 Trash rack inclination Vertical
1.6.9 TRCM No
1.6.10 No. of gates 2 no. ( 1- Service & 1- Maint.)
1.6.11 Intake Gate size 3.3 m (W) x 3.3 m (H)
1.6.12 Crest Elevation EL 195.00 m
1.6.13 Type of Intake Gate Vertical slide
1.6.14 Grade of Concrete for Reinforced
Concrete
M30
2 Water Conductor System-Main plant
2.1 Feeder Tunnel/Duct
2.1.1 No. of Feeder Tunnels One
ASSAM POWER GENERATION CORPORATION LIMITED
2.1.2 Feeder Tunnel 6.0m (W) x 6.0m ( H)
2.1.3 Concrete lined Yes (Square Section)
2.1.4 Crack width for RCC 0.2mm
2.2 Head Race tunnel
2.2.1 No. One
2.2.2 Design discharge (Rated) 112.71 Cumec
2.2.3 Shape & Size of HRT Circular, 7.0m
2.2.4 Length 3641.22 m
2.2.5 Minimum concrete lining thickness 0.35 m
2.2.6 Minimum concrete grade for lining M-30
2.3 Adit to HRT
2.3.1 No. One
2.3.2 Size & Shape 6.0 m, D-Shaped
2.3.3 Length of Adit 354.66m – Self draining
2.3.4 Inver Concrete Thickness 300mm minimum
2.3.5 Bulkhead gate – Hinge Type Yes
2.3.6 Size of Bulkhead gate 2.5m (W) x 2.5 m (H)
3 Surge Shaft
3.1 Type Elevated, Restricted Orifice Type
3.2 Diameter 25.00 m (Finished)
3.3 Minimum Down surge level EL 188.00m
3.4 Maximum Up-surge level EL 235.00m
3.5 Reinforced concrete lining Yes
3.6 Grade of Concrete M30
3.7 Dia of Orifice/Riser 3.8m/ 7.0m
3.8 Grade of concrete M30
4 Valve House
4.1 Type Surface
4.2 Size 14m (W) x 23m (L) x 27.50 m
(H)
4.3 Diameter of Valve 6.10m
4.4 Center Line of Valve EL 142.55 m
5 Pressure shaft / Surface Penstock
Embedded in Concrete
5.1 Pressure Shaft
5.1.1 No. One
5.1.2 Size & Shape 6.10 m, circular
5.1.3 Length 451.20 m
5.1.4 Steel lined Yes
5.1.5 Min Thickness of Backfill Concrete 700mm
5.1.6 Grade of Backfill Concrete M20
5.2 Surface Penstock Embedded in
Concrete (Main)
5.2.1 No.’s One
5.2.2 Diameter 6.1/5.2 m
5.2.3 Length 158.8m (Dia 6.1m) / 81.9m (Dia
5.2m)
5.2.4 Concrete encasement Yes
ASSAM POWER GENERATION CORPORATION LIMITED
5.2.5 Grade of Concrete M25
5.2.6 Bifurcation (Symmetrical) Yes
5.3 Unit Penstock (after bifurcation)
5.3.1 No.’s Two
5.3.2 Diameter 3.7 m
5.3.3 Total length 16.3 m each
5.3.4 Concrete encasement Yes
5.3.5 Grade of Concrete M25
5.3.6 Reducer Yes
5.4 Inlet Pipe (reducer)
5.4.1 No.’s Two
5.4.2 Diameter 3.7m to 3.00m
5.4.3 Total length 3.0m
5.4.4 Concrete encasement Yes
5.4.5 Grade of Concrete M25
5.5 Penstock for Auxiliary Powerhouse
5.5.1 No.’s One
5.5.2 Diameter 3.30m
5.5.3 Total length 64.00m
5.5.4 Concrete encasement Yes
5.5.5 Grade of Concrete M25
5.5.6 No’s of Bifurcations Two
5.5.7 Diameter of Unit Penstock-1 2.35m
5.5.8 Length of Unit Penstock-1 24.20m
5.5.9 Diameter of Unit Penstock-2 1.65m
5.5.10 Length of Unit Penstock-2 26.20m
6 Power House Complex
6.1 Main Power House
6.1.1 Type & Location Surface & Right Bank
6.1.2 Type of turbine Vertical Francis
6.1.3 Installed Capacity 2 x 55 MW = 110 MW
6.1.4 Centre line of Turbine El. 98.80 m
6.1.5 Normal TWL 104.00 m
6.1.6 Min TWL (For one Unit) EL 103.20m
6.1.7 Top of Tail Race Channel Outlet Weir EL 102.00m
6.1.8 Minimum Size (L x W x H) 76.5m (L) x 19.1 m (W) x 30 m
(H)
6.1.9 Rated Gross Head 114.00 m
6.1.10 Head Loss through Water Conductor
system
6.00m
6.1.11 Rated Net Head 108.00 m
6.1.12 Rated Discharge Per Unit 56.355 Cumec
6.1.13 Service Bay Level EL 113.00m
6.1.14 HFL at Power House EL 111.66m
6.1.15 Grade of Concrete (Not in contact with
water)
M25
6.1.16 Grade of Concrete (In contact with
water)
M30
ASSAM POWER GENERATION CORPORATION LIMITED
6.1.17 Grade of second stage Concrete for
Block outs
M30
6.2 Auxiliary Power House
6.2.1 Type & Location Surface, Right bank
6.2.2 Type of turbine Horizontal Francis
6.2.3 Installed Capacity 2 x 2.5 MW + 1 x 5 MW = 10 MW
6.2.4 Turbine Setting (Elevation) El 170.50 m
6.2.5 Normal TWL (Three Machines) El 169. 70 m
6.2.6 Min TWL (For one Unit) EL 169.16m
6.2.7 Invert of Tail Race Duct Outlet EL 167.50m
6.2.8 Minimum Size 50.5 m (L) x 10.0 m (W) x 27.0 m
(H)
6.2.9 Head Loss through Water Conductor
system
1.00m
6.2.10 Rated Net Head 47.30 m
6.2.11 Rated Discharge Per Unit 6.23 Cumec / 12.47 Cumec
6.2.12 Installed Capacity Per Unit 2.5 MW / 5 MW
6.2.13 Service Bay Level EL 186.50m
6.2.14 HFL at Aux Power House EL 185.34m
6.1.15 Grade of Concrete (Not in contact with
water)
M25
6.1.16 Grade of Concrete (In contact with
water)
M30
6.1.17 Grade of second stage Concrete for
Block outs
M30
7 Tailrace
7.1 Tailrace for Main Powerhouse
7.1.1 Width of Tailrace 26.00m
7.1.2 Invert of Start of Tailrace Channel EL 92.00m
7.1.3
Top of Tail Race Outlet Weir 102.00m (Min 1.00 m above
deepest River Bed Level)
7.1.4 Slope of Tailrace Channel 4 (H) :1 (V)
7.1.5 Grade of Concrete M30
7.2 Tailrace for Auxiliary Powerhouse
7.2.1 Tailrace Ducts [2 Nos of 2m(W) x 1.8m (H) and 1
No of 3m (W) x 1.8m(H)] –
merging into (3+4) m(W) x
1.8m(H)
7.2.2 Invert at Start of Tailrace Duct (2.5MW)
Invert at Start of Tailrace Duct (5.0MW)
EL 163.50m
EL 161.40m
7.2.3
Invert atTail Race Duct Outlet 167.50m (Min 1.00 m above
deepest River Bed Level)
7.2.4 Slope of Tailrace Duct (2.5 MW)
Slope of Tailrace Duct (5MW)
Horizontal (34.69 m), 2.5 (H) :1
(V) (10 m)
13.19 (H) :1 (V) (27.7 m), 2.5 (H)
:1 (V) (10m)
7.2.5 Grade of Concrete M30
ASSAM POWER GENERATION CORPORATION LIMITED
8 Switchyard
8.1 Switch Yard for Main Power House
8.1.1 Voltage Level 220.00 kV
8.1.2 Minimum Size 146.00m x 72.00 m
8.1.3 Scheme Out Door
8.1.4 Finished Ground Level 167.00m
8.1.5 Gravel depth Min 150mm
8.1.6 Grade of Concrete M25
8.2 Switchyard of Auxiliary Power
House
8.2.1 Voltage Level 33.00 kV
8.2.2 Minimum Size 21.00m x 24.00 m
8.2.3 Scheme Out door
8.2.4 Finished Ground Level 186.50m
8.2.5 Gravel depth Min 150mm
8.1.6 Grade of Concrete M25
ASSAM POWER GENERATION CORPORATION LIMITED
TO LANKA
KOPILI RIVER
N275
175
E 477500
E 478000
E 47850
0
E 479000E 479500
E 480000
E 480500
E 481000
E 48150
0
N 2838500
N 2839000
N 2839500
N 2840000
N 2840500
E 477500
E 478000
E 478500
E 479000 E 480000
E 480500
E 481000
E 481500
N 2838500N 2839000
N 2839500
N 2840000
N 2840500
N 2841000
N 2841500
N 2842000
DAM
HEADRACE TUNNELØ7.00 CIRCULARL=3641.22m ADIT-1
EXISTING ROAD
SWITCHYARD
POWER HOUSE
INTAKE
N 2841500
N 2841000
N 2842000
N 2842500
N 2842500
N 2843000
N 2843000VALVE HOUSE
SURGE SHAFTØ25.00
TAILRACECHANNEL
DAM AXIS
300
300275
250225 200
225 22
5
225 225 225
225 200
200
175150
125150
175
175
200215250
250
225215200
250
250
200
225
250
250
AUXILIARY POWER HOUSE
BUS COUPLER
Y
R
B
Y
R
B
2
ISO
CT
CB
ROAD
3m W
IDE
1
ROAD
3m W
IDE
ROAD 3m WIDE
ROAD 3m WIDE
3000
TO STA
TION SERV
ICE TRA
NSFORM
ER
GEN.
FEEDER-II
FROM
P.H.
GEN.
FEEDER-I FROM
P.H.
6m W
IDE GA
TE
Y
R
B
Y
R
B
TO LA
NKA S/S
FEDER-IV
FEDER-III
TO KAR
BI LANGPI
HEP
FEDER-II
FEDER-I
GATE
4
220KV BUS-A
220KV BUS-B
AD-0
HRT-1
HRT-3
HRT-4
SS-1
FLOW
VH-1
IN-1
10°
PS-2
PH-1
TRC-1
BEND-1
BEND-2
BEND-3
BEND-4
FLOW
Ø6.10m PRESSURE TUNNEL
TO GARAMPANI
Ø6.00m ADIT-1L= 354.66m
KOPILI RIVER
R100.00
HRT-2
DIVERSIONTUNNEL Ø10.50L=355.91m
U/S COFFER DAM
D/S COFFER DAM
PROPOSEDTEMPORARY BRIDGE
33°
R250.00
7°B
C PENSTOCK
L
A
C OF VALVE
L
PS-1
SHOTCRETE
LINING(INDICATIVE)
CL
SHOTCRETE
STEEL LINER
CL
Ø6.10BACKFILL
CONCRETE
Ø7.00
N:\W
orkin
g Dra
wing
s\429
4_Lo
wer K
opili\
Draw
ing F
inal _
R0_0
\00-G
ener
al\AF
C_42
94_0
0_00
4_0.d
wg
© A
F-C
onsult S
witzerland Ltd. 20
11
The reproduction, distribution and utilization of this docum
ent as w
ell as the com
munication of its
contents to others w
ithout explicid authorization is prohibited. O
ffenders w
ill be held liable for the
paym
ent of dam
ages. A
ll rights reserved in the event of the grant of a patent, utility m
odel or design.
NOTE:
ASSAM P
OWE
R G
E NE R A T I O N C O R P O
RA
TIO
N L
IMITED
CHECKED:APPROVED:DATE:
DRAWING No. REV. No.
PREFEASIBILITY STUDYFEASIBILITY STUDY
DRAWN: FORMAT:SCALE:
INCEPT. & BASIC DESIGNTENDER DESIGN
CONSTRUCTION DESIGNAS-BUILT DRAWINGS
AF-ConsultSwitzerland Ltd.Täfernstrasse 26CH-5405 Baden/Switzerland
REVISION DESCRIPTION DRAWN CH'KED APP'D DATEREV.No.
ASSAM POWER GENERATION CORPORATION LTD.
LOWER KOPILI H.E. PROJECT (120MW)
PROJECT AREAGENERAL LAYOUTPLAN
RAK / KSBSAKMMB27.05.19
1:7500 A1
AFC.4294.00.004 0
1. ALL DIMENSIONS, NORTHING AND EASTING ARE IN METERS EXCEPT WHERE OTHERWISE NOTED.
00 10 m5
LAYOUT PLAN
FOR TENDER PURPOSE
REFERENCE DWGS:AFC.4294.00.005 PROJECT AREA
WATER CONDUCTOR SYSTEMGENERAL LAYOUT-LONGITUDINAL SECTION
AFC.4294.00.006 DAM AREAGENERAL LAYOUTLAYOUT PLAN
AFC.4294.00.007 SURGE SHAFT TO TAILRACE CHANNELGENERAL LAYOUTLAYOUT PLAN & LONGITUDINAL SECTION
SCHEDULE OF ADITSS. NO. NAME
ADIT-1
LENGTH (m)
354.66
FINISHED SIZE (m)
1. 6.0 (W) x6.00 (H) D-SHAPED
DESCRIPTION
CONSTRUCTION ADIT TO HRT
PS-2
SS-1
VH-1
PH-1TRC-1
SCHEDULE OF CONTROL POINTSNo. NORTHINGEASTING
IN-1HRT-1HRT-2
HRT-3
HRT-4
AD-0
5.0 m2.50
TYP. SECTION OF HRT
LEGEND:
PROPOSED ROAD
EXISTING ROAD
PLATE - 004
5.0 m2.50
TYP. SECTION OF PRESSURE SHAFT478147.36 2838749.68478189.27 2838797.52478208.37 2838819.34
480336.71 2841562.37 480356.96 2841563.88
480402.68 2842025.32480418.30 2842182.93
480366.24 2842265.25480327.98 2842324.67
479825.92 2840254.41480057.20 2840459.60
PS-1 480402.14 2842019.85
DATUM 50
120
160
200
240
CHAINAGE (m)
FINISHED INVERT-HRT / CENTER LINE EL. FOR
80
SS,PS & PENSTOCK
226.00 FRL / MWL
195.00
0.00
195.0
0ST
ART
OF IN
TAKE
HRT-
1 (PO
RTAL
FAC
E)
CURV
E ST
ART
CURV
E EN
D
NSL
IN-1
INTAKE
MATC
H LIN
E-1
NSL
184.1
1
Ø7.00m HEADRACE TUNNELCIRCULAR,(L=3641.22m)
1.34%
1.34%
63.58
189.5
022
5.49
86.29
188.3
223
8.68
98.87
188.1
524
4.93
72.58
188.5
023
0.86
229.00
STAR
T OF
HRT
NSL
MATC
H LIN
E-1
CONSTRUCTION ADIT-1(6.0x6.0m), D-SHAPE
AD-0
MATC
H LIN
E-1
2254
.9515
9.33
201.2
5
2490
.3015
6.19
220.2
9
2633
.8715
4.27
210.1
4
CURV
E ST
ART
CURV
E EN
D
1.34%1.34%
Ø7.00m HEADRACE TUNNELCIRCULAR,(L=3641.22m)
DATUM 50
120
160
200
240
CHAINAGE (m)
FINISHED INVERT-HRT / CENTER LINE EL. FOR
80
PS & PENSTOCK
226.00 FRL / MWL
NSL
DATUM 50
120
160
200
240
CHAINAGE (m)
FINISHED INVERT-HRT / CENTER LINE EL. FOR
80
PS & PENSTOCK
226.00 FRL / MWL
NSL
KOPILI RIVER
UNIT PENSTOCK Ø 3.7m98.80
POWERHOUSE
NSL
PORTAL
VALVE HOUSE
Ø 6.1m PRESSURE TUNNEL
SURGE SHAFT
237.50
0.16%
102.00
ROCK LINE
C OF
SUR
GE S
HAFT
L
C OF
VAL
VE H
OUSE
L C OF
POW
ER H
OUSE
L END
OF T
RC
Ø 5.2m EMBEDDEDPENSTOCK
PH-1
TRC-
1
VH-1
PS-2
SS-1
142.06
MATC
H LIN
E-1
3657
.7214
0.58
212.2
336
74.92
140.3
521
3.62
3701
.3014
3.50
212.6
7
4326
.8814
2.06
153.2
1
4435
.3098
.8011
5.30
4506
.9610
2.00
104.2
2
CURV
E ST
ART
CURV
E EN
D
HRT-
4 (EN
D OF
HRT
)37
04.80
143.5
021
2.45
140.00?
??
?
? ? ? ??
??
??
113.00
? ? ? ? ? ? C OF VALVE
40T
40T
L
PRES
SURE
TUN
NEL P
ORTA
LPS
-1
155.00
4163
.0014
2.33
162.1
8
4168
.5014
2.32
162.2
1
N:\W
orkin
g Dra
wing
s\429
4_Lo
wer K
opili\
Draw
ing F
inal _
R0_0
\00-G
ener
al\AF
C_42
94_0
0_00
5_0.d
wg
© A
F-C
onsult S
witzerland
Ltd. 2011
The reproduction, distribution and utilization of this docum
ent as w
ell as the com
munication of its
contents to others w
ithout explicid authorization is prohibited. O
ffenders w
ill be held liable for the
paym
ent of dam
ages. A
ll rights reserved in the event of the grant of a patent, utility m
odel or design.
ASSAM P
OWE
R G
EN
E RA T I O N C O R P OR
AT
I ON
LIM
ITED
CHECKED:APPROVED:DATE:
DRAWING No. REV. No.
PREFEASIBILITY STUDYFEASIBILITY STUDY
DRAWN: FORMAT:SCALE:
INCEPT. & BASIC DESIGNTENDER DESIGN
CONSTRUCTION DESIGNAS-BUILT DRAWINGS
AF-ConsultSwitzerland Ltd.Täfernstrasse 26CH-5405 Baden/Switzerland
REVISION DESCRIPTION DRAWN CH'KED APP'D DATEREV.No.
ASSAM POWER GENERATION CORPORATION LTD.
LOWER KOPILI H.E. PROJECT (120MW)
PROJECT AREAWATER CONDUCTOR SYSTEMLONGITUDINAL SECTION
RAK / KSBSAKMMB27.05.19
1:2500 A1
AFC.4294.00.005 0
125 m500
LONGITUDINAL SECTION(WATER CONDUCTOR SYSTEM)
FOR TENDER PURPOSE
LEGEND: ROCK LINE
NSL
REFERENCE DWGS:AFC.4294.00.004 PROJECT AREA
GENERAL LAYOUTLAYOUT PLAN
AFC.4294.00.007 SURGE SHAFT TO TAILRACE CHANNELGENERAL LAYOUTLAYOUT PLAN & LONGITUDINAL SECTION
NOTE:1. ALL DIMENSIONS AND LEVEL ARE METERS EXCEPT SHOWN OTHERWISE.2. CONTRACTOR CAN EXAMINE TO EXCAVATE THIS PORTION THOUGH TUNNELING IN OVERBURDEN.
PLATE - 005
??
??
??
?
? ? ? ? ? ??
??
??
??
? ?
KOPILI RIVERØ7.0m HRT ?
UNIT PENSTOCK Ø3.7m
98.80
140.00
POWERHOUSE
461.70
NSL
PORTAL
VALVE HOUSE
Ø 6.1m PRESSURETUNNEL
SURGE SHAFT
158.38
ANCHOR BLOCK-2
113.00
237.50
0.16%
102.00
C OF
SUR
GE S
HAFT
L
PRES
SURE
TUN
NEL P
ORTA
L
C OF
VAL
VE H
OUSE
L
PS-2
C OF
POW
ER H
OUSE
L END
OF T
RC
Ø 5.2m EMBEDDEDPENSTOCK
PH-1
TRC-
1
VH-1
PS-1
SS-1
? ? ? ? ? ? ? ? ? ?
61.60 7.90 26.92
142.06
5.50
DH VH-01
DH PS-01DH PS-02
ASSUMED ROCK LINE
ROCK LINE
Ø 6.1m PENSTOCK
ANCHOR BLOCK-1
5.00(REDUCER)
1
1
2
2
C OF VALVE
40T
40T
L
155.00
COMPACTED BACKFILL
DATUM 50
120
140
160
180
200
220
240
260
100
CHAINAGE (m)
DISTANCE (m)
C/LLEVEL (m)
80
0.00
143.5
0
461.7
014
2.33
734.0
098
.80
805.6
610
2.00
461.70 5.50 158.38 71.6662
5.58
142.0
6108.42
467.2
014
2.32
139.04
E 480500
N 2841500
210
200
190
210
200 190
185
170
150160
140
Y
R
B
6m W
IDE
GATE
Y
R
B
YR
B
N 2841600
N 2841700
N 2841800
N 2841900
N 2842000
N 2842100
N 2842200
N 2842300
E 480400
E 480300
E 480200
205
180 175
165 155
145
Ø25.0m SURGE SHAFT
185
220 kV SWITCHYARDAT EL.167.00
ROAD TOSURGE SHAFT
ROAD TOPOWER HOUSE
KOPILI RIVER
POWER HOUSE
TAIL RACECHANNEL
N
205
195
200
190
AZ = 5.659
FLOOD PROTECTION WALL
130125
120 115
110
105
130125
120
N 28
4232
5
E 480400E 480300
E 480325
EXISTINGROAD
B
C PENSTOCKL
A
C OF VALVEL
Ø 5.2m EMBEDDEDPENSTOCK
AZ = 31
5.149
SS-1
PS-1
50.51°
PS-2 R25.00
HRT-4
ROAD TO VALVE HOUSE
ANCHOR BLOCK-1
VALVE HOUSE
DH VH-01 DH PS-01 DH PS-02
VH-1
461.705.50
158.38
PORTAL
ANCHOR BLOCK-2
Ø6.1m PRESSURETUNNEL
Ø6.1m PENSTOCK1
1
2
2
TRC-1
PH-1
E 480600
5.0 m2.50
SECTION 1-1
SHOTCRETE
STEEL LINER
CL
Ø6.10BACKFILL
CONCRETE
NSL
CL
VARIES
153.00
00 10 m5
SECTION 2-2
ASSUMEDROCK LINE
1
8
7.00
Ø6.10
Ø6.1m PENSTOCK
153.00
11.5
3.20
2.54.80
.805.1
6
155.00
ROCK EXCAVATIONArea = 129.65² m
Area = 111.63² mCOMPACTED BACKFILL
EXCAVATION IN OVERBURDENArea = 231.46² m
DRAIN
Area = 24.80² mCONCRETE
1
8
11.5
N:\W
orkin
g Dra
wing
s\429
4_Lo
wer K
opili\
Draw
ing F
inal _
R0_0
\00-G
ener
al\AF
C_42
94_0
0_00
7_0.d
wg
© A
F-C
onsult S
witzerland
Ltd. 2011
The reproduction, distribution and utilization of this docum
ent as w
ell as the com
munication of its
contents to others w
ithout explicid authorization is prohibited. O
ffenders w
ill be held liable for the
paym
ent of dam
ages. A
ll rights reserved in the event of the grant of a patent, utility m
odel or design.
ASSAM P
OWE
R G
EN
E RA T I O N C O R P OR
AT
I ON
LIM
ITED
CHECKED:APPROVED:DATE:
DRAWING No. REV. No.
PREFEASIBILITY STUDYFEASIBILITY STUDY
DRAWN: FORMAT:SCALE:
INCEPT. & BASIC DESIGNTENDER DESIGN
CONSTRUCTION DESIGNAS-BUILT DRAWINGS
AF-ConsultSwitzerland Ltd.Täfernstrasse 26CH-5405 Baden/Switzerland
REVISION DESCRIPTION DRAWN CH'KED APP'D DATEREV.No.
ASSAM POWER GENERATION CORPORATION LTD.
LOWER KOPILI H.E. PROJECT (120MW)
SURGE SHAFT TO TAILRACE CHANNELGENERAL LAYOUTPLAN & SECTIONS
SCJ / KSBSAKMMB27.05.19
1:1500,1:250,1:100 A1
AFC.4294.00.007 0
1. ALL DIMENSIONS AND LEVEL ARE METERS EXCEPT SHOWN OTHERWISE.2. CONTRACTOR CAN EXAMINE TO EXCAVATE THIS PORTION THOUGH TUNNELING IN OVERBURDEN.
NOTES:
00 60 m30
LONGITUDINAL SECTION(SURGE SHAFT TO TAILRACE CHANNEL)
00 60 m30
PLAN(SURGE SHAFT TO TAILRACE CHANNEL)
REFERENCE DWGS:AFC.4294.00.004 PROJECT AREA
GENERAL LAYOUTLAYOUT PLAN
SS-1
PS-1
VH-1
PH-1TRC-1
SCHEDULE OF CONTROL POINTSNo. NORTHINGEASTING
HRT-4 480356.96 2841563.88
480336.71 2841562.37
FOR TENDER PURPOSE
480402.14 2842019.85480402.68 2842025.32
LEGEND:ROCK LINE
NSL
CONCRETE
PLATE - 007
PS-2 480418.30 2842182.93
480366.24 2842265.25
480327.98 2842324.67
185
195
200
N 2839000
N
190
180
210
220
215
205
195
185
175
245
235
225
200
190
180
210
220
230
240
255
N 2838900E 478200
N 2838800
E 478300
N 2838600
N 2838800
E 477800
E 4780
00
E 478300
FRL
FRL
FRL
FRLFRLFRL
FRLFRLFRL
N 2838700 N 2839000
185
230
240
N 2838700 E 477800
E 478100
N 2838500
E 478400
E 478400
175
111.6
0
140.0
0
195
205
215
225
190
200
210
220
230
235
PLUNGE POOL
PROPOSED ROAD
RIGH
T BA
NKLE
FT B
ANK
PROPOSED TEMPORARYBRIDGE
PROPOSED ROAD
DAM
AXIS
DAM
AXIS
EXISTING ROAD
ROAD TODUMPYARD
PROPOSED ROAD
U/S COFFER DAM
Ø10.50 m DIVERSIONTUNNEL
L=355.91m
KOPILI RIVER
KOPILI RIVER
ACCESS TOINSPECTIONGALLERY
CONSTRUCTIONSULICE
D/S COFFER DAM
33kvSWITCHYARD
PROPOSED ROAD
185
ROAD TO AUXILIARYPOWER HOSUE
BRID
GE D
ECK
229.0
0
N 2838900
PROPOSED ROAD
178.0
0
Ø1.50mRIPARIANFLOW INLET
5.00
603.009
3.00
229.0
0 (DA
M TO
P)
156.00169.50
166.00
160.0
0
163.50
198.0
0
196.5
0
229.0
0
177.00
229.00
174.00
172.00
239.00
191.0
0
179.00
188.00
198.50
207.00
213.5
022
2.00
168.50
198.00
171.00
185.50
167.50
173.00179.50
187.50
179.50
198.00
209.00
219.00
229.00
239.00
177.50
204.00 (INTAKE TOP)
202.00
229.00
196.50
335.0
0
186.50
AUXILIARYPOWER HOUSE
503.009
503.009
1.7H-1V 1.7H-1V
181.0
0
184.00176.00168.00176.50
168.50
190.0
0
17.00
AUX.
INTA
KE
111.4
0NO
N OV
ER F
LOW
BLO
CK11
3.60
SPILL
WAY
BLO
CK
BA-1
BA-2
IN-1
STAIR CUMEQUIPMENTSHAFT
STAIR CUMELEVATORSHAFT
HRT PORTAL
229.00
STEELBRIDGE
ROAD TO ACCESS TOINSPECTION GALLERY
160.0
0
HRT Ø7.0m CIRCULAR
PACKAGE-2
PROPOSED ROAD(BY OTHERS)
PROPOSED ROAD
603.009
N:\@
GMT-
2019
.05.30
-03.3
0.13\W
orkin
g Dra
wing
s\429
4_Lo
wer K
opili\
Draw
ing F
inal _
R0_0
\03 -
DAM\
AFC_
4294
_03_
001_
0.dwg
© A
F-C
onsult S
witzerland
Ltd. 2011
The reproduction, distribution and utilization of this docum
ent as w
ell as the com
munication of its
contents to others w
ithout explicid authorization is prohibited. O
ffenders w
ill be held liable for the
paym
ent of dam
ages. A
ll rights reserved in the event of the grant of a patent, utility m
odel or design.
00 30 m15
LAYOUT PLAN
ASSAM P
OWE
R G
EN
E RA T I O N C O R P OR
AT
I ON
LIM
ITED
CHECKED:APPROVED:DATE:
DRAWING No. REV. No.
PREFEASIBILITY STUDYFEASIBILITY STUDY
DRAWN: FORMAT:SCALE:
INCEPT. & BASIC DESIGNTENDER DESIGN
CONSTRUCTION DESIGNAS-BUILT DRAWINGS
AF-ConsultSwitzerland Ltd.Täfernstrasse 26CH-5405 Baden/Switzerland
REVISION DESCRIPTION DRAWN CH'KED APP'D DATEREV.No.
ASSAM POWER GENERATION CORPORATION LTD.
LOWER KOPILI H.E. PROJECT (120MW)
DAM COMPLEXGENERAL ARRANGEMENT LAYOUT PLAN
KSBDKCMMB27.05.19
1:750 A1
AFC.4294.03.001 0
1. ALL DIMENSIONS, NORTHING & EASTING AND LEVELS ARE INMETERS EXCEPT WHERE OTHERWISE NOTED.
2. ALL CONTOURS ARE AT 1.0m INTERVALS.3. NO DIMENSION SHALL BE MEASURED FROM DRAWING. SECTION
SIZES ARE TENTATIVE ONLY AND ELEVATIONS WILL BE REMAINSAME AS PRESENTED IN CURRENT DRAWINGS.
4. FOUNDATION LINE SHOWN IN DRAWINGS ARE BASED ONGEOLOGICAL SECTION.
5. AFTER EXCAVATION, THE ACCEPTABLE FOUNDATION GRADESHOULD BE CONFIRMED IN CONSULTATION WITH THEGEOLOGIST.
6. THE PROFILE OF SLUICE SPILLWAY GLACIS, ENTRANCE PROFILE,LIP LEVEL, BUCKET INVERT ETC. ARE TENTATIVE AND SUBJECTTO CONFIRMATION BY THE HYDRAULIC MODEL STUDIES.
7. THE LOCATION, DEPTH AND EXTENT OF THE PLUNGE POOLSHALL BE AS PER THE RESULT OF THE HYDRAULIC MODELSTUDIES.
8. BRIDGE DECK BOTTOM EL. SHALL BE KEPT AT EL. 181.50. SPANOF THE BRIDGE SHOWN IN THE DRAWINGS IS TENTATIVE.
9. PIER THICKNESS SHALL NOT BE LESS THAN 4.50m IN SLUICESPILLWAY.
10. GUIDE WALL SHOWN IN THE DRAWING IS TENTATIVE AND SHALLBE MODIFIED AFTER HYDRAULIC MODEL STUDY.
CO-ORDINATESPOINTS EASTING NORTHING
BA-1 477972.94 2838588.48
BA-2 478193.66 2838840.49
IN-1 478147.36 2838749.68
REFERENCE DRAWINGS:
AFC.4294.03.003
AFC.4294.03.005
AFC.4294.03.006
AFC.4294.03.007
AFC.4294.03.008
UPSTREAM VIEW
OVERFLOW SPILLWAY - SECTION 1-1
CONSTRUCTION SLUICE - SECTION 2-2
DEBRIS SPILLWAY - SECTION 3-3
STAIRCASE & ELEVATOR SHAFT - SECTION 4-4
AFC.4294.03.009 SECTIONS
AFC.4294.03.002 DAMGENERAL ARRANGEMENTPLAN
AFC.4294.03.004 DOWNSTREAM VIEW
NOTES:
FOR TENDER PURPOSE
PLATE - 038
* THE DEPTH, AND EXTENT OF PLUNGE POOL WILL BE STUDIED INHYDRAULIC MODEL STUDY, WHICH IS UNDER PROCESS, ANYCHANGE OF PLUNGE POOL AREA WILL BE INTIMITATED LATER ON.
??
?
LEFT BANKNSL
12 13
20
7
5
17.60BLOCK-14
?
?
?
25.00BLOCK-20
RIGHT BANK
ROCK LINE
8 9 10 11 14
15643
2
105.60SPILLWAY BLOCK
7.0017.60BLOCK-13
17.60BLOCK-12
17.60BLOCK-11
17.60BLOCK-10
17.60BLOCK-9
8.00BLOCK-8
17.00BLOCK-17
17.00BLOCK-19
17.00BLOCK-6
17.00BLOCK-5
17.00BLOCK-4
17.00BLOCK-3
17.00BLOCK-2
9.40BLOCK-1
303.007
303.007
403.008
403.008
1
2.00 7.60 10.00 3.80
111.40NON OVER FLOW BLOCK
8.00 DEBRIS SPILLWAY BLOCK
226.00 FRL/MWL222.00
213.50
198.50
188.00
168.50
229.00 TOP OF DAM
207.00
226.00229.00
239.00
5.00
5.00
5.00
5.00
5.00
POWER PACK ROOM
103.005
103.005
INSPECTION GALLERY
FOUNDATIONGALLERY
STAIR CUM ELEVATORSHAFT
SUMP WELL
CJ
DEBRIS SPILLWAY4.0m(W)X3.0m(H)
VI NOS. SLUICE SPILLWAY9.60m(W) X 12.0m(H)
00 30 m15
UPSTREAM VIEW
I II
III IV
V VI
200.50
203.006
203.006
NSL
ROCK LINE
DRIFT DL1
DRIFT DL2
Ø1.50m RIPARIANFLOW INLET
223.00
4.00
7.60 10.007.60 10.007.60 10.007.60 10.0010.00
2.00
3.80
17.00BLOCK-7
226.00
18 19
202.50
16
179.00
5.00
17
17.00BLOCK-18
CONSTRUCTION SLUICE5.0X5.0m
STAIR CUMEQUIPMENTSHAFT
DRIFT DR2
DRIFT DR1
DRIFT DL1
DRIFT DL2
170.50
164.50
93.00NON OVER FLOW BLOCK
15.30
Ø10.5m DIVERSIONTUNNEL
173.39
335.00
17.00BLOCK-15
17.00BLOCK-16
162.50
167.50
173.00
179.50
187.50
198.00
209.00
9.005.00
5.00
5.00
5.00
CROSS GALLERY
INSPECTION GALLERY
FOUNDATION LINE
5.00
ACCESS TO INSPECTIONGALLERY
INSPECTION GALLERY
CJ CJ CJ CJ CJ
CJ
CJ
CJ CJ CJ
CJ CJ
CJ CJ CJ CJ
CJ
CJ
AUXILIARYINTAKE
195.00
181.50
AUXILIARY POWER INTAKE
205.70
?
??
?
?
?
?
? ? ? ??
?
??
?
?
?
??
??
??
??
??
?
?
?
?
?
?
?
?
?
?
?? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
??
?
???
??
?????
?
? ? ? ? ? ? ? ??
??
??
?
?
?
?
??
?
??
?
??
??
?
181.50
190.00 198.00
182.00
N:\@
GMT-
2019
.05.30
-03.3
0.13\W
orkin
g Dra
wing
s\429
4_Lo
wer K
opili\
Draw
ing F
inal _
R0_0
\03 -
DAM\
AFC_
4294
_03_
003_
0.dwg
AF-C
onsu
lt swi
tzerla
nd Lt
d.Th
e rep
rodu
ction
, dist
ributi
on an
d utili
zatio
n of th
is do
cume
nt as
well
as th
e com
munic
ation
of its
conte
nts to
othe
rs wi
thout
expli
cid au
thoriz
ation
is pr
ohibi
ted. O
ffend
ers w
ill be
held
liable
for t
hepa
ymen
t of d
amag
es. A
ll righ
ts re
serve
d in t
he ev
ent o
f the g
rant
of a p
atent,
utilit
y mod
el or
desig
n.
NOTE:1. FOR NOTES, ALL REFERENCE DWGS. AND LEGEND REFER TO DWG. NO. AFC.4294.03.001.
FOR TENDER PURPOSE
ASSAM P
OWE
R G
EN
E R A T I O N C O R P OR
AT
I ON
LIM
ITED
CHECKED:APPROVED:DATE:
DRAWING No. REV. No.
PREFEASIBILITY STUDYFEASIBILITY STUDY
DRAWN: FORMAT:SCALE:
INCEPT. & BASIC DESIGNTENDER DESIGN
CONSTRUCTION DESIGNAS-BUILT DRAWINGS
AF-ConsultSwitzerland Ltd.Täfernstrasse 26CH-5405 Baden/Switzerland
REVISION DESCRIPTION DRAWN CH'KED APP'D DATEREV.No.
ASSAM POWER GENERATION CORPORATION LTD.
LOWER KOPILI H.E. PROJECT (120MW)
DAM COMPLEXGENERAL ARRANGEMENTUPSTREAM VIEW
KSBDKCMMB27.05.19
1:750 A1
AFC.4294.03.003 0
PLATE - 040
7.50
5.5
DAM
AXIS
ENTRANCEPROFILE
ORIGIN
20.0(APRON)
X =120Y2
29.707.50 35.30
8.50 15.0
NSL
1
X
Y
T.P2BUCKET INVERT
CONSTRUCTION SLUICE
(Q=11030 CUMECS)
00 10 m5
SECTION 1-1MAX. OVERFLOW BLOCK
2.50
229.00 (TOP OF DAM)
162.50
226.00 FRL/MWL
202.00 MDDL
226.00
87.50
205.50
190.00
182.00
181.50
173.00
202.00
179.17
182.64
185.50
1.50
190.00
185.34 (TWL)
163.50
157.50
5.25
6.50
INSPECTION GALLERY
21
21
1.00
11
11
VARIES
CLADDING WALL
3.002.00
INSTRUMENTATION GALLERY
DRAINAGE HOLESCURTAIN GROUTING DRAINAGE SUMP
0.2Ø FORMED [email protected] c/c
FOUNDATIONGALLERY
2.50
12
1.50
BRIDGE (INDICATIVE)
X
Y
0.581
? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
ROCKLINE
STOPLOG GATEGROOVE
GANTRY CRANE
206.87
216.00
166.00
169.50
180.00
x² y²6² 3²
1y²3² ORIGIN
3.00
195.50
214.17
229.00
0.50(H) : 1.0(V)
Ø0.30m MSAIRVENT PIPE
CONSOLIDATION GROUTING,6.0m DEEP @ 3.0m c/c (TYP.)
198.00
HOODED CONE DISCHARGEVALVE
SLIDE VALVE
Ø1.50m RIPARIANFLOW INLET(SEE NOTE-2) 1.5
0
33.505.30 3.18 2.83 4.00
11.72
POWER PACK ROOM (7.0m x 3.8m)(IN EVERY ALTERNATE BLOCKS)
186.00
4.0
5.00
171.00
3.194.49
196.50
176.00
11.72
5.00
SHIP LADDERS
5.50
11
R4.00
35.00°
R35.0
0
25.77°
202.50
N:\W
orkin
g Dra
wing
s\429
4_Lo
wer K
opili\
Draw
ing F
inal _
R0_0
\03 -
DAM\
AFC_
4294
_03_
005_
0.dwg
AF-C
onsu
lt swi
tzerla
nd Lt
d.Th
e rep
rodu
ction
, dist
ributi
on an
d utili
zatio
n of th
is do
cume
nt as
well
as th
e com
munic
ation
of its
conte
nts to
othe
rs wi
thout
expli
cid au
thoriz
ation
is pr
ohibi
ted. O
ffend
ers w
ill be
held
liable
for t
hepa
ymen
t of d
amag
es. A
ll righ
ts re
serve
d in t
he ev
ent o
f the g
rant
of a p
atent,
utilit
y mod
el or
desig
n.
FOR TENDER PURPOSE
NOTES:1. FOR NOTES, ALL REFERENCE DWGS. AND LEGEND REFER TO DWG. NO. AFC.4294.03.001.2. BALANCE REPARIAN DISCHARGE OF 6.54m³/s THROUGH Ø1.50m RIPARIAN PIPE
PROVIDED IN DAM BLOCK - 13.
ASSAM P
OWE
R G
EN
E R A T I O N C O R P OR
AT
I ON
LIM
ITED
CHECKED:APPROVED:DATE:
DRAWING No. REV. No.
PREFEASIBILITY STUDYFEASIBILITY STUDY
DRAWN: FORMAT:SCALE:
INCEPT. & BASIC DESIGNTENDER DESIGN
CONSTRUCTION DESIGNAS-BUILT DRAWINGS
AF-ConsultSwitzerland Ltd.Täfernstrasse 26CH-5405 Baden/Switzerland
REVISION DESCRIPTION DRAWN CH'KED APP'D DATEREV.No.
ASSAM POWER GENERATION CORPORATION LTD.
LOWER KOPILI H.E. PROJECT (120MW)
DAM COMPLEXGENERAL ARRANGEMENTOVERFLOW SPILLWAY & SECTION 1-1
KSBDKCMMB27.05.19
1:250 A1
AFC.4294.03.005 0
PLATE - 042
7.505.50
0.851
DAM
AXIS
87.50
67.50 20.00(APRON)
T.P2
229.00 (TOP OF DAM)
226.00 FRL/MWL
202.00 MDDL
223.00
213.28
186.50 (Q=11030 CUMECS)185.34 (TWL)
168.50
222.00
12.75
163.50
216.50
211.00
224.00
3.50
T.P1 220.47
R76.0
0
173.00
181.50
170.50
INSPECTION GALLERY
FOUNDATION GALLERY
VERTICAL GATE4.0m (W)X3.0m (H)
262.50
49.64°
2.50
2.57
2.25
12
0.2Ø FORMEDDRAIN @3.0m c/c
3.00 2.00
2.50
2.50
00 10 m5
SECTION 3-3THROUGH DEBRIS SPILLWAY
NSL
190.00 TRAINING WALL
3.50
0.50(H) : 1.0(V)
169.50
180.00
Ø0.30m VENTILATIONPIPES
CONSOLIDATION GROUTING,6.0m DEEP @ 3.0m c/c (TYP.)
DRAINAGE HOLECURTAIN GROUTING
X1.85 = 2(H ) Y0.85dXX
Y
5.50
5.00
5.00
N:\W
orkin
g Dra
wing
s\429
4_Lo
wer K
opili\
Draw
ing F
inal _
R0_0
\03 -
DAM\
AFC_
4294
_03_
007_
0.dwg
AF-C
onsu
lt swi
tzerla
nd Lt
d.Th
e rep
rodu
ction
, dist
ributi
on an
d utili
zatio
n of th
is do
cume
nt as
well
as th
e com
munic
ation
of its
conte
nts to
othe
rs wi
thout
expli
cid au
thoriz
ation
is pr
ohibi
ted. O
ffend
ers w
ill be
held
liable
for t
hepa
ymen
t of d
amag
es. A
ll righ
ts re
serve
d in t
he ev
ent o
f the g
rant
of a p
atent,
utilit
y mod
el or
desig
n.
FOR TENDER PURPOSE
NOTE:1. FOR NOTES, ALL REFERENCE DWGS. AND LEGEND REFER TO DWG. NO. AFC.4294.03.001.
PLATE - 044
ASSAM P
OWE
R G
EN
E R A T I O N C O R P OR
AT
I ON
LIM
ITED
CHECKED:APPROVED:DATE:
DRAWING No. REV. No.
PREFEASIBILITY STUDYFEASIBILITY STUDY
DRAWN: FORMAT:SCALE:
INCEPT. & BASIC DESIGNTENDER DESIGN
CONSTRUCTION DESIGNAS-BUILT DRAWINGS
AF-ConsultSwitzerland Ltd.Täfernstrasse 26CH-5405 Baden/Switzerland
REVISION DESCRIPTION DRAWN CH'KED APP'D DATEREV.No.
ASSAM POWER GENERATION CORPORATION LTD.
LOWER KOPILI H.E. PROJECT (120MW)
DAM COMPLEXGENERAL ARRANGEMENTDEBRIS SPILLWAY - SECTION 3-3
KSBDKCMMB27.05.19
1:250 A1
AFC.4294.03.007 0
ID Task Mode
WBS Task Name Start Finish
1 1 Implementation of Lower Kopili HEP (120 MW) Mon 02‐12‐19 Thu 30‐11‐23
2 1.1 Civil & Hydromechanical Works including Road works Mon 02‐12‐19 Thu 30‐11‐23
3 1.1.1 Procurement Process Mon 02‐12‐19 Mon 02‐12‐19
4 1.1.1.1 Notice to Proceed Mon 02‐12‐19 Mon 02‐12‐19
5 1.1.2 Post Award Works (Construction and Commissioning) Tue 03‐12‐19 Thu 30‐11‐23
6 1.1.2.1 Mobilisation of Machinery for River Diversion & Road Grading Tue 03‐12‐19 Wed 01‐01‐20
7 1.1.2.2 Grading of Road (cutting & filling) up to D/s Bailey Bridge location at right bank Thu 02‐01‐20 Fri 31‐01‐20
8 1.1.2.3 Balnce Mobilisation of Machinery Thu 02‐01‐20 Tue 05‐01‐21
9 1.1.2.4 Engineering & Design Tue 03‐12‐19 Mon 11‐01‐21
10 1.1.2.4.1 Survey/Investigation Tue 03‐12‐19 Wed 03‐06‐20
11 1.1.2.4.2 Detail Engineering Wed 18‐12‐19 Mon 11‐01‐21
12 1.1.2.4.2.1 Design Submission Wed 18‐12‐19 Mon 21‐12‐20
13 1.1.2.4.2.2 Design approval Wed 08‐01‐20 Mon 11‐01‐21
14 1.1.2.5 Infrastructure (to be handed over to client after completion of works) Mon 03‐02‐20 Mon 04‐05‐20
15 1.1.2.5.1 Quality Lab Mon 03‐02‐20 Mon 04‐05‐20
16 1.1.2.5.2 Hydromechanical Workshop Mon 03‐02‐20 Mon 04‐05‐20
17 1.1.2.5.3 Electromechanical Workshop Mon 03‐02‐20 Mon 04‐05‐20
18 1.1.2.5.4 P&M Workshop Mon 03‐02‐20 Mon 04‐05‐20
19 1.1.2.6 Roads Wed 15‐01‐20 Thu 03‐09‐20
20 1.1.2.6.1 New Roads Wed 15‐01‐20 Thu 03‐09‐20
21 1.1.2.6.1.1 Grading with Temporary supports of existing Road ‐ NH to Dam crest‐R16 Mon 03‐02‐20 Tue 03‐03‐20
22 1.1.2.6.1.2 Grading with Temporary supports of Road to Dam Toe, Intake & Cofferdam‐R1 Wed 04‐03‐20 Mon 04‐05‐20
23 1.1.2.6.1.3 Grading with Temporary supports of Road to Reha area‐R2 & R2A Wed 15‐01‐20 Wed 15‐04‐20
24 1.1.2.6.1.4 Grading with Temporary supports of Road to Rock quarry & Helipad‐R3 Wed 15‐01‐20 Wed 15‐04‐20
25 1.1.2.6.1.5 Grading with Temporary supports of Road to Magzine‐R4 Wed 15‐01‐20 Wed 15‐04‐20
26 1.1.2.6.1.6 Grading with Temporary supports of Road to Dumping Area‐R5 Wed 04‐03‐20 Wed 03‐06‐20
27 1.1.2.6.1.7 Grading with Temporary supports of Road to Adit portal‐R6 Wed 04‐03‐20 Wed 03‐06‐20
28 1.1.2.6.1.8 Grading with Temporary supports of Road to Adit Portal to Dumping area‐R6A Thu 04‐06‐20 Thu 03‐09‐20
29 1.1.2.6.1.9 Grading with Temporary supports of Road to Permanent/Temporary colony‐R7 Wed 04‐03‐20 Tue 28‐04‐20
30 1.1.2.6.1.10 Grading with Temporary supports of Road to Hydromechanical workshop‐R8 Wed 15‐01‐20 Fri 28‐02‐20
31 1.1.2.6.1.11 Grading with Temporary supports of Road from Hydromechanical workshop to Electromechanical workshop‐R9
Mon 02‐03‐20 Wed 15‐04‐20
32 1.1.2.6.1.12 Grading with Temporary supports of Road to Surge Shaft‐R10 Wed 15‐01‐20 Thu 13‐02‐20
33 1.1.2.6.1.13 Grading with Temporary supports of Road to Valve House‐R10A Wed 15‐01‐20 Mon 16‐03‐20
34 1.1.2.6.1.14 Grading with Temporary supports of Road from Switch yard to to Horizontal Pressure Shaft and Valve House‐New Road Proposed
Tue 05‐05‐20 Wed 03‐06‐20
35 1.1.2.6.1.15 Grading with Temporary supports of Road to Dyke area‐R11 Wed 15‐01‐20 Mon 16‐03‐20
Jun Jul AugSepOctNovDec Jan FebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec Jan FebM2020 2021 2022 2023 2024Y2 Y3 Y4 Y5 Y6
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Critical
Critical Milestone
120 MW LOWER KOPILI HEP Program of Works
Page 1
Project: Project ImplementationDate: Fri 24-05-19
ASSAM POWER GENERATION CORPORATION LIMITED
ID Task Mode
WBS Task Name Start Finish
36 1.1.2.6.1.16 Grading with Temporary Supports of existing road‐ NH to Main Powerhouse‐R17 Wed 04‐03‐20 Thu 02‐04‐20
37 1.1.2.6.1.17 Grading with Temporary Supports of Road to Main Powerhouse‐R13 Fri 03‐04‐20 Mon 04‐05‐20
38 1.1.2.6.1.18 Grading with Temporary supports of Road from Dam top to Auxiliary Powerhouse‐R14 Wed 04‐03‐20 Mon 04‐05‐20
39 1.1.2.6.1.19 Grading with Temporary supports of Road from Dam top to Dumping area‐R14A Wed 25‐03‐20 Wed 24‐06‐20
40 1.1.2.7 Maintenance including drainage works of all roads Fri 04‐09‐20 Thu 01‐06‐23
41 1.1.2.8 Asphalting works of all roads Fri 30‐06‐23 Thu 30‐11‐23
42 1.1.2.9 Handover to Client Thu 30‐11‐23 Thu 30‐11‐23
43 1.1.2.10 River Diversion Works Mon 03‐02‐20 Mon 15‐03‐21
44 1.1.2.10.1 Downstream Bridge (Bailey bridge) Mon 03‐02‐20 Fri 18‐09‐20
45 1.1.2.10.1.1 Temprary river crossing using pipe culvert Mon 03‐02‐20 Mon 17‐02‐20
46 1.1.2.10.1.2 Shifting of machinery from Left bank to right bank (assuming the water depth in the riveris 1 meter as noticed in 2018)
Tue 18‐02‐20 Mon 24‐02‐20
47 1.1.2.10.1.3 Excavation & Concrete works for bridge abutments‐Right Bank Mon 03‐02‐20 Tue 03‐03‐20
48 1.1.2.10.1.4 Excavation & Concrete works for bridge abutments‐Left Bank Tue 18‐02‐20 Wed 18‐03‐20
49 1.1.2.10.1.5 Bailey bridge Erection Thu 19‐03‐20 Fri 18‐09‐20
50 1.1.2.10.2 Diversion Tunnel (DT) Tue 25‐02‐20 Wed 11‐11‐20
51 1.1.2.10.2.1 From Outlet Portal Tue 25‐02‐20 Fri 10‐07‐20
52 1.1.2.10.2.1.1 Grading of Access road to Outlet Portal (after crossing the machineries from right bankto left bank)
Tue 25‐02‐20 Tue 10‐03‐20
53 1.1.2.10.2.1.2 Portal Development Wed 11‐03‐20 Wed 25‐03‐20
54 1.1.2.10.2.1.3 Underground Excavation with rock support ‐240 m Thu 26‐03‐20 Thu 25‐06‐20
55 1.1.2.10.2.1.4 Shotcrete Lining Fri 26‐06‐20 Fri 10‐07‐20
56 1.1.2.10.2.2 From Inlet Portal Wed 11‐03‐20 Tue 11‐08‐20
57 1.1.2.10.2.2.1 Grading of Access road to Inlet Portal Wed 11‐03‐20 Thu 09‐04‐20
58 1.1.2.10.2.2.2 Temporary dyke to prevent inflow of water into DT Fri 10‐04‐20 Mon 11‐05‐20
59 1.1.2.10.2.2.3 Portal Development Tue 12‐05‐20 Wed 10‐06‐20
60 1.1.2.10.2.2.4 Underground Excavation with rock support‐116 m Thu 11‐06‐20 Mon 27‐07‐20
61 1.1.2.10.2.2.5 Shotcrete Lining Tue 28‐07‐20 Tue 11‐08‐20
62 1.1.2.10.2.3 Invert Lining along full length of Tunnel Wed 12‐08‐20 Thu 10‐09‐20
63 1.1.2.10.2.4 Diversion Tunnel Inlet structure Concrete & HM works Fri 11‐09‐20 Wed 11‐11‐20
64 1.1.2.10.3 Coffer Dams Thu 12‐11‐20 Mon 15‐03‐21
65 1.1.2.10.3.1 Dyke for River Diversion & River diverted through DT Thu 12‐11‐20 Fri 11‐12‐20
66 1.1.2.10.3.2 Construction of u/s Colcrete Cofferdam Mon 14‐12‐20 Mon 15‐03‐21
67 1.1.2.10.3.3 Construction of d/s Cofferdam Wed 13‐01‐21 Mon 15‐03‐21
68 1.1.2.11 Dam Tue 16‐03‐21 Thu 08‐06‐23
30-11
Jun Jul AugSepOctNovDec Jan FebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec Jan FebM2020 2021 2022 2023 2024Y2 Y3 Y4 Y5 Y6
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Critical
Critical Milestone
120 MW LOWER KOPILI HEP Program of Works
Page 2
Project: Project ImplementationDate: Fri 24-05-19
ASSAM POWER GENERATION CORPORATION LIMITED
ID Task Mode
WBS Task Name Start Finish
69 1.1.2.11.1 Abutment stripping including rock support‐80,000 cum Tue 16‐03‐21 Wed 15‐09‐21
70 1.1.2.11.2 Riverbed Excavation‐260,000 cum Thu 16‐09‐21 Wed 16‐02‐22
71 1.1.2.11.3 Mass Concrete up to Dam Crest with Consolidation Grouting‐1,47,574 cum Thu 17‐02‐22 Mon 20‐06‐22
72 1.1.2.11.4 Concreting in Spillway and Piers‐66,081 cum Tue 21‐06‐22 Mon 27‐03‐23
73 1.1.2.11.5 Concreting in NOF Blocks‐1,87,963 cum Mon 21‐03‐22 Mon 27‐03‐23
74 1.1.2.11.6 Installation of Spillway Radial Gates Wed 21‐09‐22 Thu 23‐03‐23
75 1.1.2.11.7 Curtain Grouting Mon 06‐06‐22 Thu 06‐04‐23
76 1.1.2.11.8 Construction of bridge (steel girder with concrete slab) over Spillway Piers Tue 28‐03‐23 Thu 08‐06‐23
77 1.1.2.12 Dam Impounding Fri 09‐06‐23 Fri 08‐09‐23
78 1.1.2.13 Water Conductor filling Mon 11‐09‐23 Tue 10‐10‐23
79 1.1.2.14 Intake Tue 16‐03‐21 Mon 21‐11‐22
80 1.1.2.14.1 Excavation with supports of Intake Portal level Tue 16‐03‐21 Thu 15‐07‐21
81 1.1.2.14.2 Excavation with supports from portal level to foundation level Fri 16‐07‐21 Wed 15‐09‐21
82 1.1.2.14.3 Concreting of Intake ‐ First stage Thu 16‐09‐21 Thu 19‐05‐22
83 1.1.2.14.4 Erection of Gates Fri 20‐05‐22 Tue 20‐09‐22
84 1.1.2.14.5 Concreting of Intake ‐ Second stage Wed 21‐09‐22 Mon 21‐11‐22
85 1.1.2.14.6 Construction of Feeder Duct including steel liner Thu 16‐09‐21 Thu 16‐12‐21
86 1.1.2.15 Adit constructions Thu 04‐06‐20 Fri 04‐12‐20
87 1.1.2.15.1 Construction of Intermediate Adit Thu 04‐06‐20 Fri 04‐12‐20
88 1.1.2.15.1.1 Open excavation with supports Thu 04‐06‐20 Fri 03‐07‐20
89 1.1.2.15.1.2 Portal formation Mon 06‐07‐20 Tue 04‐08‐20
90 1.1.2.15.1.3 Excavation with supports of Adit Tunnel Wed 05‐08‐20 Fri 04‐12‐20
91 1.1.2.16 Head Race Tunnel Mon 07‐12‐20 Mon 10‐04‐23
92 1.1.2.16.1 Excavation Mon 07‐12‐20 Tue 07‐06‐22
93 1.1.2.16.1.1 Excavation with supports of HRT ‐ Face‐1 (from Intake towards Adit)‐900M Fri 16‐07‐21 Tue 07‐06‐22
94 1.1.2.16.1.2 Excavation with supports of HRT‐ Face‐2 (u/s face of Adit towards Intake)‐1291M Mon 07‐12‐20 Tue 19‐04‐22
95 1.1.2.16.1.3 Excavation with supports of HRT ‐ Face‐3 (d/s face of adit towards Surge Shaft)‐1050M Wed 06‐01‐21 Tue 18‐01‐22
96 1.1.2.16.1.4 Excavation with supports of HRT ‐Face‐4 (u/s of Surge Shaft towards adit)‐400M Tue 23‐03‐21 Fri 13‐08‐21
97 1.1.2.16.2 Concrete lining including Grouting Mon 16‐08‐21 Fri 10‐03‐23
98 1.1.2.16.2.1 Removal of Undercuts and Gantry erection ‐ B/w Intake & Intermediate adit Wed 08‐06‐22 Thu 07‐07‐22
99 1.1.2.16.2.2 Removal of Undercuts and Gantry erection ‐ B/w Intermediate adit and surge bottom Wed 19‐01‐22 Thu 17‐02‐22
100 1.1.2.16.2.3 Lining of HRT ‐ Face‐1 (towards Intake)‐ 900 m Fri 08‐07‐22 Tue 08‐11‐22
101 1.1.2.16.2.4 Consolidation Grouting Wed 09‐11‐22 Fri 23‐12‐22
102 1.1.2.16.2.5 Contact Grouting Mon 26‐12‐22 Wed 08‐02‐23
Jun Jul AugSepOctNovDec Jan FebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec Jan FebM2020 2021 2022 2023 2024Y2 Y3 Y4 Y5 Y6
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Critical
Critical Milestone
120 MW LOWER KOPILI HEP Program of Works
Page 3
Project: Project ImplementationDate: Fri 24-05-19
ASSAM POWER GENERATION CORPORATION LIMITED
ID Task Mode
WBS Task Name Start Finish
103 1.1.2.16.2.6 Lining of HRT ‐ Face‐2 (towards Adit) ‐ 1291 m Fri 08‐07‐22 Fri 30‐12‐22
104 1.1.2.16.2.7 Consolidation Grouting Wed 09‐11‐22 Mon 09‐01‐23
105 1.1.2.16.2.8 Contact Grouting Tue 10‐01‐23 Fri 10‐03‐23
106 1.1.2.16.2.9 Grouting & Lining of HRT ‐ Face‐3 (between adit and Surge Shaft towards adit) and balance 300 m of Face‐4 ‐ 1350 m
Fri 18‐02‐22 Thu 13‐10‐22
107 1.1.2.16.2.10 Consolidation Grouting Fri 14‐10‐22 Thu 29‐12‐22
108 1.1.2.16.2.11 Contact Grouting Fri 30‐12‐22 Thu 23‐02‐23
109 1.1.2.16.2.12 Erection of Steel liner for 100m length of HRT u/s of Surge shaft Mon 16‐08‐21 Thu 14‐10‐21
110 1.1.2.16.3 Plugging of Adit with Installation of Bulkhead gate Mon 13‐03‐23 Mon 10‐04‐23
111 1.1.2.17 Surge Shaft Fri 14‐02‐20 Wed 22‐12‐21
112 1.1.2.17.1 Open excavation ‐ 32,290 cum Fri 14‐02‐20 Wed 15‐04‐20
113 1.1.2.17.2 Erection of Gantry Thu 16‐04‐20 Fri 15‐05‐20
114 1.1.2.17.3 Excavation of Main Shaft‐25 m dia Mon 18‐05‐20 Fri 16‐10‐20
115 1.1.2.17.4 Excavation of Riser Shaft‐ 7 m dia Mon 19‐10‐20 Thu 17‐12‐20
116 1.1.2.17.5 Steel Liner erection and back filling in Riser shaft Fri 18‐12‐20 Wed 17‐02‐21
117 1.1.2.17.6 Bottom Raft Concrete Thu 18‐02‐21 Fri 19‐03‐21
118 1.1.2.17.7 Formwork erection (slip form) Mon 22‐03‐21 Tue 20‐04‐21
119 1.1.2.17.8 Lining & Grouting of underground Surge shaft Wed 21‐04‐21 Fri 20‐08‐21
120 1.1.2.17.9 Concrete of free standing Surge shaft Mon 23‐08‐21 Wed 22‐12‐21
121 1.1.2.18 Valve House including E&M works Mon 27‐06‐22 Thu 11‐05‐23
122 1.1.2.18.1 Raft Concrete up to 137.50 m Mon 27‐06‐22 Mon 11‐07‐22
123 1.1.2.18.2 Wall Construction up to 155.00 m Tue 12‐07‐22 Tue 11‐10‐22
124 1.1.2.18.3 Compacted backfill up to 155.00 m Wed 12‐10‐22 Thu 10‐11‐22
125 1.1.2.18.4 Column and Beams including Crane Beam Fri 11‐11‐22 Fri 10‐02‐23
126 1.1.2.18.5 Roof Structure Mon 13‐02‐23 Tue 14‐03‐23
127 1.1.2.18.6 Erection and Commissioning of Valve house crane Wed 15‐03‐23 Wed 12‐04‐23
128 1.1.2.18.7 Erection & Commissioning of Butterfly valve Thu 13‐04‐23 Thu 11‐05‐23
129 1.1.2.19 Pressure Shaft & Penstock Thu 04‐06‐20 Tue 11‐10‐22
130 1.1.2.19.1 Open Excavation of Top horizontal surface Penstock (158 m) ‐ 57,000 cum Thu 04‐06‐20 Mon 05‐10‐20
131 1.1.2.19.2 Installation of Top Surface Penstock and Concrete encasing(158 m) Mon 27‐06‐22 Mon 26‐09‐22
132 1.1.2.19.3 Compacted backfill of Top surface Penstock Wed 27‐07‐22 Tue 11‐10‐22
133 1.1.2.19.4 Underground excavation with supports of top horizontal portion of Pressure shaft‐462 M Tue 06‐10‐20 Mon 22‐03‐21
134 1.1.2.19.5 Steel Liner in top horizontal portion with backfilling ‐462 m Fri 15‐10‐21 Fri 24‐06‐22
135 1.1.2.19.6 Excavation with supports of Inclined and bottom Penstock Tue 06‐10‐20 Tue 08‐06‐21
136 1.1.2.19.7 Installation of Penstock of inclined and bottom ‐ 160 m Wed 09‐06‐21 Wed 09‐02‐22
137 1.1.2.20 Tail Race Channel Tue 01‐12‐20 Mon 04‐10‐21
138 1.1.2.20.1 Excavation Tue 01‐12‐20 Tue 02‐03‐21
Jun Jul AugSepOctNovDec Jan FebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec Jan FebM2020 2021 2022 2023 2024Y2 Y3 Y4 Y5 Y6
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Critical
Critical Milestone
120 MW LOWER KOPILI HEP Program of Works
Page 4
Project: Project ImplementationDate: Fri 24-05-19
ASSAM POWER GENERATION CORPORATION LIMITED
ID Task Mode
WBS Task Name Start Finish
139 1.1.2.20.2 Concrete Wed 03‐03‐21 Fri 02‐07‐21
140 1.1.2.20.3 Outfall arrangement (cofferdam) Mon 05‐07‐21 Mon 04‐10‐21
141 1.1.2.21 Switch Yard Tue 01‐12‐20 Wed 03‐11‐21
142 1.1.2.21.1 Excavation and levelling Tue 01‐12‐20 Tue 02‐03‐21
143 1.1.2.21.2 Civil works and fencing Wed 03‐03‐21 Fri 02‐07‐21
144 1.1.2.21.3 Installation of Equipment Mon 05‐07‐21 Wed 03‐11‐21
145 1.1.2.22 Power House Complex (Auxillary) including E&M works Fri 17‐12‐21 Thu 30‐11‐23
146 1.1.2.22.1 Civil & HM Works Fri 17‐12‐21 Fri 20‐01‐23
147 1.1.2.22.1.1 Conductor System Fri 17‐12‐21 Tue 19‐04‐22
148 1.1.2.22.1.2 Power House Wed 20‐04‐22 Thu 20‐10‐22
149 1.1.2.22.1.3 TRC Fri 21‐10‐22 Fri 20‐01‐23
150 1.1.2.22.1.4 Switch Yard Fri 21‐10‐22 Fri 20‐01‐23
151 1.1.2.22.2 EM Works ‐ Auxillary Plant Mon 23‐01‐23 Thu 30‐11‐23
152 1.1.2.22.2.1 EM Installations Mon 23‐01‐23 Fri 21‐07‐23
153 1.1.2.22.2.2 Unit Dry comissioning Mon 24‐07‐23 Tue 22‐08‐23
154 1.1.2.22.2.3 Unit Wet comissioning Wed 01‐11‐23 Thu 30‐11‐23
155 1.1.2.23 Power House Complex (Main) including E&M works Mon 03‐02‐20 Fri 28‐04‐23
156 1.1.2.23.1 Award of Contract to E&M Vendor Mon 03‐02‐20 Mon 03‐02‐20
157 1.1.2.23.2 Design period-E&M Mon 03‐02‐20 Mon 11‐05‐20
158 1.1.2.23.3 Civil-E&M interface for finalisattion Powerhouse excavatiion setting out Tue 12‐05‐20 Wed 10‐06‐20
159 1.1.2.23.4 Civil design for Power House excavation (Stability analysis etc) Thu 11‐06‐20 Mon 31‐08‐20
160 1.1.2.23.5 Power house & Tailrace excavation below EL 113.0 Tue 15‐09‐20 Mon 30‐11‐20
161 1.1.2.23.6 Earthmat installation and mud concreting Tue 01‐12‐20 Tue 15‐12‐20
162 1.1.2.23.7 Draft tube First stage concreting (Unit-1 & 2) including Drainage & Dewatering Sump
Wed 16‐12‐20 Fri 12‐02‐21
163 1.1.2.23.8 MIV floor raft (including drainage & dewatering Gallery) concreting for both unitsincluding embeddments for Spiralcase
Mon 15‐02‐21 Tue 13‐04‐21
164 1.1.2.23.9 Concrete walls all four sides (including Draft tube gate Piers) upto Service bay Wed 14‐04‐21 Mon 12‐07‐21
165 1.1.2.23.10 Unit-1 Draft tube erection by Tower Crane including concrete encasement Wed 14‐04‐21 Thu 13‐05‐21
166 1.1.2.23.11 Unit-2 Draft tube erection by mobile Crane including concrete encasement Wed 28‐04‐21 Fri 28‐05‐21
167 1.1.2.23.12 Control room building including brick walls, flooring & finishing Tue 13‐07‐21 Fri 07‐01‐22
168 1.1.2.23.13 Erection & testing of Penstock Y-Piece including inclined Penstock upto EL. 113.0 Wed 14‐04‐21 Mon 12‐07‐21
169 1.1.2.23.14 Concrete encasement of Y-Piece including inclined Penstock upto EL. 113.0 Tue 13‐07‐21 Fri 10‐09‐21
170 1.1.2.23.15 Soil backfill at three sides of Powerhouse building Mon 13‐09‐21 Fri 24‐09‐21
171 1.1.2.23.16 Part Service bay Raft and Concrete super struture upto Crane beam level for Service bay, Unit-1&2
Tue 01‐12‐20 Fri 12‐02‐21
03-02
Jun Jul AugSepOctNovDec Jan FebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec Jan FebM2020 2021 2022 2023 2024Y2 Y3 Y4 Y5 Y6
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Critical
Critical Milestone
120 MW LOWER KOPILI HEP Program of Works
Page 5
Project: Project ImplementationDate: Fri 24-05-19
ASSAM POWER GENERATION CORPORATION LIMITED
ID Task Mode
WBS Task Name Start Finish
172 1.1.2.23.17 Steel Super Sructure for part Service bay including roofing & cladding Mon 15‐02‐21 Mon 29‐03‐21
173 1.1.2.23.18 Erection & Testing of EOT Crane at Service bay Tue 30‐03‐21 Thu 13‐05‐21
174 1.1.2.23.19 Machine hall Concrete super structure upto Crane beam level (Unit‐1 & 2) including completion of remaining Service bay Super structure adjoining Unit‐1
Tue 13‐07‐21 Wed 20‐10‐21
175 1.1.2.23.20 Steel Super Sructure all for full Machine Hall (Unit‐1 & 2) including roofing & cladding Thu 21‐10‐21 Fri 03‐12‐21
176 1.1.2.23.21 Concrete Deck slab for Draft tube gate Operating Floor Tue 13‐07‐21 Fri 10‐09‐21
177 1.1.2.23.22 Erection of Gantry Crane for Draft tube gates Mon 13‐09‐21 Tue 09‐11‐21
178 1.1.2.23.23 Erection of DT Gate for Unit-1 Wed 10‐11‐21 Fri 07‐01‐22
179 1.1.2.23.24 Erection of DT Gate for Unit-2 Mon 10‐01‐22 Wed 09‐03‐22
180 1.1.2.23.25 Erection and testing of Spiralcase for Unit-1 Mon 06‐12‐21 Tue 18‐01‐22
181 1.1.2.23.26 Encasement concrete around Unit-1 Spiralcase including turbine floor concreting Wed 19‐01‐22 Fri 18‐03‐22
182 1.1.2.23.27 Erection and testing of Spiralcase for Unit-2 Mon 03‐01‐22 Thu 17‐02‐22
183 1.1.2.23.28 Encasement concrete around Unit-2 Spiralcase including turbine floor concreting Fri 18‐02‐22 Mon 18‐04‐22
184 1.1.2.23.29 Generator barrel concrete for Unit-1 from EL. 101.80 upto EL. 106.30 including Generator floor slab
Tue 19‐04‐22 Fri 17‐06‐22
185 1.1.2.23.30 Generator barrel concrete for Unit-2 from EL. 101.80 upto EL. 106.30 including Generator floor slab
Wed 18‐05‐22 Mon 18‐07‐22
186 1.1.2.23.31 Generator barrel concrete for Unit-1 from EL. 106.30 upto EL. 110.80 including operating floor slab
Mon 20‐06‐22 Tue 16‐08‐22
187 1.1.2.23.32 Generator barrel concrete for Unit-2 from EL. 106.30 upto EL. 110.80 including operating floor slab
Tue 19‐07‐22 Thu 15‐09‐22
188 1.1.2.23.33 Concreting of Transformer Bay Foundation at EL. 113.0 Tue 19‐07‐22 Fri 14‐10‐22
189 1.1.2.23.34 Erection of Transformers Mon 17‐10‐22 Fri 13‐01‐23
190 1.1.2.23.35 Unit-1 Rotor / Stator erection including 2nd stage grouting of foundation pockets Fri 16‐09‐22 Tue 29‐11‐22
191 1.1.2.23.36 Unit-2 Rotor / Stator erection including 2nd stage grouting of foundation pockets Mon 17‐10‐22 Thu 29‐12‐22
192 1.1.2.23.37 Erection of MIV ‐ Unit‐1 & Unit‐2 Fri 30‐12‐22 Mon 27‐02‐23
193 1.1.2.23.38 Erection of various BOP for Unit-1 & 2 Fri 30‐12‐22 Mon 27‐02‐23
194 1.1.2.23.39 Dry testing for Unit-1 & 2 Tue 28‐02‐23 Fri 28‐04‐23
195 1.1.3 Wet testing for Unit-1 Wed 11‐10‐23 Wed 25‐10‐23
196 1.1.4 Wet testing for Unit-2 Thu 26‐10‐23 Thu 09‐11‐23
197 1.1.5 Commissioning of Unit-1 Fri 10‐11‐23 Thu 23‐11‐23
198 1.1.6 Commissioning of Unit-2 Fri 24‐11‐23 Thu 30‐11‐23
199 1.1.7 Commercial Operation Date (COD) Thu 30‐11‐23 Thu 30‐11‐23 30-11
Jun Jul AugSepOctNovDec Jan FebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec JanFebMarAprMayJun Jul AugSepOctNovDec Jan FebM2020 2021 2022 2023 2024Y2 Y3 Y4 Y5 Y6
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Critical
Critical Milestone
120 MW LOWER KOPILI HEP Program of Works
Page 6
Project: Project ImplementationDate: Fri 24-05-19
ASSAM POWER GENERATION CORPORATION LIMITED