Sahiwal Power Plant - Pakistan-China

27
华能山东如意(巴基斯坦)能源有限公司 Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited Sahiwal Power Plant ISLAMBAD Oct 26 th 2018

Transcript of Sahiwal Power Plant - Pakistan-China

Page 1: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司

Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Sahiwal Power Plant

ISLAMBADOct 26th 2018

Page 2: Sahiwal Power Plant - Pakistan-China

1. Introduction

Sponsored by Huaneng Shandong and Shandong Ruyi Group

First coal-fired power plant in operation under CPEC

Equipped with 2×660MW supercritical coal-fired units.

Coal mainly imported from South Africa and transported by the national railway

Water sourced from LBDC.

With the capacity 9 billion KWh annual power output ability

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Brief introduction

Page 3: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

More than 300 days of safe production after COD.

11.81 billion KWh output to the grid start from power generation up to now

Fill One Quarter of the country's power shortage and meet the electricity

demand of more than 4 million families.

Tax paid to the country with Rs 32 .3 Billion from start of the project.

Key Data

1. Introduction

Page 4: Sahiwal Power Plant - Pakistan-China

Why Sahiwal?

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Power hub of Pakistan:

Sahiwal is situated at the load center of this country

2. Introduction

Page 5: Sahiwal Power Plant - Pakistan-China

Why Sahiwal?

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

To supply the required MVAR (Reactive power) efficiently into the grid system to maintain

its grid voltage and reduce line losses.

Near 500 KV national transmission line: to connect the power plant into that existing 500

KV transmission line in an IN-OUT arrangement.

Railways: Coal transportation, Yousafwala Railway Station 4.5 KM

Lower Bari Doab Canal (LBDC): Source of Cooling Water & Feed Water for the power

plant

National highway N5: Convenient transportation

2. Introduction

Page 6: Sahiwal Power Plant - Pakistan-China

June, 2015

July 31, 2015

All related

agreements and

formalities were

completed May 29, 2017

October 28, 2017

Unit 1 was

synchronized

to national

grid

Unit 2 was

synchronized

to national

grid

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Official start

of project

construction

COD was achieved

May 12, 2017

3. Construction Milestones

Major Milestones

Page 7: Sahiwal Power Plant - Pakistan-China

Develop economy

Medical aid and drinking water

program

Strengthen strategic

cooperative relations Promote CPEC

Technical training institute

Broadcast technology

4. Social Benefits华能山东如意(巴基斯坦)能源有限公司

Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

With the vision of “High efficiency power plant with green energy to boost local economy ,

benefit local people and create harmony”.

HSR always fulfill his corporate social responsibilities.

Mitigate power

shortage

Cultivate talents

Page 8: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Installation of environmental protection facilities:Sahiwal Power Plant has set up environmental protection facilities using the world’s mostadvanced environmental protection technology.

Water treatment Flue gas desulfurization

4. Social Benefits

Green development

Page 9: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Environmental protection standard of Pakistan&

International standard and implementing clean

production

Complete environmental management system, which

optimizes the production process and strengthens the

waste management.

Third party environmental monitoring agencies engaged

to monitor the quality of air, water and soil, and the

reports are submitted to Environmental Protection

Agency of Punjab and made public regularly.Green Crescen staff monitoring the qualityof air and water

4. Social Benefits

Green development

Page 10: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Based on the environmental management

system, environmental protection control

measures have been taken to protect the

environment.

Strengthen coal procurement management with

low-sulfur coal to significantly reduce sulfur

dioxide emissions from the source and

considerably improve efficiency.

4. Social Benefits

Green development

Page 11: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited4. Social Benefits

Green development

0

200

400

600

800

1000

1200

1400

1600

1800

SOx NOx Dust Mercury

1700

1200

500

10

850

510

50

200 200

300.03

172 200

40 0.0390175

250.001

NEQS Pakistan

World Bank standard

European Union Standard

Japanese Standard

Sahiwal Power Plant

Page 12: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited4. Social Benefits

Green development

Green Pakistan : More than 30,000 trees and 140,000 square meters of turf have beenplanted. and 15,000 more trees will be planted in the near future

Page 13: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Construction Period, more than 3,000 local staff were hired, benefit them on their economic

conditions.

Operation Period, about half of the employees are Pakistanis. the proportion of Pakistani

employees is increasing by each year.

4. Social Benefits

Creating employment

Page 14: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Donate about 200 million Rupees every year to the trust fund of Punjab for social

welfare of Sahiwal Division, which provides medical aid and clean drinking water

programs for local communities.

Invest more than 500 million Rupees to build a technical training school and

provide free education and technical training for local communities.

4. Social Benefits

Social responsibility

Page 15: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Progress of technical training school: At present, the technical training school has been

completed and ready for using.

4. Social Benefits

Social responsibility

Page 16: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Regularly organize social activities for public good

4. Social Benefits

Social responsibility

Company staff took an active part to donate for Diamer Bhasha Dam

Page 17: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

171 Pakistani employees had been sent to developed power plants in China for technicaltraining, making this training program the largest of this kind.

5. Internationalization and localization

International talent training

HSR does not only builds world-leading modern power plant, but also unreservedly imparts the knowledge in construction, operation and management to local employees so that they can run this power plant by themselves within about 5 years.

Page 18: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Customized training agreement was made between HSR and UET Lahore to develop a school-enterprise cooperation relationship. employees participated in the four-month training program.

1,000 teachers and students from various universities, including University of Engineering andTechnology(UET), University of the Punjab(PU), Bahaudin Zakria University(BZU), etc., havevisited this state-of-the-art power plant.

5. Internationalization and localization

International talent training

Page 19: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Various talent growth channels are provided to local employees for improving their

professional skills and international vision.

• Teacher & student activities : A one-to-one teacher & student agreement was signed between

Chinese vateren engineers and local employees to enhance theoretical knowledge and practical skills.

5. Internationalization and localization

International talent training

Page 20: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

• External trainings: Invite experts to site for professional trainings regarding

languages, cross-culture, health, international management, etc..

5. Internationalization and localization

International talent training

Page 21: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited5. Internationalization and localization

International talent training

• Local employees on dais: Organize outstanding local employees to train their colleagues

on specific technical topics.

Page 22: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Offer market competitive salary packages, pension to EOBI and insurances for every

employee;

Provide free and well-furnished independent apartment with all living facilities.

5. Internationalization and localization

Facilities and benefits for local employees

Page 23: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Equipped with advanced medical equipment and doctors in power plant self own-dispensary

5. Internationalization and localization

Facilities and benefits for local employees

Page 24: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Sports center for various sports and recreational activities

5. Internationalization and localization

Facilities for local employees

Page 25: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Build a Pakistan-China family culture

Respect Islamic cultural norms and traditions

Advocate HSR corporate culture

Organize various cross-cultural and sports activities

5. Internationalization and localization

Corporate culture construction

Page 26: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited6. Long Live China-Pakistan friendship

Pakistan and China has been supporting each other for years, which makes us iron

brothers. we believe, CPEC will bring further socio-economic growth and benefits

for both countries.

Long Live China-Pakistan friendship!

Page 27: Sahiwal Power Plant - Pakistan-China

华能山东如意(巴基斯坦)能源有限公司Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited

Thanks

Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited