SAIC-L-2011 Rev 0

5
A7 Only seamless or sub-arc, straight or spiral seam-welded pipe is used within plant limits for ASME B31.3 code piping. ERW and high frequency induction welded pipe are not allowed. SAES-L-105 Section 5 A6 Corrosion Allowance by individual piping class is specified and included in the pipe wall and fitting schedules. SAES-L-105 Section 5 A5 In all cases, the Code break boundaries between Codes are on the side of the more stringent Code and the higher piping class is used. SAES-L-100 Para. 8.3 A4 Piping standards have adopted the latest edition of the applicable ASME B31.1, ASME B31.3, ASME B31.4 and ASME B31.8 Codes for pressure piping (all relative documents in Checklist Item 1). SAES-L-100 Section 5 A3 Piping material specifications and line classes are in accordance with SAES-L-105. Cross reference materials by line class against piping specs and drawings prior to installation. Be familiar with line classes and quickly reference materials. SAES-L-310 Section 9 A2 Each pressure piping system located within a plant area has been given a material specification code per SAES-L-105. SAES-L-310 Section 9 A1 The design of pressure piping located inside plant is complete and the following documents (with SA dwg numbers) are available: • Process Flow Diagram (PFD) or Utility Flow Diagram (UFD) • Piping and Instrument Diagram (P&ID) • Piping Designation Table (Saudi Aramco Form) • Calculation sheets supporting major flow data and pressure drop data shown on the Piping Designation Table. • Safety Instruction Sheets (SIS) for critical piping per SAES-L-125 • Piping Plan Drawings (details and sections must be shown on separate drawings) • Piping Section Drawings and details • Isometric Piping Detail Drawing • Piping flexibility calculations per SAES-L-120 • Hydrostatic Test Diagram • Pipe support and foundation location drawing • Pipe support and anchor detail drawings • Valves operating diagram (VOD) as required by Operation • Project Scope of Work or Project Specifications in which the piping shall be described, highlighting any special features or precautions concerning welding, adjustment of spring hangers, cold spring, etc. SAES-L-310 Section 7 A Review (At Start of On-Plot Construction) Note Inspectors have access to piping specs, line class tables, Isometric drawings, SA Standards and procedures. The Checklist is intended to aid Inspector awareness of the numerous constructability issues on projects and increase Inspection value at the start of the project . See Below SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER EC / PMCC / MCC NO. REV. NO. PURCHASE ORDER NUMBER FAIL N/A CONTRACTOR INSPECTION LEVEL RE-INSP DATE ITEM No. ACCEPTANCE CRITERIA REFERENCE PASS SAUDI ARAMCO INSPECTION LEVEL TRAVEL TIME QUANTITY INSP. WORK PERMIT REQUIRED? ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO USE ONLY MH's SPENT SCHEDULED INSPECTION DATE & TIME LAYOUT DRAWING NUMBER PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR Piping Pre-Installation Inspection (Prior to On-Plot Work) SAIC-L-2011 25-May-05 MECH- SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER Page 1 of 5

description

Piping check list

Transcript of SAIC-L-2011 Rev 0

Page 1: SAIC-L-2011 Rev 0

A7Only seamless or sub-arc, straight or spiral seam-welded pipe is used within plant limits for ASME B31.3 code piping. ERW and high frequency induction welded pipe are not allowed.

SAES-L-105 Section 5

A6 Corrosion Allowance by individual piping class is specified and included in the pipe wall and fitting schedules.

SAES-L-105 Section 5

A5 In all cases, the Code break boundaries between Codes are on the side of the more stringent Code and the higher piping class is used.

SAES-L-100 Para. 8.3

A4Piping standards have adopted the latest edition of the applicable ASME B31.1, ASME B31.3, ASME B31.4 and ASME B31.8 Codes for pressure piping (all relative documents in Checklist Item 1).

SAES-L-100 Section 5

A3

Piping material specifications and line classes are in accordance with SAES-L-105. Cross reference materials by line class against piping specs and drawings prior to installation. Be familiar with line classes and quickly reference materials.

SAES-L-310 Section 9

A2 Each pressure piping system located within a plant area has been given a material specification code per SAES-L-105.

SAES-L-310 Section 9

A1

The design of pressure piping located inside plant is complete and the following documents (with SA dwg numbers) are available: • Process Flow Diagram (PFD) or Utility Flow Diagram (UFD)• Piping and Instrument Diagram (P&ID)• Piping Designation Table (Saudi Aramco Form)• Calculation sheets supporting major flow data and pressure drop data shown on the Piping Designation Table.• Safety Instruction Sheets (SIS) for critical piping per SAES-L-125• Piping Plan Drawings (details and sections must be shown on separate drawings)• Piping Section Drawings and details• Isometric Piping Detail Drawing• Piping flexibility calculations per SAES-L-120• Hydrostatic Test Diagram• Pipe support and foundation location drawing• Pipe support and anchor detail drawings• Valves operating diagram (VOD) as required by Operation• Project Scope of Work or Project Specifications in which the piping shall be described, highlighting any special features or precautions concerning welding, adjustment of spring hangers, cold spring, etc.

SAES-L-310 Section 7

A Review (At Start of On-Plot Construction)

Note

Inspectors have access to piping specs, line class tables, Isometric drawings, SA Standards and procedures. The Checklist is intended to aid Inspector awareness of the numerous constructability issues on projects and increase Inspection value at the start of the project.

See Below

SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

FAIL N/A

CONTRACTOR INSPECTION LEVEL

RE-INSP DATEITEM No. ACCEPTANCE CRITERIA REFERENCE PASS

SAUDI ARAMCO INSPECTION LEVEL

TRAVEL TIMEQUANTITY INSP.

WORK PERMIT REQUIRED?

ACTUAL INSPECTION DATE & TIMESAUDI ARAMCO USE ONLY

MH's SPENTSCHEDULED INSPECTION DATE & TIME

LAYOUT DRAWING NUMBER

PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Piping Pre-Installation Inspection (Prior to On-Plot Work) SAIC-L-2011 25-May-05 MECH-

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Page 1 of 5

Page 2: SAIC-L-2011 Rev 0

MECH-Piping Pre-Installation Inspection (Prior to On-Plot Work) SAIC-L-2011 25-May-05

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

PASS FAIL N/A RE-INSP DATEITEM No. ACCEPTANCE CRITERIA REFERENCE

A8

Minimum pipe size is ½" NPS (Nominal Pipe Size) except tubing and piping used in Category D Fluid, individual instrument leads, pump and compressor auxiliary piping, steam tracing, and for reduction at instruments or other equipment having connections smaller than ½" NPS. Pipe sizes: 1¼", 2½", 3½" and 5" are not used.

SAES-L-105 Section 5

A9

Insulating gaskets and kits are shown on drawings as follows: A) For flanged joints of dissimilar metals, insulating gaskets, stud bolt sleeves and washers such as PIKOTEK, or approved equal. B) Non-flanged mech. dissimilar metal joints have dielectric unions.

SAES-L-105 Section 5

A10 Spiral-wound gaskets are specified with inner rings for vacuum and catalyst services.

SAES-L-105 Section 5

A11

For CS piping, the following services are listed for PWHT on dwgs: A) Those determined during project design or as specified by the Materials Engineering Unit (MEU) of Consulting Services Department.B) All caustic soda solutions at all temperatures.C) All monethanolamine (MEA) solutions at all temperatures.D) All diglycol amine (DGA) solutions above 140°C design temp.E) All rich amino diisopropanol (ADIP) solutions above 90°C design.F) All lean ADIP solutions above 60°C design temperature.

SAES-L-105 Section 6

A12

On review prior to installation, Specifications and Drawings have the following 2 notes relative to Post Weld Heat Treatment (PWHT): A) When PWHT of pipe spools is required, non-pressure containing welded attachments such as shoe support for insulated lines, dummy extensions and legs, and wear pads are to be welded to pipe spools before stress relieving. B) PWHT piping spools with flanged joints before flange assembly.

SAES-L-350 Section 10

A13On review prior to installation, Structural attachment drawings for saddle pads show the following details: A) The corners of the reinforcement pads are rounded.

SAES-L-350 Section 11.3

A14

Isometric drawings and material lists detailing piping are approved. Associated anchors/supports are identified on Isometrics. Standard piping symbols are used on Piping Detail Sheets and Iso Detail Sheets are as identified on Standard Drawing AB-036227.

01-SAMSS-010 Section 6

A15

Prior to erection and Installation, a list of all equipment sensitive to damage during cleaning and flushing of the piping system is reviewed and agreed upon. Work is carefully planned as follows: A) These sensitive items will not be installed and are to be removed if installed prior to commencing a cleaning process. B) The list of these equipments has been established during early stages of the execution of the project. (Examples of sensitive equipment are: rotating machinery, orifices, control valves, flow-elements, soft-seated valves, globe valves and relief valves)

SAES-L-350 Section 14

A16

Prior to installation, Relief Valve Program plan includes a Field Pop Test (follow 60-day rule or agreement per Schedule B) as follows: A) Relief valve checks (at all construction stages) are as follows: • Visual inspection for damages (improper handling)• Ensure proper storage/padding in upright position (treat like glass)Note: Relief Valves should be installed, then pulled for pop tests during hydrotesting (follow Schedule B), tested/witnessed at approved sites or shops to ensure proper relief line installation.

Sch Q Attachment II

Item 9

Page 2 of 5

Page 3: SAIC-L-2011 Rev 0

MECH-Piping Pre-Installation Inspection (Prior to On-Plot Work) SAIC-L-2011 25-May-05

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

PASS FAIL N/A RE-INSP DATEITEM No. ACCEPTANCE CRITERIA REFERENCE

A17

Prior to installation, a Valve Field Testing program is established with elements as follows: A) An Inspector specifically used for Valve Field Testing is approved, works with an approved procedure and is in place before work starts with the following responsibilities. • The inspector performs visual exams on all valves and witnesses all tests in accordance with an approved procedureB) The acceptable field tested valves are uniquely identified, marked and traceable to a field test report

Sch Q Attachment VI

Item 2.3

B Spool & Material Identification

B1Spools are stamped, stenciled, or clearly marked with a permanent marking method, properly color-coded and uniquely identified, labelled & traceable to Isometric Drawings.

SAES-L-350, Para. 6.1

B2

Color coding of loose piping and materials conforms to PFI-ES-22 with color striping unless permanently tagged or stamped. Coated piping lengths have a low stress stamp in a consistent location per procedure and can be easily identified.

SAES-A-206 Section 13.2

B3PMI programs and procedures are developed and in place prior to field installations. Field (on-plot) materials have been PMI examined and are traceable for all alloy steel materials

SAES-A-206 Section 5.1

C Spool & Length Checks Prior to Installation

C1

Detailed cleaning and flushing procedures of piping spools/systems are established and the following is checked: A) Procedures identify cleaning methods are applicable for every individual system category and are being followed. B) As a minimum, prior to installation and/or erection of pipe spools on the pipe racks and pipe supports the following is conducted:• Pipes are internally cleaned by air blowing and large diameters pipes are rag cleaned when possible.• Prefabricated pipe spools are visually inspected for cleanliness with all foreign material removed from ID.• Piping ends are covered after inspection to prevent unauthorized removal of end covers before making succeeding joints. C) Spool cleanliness checks prior to installation (best with mirror and natural sunlight) are identifiable as "clean". D) The covering of pipe ends is followed without exception daily.

SAES-L-350 Section 15

C2Lines to be chemically cleaned are identified on the P&ID's and Line Index. Note: Identify spools requiring chemical cleaning and ensure high and low point vents and drains are installed.

SAES-L-350 Para. 15.4.3

C3

Structural steel member erection is complete and foundations are adequately backfilled to safely support piping spools in racks: A) For incomplete structural sections loaded, analysis is provided to demonstrate loading safety. (See PIP STS05130, Para 6.2.5):

12-SAMSS-008 Section 1

C4Damaged or rejected spools and items are identified, segregated, controlled and tracked. Such items are clearly marked REJECTED to prevent inadvertent use. A quarantined area has been established.

Sch Q Para. 7.3.7

Page 3 of 5

Page 4: SAIC-L-2011 Rev 0

MECH-Piping Pre-Installation Inspection (Prior to On-Plot Work) SAIC-L-2011 25-May-05

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

PASS FAIL N/A RE-INSP DATEITEM No. ACCEPTANCE CRITERIA REFERENCE

C5

Ovality checks are performed to ensure roundness and alignment of piping (to meet 1.5 mm maximum misalignment tolerances). A) Piping ends out of round are identified at grade before installation in the overhead racks. (This prevents costly out of position work). B) The inspector checks/ensures others check that single lengths matched/welded in overhead racks have similar ovality readings. (A systematic plan results in better progress and improved quality) C) Ovality repairs are performed (at grade) prior to installation. (Ovality repair procedures are approved and force not exceeding yield strength or 30 ksi maximum for Carbon steel is applied.)

SAES-L-350 Para. 10.1

C6

The following is checked before spool installation: A) Each spool has a clearance sheet or report, one per spool.B) Spools are fabricated per drawings and specifications.C) Joints were welded per relevant WPS by qualified welders.D) NDE / PWHT was per procedure and documented.E) Documentation (spool clearance and related items) is acceptable.

SAES-L-350 Para.

D Coating Sequence before Installation

D1

External coating is complete prior to installation as follows: A) Flange faces & bolt hole surfaces (except gasket seating area) B) Valve (bolted types) flange faces (except gasket seating area) • Once installed, flange faces and bolt hole surfaces are inaccessible for coating unless disassembled (impractical/costly). H-Std Tables require exterior surfaces be coated. C) Contact point surfaces between spools and supports have received a final top coat when lifting or rolling piping is impractical.

SAES-H-001 Section 5

D2

Internal coating is complete prior to installation as follows: A) Spools internally coated and cleared can be installed. B) Where field welding and PWHT applications apply, Spools requiring field coating repairs must be disassembled for later internal coating where required and access and sequence of coating repairs is well planned and supported by procedures.

SAES-H-001 Section 5

E On-Plot Material Handling and Storage

E1

Pipe handling procedure including equipment used for handling is Company approved and good practice is in effect as follows: A) Material is not rolled/dropped off trucks during unloading. B) Material is stacked properly to protect pipe and coatings. C) Slings are nylon or similar and wire rope slings are not used. D) Metal hooks are padded to prevent contact damage to coating E) Internally coated fittings are handled on the OD only. F) Bevel protectors remain intact and don't damage coatings.

SAES-L-450 Section 8

E2

Components are protected from mechanical damage with welding ends protected with suitable wood, plastic, or metal covers and all fittings packaged in steel-banded wooden crates or secured to skids in staging areas for field use as follows: A) All fittings (02-SAMSS-005, Section 10) B) All flanges (02-SAMSS-011, Section 10)

02-SAMSS-005 Section 10

Page 4 of 5

Page 5: SAIC-L-2011 Rev 0

MECH-Piping Pre-Installation Inspection (Prior to On-Plot Work) SAIC-L-2011 25-May-05

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

PASS FAIL N/A RE-INSP DATEITEM No. ACCEPTANCE CRITERIA REFERENCE

2- 01-SAMSS-010 -- Fabricated Carbon Steel Piping, 31 October 20003- 02-SAMSS-005 -- Butt Welding Pipe Fittings, 30 June 20044- 012-SAMSS-008 -- Erection of Structural and Miscellaneous Steel, 28 January 20045- SAES-A-206 -- Positive Material Identification, 28 January 2004

QC Record Reviewed

Name, Sign and Date: Quality Record Approved: Name, Organization,

Initials and Date:

T&I Witnessed QC Record Reviewed

Work Verified

Contractor / Third-Party

Name, Initials and Date:Performed Inspection T&I Witnessed

Name, Initials and Date:Work / Rework May Proceed

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

QC Supervisor Proponent and OthersWork Verified

REMARKS:

QC Inspector PID Representative

Construction Representative*

Name, Initials and Date:Work is Complete and Ready for Inspection:

Name, Initials and Date:

REFERENCE DOCUMENTS:1- Contract Schedule Q -- Quality Assurance and Control, Inspection and Testing, Date Variable

Work Verified

Saudi AramcoPMT Representative

T&I Witnessed QC Record Reviewed

E3

Field facilities for storage/preservation of materials are approved prior to the start of piping installation as outlined in SAES-L-350 Section 7 and as follows: A) On-Plot Material Warehouse and Storage Facilities B) Field Welding Consumable Storage Facilities C) Yard Welding Areas/Shops (CS, alloy and SS areas) D) Spool Storage areas, Lay Down Yards and staging areas E) Site Valve Testing Facility, Site Instrumentation/Testing facility

Sch Q Attachment IV

Section 7

E4

The minimum amount of temporary support is available and spools are not laying on the ground. They are supported on wooden cribbing in approved staging areas. Fittings and valves are covered and stored in shipping crates or on racks off the ground.

SAES-L-350 Section 7

E5 Stainless steel spools, components and other materials are kept covered during storage in lay down yards and staging areas.

SAES-L-350 Section 7

6- SAES-H-200 -- Storage, Handling and Installation of Externally Coated Pipe, 31 July 20047- SAES-L-310 -- Design of Plant Piping, 30 September 20038- SAES-L-350 -- Construction of Plant Piping, 30 September 20039- ASME B31.3 -- Process Piping, Latest Edition

Page 5 of 5