What is BIM?

“A coordinated set of processes, supported by technology, that adds value through creating, managing and sharing the properties of an asset throughout its lifecycle.”

“Single source of truth throughout the asset life cycle”

Page 3: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Source: Autodesk

For the whole lifecycle

BIM MODEL

Page 4: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

The three Ps

People – Knowledge, experience, handling

Process – Establishing a set of requirements and methodologies between collaborating parties

Platform – Software, hardware and network infrastructure and interoperability

Page 5: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

TIME

INFORMATION VALUE

Design Tender Construction

BIM approach

Traditional approach

Handover & AM

Information Value

OPERATE

DESIGNBUILD

= Cost

Page 6: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

• The same information is re-entered on average 7 times in different systems

• significant communication errors and loss of project information, building damages(5% of investment)

• 25-30% of the construction cost is caused by splitting up of processes and lousy communication

Traditional Flow of Information

Page 7: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Building Information Communication Flow

Page 8: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

detail /document

design

analyze

analyze

exportdocumentation

concept concept

BIM – Changing the way we collaborate

CollaborationCollaboration

modelcreation

Traditional 2D Workflow Building Information Modelling (BIM) Workflow

Source: Autodesk

Page 9: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Type of documents

Page 10: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Operating Platform Project Platform

Operations

Special services

Project Lead

Standards, Project-contracts,

Management of Documents, Plans

and Models

Data, Documents, Plans, Models,

Project correspondence

Project requirements

Approved documents, models, information

External Planner

Internal Project Lead

External Construction

firms

External ChecksInternal

Checks

AssetWise ProjectWiseCommon Data Environment

Common Data Environment

Page 11: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Virtual Asset

Documents ERP/Finance

Procurement

MaintenanceEquipment Performance

BusinessPerformance

Documentation

Assets

Requirements

Centralized Information Management

Page 12: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

BIM Enabled Delivery Activities

Page 13: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Survey – Data Capture

Source: Mott Macdonald

Page 14: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Survey – Data Capture

Source: Mott Macdonald

Page 15: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Spatial Planning & Concept Design

Source: Mott Macdonald

Page 16: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Stakeholder Engagement

Source: Mott Macdonald

Page 17: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Health and Safety

Source: Mott Macdonald

Page 18: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Design Co-ordination & Review

Source: Mott Macdonald

Page 19: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Design Co-ordination & Review

Source: Mott Macdonald

Page 20: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Design Co-ordination & Review

Source: Mott Macdonald

Page 21: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Design Co-ordination & Review

Source: Mott Macdonald

Page 22: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Clash Detection

Source: Mott Macdonald

Page 23: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Documentation

Page 24: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Construction Sequencing (4D)

Source: Mott Macdonald

Page 25: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Cost Planning and Estimating (5D)

Source: Mott Macdonald

Page 26: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Asset Management– Mobile technology

Source: Mott Macdonald

Page 27: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Governance & Standardisation

Page 28: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Success stories – Water treatment, USAB555 Roadmap and the Maturity Model

(c/o Bew Richards 2008)

Page 29: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Level Definitions

Level 0 - Unmanaged CAD typically 2D, with paper (or ‘electronic ink’) exchanged between participants.

Level 1 - Managed CAD in 2D or 3D using BS 1192:2007 with a common data environment, but standalone commercial data management

Level 2 - Managed 3D environment using separate discipline BIM tools with attached data and integrating commercial data

Level 3 – to be defined: iBIM or integrated BIM potentially accessing all available data forms, adding value in operation and supported by open standards.

Page 30: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Success stories – Water treatment, USA

BS and PAS 1192 series

Page 31: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Success stories – Water treatment, USA

PAS 1192 – 5

PAS 1192-5 Specification for security-minded building information management, digital built environments and smart asset management

Page 32: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Uniclass 1 –Not fit for infrastructureUniclass 2 –A vast improvement but not for Rail or RoadUnilcass 3 – Tackles the infrastructure and leaner assets

Asset Classification

“Is a classification system providing a framework of common identification to assets”

Page 33: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

How does it work (dPoW)

Page 34: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Modelling

Page 35: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Documentation

Assets

3D Models

Spatial

Visualisations

Virtual World Physical WorldIn

form

atio

n &

Dat

a Li

nkin

g

Vision… Build Two Rails ...Virtual - Physical

Page 36: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Future perspective

Page 37: Salah Al Dilimi - Urban Mobility India Conference & Expourbanmobilityindia.in/Upload/Conference/a1b9a7d8-7c10-4f7e-adde-e… · Level 0 - Unmanaged CAD typically 2D, with paper (or

Where are we now

Where wewant to be and

beyond THE PLAN

20% faster delivery of transport infrastructure

Multi £million facility management savings

Zero coordination errors on site

100% increase in information access

Delivery and running costs increase year on year

Design quality could be improved

Frequent delays on site due to poor coordination

Loss of production due to facility maintenance slower than liked

2 to 3 years

Review BIM Strategy

Develop BIM Protocols & Guidance

Pilot Project Implementation

BIM Library & Tools

Phased approach of controlled risks and lessonslearned and shared. Gradual roll-out across business

Implementation Plan